3. NEW 25Z5AB9 Upgrade Chiller Control 15B51525Q00000001.pdf
PDF 629 KB Posted
- Attached to
- Project 25Z5AB9 Upgrade Chiller Control - 15B51525Q00000001 Federal contract opportunity
- Solicitation number
- 15B51525Q00000001
About this file
This is a Request for Quote (RFQ) solicitation document issued by the Federal Bureau of Prisons (BOP) FCI Texarkana for upgrading/retrofitting controls between the chiller and cooling tower. The contractor will replace or retrofit the current Trane Building Control Unit, Summit software, and MP580 to enable communication with Niagara 4, upgrade the FX 8000 for HTML 5 viewing over the standalone network, and provide a Dell computer with monitor to view chiller plant operations. The work includes installing various control system components including expansion panels, supervisory controllers, connectivity modules, and programming services.
The solicitation (15B51525Q00000001) will be released on December 13, 2024, with quotes due December 30, 2024 at 3:00 PM CST via email to tex-procurementprop-s@bop.gov. Award is anticipated by January 8, 2025, with performance from February 10, 2025 to March 14, 2025. This is a firm-fixed-price contract under NAICS code 426610. The evaluation will be based on price and past performance, with price rated as more important. The work will be performed at FCI Texarkana, 4001 Leopard Drive, Texarkana, TX 75501. Contractors must provide certification of qualified installers/technicians 7 days before project start.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Letter of Solicitation - Project 25Z5AB9 Upgrade Chiller Control.pdf | ||
| Pre Solicitation - Project 25Z5AB9 Upgrade Chiller Control.pdf | ||
| 4. 25Z5AB9 SOW Chiller Plant Controls.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15B51525Q00000001 Page 1 of 88
SOLICITATION,OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER
15B51525Q00000001
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
2. TYPE OF SOLICITATION 3. DATE ISSUED
12/13/2024
PAGE OF PAGES
1 88
IMPORTANT -The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
25Z5AB9
CODE 15B515
Federal Bureau of Prisons FCI Texarkana
4001 LEOPARD DRIVE
Texarkana, TX 75501
7. ISSUED BY
Federal Bureau of Prisons FCI Texarkana
4001 LEOPARD DRIVE
Texarkana, TX 75501
8. ADDRESS OFFER TO
9. FOR
INFORMATION CALL:
a. NAME
Nicholas Zwermann nzwermann@bop.gov
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
(903) 838-4587
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
Upgrade Chiller Control Services - Project 25Z5AB9
Awarded contractor will be required to provide all labor, materials, tools, permits, and equipment necessary to Replace/Retrofit the controls between the chiller and cooling tower. The current Trane Building Control Unit, Summit software, and MP580 must be replaced or retrofitted. The system needs to be able to communicate with Niagara 4. This requires the upgrading of the FX 8000 as it uses HTML 5 and viewing information over the stand-alone network. With IT Administrator approval, Tridium Web can be allowed. We are also requesting a Dell computer with monitor to view chiller plant operation at FCI Texarkana in accordance with the requirements of solicitation 15B51525Q00000001.
The Federal Bureau of Prisons (FBOP) intends to make a single award to a responsible entity for the Upgrade Chiller Control located at FCI Texarkana.
The anticipated date for receipt of quote is December 30, 2024, at 3:00 p.m. Central Standard Time via e-mail - tex-procurementprop-s@bop.gov
*INCLUDE THE FOLLOWING INFORMATION*
Unique Entity Identifier (UEI): ________________
TIN NUMBER: ___________________
CAGE CODE: ____________________
EMAIL: _________________________
11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving30 30 award, X notice to proceed. This performance period is mandatory X negotiable. (See __________________________.)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12b).
YES X NO
12b. CALENDAR DAYS
Sealed offers in original and copies to perform the work required are due at the place specified in item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
1 15:00 US/
Central a.
12/30/2024
b. An offer guarantee X is, is not required.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.c.
