3. AL-1745-0998 SR Photon Absorber - Compliance Matrix.xlsx
XLSX spreadsheet 70 KB Posted
- Attached to
- Storage Ring Photon Absorbers for the ALS-U
- Solicitation number
- AA-2024-05
- Issued by
-
Department of Energy
About this file
This document is a compliance matrix that outlines the requirements and specifications for the fabrication of Storage Ring (SR) Photon Absorbers for the Advanced Light Source Upgrade (ALS-U) project. The compliance matrix covers the key deliverables, scope of work, management and reporting requirements, packaging and shipping specifications, quality assurance, and technical requirements such as vacuum pressure, manufacturing processes, cleaning, testing, and packing/shipping.
The key requirements include the Subcontractor providing documentation, drawings, hardware, and performing a first article and production run. The Subcontractor must also adhere to a defined schedule, participate in design reviews, and comply with various standards and processes related to materials, fabrication, cleaning, testing, and packaging/shipping. The contract opportunity associated with this compliance matrix is Solicitation Number AA-2024-05 for the fabrication of the SR Photon Absorbers for the ALS-U project. Proposals are due Thursday June 27, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Read me first Specification definition
Shall, will, may, and should are used to define every specification listed in this document. The definitions of these terms are as follows :
| May – is used to indicate a desire or goal of a specification. This can also be interpreted ‘as nice to have’ and are not contractually binding. |
| Shall –is a specification that is contractually binding and must be implemented. |
| Should – is used to indicate a desire or goal of a specification. This can also be interpreted ‘as nice to have’ and are not contractually binding |
| Will – is used to inform intent or declaration of purpose. This is not a specification. Example, the author will use the word ‘shall’ to indicate that a specification is contractually binding and must be implemented. |
Compliance matrix
| Storage Ring - Photon Absorber - Compliance Matrix | ||||||||
| Source | Section | Sub-Section | Sub-Section (2x) | Sub-Section (3x) | Sub-Section (4x) | Description | Compliance | Comments - Please provide a narrative if not compliant |
| SOW - AL-1720-3469 | 5 | Deliverables / Scope | ||||||
| 5.1 | Deliverables | |||||||
| 5.1.1 | Documentation | |||||||
| The Subcontractor must provide the entire list of documentation | ||||||||
| 5.1.2 | Built to print drawing | |||||||
| The Subcontractor must provide the final 3D CAD model (if modification done by vendor) | ||||||||
| The Subcontractor must provide the final manufacturing drawing (if modification done by vendor) | ||||||||
| 5.1.3 | Hardware | |||||||
| 5.1.3.1 | Components included | |||||||
| The Subcontractor must deliver all hardwares included in each SR Photon Absorber assamblies | ||||||||
| 5.1.3.2 | First Article | |||||||
| The Subcontractor must manurfature AL-1636-0076 Crotch Absorber defined by LBNL as First Article | ||||||||
| 5.1.3.3 | Production Article | |||||||
| The Subcontractor must manurfature the entire production after approval of the first article by LBNL | ||||||||
| 5.2 | Scope of Work | |||||||
| 5.2.1 | Management and Quality plan | |||||||
| The Subcontractor must provide a quality plan within 7 days ARO | ||||||||
| The Subcontractor must provide an initial schedule within 7 days ARO | ||||||||
| 5.2.2 | Final Design Review Requirements | |||||||
| The subcontractor must be responsible for supplying all documentation related to the FDR prior to fabrication of the SR Photon Absorbers | ||||||||
| The subcontractor must adhere to SR Photon Absorbers engineering specification (REF AL-1720-3468) | ||||||||
| The subcontractor must participate in the Final Design Review | ||||||||
| The subcontractor must include at least the following documentation: 1. Control Plan and Work Instruction for all absorber configuration |
2. Final manufacturing drawings (if modification done by vendor)
3. Final CAD model (if modification done by vendor)
4. Test plan and associated procedures
5. Bill of material
| The subcontractor must wait for a written approval and resolution of all related FDR action items prior to fabrication | |
| 5.2.3 | First article |
| The subcontractor must produce the first article after approval of the FDR | |
| The subcontractor must produce the first article with the same testing and quality assurance as the production | |
| 5.2.4 | First article delivery |
| The subcontractor must be responsible for the delivery of the first article to LBNL | |
| 5.2.5 | Complete production |
| The subcontractor must wait the final approval of the first article for the commencement of fabrication of the production | |
| The subcontractor must include at least the following documentation prior shipment: | |
| 1. Complete SR Photon Absorbers assemblies packed in an appropriate crate. |
2. Completed FAT and associated reports
3. Final and completed CP
4. Final and completed ACL
5. Quality assurance receipts and certifications
6. Nonconformance or deviation documentation pertaining to each individual assembly
7. Final, approved shipping plan
8. Written authorization from LBNL to proceed with shipping
| 5.2.6 | Delivery | |
| The subcontractor must be responsible for the delivery of the production to LBNL in the way as indicated in the section 5.2.6 | ||
| 5.3 | Final documentation packages(s) | |
| The subcontractor must provide the final documentation package with at least the following: | ||
| 1. A complete, as-built bill of materials identifying both fabricated and commercially available components |
