Plums National Forest; Feather River Ranger District; 22N94 Replace Retailing Wall 3
Solicitation number
12970224R0021
Issued by

About this file

This document appears to be an Independent Government Estimate (IGE) for a federal contract opportunity related to the replacement of a retaining wall on the Plumas National Forest, Feather River Ranger District.

The key details are: The contract is for the removal and replacement of an existing wire-faced retaining wall with a government-furnished Hilfiker Wall structure. The work includes excavation, disposal of existing materials, construction of the new wall, installation of drainage systems, road reconstruction, and traffic control. The estimated price range for the contract is $100,000 to $250,000. The contract is anticipated to be a firm-fixed price award. Requests for Information are due by April 29, 2024. The project location is on Forest Service Road 22N94 in the Feather River Ranger District of the Plumas National Forest, California.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Independent Government Estimate (IGE)

Use if you have a need that is reoccurring or multi-year requirement.

Use if you want to issue a order against an existing contract or agreement. Task Order:

Use if the below do not apply to your requirement.

INSTRUCTIONS: HOW TO USE THIS FORM

No specific format is required for an IGE; however this must be an independent estimate and not a reiteration of a contractor quote. The selected format should generally be in the same level of detail and manner that the Schedule of Items pricing we request from contractors. The estimate should state any underlying assumptions or rationale used in formulating the estimate. Initially the CO will use the IGE to determine the estimated value of the procurement and to identify the appropriate procurement thresholds applicable to the solicitation. Later the IGE is compared to prices received to evaluate an offeror’s understanding of the government requirements and in supporting a price reasonableness determination.

Stand Alone IGE:

EXPLANATION OF TABS

IDIQ:

Stand Alone IGE w/options: Use if you have a requirement where you know you have an ongoing/recurring need year after year.

ITEM

NUMBER DESCRIPTION PAY

UNIT EST QTY

15101 MOBILIZATION LS 1

15210 MISC SURVEY & STAKING LS 1

15601 TRAFFIC CONTROL LS 1

15713 SOIL EROSION & POLLUTION CONTROL LS 1

20407 ROADWAY EXCAVATION CUYD 1550

25102 PLACED RIP RAP, CLASS 3 TON 13

25501 MSE WALL GOVERNMENT FURNISHED HILFIER NO BID 1032 SQFT

22501 MECHANICALLY STABILIEZED EARTH WIRE WALL SQFT 1032

30202 AGGREGATE BASE, GRADE E, COMPACTION C TON 25

40304 ASPHALT CONCRETE, TYPE II TON 50

60501 STANDARD UNDERDRAIN SYSTEM LF 114

60502 GEOCOMPOSITE UNDERDRAIN SYSTEM LF 118

63307 OBJECT MARKERS, TYPE II EACH 4

EA - EACH

MO - MONTH

Award anticipated to be a firm fixed price contract.

SCHEDULE OF ITEMS

FEATHER RIVER RANGER DISTRICT/PNF/ENGINEERING

PROJECT TITLE: 22N94 SITE3 WELDED WIRE WALL

WORKPLAN ACQUISITION PLAN/REQUISITION NO:

SCHEDULE OF ITEMS

Period of Performance (Required for Services and A&E)

Anticipated Delivery Date (Required for Supply and Construction) 6/3/2024

UNIT EST QTY

ITEM

NUMBER DESCRIPTION PAY

UNIT EST QTY

ITEM

NUMBER DESCRIPTION PAY

UNIT EST QTY

Period of Performance Option Year 2: MM/DD/YR – MM/DD/YR

FILL OUT THE AREAS IN RED BELOW

SCHEDULE OF ITEMS

(NAME) DISTRICT/FOREST/STATION/ACTIVITY

PROJECT TITLE: (NAME)

WORKPLAN ACQUISITION PLAN/REQUISITION NO: (NUMBER)

SCHEDULE OF ITEMS

Period of Performance Base Year: MM/DD/YR – MM/DD/YR

Period of Performance Option Year 1: MM/DD/YR – MM/DD/YR

UNIT EST QTY

ITEM

NUMBER DESCRIPTION PAY

UNIT EST QTY

Period of Performance Option Year 3: MM/DD/YR – MM/DD/YR

Period of Performance Option Year 4: MM/DD/YR – MM/DD/YR

EA - EACH

MO - MONTH

Award anticipated to be a firm fixed price contract.

Instructions
CONTRACT (NO OPTIONS)