15d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
15B51525Q00000001 Page 2 of 88
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ___________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
17.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified) 8
ITEM
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE
UNITED STATES CODE AT
26. ADMINISTERED BY 15B515
Federal Bureau of Prisons FCI Texarkana
4001 LEOPARD DRIVE
Texarkana, TX 75501
Nicholas Zwermann
(O) 903-838-4587 nzwermann@bop.gov
Federal Bureau of Prisons FCI Texarkana
PO BOX 9500
Texarkana, TX 75505-9500
Nicholas Zwermann
(O) (903) 838-4587 Invoice to nzwermann@bop.gov
27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return __________ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
X 29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a.NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
Galo Morlet
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY 12/13/2024
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
OFFER AMOUNT FOR 15B51525Q00000001: $ __________________
15B51525Q00000001 Page 3 of 88
Table of Contents
Section Description Page Number
1 Solicitation, Offer and Award 2 Commodity or Services Schedule 3 Special Contract Requirements
FAO-0001 Bonds FAO-0002 Magnitude FAO-0003 Required Insurance FAO-0004 Pre-Construction Conference FAO-0005 Submittals FAO-0006 Contractor Use of Premises FAO-0007 Payment Services FAO-0008 Request for Final Inspection FAO-0010 Assignment of Contract Administration Office and Functions FAO-0012 Progress Meetings FAO-0014 Contract Closeout Procedures (for construction contracts $150,000 or less) DOJ-05 Security of Department Information and Systems DOJ-05 (OCT 2023)
4 Contract Clauses 52.223-18 [Reserved] 52.225-13 Restrictions on Certain Foreign Purchases (Feb 2021) 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) 52.244-6 Subcontracts for Commercial Products and Commercial Services (Nov 2024) 52.203-5 Covenant Against Contingent Fees (May 2014) 52.203-7 Anti-Kickback Procedures (Jun 2020) 52.204-13 System for Award Management Maintenance (Oct 2018) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.204-2 Security Requirements (Mar 2021) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) 52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Nov 2021) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) 52.219-6 Notice of Total Small Business Set-Aside (Nov 2020) 52.222-1 Notice to the Government of Labor Disputes (Feb 1997) 52.222-6 Construction Wage Rate Requirements (Aug 2018) 52.222-7 Withholding of Funds (May 2014) 52.222-8 Payrolls and Basic Records (Jul 2021) 52.222-9 Apprentices and Trainees (July 2005) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) 52.222-11 Subcontracts (Labor Standards) (May 2014) 52.222-12 Contract Termination - Debarment (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) 52.222-15 Certification of Eligibility (May 2014) 52.222-21 Prohibition of Segregated Facilities (Apr 2015) 52.222-26 Equal Opportunity (Sept 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) 52.222-35 Equal Opportunity for Veterans (Jun 2020) 52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020) 52.222-37 Employment Reports on Veterans (Jun 2020)
15B51525Q00000001 Page 4 of 88
52.222-50 Combating Trafficking in Persons (Nov 2021) 52.222-50 Alt I Combating Trafficking in Persons (Nov 2021) - Alternate I (Mar 2015) 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) 52.228-5 Insurance-Work on a Government Installation (Jan 1997) 52.236-5 Material and Workmanship (Apr 1984) 52.236-26 Preconstruction Conference (Feb 1995) FAO-0016 Equitable Adjustments: Waiver and Release of Claims 52.225-11 Buy American-Construction Materials under Trade Agreements (Nov 2023) DOJ-01 Whistleblower Information Distribution (Oct 2021) DOJ-02 Contractor Privacy Requirements (JAN 2022) DOJ-03 Personnel Security Requirements For Contractor Employees (Nov 2021)
5 Attachments 6 Solicitation Provisions
52.204-16 Commercial and Government Entity Code Reporting (Aug 2020) 52.204-7 System for Award Management (Nov 2024)
7 Representations and Certifications 52.225-2 Buy American Certificate (Oct 2022)
15B51525Q00000001 Page 5 of 88
Section 2 - Commodity or Services Schedule
Upgrade Chiller Control - Project 25Z5AB9
Firm Fixed Price
SCHEDULE OF SUPPLIES/SERVICES
CONTINUATION SHEET
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 The Federal Bureau of Prisons (FBOP) intends to award to a responsible entity for the provision of updating/retrofitting the controls between the chiller and cooling tower at FCI Texarkana.
Workstation
1. Furnish and install one (1) Dell Tower Workstation
• Windows 11 Pro
• Microsoft Office
2. Furnish and install one (1) Dell 24” Monitor
3. Furnish and install one (1) APC 1500 UPS Battery Backup
4. ProSupport 36 Month
• Web based access of the control system
• Equipment Graphics
• Time Scheduling
• Setpoint Scheduling
• Alarm routing
PSC: J059
Line Period of Performance: 02/10/2025 - 03/14/2025
1 EA $________ $_________________
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 The Federal Bureau of Prisons (FBOP) intends to award to a responsible entity for the provision of updating/retrofitting the controls between the chiller and cooling tower at FCI Texarkana.
JCI System Controller
1. Furnish and install one (1) PA0000001FH0 Expansion Panel 16x20.
2. Furnish and install one (1) FX-SC9BASE-0 Supervisory Controller.
3. Furnish and install one (1) FX-SC8CL005 5 Device License.
4. Provide Initial SMA-8005 36 month SW Maintenance.
5. Furnish and install one (1) HEP Connectivity Module.
6. Furnish and install one (1) Netgear 5-port switch.
7. Generate Equipment Graphics.
• Chiller Plant Chillwater System.
• Chiller Plant Condenser Water System.
• Chiller 1 & 2 Monitoring and Control.
8. Provide (2) hours customer on-site training.
9. Program and start-up Chiller Plant Controller.
10. Furnish and install one (1) F4-CGM09090-0H Fully programmable controller w/ integral display, BACnet MS/TP.
11. Furnish and install two (2) FX-XPM Expansion Input/output Modules.
12. Utilize existing panel.
13. Utilize existing field devices and wiring
14. Furnish and install BACnet Communication trunk.
15. Program and start up.
PSC: J059
Line Period of Performance: 02/10/2025 - 03/14/2025
1 EA $________ $_________________
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 The Federal Bureau of Prisons (FBOP) intends to award to a responsible entity for the provision of updating/retrofitting the controls between the chiller and cooling tower at FCI Texarkana.
