This document is a comprehensive set of specifications for road maintenance services by the USDA Forest Service Pacific Southwest Region, dated 10/2016. The specifications cover a wide range of road maintenance activities including snow removal, equipment mobilization, blading, dust abatement, drainage structure maintenance, vegetation establishment, sign maintenance, and road decommissioning. The document provides detailed technical requirements, measurement methods, and payment terms for each maintenance activity, with specific pay items ranging from snow removal and equipment rental to culvert cleaning and road surface treatments.
The specifications include 32 distinct sections covering activities such as road surface maintenance, drainage management, vegetation control, hazard removal, and infrastructure preservation. Each section outlines precise maintenance requirements, equipment standards, measurement protocols, and unit pricing. The document is designed to provide contractors with comprehensive guidance on performing road maintenance services for forest service roads, with pay items measured in units like single-lane miles, hours, cubic yards, linear feet, and acres. The specifications are structured to ensure consistent, high-quality road maintenance across the Pacific Southwest Region's forest road network.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment A00002 - 127EAW25R0022 - BAER Emergency Road Stabilization.pdf | ||
| Amendment A00001 - 127EAW25R0022 - BAER Emergency Road Stabilization.pdf | ||
| 4. Maps.pdf | ||
| 6. Service Contract Act WD # 2015-5613.pdf | ||
| Solicitation - 127EAW25R0022 - BAER Emergency Road Stabilization.pdf | ||
| 5. Fire Plan.pdf | ||
| 7. FAR-Class-Deviation-EO-14148-and-EO-14208-03142025.pdf | ||
| 8. FAR-Class-Deviation-EO14173-and-EO14168-03142025.pdf | ||
| 1. Statement Of Work.pdf | ||
| 9. RFI Form.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA Forest Service Pacific Southwest Region
Specifications for Maintenance of Roads Service Contracts
R5 Regional Office – USFS
10/2016
TYPICALS
801-1 ILLUSTRATION OF ROAD MAINTENANCE TERMS
834-1 DITCH RELIEF CULVERT AND CATCH BASIN MAINTENANCE
837-1 DRAINAGE DIP
838-1 CROSS DITCH
838-3 HAZARD REMOVAL
838-4 TREATMENT OF SLIDES AND SLOUGH
838-5 TREATMENT OF SLUMPS AND ROADBED CRACKS
838-6 WATER BAR
CONTRACT INFORMATION
DEFINITIONS
ABBREVIATIONS
QUANTITY MEASUREMENT TERMS
SPECIFICATIONS
803 SNOW REMOVAL (10/16)
805 MOBILIZATION / EQUIPMENT MOVING (10/16)
807 EQUIPMENT RENTAL (10/16)
808 W ORK AREA MANAGEMENT (10/16)
811 BLADING (10/16)
812 DUST ABATEMENT (10/16)
813 SPOT SURFACING (10/16)
814 ASPHALT PAVEMENT PATCHING (10/16)
815 PAVED SURFACE CLEANING (10/16)
816 MAINTENANCE OF UNPAVED SHOULDERS (10/16)
818 ASPHALT CRACK CLEANING AND SEALING (10/16)
831 DITCH MAINTENANCE (10/16)
832 REMOVE AND END HAUL MATERIALS (10/16)
834 DRAINAGE STRUCTURE MAINTENANCE (10/16)
835 ROADW AY DRAINAGE MAINTENANCE (10/16)
836 ROAD DECOMMISSIONING (10/16)
837 DRAINAGE DIP MAINTENANCE (10/16)
838 MAINTENANCE FOR LIMITED USE (10/16)
839 RESTORE DRAINAGE (10/16)
840 CORRUGATED METAL SPILLWAYS AND FLUME (10/16)
841 VEGETATION ESTABLISHMENT (10/16)
841-1 VEGETATION ESTABLISHMENT, SPECIAL PROJECT SPECIFICATION (10/16)
842 CUTTING ROADWAY VEGETATION (10/16)
851 LOGGING OUT (10/16)
854 HAZARD REMOVAL AND CLEANUP (10/16)
861 MAINTENANCE OF CATTLEGUARDS (10/16)
861-1 MAINTENANCE OF CATTLEGUARDS, SPECIAL PROJECT SPECIFICATION (10/16) 81
862 MAINTENANCE OF TRAFFIC GATES (10/16)
872 SIGN MAINTENANCE (10/16)
891 WATER SUPPLY AND WATERING (10/16)
892 BITUMINOUS PRODUCTS (10/16)
893 AGGREGATE (10/16)
893-1 AGGREGATE, SPECIAL PROJECT SPECIFICATION (10-16)
LIST ELIGIBLE PAY ITEMS
This page is left blank.
TYPICALS
CONTRACT INFORMATION
DEFINITIONS
Wherever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:
1. Agreed or Approved - Official agreement or approval by use of a written document issued by the Government. Agreements also require signature of Contractor's Representative and are dated.
2. Base Course - The layer or layers of specified or selected material of designed thickness placed on a subbase or a subgrade to support a surface course. (See Drawing 801-1, Illustration of
Road Maintenance Terms)
3. Berm - A curb or dike which controls roadway runoff water, or delineates traffic direction. Berms are commonly placed parallel to road centerline; however, on Limited Use Roads (Section 838) may be placed diagonally across the roadbed. (See Drawing 801-1, Illustration of Road
Maintenance Terms)
4. Channel - A natural waterway leading into or away from a culvert or bridge.
5. Contract Amendment - A bilateral written supplemental agreement between the Government and the Contractor, documenting a modification outside the scope of the contract and establishing an equitable adjustment therefor.
6. Contractor - The individual, partnership, joint venture, or corporation undertaking the execution of the work under the terms of the contract.
