A10 1124163 SAM.gov Q&A.pdf

PDF 47 KB Posted

Attached to
Plums National Forest; Feather River Ranger District; 22N94 Replace Retailing Wall 3
Solicitation number
12970224R0021
Issued by

About this file

This document appears to be a set of questions and answers related to a federal contract opportunity to remove and replace an existing wire-faced retaining wall with a government-furnished Hilfiker Wall material on the Plumas National Forest in California.

The key details are: The contractor shall furnish all equipment and personnel necessary to remove and replace the existing wall, including removing and disposing of the existing AC surface, aggregate base, and MSE structure, preparing the base, constructing the new government-furnished MSE structure with a retained rock facing and drain system, backfilling, replacing the road base, paving, and installing object markers. The government will provide the Hilfiker Wall material, and the contractor shall furnish all other materials. The contract value range is $100,000 to $250,000, and RFIs are due by April 29, 2024. The project location is on FSR 22N94 in the Plumas National Forest.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions Received Answers Justin wanted to clarify one thing as I am running my numbers. Item 22501, Mechanically Stabilized Earth Wall, shows up twice in the schedule. My assumption is that you are saying that the Government will provide the earth wall and I will add the pay item to install. You know what they say about assuming, so I just wanted to make sure. The only thing we are bidding there is the installation of one MSE, that the Government provides. We don’t need to source a second one from Eureka, correct?

Correct, the Government will furnish Hilfiker Wall material. I’ve included the Statement of work below to ensure we are on the same page. Let me know if you have any additional questions.

C.1 Statement of Work The Contractor shall furnish all equipment and personnel necessary to remove and replace the existing Wire-Faced Retaining Wall with government furnished Hilfiker Wall material. The Contractor shall furnish all materials not provided by the government to complete the project. (See Section G) Work includes: Remove and dispose of the existing AC surface, remove and stockpile the aggregate base, excavate the existing MSE structure, dispose of all steel and fabric encasement materials, prepare the structure base, construct the new Government Furnished MSE structure with the retained rock facia including an upper and lower drain system, Backfill as needed to the sub-base level, replace the augmented road base, place a 3” course of hot asphalt, and install object markers.