Chiller 1 & 2:
1. Furnish and install daisy chained BACnet Communication trunk from Daikin Chillers to Chiller Plant Control Panel and System Control Panel.
2. Set up BACnet Communication protocol.
C. QUALITY ASSURANCE/INSTALLATION REQUIREMENTS
Equipment/Work Specifications
• Fully-customized, real-time graphical user interface (GUI).
1 EA $________ $_________________
15B51525Q00000001 Page 6 of 88
• Non-proprietary “open protocol” platform.
• Non-proprietary software upgrades.
• Non-proprietary device licenses.
• Provides freedom and flexibility to choose what service company you select.
• Scalability allows for ease of future expansion.
• Communication in multiple protocol languages.
All installers/technicians shall be qualified and certified by the manufacturer to install, test, and certify the new retrofit control system. Such certification must be verified in writing by the manufacturer and submitted to the COR seven (7) days before the project starts.
PSC: J059
Line Period of Performance: 02/10/2025 - 03/14/2025
15B51525Q00000001 Page 7 of 88
Section 3 - Special Contract Requirements
Clauses By Full Text
FAO-0001 Bonds
(a) Bid Guarantee. Each bidder shall submit with his bid a Bid Bond (Standard Form 24) with good and sufficient surety or sureties acceptable to the Government, or other security as provided in provision 52.228-1, in the form of twenty percent (20) of the bid price or not to exceed $3,000,000. The bid bond penalty may be expressed in terms of a percentage of the bid price or may be expressed in dollars and cents. A bid bond is not required for bids of $150,000 or less. (FAR 28.102-1)
(b) Performance and Payment Bonds. Within 10 days after award the contractor shall execute and submit to the Contracting Officer two bonds, each with good and sufficient surety or sureties acceptable to the Government, as follows;
a Performance Bond (Standard Form 25) and a Payment Bond (Standard Form 25A). The penal sums of such bonds will be as follows: (Not required for contracts of $150,000 or less)
(1) Performance Bond: The penal sum of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bond: The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(c) For construction contracts greater than $30,000 but not greater than $150,000, the Contracting Officer shall select two or more of the following payment protections, giving particular consideration to inclusion of an irrevocable letter of credit as one of the selected alternatives (FAR 28.102-1(b)(1)):
(1) A Payment Bond;
(2) An irrevocable letter of credit (ILC);
(3) A tripartite escrow agreement;
(4) A Certificate of Deposit; or
(5) A deposit of the types of security listed in 28.204-1 and 28.204-2.
(d) Individual Sureties.
15B51525Q00000001 Page 8 of 88
(1) Bidders may elect to furnish individual surety bonds. If individual surety bonds are furnished for bid guarantees, payment or performance bonds, the individual sureties must submit their bonds proof of ownership and value of the assets which they claim in their net worth at time of bid opening. The Government's preferred method of proof is to have a statement of net worth prepared by a Certified Public Accountant (CPA) in accordance with Generally Accepted Accounting Principles (GAAP). Statements from a CPA that contain disclaimers are not acceptable. The statement of net worth on the Standard Form 28, Affidavit of Individual Surety, is insufficient and will not be accepted without additional proof of value and ownership.
(2) Bidders are cautioned that individual sureties must provide complete and detailed information in Block 9 of Standard Form 28 concerning other contracts on which they have provided bonds. This information shall include contract number, contract location, amount, and type of bond and telephone number of the involved contracting office. Failure to provide the proof and information required may result in rejection of the bid or termination of the contract for failure to provide adequate bonds.
(a) Bid Guarantee. Each bidder shall submit with his bid a Bid Bond (Standard Form 24) with good and sufficient surety or sureties acceptable to the Government, or other security as provided in provision 52.228-1, in the form of twenty percent (20) of the bid price or not to exceed $3,000,000. The bid bond penalty may be expressed in terms of a percentage of the bid price or may be expressed in dollars and cents. A bid bond is not required for bids of $150,000 or less. (FAR 28.102-1)
(b) Performance and Payment Bonds. Within 10 days after award the contractor shall execute and submit to the Contracting Officer two bonds, each with good and sufficient surety or sureties acceptable to the Government, as follows; a Performance Bond (Standard Form 25) and a Payment Bond (Standard Form 25A). The penal sums of such bonds will be as follows: (Not required for contracts of $150,000 or less)
(1) Performance Bond: The penal sum of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bond: The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(c) For construction contracts greater than $30,000 but not greater than $150,000, the Contracting Officer shall select two or more of the following payment protections, giving particular consideration to inclusion of an irrevocable letter of credit as one of the selected alternatives (FAR 28.102-1(b)(1)):
(1) A Payment Bond;
(2) An irrevocable letter of credit (ILC);
(3) A tripartite escrow agreement;
(4) A Certificate of Deposit; or
15B51525Q00000001 Page 9 of 88
(5) A deposit of the types of security listed in 28.204-1 and 28.204-2.