7. Culvert - Any structure, not classified as a bridge that provides an opening under the roadway.
8. Cross Ditch - A shallow ditch placed across the roadbed to remove water from the roadbed surface which can be driven across by full-size pickups or other high clearance vehicles; usually placed diagonal to the centerline. (See Section Drawing 838-1, Cross Ditching of Limited use
Roads)
9. Lead-off Ditch - A ditch used to remove water from roadside drainage ditches, the roadway, cattleguards, or drainage structures such as culverts and drainage dips.
10. Ditch - A relatively long narrow excavation placed to collect or disperse water, located parallel to and abutting the roadbed. (See Drawing 801-1, Illustration of Road Maintenance Terms)
11. Drainage Structure - A term identifying man-made devices placed to control water movements.
12. Drawings - Illustrations showing detailed maintenance required.
13. Equipment - All machinery, operating supplies and tools necessary for the proper performance and acceptable completion of the work.
14. Excess Material - Material from the roadway excess to that needed for maintenance of roadway.
15. Fore Slope - The slope of the ditch section nearest to the traveled way. (See Drawing 801-1, Illustration of Road Maintenance Terms)
16. Government - The Contracting Officer or the duly authorized Contracting Officer's
Representative (COR) with authority to sign orders.
17. Grade - The vertical alignment of the top surface of the road.
18. Inspector - The Government's authorized representative designated in writing, assigned to make detailed inspections of contract performance, but not to sign orders to the Contractor.
19. Materials - Any substances specified for use in the performance of the work.
20. Measurement – The process of identifying the dimensions, quantity, or capacity of an item.
21. Nominal Dimensions or Weights - The numerical values shown on the drawings or in the specifications as measurements for the work.
22. Order - A written order by the Government directing fulfillment of work requirements under the terms of the contract.
23. Original Contract Quantities - Those estimated quantities shown in the Schedule of Items as awarded.
24. Patching - Minor repairs to the roadway surface.
25. Paved Surface or Pavement - Denotes asphalt, concrete, or other stabilized materials excluding natural aggregates. Dust palliative treatments are not considered as pavement.
26. Reasonably Close Conformity - Means compliance with customary maintenance tolerances where working tolerances are not specified.
27. Right-of-Way - A general term denoting land, property, or interest therein acquired for or devoted to a road. (See Drawing 801-1, Illustration of Road Maintenance Terms)
28. Roadbed - The portion of a road between the intersection of the subgrade and side slopes, excluding that portion of the ditch below the subgrade. (See Drawing 801-1, Illustration of Road
Maintenance Terms)
29. Road Listing - A preliminary listing of road locations and any established work priorities.
30. Roadside – All area within the right-of-way excluding the traveled way and shoulders (See
Drawing 801-1, Illustration of Road Maintenance Terms)
31. Schedule of Items - Schedule containing a listing and description of maintenance items, quantities, units of measure, unit price, and amount.
32. Shoulder - As used in this contract, the term is restricted to roads having a paved surfacing. The portion of the roadway contiguous to the traveled way for the accommodation of stopped vehicles, for emergency use, and for lateral support of the pavement structure (See Drawing 801-
1, Illustration of Road Maintenance Terms)
33. Slough or Slide - Material deposited on the roadway which may need to be repositioned or removed.
34. Slump - A localized portion of the roadbed which has slipped or otherwise become lower than that of the adjacent roadbed and constitutes a hazard to traffic.
35. Special Project Specifications - Specifications which detail conditions and requirements to a particular individual project.
36. Standard Specifications - Specifications for specific divisions of work.
37. Subgrade - Top surface of roadbed upon which subbase, base course, or surface course was constructed. (See Drawing 801-1, Illustration of Road Maintenance Terms)
38. Traveled Way - The portion of the roadway for the movement of vehicles. For purpose of this contract, traveled way includes turnouts and curve widening. (See Drawing 801-1, Illustration of
Road Maintenance Terms)
39. Turnouts - A short auxiliary lane on a one-lane road provided for passage of meeting vehicles.
40. Unit of Measure - The unit and fractions of units shown in the Schedule of Items.
41. Unsuitable Material - Material removed during maintenance which must be disposed of in designated locations. Includes material with substantial amounts of vegetation or other objectionable material.
42. Waterbar - A deeper type cross ditch which is not intended for passage of standard passenger vehicles. This structure intercepts runoff from both the road surface and ditch adjacent to the roadbed.
43. Work Schedule - The Contractor's current schedule for work progression.
ABBREVIATIONS
Whenever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:
(Reference to a specific standard or specification shall mean the latest addition or amendment thereto in effect on date of Invitation for Bids.)
1. AASHTO - American Association of State Highway and Transportation Officials.
2. CS - Commercial Standard Issued by U.S. Department of Commerce.
3. EPA - Environmental Protection Agency.
4. FAR - Federal Acquisition Regulation System.
5. FED SPEC - Federal Specifications.
6. FSS - Federal Specifications and Standards.
7. MSHA - Mine Safety Health Administration.
8. MUTCD - Manual of Uniform Traffic Control Devices.
9. NBS - National Bureau of Standards.
10. OSHA - Occupational Safety and Health Act.
11. PS - Product Standard issued by the U.S. Department of Commerce.
12. UL - Underwriter's Laboratories, Inc.
13. ASTM – American Society for Testing and Materials
QUANTITY MEASUREMENT TERMS
Measurement under the contract shall be according to the United States standard measure.
The methods of measurement and computation will be those necessary to accurately determine the quantities of materials furnished and work performed. Measurement will be made of each item or unit of work, as shown in the Schedule of Items, completed and accepted in accordance with the contract provisions, specifications, and drawing.
1. All items which are measured by the linear foot, will be measured parallel to its longitudinal centerline, unless otherwise shown on the drawings.