2. A complete, as built CAD model in an editable format
3. Complete, as built drawings in English, and in an editable format.
4. Other documentation as requested
| 6 | Management, reporting, documentation and reviews | |
| 6.1 | Schedule | |
| The subcontractor must comply with the proposed schedule | ||
| 6.2 | Reporting requirements | |
| Upon award of the subcontract, the LBNL technical representative will contact the selected subcontractor to set up a Project Kick-off meeting | ||
| Written progress updates are required on before the fifth of each month. This may include drawings, schedule updated or other documents upon request in any state | ||
| Visits by LBNL personnel, including access to the factory where the units are being built, as the discretion of LBNL, may be required | ||
| Subcontractor must be responsible for maintaining an action item list for documenting the actions resulting from each meeting, identifying the responsible party and providing an anticipated completion date for each action | ||
| Subcontractor must be responsible to set up a weekly or bi-weekly status meeting | ||
| Other reports or data as requested in writing | ||
| 6.3 | Reviews | |
| The subcontractor must provide review drawings, documentation, and presentations 10 business days prior the scheduled FDR | ||
| 6.4 | Hold points | |
| The subcontractor must comply with the hold points | ||
| 7 | Packaging and Shipping Specification | |
| The subcontractor must submit to LBNL a shipping plan and be approved before the first shipment | ||
| 7.1 | Container | |
| The subcontractor must use container or crates for the SR Photon Absorbers shipment | ||
| The subcontractor must use container or crates for the SR Photon Absorbers storage | ||
| The subcontractor must use a reusable crates with sides using standard attachments | ||
| The subcontractor must submit design of crates to LBNL | ||
| The subcontractor must wait for approval of crates design before fabrication | ||
| The subcontractor must can ship multiple SR Photon Absorbers per crate | ||
| The subcontractor must secure crate during shipment | ||
| 7.2 | Marking | |
| The subcontractor must clearly identify tie-downs on crate | ||
| The subcontractor must clearly identify lifting points on crate | ||
| The subcontractor must clearly identify center of gravity on crate | ||
| The subcontractor must labeled crate with all subcontract information including subcontract number, contact, and delivery information. | ||
| The subcontractor must use self-adhesive shock indicators on crate | ||
| The subcontractor must clearly indicate with clear and obvious labels indicating the presence of fragile contents | ||
| The subcontractor must use originating native language and English on the crate | ||
| The subcontractor must use up arrow to indicate the crate orientation | ||
| The subcontractor must marked the serial number of each SR Photon Absorbers contained therein. | ||
| 7.3 | Packaging | |
| The subcontractor must not use desiccant | ||
| The subcontractor must have all SR Photon Absorbers free of any liquid prior to shipping | ||
| Each absorber needs to be assembled along with each associated with steel support(s), flange blanks and chain clamps, in accordance with their associated FDR approved assy drawings | ||
| Placement of foam between the SR Photon Absorbers (if crate contain multiple SR Photon Absorbers) | ||
| Placement of foam between the SR Photon Absorbers and the sides of the crate to assist in minimizing movement during transportation | ||
| SR Photon Absorbers shipping containers should incorporate a moisture barrier to prevent condensation during air shipment | ||
| The exterior of the crate must have self-adhesive shock indicators | ||
| 7.4 | Handling and storage | |
| In case of storage, the contractor must have a temperature and moisture controlled storage facility | ||
| The contractor must ensure that the temperature during storage is between 10 C and 40 C | ||
| 8 | Quality assurance | |
| The contractor must comply with the entire QA request by LBNL. If not please describe in column I your discrepancies |
| ESD - AL-1720-3468 | 7 | Final Design | |
| The final design must include features to aid careful handling of the part during fabrication, transportation and assembly | |||
| 8 | Environmental requirements | ||
| 8.1 | Codes and Standards | ||
| The following standards must apply for the fabrication and test of the SR Photon Absorbers: |
• EN ISO 13919 or EN ISO 5817
• EN ISO 17637
• ASTM E498.