(d) Individual Sureties.
(1) Bidders may elect to furnish individual surety bonds. If individual surety bonds are furnished for bid guarantees, payment or performance bonds, the individual sureties must submit their bonds proof of ownership and value of the assets which they claim in their net worth at time of bid opening. The Government's preferred method of proof is to have a statement of net worth prepared by a Certified Public Accountant (CPA) in accordance with Generally Accepted Accounting Principles (GAAP).
Statements from a CPA that contain disclaimers are not acceptable. The statement of net worth on the Standard Form 28, Affidavit of Individual Surety, is insufficient and will not be accepted without additional proof of value and ownership.
(2) Bidders are cautioned that individual sureties must provide complete and detailed information in Block 9 of Standard Form 28 concerning other contracts on which they have provided bonds. This information shall include contract number, contract location, amount, and type of bond and telephone number of the involved contracting office. Failure to provide the proof and information required may result in rejection of the bid or termination of the contract for failure to provide adequate bonds.
FAO-0002 Magnitude
The magnitude of this project is between $__.00 and $__.00.
FAO-0003 Required Insurance
See FAR 52.228-5, Insurance - Work on a Government Installation.
The Contractor shall, at its own expense, provide and maintain during the entire performance period of this contract, at least the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract.
TYPE AMOUNT
(1) WORKERS COMPENSATION & EMPLOYER'S LIABILITY $100,000
The required Workmen's Compensation Insurance shall extend to cover employee's liability for accidental bodily injury or death and for occupational disease with a minimum liability of $100,000.
(2) COMPREHENSIVE GENERAL LIABILITY with a minimum limit of:
PER ACCIDENT OR
OCCURRENCE FOR BODILY INJURY $500,000
This insurance shall include contractor's protective and contractual liability.
(3) COMPREHENSIVE AUTOMOBILE LIABILITY with the following minimum limits:
PER PERSON $200,000
PER OCCURRENCE FOR BODILY INJURY $500,000
15B51525Q00000001 Page 10 of 88
PER OCCURRENCE FOR PROPERTY DAMAGE $ 20,000
FAO-0004 Pre-Construction Conference
(a) Prior to the start of construction, Contracting Officers shall call a conference with the contractor, subcontractor(s), Warden, Controller/Business Administrator, Safety Manager, Facilities Administrator, Project Representative, A&E firm, Captain and other interested personnel to discuss the statutory labor standards, prevailing wage requirements, submission of the contractor's payrolls, subcontractor's responsibilities, institution work schedules, local policies, contraband, parking, storage of vehicles and equipment, etc.
Minutes of the conference shall be recorded, listing the names and titles of all attendees, and the subject matter of all items covered. The minutes shall be signed by the contractor and the Contracting Officer, and a signed copy placed in the contract file.
(b) The Contractor shall familiarize himself/herself with all procedures involved in normal institution routines. Any requirements which may constitute a problem or result in conflict, will be brought to the attention of the Contracting Officer or his representative for determination.
FAO-0005 Submittals
Within 10 calendar days after commencement of work or as otherwise established by the Contracting Officer, all materials and articles requiring approval, as contemplated by the Materials and Workmanship clause, shall be submitted by the contractor.
The submittal process is in place to allow the Government the opportunity to determine whether materials or procedures used by the contractor are in accordance with contract requirements. It is ultimately the Contractor's responsibility via the quality control process to ensure submittal items installed under the contract and work performed on site are in accordance with industry standards and general practices.
(a) The types of submittal requirements specified in this contract may include, but is not limited to; shop drawings, product data, samples, certificates of conformance or compliance, certified test or inspection reports, equipment, materials, and miscellaneous work related submittals for construction. Individual submittal requirements are generally specified in applicable sections for each unit of work in the specifications and/or as a whole in one section in the statement of work.
(b) The Bureau of Prisons (BOP) Contracting Officer’s Representative (COR) shall act for the Contracting Officer in the review and acceptance of all submittals. The Contractor shall submit submittals as required by the contract/ specifications to the COR for transmittal to the Contracting Officer. Fabrication of any work or purchase or use of any submittals (such as materials for which samples are required or equipment, etc.) shall not take place until written acceptance is given by the COR, except at the Contractor's own risk.
(c) The Contractor shall submit all shop drawings and submittals sufficiently in advance (unless otherwise specified in the specifications) of the construction requirements to allow ample time for checking, re-submitting, and re-checking.
(d) Failure of any materials to pass their specified tests shall be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. The Government reserves the right to disapprove any material or equipment which has previously proven unsatisfactory in service.