2. A station when used as a definition of term or measurement will be 100 linear feet
3. Miles will, in the absence of known distances from existing plans or surveys, be determined by the Government using a calibrated survey odometer or equal substitute operated on the traveled way at or parallel to road centerline. Single lane mile measurement will mean the product of the road length in miles times the equivalent number of continuous traveled way lanes on the road. On two (2) lane roads, the lane miles will be twice the length of the road segment maintained. On one (1) lane roads, the added length of turnouts will be determined by using a factor that includes the cumulative length of the turnouts. Unless a different factor is established in Special Project Specifications or listed for each affected one (1) lane road in the Road Listing, forty percent (40%) of the road will be considered as having turnouts;
this yields a factor of one point four (1.4) times the length in miles of the road segment maintained. This adjustment applies only to work performed under Section 811.
4. The term "ton" will mean the short ton consisting of 2,000 pounds avoirdupois. Trucks used to haul material measured by truck weight shall be weighed empty at least once daily, and each truck shall bear a plainly legible identification mark. Weigh tickets furnished by the
Contractor from certified scales will be used to determine weight measurements.
5. Materials measured by the cubic yard in the hauling vehicle shall be measured therein at the point of delivery. Vehicles may be of any size or type, provided that the box is of such shape that the actual volume may be readily and accurately determined.
6. Measurement by the acre will use the length and width treated. Measurement of width will approximate significant slope breaks, but will not include minor deviations along the slopes.
The measured slope distance for width will be multiplied by the length treated and converted to a standard 43,560 square foot acreage value of the surface area treated.
7. Volume of bituminous products will be measured at 60° F, using ASTM D-1250 for asphalts except the quantity of emulsified asphalt will be determined by measuring the emulsified asphalt at a temperature of 60° F, or by converting the gallonage measured at another temperature to gallonage at 60° F by means of the following formula:
Gallons. at 60° F = Gallons at A° F
1+0.00025 (A° F − 60° F)
In which A° F is the temperature of the material at the time the gallonage is measured.
8. The term "lump sum" when used in the Schedule of Items will mean the complete unit as required by or described in the contract.
SPECIFICATIONS
803 SNOW REMOVAL (10/16)
1. DESCRIPTION
This Section provides for removal of snow from roads to facilitate logging or construction operations and safe use.
2. MAINTENANCE REQUIREMENTS
a. Perform work in a manner to preserve and protect roads and appurtenances, and prevent erosion damage to roads, streams, and other Forest values.
b. Do not undercut banks. Do not blade gravel or other surfacing material off the road.
c. Keep roadbed drainage ditches, drain dips, and culverts functional when needed during operations and upon completion of operations.
d. Control snow removal to identify the usable traveled way having roadbed support.
Reshape over-width plowing as necessary to define the usable width.
e. Space, construct, and maintain drainage holes in the dike of snow or berm caused by snow removal operations. Place drain holes to obtain surface drainage without discharging on erodible fills.
f. Snow removal for public access:
Remove snow from all of the traveled way (including turnouts) for safe and efficient use for public use. Remove intruding windfalls, debris, or slough and slide material for the full width of the traveled way and deposit out of drainage’s at locations designated by the
Contracting Officer.
g. When directed by the Contracting Officer, replace in kind within sixty (60) days after the start of the Normal Operating Season, any surfacing material which has been bladed off the road, unless otherwise agreed. Contracting Officer will notify Contractor in writing as to the cubic yard equivalent of bladed off material by the start of the Normal Operating
Season.
3. EQUIPMENT
Contractor may use any type of equipment to remove snow, providing:
a. Equipment is of the size and type commonly used to remove snow and will not cause damage to the road.
b. The use of plows or dozers to remove snow requires written approval by the Contracting
Officer. Equip plows or dozers to remove snow requires written approval by the
Contracting Officer. Equip plows or dozers with shoes or runners to keep the dozer blade a minimum of 2 inches above the road surface unless otherwise approved by the
Contracting Officer.
4. ICE CONTROL
Ice control may be performed by Contractor when approved by the Contracting Officer in writing. Such approval will include ice control materials, application rates, and any specific requirements of use.
5. MEASUREMENT
Measurement for snow removal will be single-lane mile measured along the centerline of the roadway measured to the nearest one-tenth (0.1) miles including turnouts.
6. PAYMENT
a. The accepted quantities will be paid for at the contract unit prices shown in the Schedule of Items
b. Payment will be made under:
Pay Item Description Pay Unit
803 (1) Snow Removal Single-Lane
Mile
805 MOBILIZATION / EQUIPMENT MOVING (10/16)
This Section consists of one or more mobilizations of personnel, equipment, supplies, and incidentals to the project site, or sites listed in the Schedule of Items.
2. REQUIREMENT
a. Make equipment available for inspection before it is used on National Forest System lands.
b. Moving is complete, when the contractor has moved from the present work site to the ordered work site and returned to the previous location.
c. Equipment will be clean and weed free before it arrives on National Forest System lands.
3. LOCATION OF WORK
As specified on roads listed on the Road Listing, Shown on the Plans, or as ordered by the
Contracting Officer.
4. MEASUREMENT
Measurement under this Section will be made by the total number of units for each item listed in the Schedule of Items completed and accepted.
Mile: work activity will be measured along the shortest feasible route to the nearest one (1) mile, from the starting location of the move, to the ordered work site.
5. PAYMENT
a. The accepted quantities will be paid at the contract price per unit of measurement for the
Section 805 pay items listed in the schedule of items. Mobilization is complete when all equipment, personnel, and materials are moved to the project site and work has been started. Payment will be full compensation for the work prescribed in this Section.
Mobilization is incidental unless ordered for a specific project at a specific time.
b. Payment will be made under:
805 (1) Mobilization Mile
807 EQUIPMENT RENTAL (10/16)
This Section establishes the basis for the Government to equipment with operators to accomplish road maintenance work.
2. PERFORMANCE STANDARD
Make equipment available for inspection and approval before use.