• EN ISO 17640
• ASTM E2734/E2734 M − 10
| 8.2 | Cleanliness environment | |||
| The cleaning environment must comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev B, §7.2 | ||||
| 8.3 | Cleaning fluids | |||
| The cleaning fluids must comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev B, §7.3 | ||||
| 8.4 | Cutting fluids | |||
| The cutting fluids must comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev B, §7.4 | ||||
| 8.5 | Fasteners | |||
| The fasteners for the crotch absorber must comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev B, §7.6 | ||||
| 8.6 | Flange and gaskets | |||
| The flanges and gaskets of the SR Photon Absorbers must comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev B, §7.7 | ||||
| 9 | Technical requirement | |||
| 9.1 | Vacuum pressure | |||
| All SR Photon absorber must be tested in an enclosure vacuum chamber setup | ||||
| The maximum thermal outgassing rate must be better than 1.00e-11 Torr.l.s-1.cm-2 | ||||
| Achievable final pressure must be 1e-10 Torr | ||||
| 9.2 | Manufacturing process | |||
| 9.2.1 | Material | |||
| All materials must be new. | ||||
| All material must be free from surface cracks and fissures, forge and other tool marks, burns, delamination and other defects that would make it incompatible with a high vacuum environment. | ||||
| Certification must be in accordance with EN ISO 10204 3.1. | ||||
| Magnetic permeability for the base material must be 1.01 and for welds or braze joints 1.04 | ||||
| The material must be compatible with synchrotron radiation | ||||
| 9.2.2 | Fabrication | |||
| 9.2.2.1 | Part fabrication | |||
| A water-soluble and non-halogenated cutting fluids must be used for fabrication | ||||
| All others requirements relative to the vacuum components fabrication must comply with AL-1220-7841, §8.1, §8.2, §8.3 | ||||
| 9.2.2.2 | Cleaning after manufacturing | |||
| UHV surfaces must be protected as per best practices during handling operations. | ||||
| Parts must be stored in a clean area from the workshop (See §8.2). | ||||
| Parts must be suspended in tanks by wire, hooks or in baskets | ||||
| All others requirements relative to the vacuum components cleaning must comply with AL-1220-7841, §9 | ||||
| 9.2.2.3 | Part joining | |||
| Step change in geometrical profile across weld must be less than 0.2mm | ||||
| All parts must be cleaned prior to welding | ||||
| A WPS is not required | ||||
| The weld quality must be level D according to EN ISO 13919 or EN ISO 5817 | ||||
| All welds must be free from cracks and fissures or other defects that would make it incompatible with a high vacuum environment. | ||||
| 100% of the vacuum boundary welded joints must be visually inspected | ||||
| The visual inspection must comply with EN ISO 17637 | ||||
| 100% of the vacuum boundary welded joints must be leak tested. | ||||
| The leak test of the welded joint must comply with ASTM E498. | ||||
| The criteria and parameter expected for the He leak check must comply with AL-1220-7841, §14 | ||||
| 9.3 | Final cleaning | |||
| Once the final cleaning process has started, it must not be stopped before the end. | ||||
| After the final cleaning, all subsequent operations must be performed in a cleanroom. | ||||
| The cleaning agent used must be identified and approved by LBNL prior to the Factory acceptance test. | ||||
| All other requirements regarding the final cleaning and intermediate inspection must comply with AL-1220-7841, §11 and §12. | ||||
| 9.4 | Final assembly | |||
| All requirement with final assembly must comply UHV Chamber and Component Production Requirements AL-1220-7841_Rev B, §13 | ||||
| 9.5 | Final test | |||
| All test must take place in a clean room | ||||
| During pumping down of the part, all connection above the turbo pump must be all-metal | ||||
| LBNL must have right to visit the contractor during these tests | ||||
| 9.5.1 | CMM Measurement before bakeout | |||
| A CMM measurement must be performed, on all SR Photon Absorbers | ||||
| The dimensions to be controlled must be specified by the University technical representative. | ||||
| 9.5.2 | Water Pressure Test | |||
| The cooling channel pressure test must be conducted at 120 psi | ||||
| The cooling channel pressure test must last 10 mins | ||||
| No leak must appear at the completion of the pressure test | ||||
| 9.5.3 | Bakeout | |||
| Bakeout must comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev B, §14.1 | ||||
| 9.5.4 | Residual Gas Analysis | |||
| Residual Gas Analysis must comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev B, §14.2 | ||||
| 9.5.5 | Final He leak test | |||
| Final pressure measurement must comply with AL-1220-7841, §14.4 | ||||
| 9.5.6 | Final pressure measurement | |||
| Final He leak test must comply with UHV Chamber and Component Production Requirements AL-1220-7841, §14.5 | ||||
| 9.5.7 | CMM Measurement after bakeout | |||
| A CMM measurement must be performed on all SR Photon Absorberswith the same critical dimension given in §9.5.1 after the bakeout | ||||
| 9.6 | Packing and shipping | |||
| Packing and shipping must comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev B, §15 |
Parameter
| Comply |
| Not comply |
| Partialy Comply |