(e) The Contracting Officer’s or designee’s approval or acceptance of submittals is not to be construed as a complete check. Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor is responsible for the satisfactory construction of all work. The Contractor is responsible for delivering a final product/system that is operational as intended by the contract requirements, regardless of any Government approvals or acceptance of submittals. The Government assumes no liability during the submittal approval/acceptance process. It is the sole responsibility of the Contractor to deliver a properly functioning product or system.
FAO-0006 Contractor Use of Premises
Work Hours
15B51525Q00000001 Page 11 of 88
The project schedule is based on a normal forty (40) hour work week, eight (8) hours per day, Monday through Friday, excluding Federal holidays. The Contracting Officer’s Representative (COR) shall establish the work hour time frames for the duration of the project, subject to the approval of the Contracting Officer. Work hours and work days may be altered only with a 48 hour advance approval of the Contracting Officer.
NOTE: Access to the site will be available during normal working hours except during emergencies. It shall be the responsibility of the Contractor to familiarize himself, his employees, and his subcontractors of the working hours and conditions in the correctional facility, as working hours may not constitute a full eight hour day. The Government assumes no responsibility to the Contractor, nor to any of his subcontractors, for shorter hours due to institutional emergencies or entry and/or exit of workers necessitated by normal institution routines. The procedures and institutional entrance/ exit routines applicable to this project will be explained at both the pre-bid conference/site visit and the pre-construction meeting.
Contraband The Contractor shall inform his employees that intoxicating beverages, drugs, weapons, etc., will not be allowed on the site. Introduction of contraband shall be subject to the penalties prescribed by Title 18 USC-1791.
Explosives The use of explosives is absolutely forbidden without written authorization from the Contracting Officer.
Parking and Temporary Office Parking will be available at the site to the extent it does not interfere with construction activities. Otherwise, parking shall be provided for by the Contractor, at his expense, off the site for workmen employed on the project. Any temporary field office used by the Contractor shall be located in an area approved by the COR.
Safety and Accident Prevention In performing work under this contract the contractor shall:
(a) Conform to the specific safety requirements established by this contract;
(b) Comply with the safety rules of the Government institution that concern related activities not directly addressed in this contract;
(c) Take all reasonable steps and precautions to prevent accidents and preserve the life and health of contractor and Government personnel performing or in any way coming in contact with the performance of this contract; and
(d) Take such additional immediate precautions as the Contracting Officer and/or COR may reasonably require for safety and accident prevention purposes.
FAO-0007 Payment Services
(a) Original application for payment shall be prepared on AIA (American Institute of Architects) Form G-702 "Application and Certificate for Payment" and submitted to the Contracting Officer. The contractor may use another form;
however, it shall contain similar information as the AIA Form G-702. The Contracting Officer will approve the amount of payment by signing and forwarding the application and certificate as follows: Original to Accounting; Copy for Contract Award File.
(b) All small business contractors are required to self-certify on all invoices their small business status.
FAO-0008 Request for Final Inspection
The Contractor shall give the Contracting Officer’s Representative (COR) a minimum of ten (10) working days advanced written notice of the date on which the work will be fully completed and ready for the Government’s final inspection.
FAO-0010 Assignment of Contract Administration Office and Functions
Pursuant to FAR 42.201 and 42.202, the assigned Contract Administration Office is listed in Block 26 of the Standard Form 1442 Back. This assignment carries with it the authority to perform all of the contract administration functions listed in FAR 42.302(a) and 42.302(b) to the extent that those functions apply to the contract.
15B51525Q00000001 Page 12 of 88
FAO-0012 Progress Meetings
The Administrative Contracting Officer (ACO) shall conduct progress meetings at the project site on a monthly basis, or at intervals as determined by the ACO.
(a) At a minimum, the attendees shall include but is not limited to:
(1) FBOP: Administrative Contracting Officer, Contracting Officer’s Representative (COR), Facility Administrator/Manager, Architect/Engineer (if applicable), Other Personnel (Executive Staff, Captain, Safety Manager, etc.).
(2) Contractor: Project Manager, Superintendent, and technical support disciplines as appropriate (Subcontractors, Manufacturers, Suppliers, etc.).
(b) The meeting should include, but is not limited to issues such as:
Administrative Contracting Officer:
(1) Old business from previous progress meeting(s);
(2) Status of modifications, certified payrolls, submittals, requests for information (RFI);
(3) Review of payments made to date and review/approve current payment request;
(4) Status of modification proposal requests;
(5) Discuss new business.
COR:
(1) Status of escort coverage;
(2) Review gate or sallyport entrance/exit issues;
(3) Discuss other delays contractor may be experiencing;
(4) Discuss performance/quality issues.
Contractor:
(1) Review/discuss updated progress schedule;
(2) Provide 30 day outlook;
(3) Discuss other issues affecting performance.
FAO-0014 Contract Closeout Procedures (for construction contracts $150,000 or less)
Contract Closeout must be completed upon receipt of property and final payment.
Prior to payment of final invoice:
The Contractor shall submit the following documentation:
(1) Guarantees and warranties;
(2) All operation/maintenance manuals;
15B51525Q00000001 Page 13 of 88
(3) Consent of Surety to Final Payment (AIA Document G707), if the contractor furnished a bond;
(4) Release of Claims (GSA Form 1142);
(5) Evidence of no pending labor disputes;
(6) As-built drawings/shop drawings, (if applicable);
(7) Contractor’s final invoice.