3. LOCATION OF WORK
As specified on roads listed on the task orders, shown on the plans, or as ordered by the
Contracting Officer.
4. ACCEPTABLE QUALITY LEVELS
a. Equipment shall be weed free before used on National Forest System Lands, see contract section H Control of Noxious Weeds-Cleaning of Equipment.
b. Equipment shall be well maintained, free of leaks, capable of operating at least 90% of the time, and meet all state and federal regulations.
c. Equipment under this Section, shall be provided fully operated by the Contractor and includes subcontractor equipment performing work under the contract. The equipment shall be operated by a fully trained, qualified, and competent operator at all times.
5. HOURS OF OPERATION
Hours of operation shall be the same as for the Contractor's regular work shift, unless otherwise directed in writing by the Government.
6. MEASUREMENTS
a. The accepted quantities will be paid at the established hourly rate, rounded to the nearest half (1/2) hour, that the equipment is in operation.
b. Non-operable equipment or equipment dependent on another piece of non-operable equipment will not be paid for.
c. Hours of operation shall be the same as for the Service Provider’s regular work shift, unless otherwise directed in writing by the Contracting Officer.
d. Moving of equipment will be paid at the established hourly rate. Pay item for Mobilization may be used if additional transport is shown in the task order.
7. PAYMENT
a. The quantities measured and accepted will be paid for at the contract unit price shown in the Schedule of Items.
807 (1) Excavator with Operator, in one or more of the following classes:
121-160 FWHP Hour
161-200 FWHP Hour
201-280 FWHP Hour
807 (2) Backhoe with Operator Hour
807 (3) Grader with Operator Hour
807 (4) Crawler Tractor (Dozer) with Operator, in one or more of the following classes:
80-120 FWHP Hour
121-180 FWHP Hour
181-269 FWHP Hour
807 (5) Dump Truck with Operator Hour
807 (6) Brush Cutter with Operator Hour
807 (7) Roller with Operator Hour
807 (8) Trailer Hour
807 (9) Laborer Hour
808 - W ORK AREA MANAGEMENT (10/16)
This Section establishes Contractor responsibilities for traffic control and equipment requirements in work areas.
2. REQUIREMENTS
a. Traffic Conditions - Roads other than those listed for work under Section 835 shall be open to traffic with not more than fifteen (15) minutes maximum delay time unless otherwise provided in Special Project Specifications.
b. Work which interferes with use of traveled roadways shall not be initiated or performed until a plan for satisfactory handling of traffic has been approved by the
Government.
3. TRAFFIC CONTROL DEVICES
a. The Contractor shall provide signs and other devices complying with National
Standards as contained in Part VI of the Manual of Uniform Traffic Control Devices
(MUTCD). Traffic control for occupied work areas shall be in accordance with these specifications. All signs and devices remain the property of the Contractor.
b. Traffic devices shall be kept current with maintenance operation and removed upon its completion.
c. Traffic approaching the work area from either direction and side accesses having standard Government rectangular -or trapezoidal- shaped route markers with horizontal numbering shall be warned by signing.
d. Required signs may be mounted on portable or temporary mountings. Standard
MUTCD shapes, colors, sizes, and legends shall be used.
e. Hazards incidental to the work within or on the traveled way, shoulders, or turnouts shall be marked with hazard identification markers, illuminated beacons, and other MUTCD devices to safely guide road users through the area. Work segments not completed on a daily basis shall be marked appropriately for night travel. Contractor shall obtain authorization before commencing work at night.
f. Advisory speed plates may be used to control traffic through the work area.
g. Flaggers - Properly equipped flag person(s) shall be provided where the traffic is required to stop before proceeding. Traffic shall be stopped in locations which provide width enough for passage of traffic and reasonable protection for vehicles.
When flag control is used, advance warning signs are required.
4. CONTRACTOR’S EQUIPMENT
a. All vehicles and machinery operating on or from the traveled way or road shoulder shall have flashing lights, strobes, or rotary beacons operated continuously while work is in progress. Truck headlights shall be on while operating. Back-up horns shall be required on all self-propelled equipment in excess of 10,000 lbs. gross weight.
b. Vehicles and machinery not currently used in the maintenance operation shall be parked off the traveled way at approved locations to minimize interference with normal use.
5. MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for meeting requirements of this
Section. All work and materials shall be incidental to paid work in this contract.
811 BLADING (10/16)
This work consists of
a. Surface blading native or aggregate roadbed to a condition to facilitate traffic and provide proper drainage.
b. Smooth blading to remove loose surfacing materials from the wheel paths and store the removed materials in a recoverable windrow.
Blading includes shaping the crown or slope of traveled way, berms, and drainage dips in accordance with this specification. Compaction is required when ordered by the
Contracting Officer.
2. MAINTENANCE REQUIREMENTS
a. Timing
Surface blading shall be performed during the contract period as ordered by the
Government.
b. General
1) The existing traveled way and shoulders, including turnouts unless otherwise ordered, shall be bladed and shaped to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface unless otherwise shown in the Road Listing, to at least one half inch (1/2") per foot of width, but not more than three quarter inch (3/4") per foot of width. Surfacing materials shall be thoroughly loosened to no less than 2 inch depth or the depth of potholes or corrugations. Scarification to facilitate cutting to the full depth of potholes or corrugations may be elected by the Contractor but will be considered incidental to blading. Scarification shall not go deep enough to cause contamination of the surfacing.
2) When Section 891 is included in the Road Listing, the Contractor shall apply water during blading when sufficient moisture is not present to prevent segregation. Water supply, hauling, and application shall be in accordance with Section 891 and shall be incidental to blading unless Pay Items for Section 891 are included in the Schedule of Items.
3) Existing native, rock or aggregate surfaced drainage dips shall be shaped incidental to blading to divert surface runoff to existing outlet devices, ditches and discharge locations.
