3. SOMS Repair Fire Access Road, Dorms 13-1084 23 Oct 2020.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
Fire Lane Access Road, Dorms Federal contract opportunity
Solicitation number
FA485521R0005
Issued by
Department of the Air Force Special Operations Command

About this file

This document contains a schedule of materials submittals for a federal contract solicitation to repair a fire access road and dormitories at Cannon Air Force Base in New Mexico. The solicitation is for a firm-fixed-price contract with a magnitude between $250,000 and $500,000 to complete full-depth reconstruction of asphalt pavement, sidewalks, and a walled dumpster container area. The schedule lists 24 required submittals such as certificates of insurance, quality control and waste management plans, product data, test results, as-built drawings, and warranties. Key due dates include items due 7 days, 14 days, and 21 days after notice to proceed as well as requirements to be approved prior to use or implementation. The work must be completed within 120 calendar days of award. The North American Industry Classification System code for this effort is 237310 and it is set aside 100% for historically underutilized business zones in accordance with Federal Acquisition Regulation 19.1305.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

AF FORM 66 SCHEDULE OF MATERIALS SUBMITTALSPROJECT #PROJECT TITLESOLICITATION/CONTRACT NO.
CZQZ 131084Repair Fire Access Road, Dorms
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM, DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIF OF COMPLIANCESHOP DRAWINGSSAMPLES / COLOR SELECTTEST RESULTSMANF'R RECOMMENDATIONSMANF'R. WARRANTYLICENSED APPLICATORMANUF'S TECHNICAL DATAINSPECTORS FILES ONLYOTHERREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATEFOLLOW-UPCONTRACTOR NOTIFIED: Approval DateCONTRACTOR NOTIFIED: DisApproval DateCONTRACTOR RE-SUBMITTALFINAL APPROVALREMARKS
101 01 00.1.2.C AF Form 103 - Work Clearance Request111NLT 7 Days prior to work start
201 33 00 1.1 Certificates of Insurance17 days after NTP
301 45 00.00 10 Quality Control Plan17 days after NTP
4Base Access Request Form1NLT 7 Days Prior To Base Access
501 33 00 1.1 Surety Bonds17 Days after NTP
601 33 00 1.1 List of Proposed Subcontractors17 days after NTP
701 33 00 1.1 Construction Progress Schedule17 days after NTP
803 30 00/32 12 16 Mix Design1Must be approved prior to use/implementationRequest submission as early as possible. Submit a design for all intended mixes of concrete and asphalt intended for use
901 35 26.1.13 Accident Notification1As Incident Occurs
1001 35 26.1.13 Accident Report1As Incident Occurs
1101 74 19 1.6 Waste Management Plan1NLT 14 Days after NTP
1203 15 00 Sealant1NLT 14 Days after NTP
1332 17 24 Product Data1Must be approved prior to use/implementationRequest submission as early as possible. Items include reinforcing steel/rebar, joint filler, joint sealants, recycled aggregate materials, cementitious materials, admixtures, connectors, sealants, curing compound, grout, mortar
1401 35 26 Monthly exposure reports1First week of each month when working with/handling materials, fumes, etc. as required by Specifications
1501 01 00 1.8 Utility Outage Request11NLT 21 Days prior to Outage
16Confined space entry permit121 Days Prior to Entry
1701 35 26 Hot work permit121 Days Prior to Hot Work
1803 30 00 Compressive strength tests1Prior to paving/pouringRequired compressive strength for concrete is 3,000 psi
19Accent brick samples1Must be approved prior to use/implementationMust meet CAFB architectural standards
2003 30 00/32 12 16 Sub base/base course test results1Must be approved prior to use/implementation
2101 78 00 Certification of EPA/USDA designated items1Before final payment
2201 33 00 Operations and Maintenance Data1NLT 14 Days Ater Project Completion and before final payment2 (8.5"x11" binder) hard copies and 1 electronic copy
2301 01 00.1.5 As-builts1NLT 14 Days Ater Project Completion and before final payment
2401 01 00 Warranty Information2NLT 14 Days Ater Project Completion and before final payment2 (8.5"x11" binder) hard copies and 1 electronic copy
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51

Sheet2

Sheet3

File details come from the government source that posted it. Updated .