AIA forms can be obtained from The American Institute of Architects at www.aiabookstore.com.
GSA forms can be obtained from the General Services Administration at www.gsa.gov (click on the “Forms Library” link).
DOJ-05 Security of Department Information and Systems DOJ-05 (OCT 2023)
I. Applicability to Contractors and Subcontractors Section 2839.102 of the Justice Acquisition Regulation (JAR), (48 C.F.R. § 2839.102), applies to this contract. Accordingly, all contractors are obligated to comply with all applicable DOJ security policies, directives, or guidance documents, including the security requirements in the provisions in this contract clause. This contract clause applies to all contractors and subcontractors, including cloud service providers (“CSPs”), and personnel of the contractors and subcontractors (hereinafter collectively, “Contractor”) that may access, collect, store, process, maintain, use, share, retrieve, disseminate, transmit, or dispose of DOJ Information. The security requirements set forth herein are in addition to those required by the Federal Acquisition Regulation (“FAR”), and any other applicable laws, mandates, contract clauses, DOJ policies, directives or guidance documents and Executive Orders pertaining to the development and operation of Information Systems and/or the protection of Government Information. This clause does not alter or diminish any existing rights, obligations, or liability under any other civil and/or criminal law, rule, regulation, or mandate.
II. General Definitions The following general definitions apply to this clause. Specific definitions also apply as set forth in other paragraphs.
A. Authorization to Operate (“ATO”), as defined in National Institute of Standards and Technology (“NIST”) Special Publication (“SP”) 800-37 Revision 2, is the official management decision given by a senior Federal official or officials to authorize operation of an information system and to explicitly accept the risk to agency operations (including mission, functions, image, or reputation), agency assets, individuals, other organizations, and the Nation based on the implementation of an agreed-upon set of security and privacy controls.
B. Cloud Computing, as defined in DOJ Order 0904 Cybersecurity Program, is a model for enabling ubiquitous, convenient, on-demand network access to a shared pool of configurable computing resources (e.g., networks, servers, storage, applications, and services) that can be rapidly provisioned and released with minimal management effort or service provider interaction. This cloud model is composed of five essential characteristics, three service models, and four deployment models in accordance with NIST SP 800-145.
C. Covered Contract is any contract, order or other agreement under which the contractor, or a subcontractor at any tier, including a cloud service provider, may access, collect, store, process, maintain, use, share, retrieve, disseminate, transmit, or dispose of DOJ Information (as defined below) in the course of providing a product or service to the Department, with the exception of acquisitions under the micro-purchase threshold.
D. Covered Information System means any information system used for, involved with, or allowing, the processing, storing, or transmitting of DOJ Information under a Covered Contract.
E. Data means recorded information, regardless of form or the media on which it may be recorded. The term includes technical data, computer software, and personally identifiable information (PII) (defined below). The term does not include information incidental to contract administration, such as financial, administrative, cost or pricing, or management information.
F. DOJ Information, as defined in DOJ Order 0904, means any Information that is owned, produced, controlled, protected by, or otherwise within the custody or responsibility of the DOJ, including, without limitation, information
15B51525Q00000001 Page 14 of 88 related to DOJ programs or personnel. It includes, without limitation, Information (1) provided by or generated for the DOJ, (2) managed or acquired by the Contractor for the DOJ in connection with the performance of the contract, and/or (3) acquired to perform the contract.
G. Information, as defined in DOJ Order 0904, is any communication or representation of knowledge such as facts, data, or opinions, in any form or medium, including textual, numerical, graphic, cartographic, narrative, or audiovisual. This includes any communication or representation of knowledge in an electronic format that allows it to be stored, retrieved, or transmitted.
H. Information System, means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502(8)).
I. Personally Identifiable Information (“PII”), as defined in the FAR 24.101, means information that can be used to distinguish or trace an individual's identity, either alone or when combined with other information that is linked or linkable to a specific individual. It includes but is not limited to common data elements such as names, addresses, dates of birth, and places of employment, to identity documents, Social Security numbers or other government-issued identifiers, precise location information, medical history, and biometric records.
This definition covers all PII that is created by or becomes available to the contractor, including its employees, subcontractors, or affiliates, as a result of performing under this contract. PII, as supplementally defined in DOJ Order 0904, also includes information about an individual maintained by an agency, including, but not limited to, information related to education, financial transactions, medical history, and criminal or employment history and information, which can be used to distinguish or trace an individual’s identity.
J. Private Cloud, as defined in NIST SP 800-145, is the deployment model for cloud infrastructure provisioned for exclusive use by a single organization comprising multiple consumers (e.g., business units). It may be owned, managed, and operated by the organization, a third party, or some combination of them, and it may exist on or off premises.