4) The Contractor shall establish a blading pattern which provides a uniform driving surface, retains the surfacing on the roadbed and provides a thorough mixing of the materials within the completed surface width. Upon final blading, no disturbed rock shall protrude more than two (2) inches above the adjacent surface unless otherwise provided in the contract. Material not meeting this dimension shall be removed and placed outside the roadbed so as not to obstruct drainage ways or structures. This material may be scattered off the roadbed if there is free drainage.
5) Watering will not be required for smooth blading. Smooth blading shall be accomplished without distorting the existing cross-slope or crown of the traveled way. Loose surfacing materials shall be moved and stored on the high side of super-elevated curves and sections with uniform inslope or outslope. In crowned sections, the material shall be stored on either or both sides as elected. Stored materials shall be windrowed and shall be placed to provide not less than eleven (11) feet of smoothed traveled way on one- lane segments or twenty (20) feet of smoothed traveled way on two-lane or sections with turnouts. Windrows which may collect water on the road shall have holes cut through for drainage at least every 500 feet.
c. Routine Blading
1) Upon completion of blading, the surfaces shall conform to the dimensions shown in the Special Project Specifications 811-3.
2) Roadbed width in excess of the dimensions shown shall be shaped only as needed to provide drainage away from the traveled way. Established grasses and other vegetation shall not be removed from the excess width except as incidental to providing drainage or unless otherwise provided in the contract.
d. Compaction
Roads requiring compaction will be included in the Road Listing. Unless otherwise specified, all traveled ways requiring compaction shall be compacted by breaking track while operating equipment on the traveled way.
e. Intrusions
Where the minimum width shown in the Special Project Specifications is not available, the Contractor will construct berms where ordered and marked on the ground. Material to provide berms will come from sources designated in the Special Project
Specifications.
f. Undercutting
Roadway back slope shall not be undercut.
g. Intersections
1) At intersections, the roadbeds of side roads which are not closed or restricted from vehicular use shall be bladed to assure smooth transitions.
2) Field evidence of closure or restrictions shall be considered to be signing, cross ditching in the road surface (traveled way), earth berms or other devices placed to discourage or eliminate use by passenger cars, also roads listed for work under
Sections 835 or 838 shall be considered restricted.
3) Side roads listed for work under this Section shall be considered as not restricted.
h. Cleaning of Structures
Materials resulting from work under this Section shall not be allowed to remain on or in structures, such as bridges, culverts, cattleguards, or drainage dips.
i. Berms
Existing berms shall be maintained to the condition of adjacent segments when ordered by the Government.
3. MEASUREMENT
a. Measurement under this Section will be made by the total number of units for each item listed in the Schedule of Items completed and accepted.
b. Measurement for blading will be single-lane mile measured along the centerline of the roadway (see quantity measurement terms). Two-lane roads will be measured as two
(2) single-lane miles. Measurement will be measured to the nearest one-tenth (0.1) mile.
c. Each intersection bladed under 2.g. will be equivalent to one-tenth (0.1) single-lane mile; however, when the intersecting side road is scheduled for subsequent blading under this Section, no measurement will be made.
d. Berm maintained or established will be measured by linear foot.
e. No measurement will be made under this Section for compaction method specified in
2.d. For roads needing compaction with special compaction equipment (ie. pneumatic or steel roller), use pay items in Section 807 for additional compaction efforts.
4. PAYMENT
a. The quantities measured and accepted will be paid for at the contract unit price shown in the Schedule of Items.
b. Payment will be made under:
Pay Item Description Pay Unit
811 (1) Blading Surfaced Roads Single-Lane Mile
811 (2) Blading Native and Pit Run Roads Single-Lane Mile
811 (3) Smooth Blading Single-Lane Mile
811 (4) Berm Maintained Linear Foot
811 (5) Establishing Berms Linear Foot
Blading Dimensions
Road Number
Standard Width
Minimum Width
Maximum Width
Tangent Width
Curve Width
Turnout Width
Aggregate Edge Slope
812 DUST ABATEMENT (10/16)
This work consists of applying dust palliatives on roads shown in the Road Listing.
2. MATERIALS
The dust palliative materials shall be as shown in the road listing unless shown as Option (OPT) for Contractor's election from the following materials:
a. Water (H2O) for dust abatement will be incidental to hauling under this contract and shall be obtained from sources listed in Special Project Specification to Section 891 Water
Supply, unless otherwise agreed.
b. Lignin Sulfonate (LIG S) shall be the chemical residue produced as a by-product of the acid sulfite pulping process, and supplies as a water solution. The base solution shall be ammonia, calcium, or sodium and shall be water soluble to allow field dilution. Contractor shall provide certification that:
1) Solids determination has been made in accordance with the modified Technical
Association of the Pulp and Paper Industry Standard T629-M53 or by a specific gravity/percent solids versus temperature graph that correlates with the Standard.
2) The pH of the delivered material is at 4.5 minimum as determined by AASHTO-T200.
c. Magnesium Chloride (MgCl2) shall be the liquid residue of evaporative mineral recovery processes.
1) The chemical analysis shall meet the following requirements:
Chemical Percent by Weight of Brine
Magnesium (Mg) 7.0 minimum
Chloride (Cl2) 20.4 minimum
Sulfate (SO4) 3.5 maximum
Nitrate 5.0 maximum
The pH shall be between 4.5 and 10.0
2) Solids determination shall be made from suppliers provided graph of specific gravity/percent solids versus temperature.
d. Petroleum derivatives shall be used only when shown in the Schedule of Items.
Materials, equipment and maintenance requirements are specified in Section 892 and in
Special Project Specifications. Materials shown for each listed road in the Road Listing shall be the only acceptable product(s).