K. Security Breach means any security incident (as defined below) that directly relates to the loss of control, compromise, exfiltration, manipulation, unauthorized disclosure, unauthorized acquisition, unauthorized exposure or unauthorized access or any similar occurrence of any Covered Information System or any DOJ Information or any PII accessed by, retrievable from, processed by, stored on, or transmitted within, to or from any such system. This includes incidents where (1) a person other than an authorized user accesses or potentially accesses PII or DOJ Information or (2) an authorized user accesses or potentially accesses PII or DOJ Information for an unauthorized purpose.
a. Potential Security Breach (hereinafter, “Potential Breach”) means any suspected, but unconfirmed security breach (as defined above).
b. Confirmed Security Breach (hereinafter, “Confirmed Breach”) means any confirmed security breach (as defined above).
L. Security Incident means any occurrence that (1) may actually or imminently jeopardize, without lawful authority, the availability, integrity, authentication, confidentiality, or nonrepudiation of DOJ Information or a Covered Information System; or (2) may constitute a violation or imminent threat of violation of law, security policies, security procedures, or acceptable use policies.
a. Potential Security Incident means any suspected, but unconfirmed security incident (as defined above).
b. Confirmed Security Incident means any confirmed security incident (as defined above).
M. Vulnerability, as defined in DOJ Vulnerability Management Plan, and the OCIO Information Security Management Procedure, means a weakness or flaw discovered in the design of a system that, when exploited, may result in a loss of confidentially, integrity, or availability of DOJ Information or an Information System.
III. Confidentiality and Non-Disclosure of DOJ Information A. Preliminary and final contract deliverables and all associated working papers and material generated by the Contractor developed using DOJ Information, product, source code, and/or methods of operations, are the property of the U.S. Government and must be submitted to the Contracting Officer (“CO”) or the CO’s Representative (“COR”) at the conclusion of the contract. The U.S. Government has unlimited data rights to all such deliverables and associated working papers and materials in accordance with FAR 52.227-14 (Rights
15B51525Q00000001 Page 15 of 88 in Data-General). The Contractor will define a method of monitoring the development activity to include any activity associated with DOJ Information, product, source code, and methods of operations. The data rights and development details shall be defined within the Contract.
If the Contractor intends to utilize its existing data, for which it has a patent or copyright, to develop a contract deliverable, it is incumbent upon the Contractor to negotiate with the CO the proper FAR Part 27 clauses in the contract to protect its existing data.
B. Pursuant to FAR 52.227-14(d)(2), all documents and data produced in the performance of this contract containing DOJ Information, product code, source code, and/or methods of operations are the property of the U.S. Government and, without the prior written permission of the CO, the Contractor shall neither reproduce nor release such information to any third-party at any time, including during performance or following expiration and/ or termination of the contract.
C. Any DOJ Information made available to the Contractor under this contract shall be used only for the purpose of performance of this contract and shall not be divulged or made known in any manner to any persons except as may be necessary in the performance of this contract. In performance of this contract, the Contractor assumes responsibility for the protection of the confidentiality of all DOJ Information processed, stored, or transmitted by the Contractor. The Contractor shall comply with information security responsibilities and duties throughout the contract and after expiration/termination as appropriate per contract close-out activities. When requested by the CO (typically no more than annually), the Contractor shall provide a report to the CO identifying, to the best of the Contractor’s knowledge and belief, the type, amount, and level of sensitivity of the DOJ Information processed, stored, or transmitted under the Contract, including an estimate of the number of individuals for whom PII has been processed, stored or transmitted under the Contract and whether such information includes social security numbers (in whole or in part).
IV. Compliance with Information Technology Security Policies, Procedures and Requirements A. For all Covered Information Systems, in addition to any other applicable requirements, as set forth in Part I, the Contractor shall comply with the security requirements of the Federal Information Security Modernization Act of 2014 (“FISMA”), Privacy Act of 1974, E-Government Act of 2002, National Institute of Standards and Technology (“NIST”) Special Publications (“SP”), including NIST SP 800-37, 800-53, and 800-60 Volumes I and II, Federal Information Processing Standards (“FIPS”) Publications 140-2, 199, and 200, Federal Risk and Authorization Management Program (“FedRAMP”), DOJ IT Security Standards as amended, and OMB Memoranda relating to the security of information and/or Federal Information Systems.
B. In addition, for all Covered Information Systems, the Contractor shall comply with the following requirements, which are listed here only to highlight certain specific applicable requirements from one of the sources identified in the first paragraph of this Section. This is not an exhaustive list of all such requirements with which the Contractor is obligated to comply, and the omission of a requirement from this list should not be construed as negating the materiality of that requirement. These requirements and those in the authorities in the prior paragraph should be read together.
1. Limiting access to DOJ Information and Covered Information Systems to authorized users and to transactions and functions that authorized users are permitted to exercise.
2. Providing security awareness training at least annually to all Contractor employees and contractors involved with the Covered Contract. Such training shall include, but not be limited to, recognizing and reporting potential indicators of insider threats to users and managers of DOJ Information and Covered Information Systems.