3. WEATHER LIMITATIONS
a. Water applications are not limited by weather forecast or temperature.
b. Commercial petroleum palliatives, Lignin Sulfonate and Magnesium Chloride shall be applied only when atmospheric temperature in the shade is a minimum 45 degrees
Fahrenheit, and steady or rising. The material shall not be applied when rain is anticipated within twenty-four (24) hours of treatment application.
4. EQUIPMENT
a. Application equipment for spreading commercial palliatives shall be so designed, equipped, maintained, and operated that the material is uniformly applied at the rate and traveled way widths shown in the Road Listing.
b. Dilution of commercial palliatives shall be accomplished within the application vehicle with the water source protected from contamination. The resulting mixture shall be circulated at least five (5) minutes to assure uniform mixing prior to application.
5. MAINTENANCE REQUIREMENTS
a. Water applications shall be limited to abatement for hauling vehicles under this contract and shall be provided at a frequency and rate which controls dust such that vehicle tail lights and turn signals remain visible. Rates of application shall be varied as needed but shall be low enough to avoid forming rivulets. Frequency of application shall be sufficient to accomplish the abatement without saturating and softening the traveled way.
Compacted or glazed road surface or wheel tracks may be loosened as needed for water penetration.
b. Commercial palliatives shall be applied at the rates determined by the Government to be appropriate at the time of application. The Road Listing shows the expected average application rate and may be varied to meet field conditions.
1) Lignin Sulfonate rates of application are shown in the Road Listing as gallons per square yard of the undiluted product at fifty percent (50%) solids.
2) Magnesium Chloride rates of application are shown in the Road Listing as gallons per square yard of the undiluted product at thirty-three percent (33%) solids.
3) Prior to initial application, when needed the road will be ordered bladed and shaped under Section 811, Blading.
4) Required subsequent applications may be applied to the existing road surface without blading unless it is ordered.
5) Contractor shall not apply commercial palliatives in a manner that spatters or mars adjacent structures or trees. Palliatives shall not be placed on or across cattleguards or bridges. Dust abatement material shall be discharged only on roads approved by the
Government.
6. MEASUREMENT
a. Lignin Sulfonate measurement shall be the tonnage of lignin sulfonate solids supplied as determined by manufacturer's certificate or by tests on job samples obtained during application.
b. Magnesium Chloride measurement shall be the undiluted tonnage (as corrected to 33 percent solids) as determined by manufacturer's certificate.
c. Bituminous material will be measured prior to any ordered dilution by the ton or gallon as provided in the Schedule of Items and the Special Project Specifications.
d. Addition of water to dilute commercial palliatives shall be incidental.
7. PAYMENT
a. The accepted quantities will be paid for at the contract unit price shown in the Schedule of
Items.
812 (1) Dust Abatement – Lignin Sulfonate Solids Ton
812 (2) Dust Abatement – Magnesium Chloride Ton
813 SPOT SURFACING (10/16)
This work consists of placing surface aggregate as staked on the ground, or designated by the
Government. It includes preparing the area, furnishing, hauling, and placing all necessary materials and other work necessary to blend with the adjacent road cross section.
2. MATERIALS
a. Materials will be Government furnished when stated in the task order.
b. Materials furnished by the Contractor shall conform to the gradation requirements shown in the task order and the quality requirements of Section 893.
3. MAINTENANCE REQUIREMENTS
The area to be spot surfaced shall be thoroughly loosened to a minimum depth of one inch (1") prior to placement of aggregate.
4. MIXING AND PLACING
a. When scheduled coincident with work under Section 811, spot surfacing and existing aggregate, when ordered, shall be mixed with water until a uniform mixture is obtained prior to final shaping and compaction.
b. The material shall otherwise be spread on the prepared area in layers no more than four
(4) inches in depth. When more than one (1) layer is required, each layer shall be shaped and compacted before the succeeding layer is placed. Upon completion, the spot surfacing shall reasonably conform to the adjacent cross section and provide smooth transitions in the road profile.
c. Compaction shall be accomplished by breaking track while operating equipment on the traveled way
5. MEASUREMENT
a. The quantity will be the weight of the actual aggregate placed in tons, cubic yards of aggregate measured in place, or square yards of aggregate measured in place, whichever is shown in the Schedule of Items.
b. Hauling is considered incidental.
6. PAYMENT
a. The accepted quantities will be paid for at the contract unit prices shown in the Schedule of Items
b. For payment by weight, certified weight ticket shall be submitted to the Contracting Officer.
c. Payment will be made under:
813 (1) Spot Surfacing, Grading__, Commercial Source
Ton
813 (2) Spot Surfacing, Grading__, Commercial Source
Cubic Yard
813 (3) Spot Surfacing, Grading__, Commercial Source
Square Yard
813 (4) Spot Surfacing, Grading__, Government Source
Ton
813 (5) Spot Surfacing, Grading__, Government Source
Cubic Yard
813 (6) Spot Surfacing, Grading__, Government Source
Square Yard
814 ASPHALT PAVEMENT PATCHING (10/16)
This work consists of patching potholes and skin patching of asphalt surfaces. The work includes preparing the area to be patched, furnishing and placing all necessary materials and work. All areas to be patched will be marked by the Government.
2. MATERIALS
Materials used for asphalt patching shall conform to the requirements in Sections 892 and
893. Bituminous mixture material shall conform to requirements of Special Project
Specifications.
3. MAINTENANCE REQUIREMENTS
a. Potholes
1) Existing materials shall be removed to a minimum of two (2) inches or as necessary to reach firm support, but limited to maximum twelve (12) inch depth. If firm support for a patch is not available, the hole shall be barricaded and the
Government shall be notified. Prior to Contractor placing any materials, Government will determine corrections to be made.
2) The edges of the prepared hole shall be extended to form a vertical face in un-fractured asphalt surfacing. The prepared hole shall generally be round or rectangular in shape and cleaned of all loose material. The bottom and sides shall be sprayed with an emulsified asphalt.
3) Prepared potholes shall be patched or barricaded immediately.
4) The bituminous mixture shall be placed in layers not exceeding four (4) inches. Each layer shall be compacted thoroughly with hand tampers, mechanical tampers, or rollers.
5) Finished surface shall, as a minimum, be compacted with a tamper or an 8- to 10-ton steel roller or comparable vibratory roller. Upon completion, the compacted pothole patch shall be flush with or not more than one quarter (1/4) inch above the level of the adjacent pavement.
b. Disposal
All materials removed from pothole and skin patching operations shall be removed to a disposal site designated by the COR or shown on the drawings.
4. MEASUREMENT
a. Bituminous Mixture
1) Hot and cold bituminous mixture acceptable placed will be measured by the ton.
Bituminous materials incorporated into the mixture will be incidental to the item.
2) Ton Measure - The quantity of mixture will be the number of tons in the accepted work. Any material rejected in the field as not meeting specifications shall be deducted based on estimated quantities. Rejected quantities shall be reconciled between the Government and the Contractor each day. If not reconciled each day, the Government's figures will apply.
b. The following work is incidental:
1) Cleaning of surfaces.
2) Haul and compaction of bituminous mixture.
3) Material removal and disposal.
4) Emulsified asphalt used on existing surfaces will be measured by the gallon prior to dilution. Dilution materials shall be considered incidental.
5. PAYMENT
a. The accepted quantities will be paid for at the contract unit price shown in the Schedule of Items.
b. Payment will be made under:
Pay Item Description Pay Unit
814 (1) Pothole Patching Ton
814 (2) Emulsified Asphalt Gallon
815 PAVED SURFACE CLEANING (10/16)
This work consists of removing loose material from paved, traveled way, including bridge decks and paved shoulders.
2. EQUIPMENT
a. Equipment shall have the capability of removing all loose material from paved surfaces without damage to the surface.
b. Use of hydraulic flushing equipment will not be permitted within a horizontal distance of two hundred (200) feet from a live stream, unless approved by the Government.
3. MAINTENANCE REQUIREMENTS
The paved surface shall be cleaned to the width stated in 4(a) or 4(c) for the Pay Item or as ordered under 4(b). Materials shall be moved away from road centerline on double-lane roads.
Bridge deck cleaning shall require all materials be moved longitudinally off the deck.
4. MEASUREMENT
a. Measurement for Pay Item 815(1), will be by the pass mile, determined by the product of the number of five (5) foot wide increments times the length to the nearest one-tenth (0.1) mile.
b. Partial width passes ordered under Pay Item 815(1) will be measured as full five (5) foot passes. Additional width incidentally produced by Contractor's equipment will not be considered as a partial pass.
c. Measurement for Pay Item 815(2) will be lane miles measured to the nearest one-tenth
(0.1) miles for cleaning the entire width of the paved surface, including turnouts.
d. Measurement for Pay Item 815(3) will be for cleaning the entire length and width of the surface of each bridge and paved approaches.
5. PAYMENT
a. The ordered and accepted quantities shall be paid for at the unit price shown in the Schedule of Items.
b. Payment will be made under:
Pay Item Description Pay Unit
815 (1) Paved Surface Cleaning Pass Mile
815 (2) Paved Surface Cleaning Single-lane Mile
815 (3) Bridge Deck Cleaning Each
816 MAINTENANCE OF UNPAVED SHOULDERS (10/16)
This work consists of maintaining unpaved shoulders adjacent to a paved traveled way.
Work area will be identified by the Government.
2. MAINTENANCE REQUIREMENTS
Existing shoulder material shall be bladed and shaped the entire width to drain away from the traveled way. Vegetative or other unsuitable materials may be bladed onto slopes adjacent to the roadbed unless otherwise required in Special Project Specifications. The shoulder material shall be moistened if necessary for compaction. The shoulder shall be compacted adjacent to paved surface edge prior to final shaping. Grader wheels may be used for this compaction. Final shaping shall provide a smooth transition to the paved surface edge. Upon completion, the paved surface shall be cleaned of loose materials in accordance with Section 815 and is incidental.
3. MEASUREMENT
Measurement of unpaved shoulder maintenance will be the number of side miles of each shoulder completed and accepted. Measurement will be to the nearest one-tenth (1/10) mile determined along the centerline.
4. PAYMENT
a. The ordered and accepted quantities shall be paid for at the unit price shown in the
Schedule of Items.
816 (1) Unpaved Shoulder Maintenance Side Mile
818 ASPHALT CRACK CLEANING AND SEALING (10/16)
This work shall consist of cleaning and filling cracks in existing asphalt concrete surfaces that are 1/4-inch wide and wider. This work shall be performed and paid for in accordance with the following specifications.
2. EQUIPMENT
a. All methods employed in performing the work and all equipment, tools and machinery used for handling the material and executing any part of the work shall be subject to the approval of the Government before the work is started, and whenever unsatisfactory, they shall be changed or improved as required. All equipment, tools, machinery and containers must be kept clean and maintained in satisfactory condition.
b. Sealing equipment shall consist of a double boiler type machine, capable of maintaining the temperature of the material in the range of 350 to 400 degrees Fahrenheit, with continuous circulation and agitation. Material shall never be heated above 400 degrees
Fahrenheit.
3. MATERIALS
The sealing material shall comply with the requirements of ASTM D 3405-78 and AASHTO
M 301-85. The Contractor shall submit a certificate of compliance signed by the manufacturer certifying that the material meets these requirements. The certificate shall be submitted prior to the use of the material in the work.