3. Creating, protecting, and retaining, in accordance with applicable requirements but in any event at least until the expiration of the contract, Covered Information System audit records, reports, and supporting documentation to enable reviewing, monitoring, analysis, investigation, reconstruction, and reporting of unlawful, unauthorized, or inappropriate activity related to such Covered Information Systems and/or DOJ Information.
4. Maintaining authorizations to operate any Covered Information System.
15B51525Q00000001 Page 16 of 88
5. Performing continuous monitoring on all Covered Information Systems, to include but not be limited to, collecting, reviewing, and analyzing appropriate logs and timely investigating security alerts and potential security incidents.
6. Establishing and maintaining baseline configurations and current inventories of Covered Information Systems, including hardware, software, firmware, and documentation, throughout the Information System Development Lifecycle, and establishing and enforcing security configuration settings for IT products employed in Covered Information Systems.
7. Ensuring appropriate contingency planning has been performed, including DOJ Information and Covered Information System backups.
8. Identifying Covered Information System users, processes acting on behalf of users, or devices, and authenticating and verifying the identities of such users, processes, or devices, using multifactor authentication or HSPD-12 compliant authentication methods as defined by NIST 800-63-3, Digital Identity Guidelines or current revision.
9. Establishing and maintaining an operational incident handling capability for Covered Information Systems that includes adequate and timely development, logging, detection, analysis, containment, recovery, and user response activities, and tracking, documenting, and timely reporting incidents to appropriate officials and authorities within the Contractor’s organization and the DOJ.
10. Performing periodic and timely maintenance on Covered Information Systems, and providing effective controls on tools, techniques, mechanisms, and personnel used to conduct such maintenance.
11. Protecting Covered Information System media containing DOJ Information, including paper, digital and electronic media, and DOJ assets under Contractor control; protecting them from environmental impacts, access, and equipment positioning requirements defined; limiting access to DOJ Information to authorized users; and sanitizing or destroying Covered Information System media containing DOJ Information before disposal, release or reuse of such media.
12. Limiting physical access to Covered Information Systems, equipment, and physical facilities housing such Covered Information Systems to authorized personnel according to DOJ 03.
13. Screening individuals prior to authorizing access to Covered Information Systems to ensure compliance with DOJ Security standards including personnel background checks.
14. Continuously assessing the risk to DOJ Information in Covered Information Systems, including scanning and remediating vulnerabilities, or implementing appropriate mitigation in accordance with DOJ policy, and ensuring the timely removal of assets no longer supported by the Contractor.
15. Continuously monitoring the application of security controls of Covered Information Systems, assessing the efficacy of such controls, and developing and implementing plans of action designed to correct deficiencies and eliminate or reduce vulnerabilities in such Covered Information Systems.
16. Monitoring, controlling, and protecting information transmitted or received by Covered Information Systems at the external boundaries and key internal boundaries of such Covered Information Systems, and employing architectural designs, software development techniques, and systems engineering principles that promote effective security.
17. Identifying, reporting, and correcting Covered Information System security flaws in a timely manner, providing protection from malicious code at appropriate locations, monitoring security alerts and advisories and taking appropriate and timely action in response.
18. Ensuring return of Government Furnished Equipment (“GFE”) and/or PIV card assets within 10 business days of notification for end of use (contract end, staff change, etc.).
19. Complying with rights in data (FAR 52.227-14) as to the development, management, and protection of DOJ Information.
15B51525Q00000001 Page 17 of 88
20. Reporting on risks or known issues impacting DOJ Services (staffing, hardware, process, changes, etc.) through the Contractor’s CO or COR, DOJ Service Owner (“SO”), and Government Technical Manager (“GTM”) including risk mitigation activities.
21. Reporting through the Contractor’s CO or COR on any projected or planned changes in corporate ownership, covered information system design, and/or any technical changes that could impact the confidentiality, integrity or availability of DOJ Information, data, or systems. Changes to system design must be updated through the authorization process per NIST SP 800-37 Revision 2, Step 6 (‘Continuous Monitoring”) or current NIST revision.
22. When, as part of operating within the DOJ environment, the Contractor’s covered information system is subject to review, audit, or assessment by third parties, facilitating DOJ access to information system resources, facilities, personnel, and documentation in a timely manner as required by the auditors. Should a third-party organization conduct a review of any Covered Information System, the Contractor must provide a copy of the report to DOJ, through the CO and COR.
23. Completing an attestation that meets OMB Memorandum M-22-18 for software procurements following the template attestation form developed by NIST. The attestation form must be returned to the CO and COR for sharing with the component Chief Information Officer (CIO).
24. Reporting on outages impacting DOJ Services through the Contractor’s CO, COR, and DOJ Service Owner (SO) to include event and mitigation details.
C. The Contractor shall not process, store, or transmit DOJ Information using a Covered Information System without first obtaining an ATO for each Covered Information System. The ATO shall be signed by the Authorizing Official for the DOJ component responsible for maintaining the security, confidentiality, integrity, and availability of the DOJ Information under this contract.