4. MAINTENANCE REQUIREMENTS
a. Cleaning of cracks:
The cracks shall be steel wire brushed, broomed, cleaned using compressed air or pressurized water jet, or cleaned and dried using a hot lance (use of a back-pack hot air blower will not be sufficient), as shown in the Schedule of Items, in order to remove all loose material, vegetation, and other objectionable material.
b. Filling:
Filling of cracks and voids shall not commence until they are clean and dry. When the use of a hot lance is required, filling should closely follow cleaning. The cracks shall be sealed from the bottom up. The filler material shall be placed within 1/8-inch of the top of the crack. Any excess material shall be leveled flush to the surface with a "V" shaped squeegee device. The excess material will be squeegeed so as not to exceed 1 1/2-inches on each side of the crack. Excess material remaining in the squeegee at the end of the crack will be distributed over the crack in a return motion. If settlement of the filler material occurs, the cracks shall be refilled until they are again within 1/8-inch of the finished surface. No excess build-up of filler material will be permitted. Any spillage or loose material shall be removed from the surface.
c. Weather Limitations:
The filler material shall not be applied when it is raining, excessive moisture is present, or either atmospheric or pavement temperature is 45 degrees Fahrenheit and falling.
Filler material may be applied when moisture is not present and either the atmospheric or pavement temperature is 40 degrees Fahrenheit and rising.
5. MEASUREMENT
The quantity will be measured by the linear foot or pound of filler material used as shown in the Schedule of Items. When measurement by the pound is specified, the Government may require the weighing of equipment for determination of actual quantities of material used.
Payment by the pound will not include any materials wasted or not used as specified.
6. PAYMENT
a. Payment shall be made at the contract unit price for cracks repaired as specified. This payment shall be full compensation for all labor, equipment, materials, traffic control, tools and incidentals necessary to complete the work.
818 (1) Crack Cleaning and Sealing Linear Foot
818 (2) Crack Cleaning and Sealing, Hot Lance Cleaning Only
Linear Foot
818 (3) Crack Filling Material, Commercial Source Pound
831 DITCH MAINTENANCE (10/16)
This Section provides for routine maintenance of various types of ditches to provide a waterway which is unobstructed, as shown on the road listing or marked on the ground. Drainage ditch maintenance is limited to materials contained within the ditch below the elevation of the adjacent edge of the traveled way or shoulder.
2. MAINTENANCE REQUIREMENTS
a. During ditch maintenance care shall be taken to retain existing low growing vegetative cover (primarily grasses and forbs).
b. Ditches shall be maintained by removing rock, soil, wood, and other materials. Upon completion the maintained ditch shall be of the same character as abutting segments that were not required to be maintained.
c. Back slopes shall not be undercut by removal operations.
d. Suitable material up to four (4) inches in greatest dimension removed from the ditches may be blended into existing native road surface and shoulder or placed in designated berm.
e. Material from ditch cleaning operations shall not be blended into or bladed across aggregate surfaced roads nor bladed onto or across bituminous surfaced roads.
f. Material in excess of 2(d) or subject to 2(e) will be ordered hauled to a designated waste area under Section 832. Excess materials temporarily stored on the ditch slope or edge of the shoulder shall be removed daily.
g. Limbs and wood chunks in excess of one (1) foot in length or three (3) inches in diameter shall be removed from ditches and placed outside the roadway.
h. Paved surfaces shall be cleaned of all materials resulting from Contractor's ditch maintenance work. Paved surface cleaning shall be in accordance with Section 815.
i. Lead-off ditches shall be shaped to drain away from the traveled way.
3. MEASUREMENT
a. Drainage ditch maintenance will be measured to the nearest one-tenth (0.1) mile. Segments of less than one-tenth (0.1) mile will be counted as a full one-tenth (0.1) mile. Lead off ditches shall be measured by the number of ditches completed.
b. Ordered haul of excess material will be measured and paid under Section 832.
4. PAYMENT
a. The accepted quantity will be paid for at the contract unit price shown in the Schedule of
831(1) Clean and Reshape Drainage Ditch Ditch Mile
831(2) Clean and Reshape Lead off Ditch Each
832 REMOVE AND END HAUL MATERIALS (10/16)
Work consists of ordered loading, hauling, and placing of slide, slough, or excess materials such as rock, soil, vegetation, and other materials to designated disposal sites.
2. MAINTENANCE REQUIREMENTS
a. Excess materials generated by work under other Sections of this contract may be ordered for removal, haul, and disposal under this Section. Removal and disposal under all Sections will be ordered without haul when a distance of less than two hundred (200) feet is involved.
b. Slide and slough materials to be removed shall include those in the area extending approximately six (6) feet vertically above the road surface and that area extending not more than four (4) feet down slope from the roadbed. Material shall be disposed of at designated sites as shown on Drawings or identified in Special Project Specifications.
c. The slope which generated the slide material shall be reshaped as nearly as practical to its original condition by equipment operating from road surface. Reshaping of roadside ditches in slide area shall be in accordance with Section 831.
d. When ordered by the Government, slumps shall be filled by compacting selected materials into roadway depressions. Compaction shall be by Method (2).
e. All materials removed and placed in disposal sites shall be placed by one or more of the following methods as shown in Road Listing, Special Project Specifications, or
Drawing.
1) Method 1: Side Casting and End Dumping. Material may be placed by side casting and end dumping. Where materials include large rocks, a solid fill shall be provided by working smaller pieces and fines into voids. The finished surfaces shall be shaped to drain.
2) Method 2: Layer Placement - Surfaces on which materials are to be placed shall be stepped or roughened prior to placing any material. Materials shall be placed in approximately horizontal layers no more than twelve (12) inches thick. Each layer shall be compacted by operating hauling and spreading equipment over the full width of each layer.
3. MEASUREMENT
a. Removal will be measured by the cubic yard, determined by equipment measure, for materials acceptably removed.
b. Except as provided in 2(a) of this Section, haul of materials will be measured by the cubic yard mile, determined by the number of miles hauled times…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .