1. Sample Subcontract AA-2024-05.pdf
PDF 315 KB Posted
- Attached to
- Storage Ring Photon Absorbers for the ALS-U
- Solicitation number
- AA-2024-05
- Issued by
-
Department of Energy
About this file
This document is a subcontract from the Lawrence Berkeley National Laboratory, a management and operating contractor for the Department of Energy, to an unspecified subcontractor for the fabrication and delivery of various photon absorber components for the Advanced Light Source Upgrade project.
The subcontract details the specific photon absorber items to be provided, including crotch absorbers, masks, and related components, with delivery timelines ranging from 12 to 30 weeks after approval milestones. The total fixed price for the items is to be determined. The subcontract outlines acceptance criteria, shipping requirements, invoicing and payment terms, reporting obligations, and other standard clauses. It also references the applicable Statement of Work and related drawings available through a provided Google Drive link.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subcontract No. TBD Page 1
SUBCONTRACT
NO. TBD
The Regents of the University of California Lawrence Berkeley National Laboratory One Cyclotron Road Berkeley, CA 94720
Subcontractor:
TBD
University Procurement Representative:
Name: Arielle Anoop Phone: (510) 486-5519 Fax: (510) 486-4380 E-Mail: AAnoop@lbl.gov
Introduction This is a fixed price subcontract (hereinafter "Subcontract") for Storage Ring Photon Absorbers for the Advanced Light Source Upgrade project, as further described herein.
This Subcontract is between The Regents of the University of California, (hereinafter "University") and the party identified above as the "Subcontractor".
This Subcontract is issued under Prime Contract No. DE-AC02-05CH11231 between the University and the United States Government (hereinafter "U.S. Government"), represented by the Department of Energy (hereinafter "DOE") for the management and operation of the Lawrence Berkeley National Laboratory (hereinafter "LBNL") and the performance of certain research and development work.
Agreement The parties agree to perform their respective obligations in accordance with the terms, conditions, and provisions of the attached SCHEDULE OF ARTICLES and the documents referenced or incorporated therein, which together with this Signature Page shall collectively constitute the entire Agreement and shall supersede all prior negotiations, representations, or agreements, whether verbal or written.
TBD
THE REGENTS OF THE
UNIVERSITY OF CALIFORNIA
By:
By:
Name:
Name:
Title:
Title:
Date:
Date:
Subcontract No. TBD Page 2
SCHEDULE OF ARTICLES
ARTICLE 1 – ORDERED ITEMS
A. Description
The Subcontractor shall furnish and deliver the following ordered item(s), in accordance with this Subcontract:
Item
Drawing ID Description QTY Delivery Schedule:
1 AL-1636-0076 Crotch Absorber, I, Non-WIGGLER 1 12 Weeks after FDR Approval
2 AL-1636-0076 Crotch Absorber, ID, Non-WIGGLER 9
30 Weeks after First Article Approval
3 AL-1637-3574 Crotch Absorber, ID, WIGGLER 2 4 AL-1468-1176 Crotch Absorber, Standard, X.1 7 5 AL-1633-8716 Crotch Absorber, HBND, X.2 4 6 AL-1635-5870 Absorber MASK 7 7 AL-1633-6274 Crotch Absorber, Standard, X.3.X 8 8 AL-1635-5721 Crotch Absorber, HBND, X.3 4
The above delivery schedule identifies the date(s) by which the specified item(s) shall be delivered to the shipping address indicated in the article below entitled Shipping Requirements.
A. Acceptance B. Acceptance
Acceptance of the items described above is based upon successful completion of the acceptance criteria list entitled AL-1720-3470 Rev. A dated May 20, 2024, in accordance with the SOW incorporated into this Subcontract.
C. Notice to Proceed
The Subcontractor must adhere to and receive approval to proceed beyond each Hold Point;
as outlined within Section 6.5 of the incorporated SOW.
ARTICLE 2 – PRICE AND PAYMENT
Subcontract No. TBD Page 3
A. Fixed Price
The Subcontractor shall furnish and deliver the ordered item(s) for the total fixed price of $TBD.
B. Sales or Use Tax
Items purchased by the University hereunder are treated as for resale, per the University's California State Resale Permit No. SR-CH 21-835970 for LBNL, and shall not be subject to any California or other State sales or use tax if shipped to California. Any items furnished hereunder for rentals or leases are subject to California State sales or use tax, and such tax is included in the fixed prices/rates stated herein.
The University of California State Resale Permit No. SR-CH 21-835970 for LBNL is available at:
http://procurement.lbl.gov/supplier-forms/.
C. Invoices
1. The Subcontractor shall email invoice(s) directly to the LBNL Accounts Payable Office at
APInvoice@lbl.gov, within thirty days of the acceptance of the item(s). The "subject" line of the email shall state the Subcontractor's name and the Subcontract number. If final invoices are not submitted within 180 days of acceptance, then any amounts paid by the University to that point will represent satisfaction in full by LBNL under this Subcontract and an Accord and Satisfaction. This means that LBNL will not be obligated to make any further payments under this Subcontract.
To avoid delays in processing and payment, Subcontractors should include only one attachment per email. Multiple invoices should be combined and attached as a single portable document format (PDF) or Microsoft Word or rich text format (RTF) file (up to 30 individual invoices per attachment) or emailed separately (one attachment per email).
Do not include icons/pictures in the email (logos, etc.) and ensure only one subcontract number is listed on the invoice.
2. If unable to submit an invoice by email, the Subcontractor may submit the invoice to the following address:
Lawrence Berkeley National Laboratory Accounts Payable Office, Subcontract No. TBD One Cyclotron Road, M/S 971-AP Berkeley, CA 94720
3. Invoice(s) shall state: the Subcontract number; the Subcontractor (including business heading or logo); bill to address (same address as above); invoice date; unique invoice number; remittance address; sufficiently identify the items/services being invoiced; and identify any separately payable freight charges (with receipts if available) and taxes.
Invoice(s) in a spreadsheet format are not acceptable, but a spreadsheet can be used to support an invoice. The Subcontractor shall maintain records which support all invoiced amounts, and provide them to the University Procurement Representative upon request.
http://procurement.lbl.gov/supplier-forms/ mailto:APInvoice@lbl.gov
Subcontract No. TBD Page 4
D. Payment Terms
All invoices except the final invoice shall be payable within 30 days of receipt; provided, however, that payments made thereafter shall not be subject to any penalty, interest, or late charges. Only those items/services identified in this Subcontract or a Subcontract Modification will be considered for payment. Payment amounts may be adjusted for any applicable credits, offsets, or withholds.
Full payment shall not be due until any final acceptance requirements of this Subcontract have been satisfied. For inquiries about the status of an invoice, call (510) 486-6954 or aphelp@lbl.gov.
ARTICLE 3 – SUBCONTRACT ADMINISTRATION
A. Notices, Requests, and Modifications The Subcontractor shall submit all notices and requests for approval by email to the University Procurement Representative indicated on the signature page or at the following mail address:
Attn: Arielle Anoop One Cyclotron Road M/S 971-PROC
Only the University Procurement Representative is authorized to modify the terms, conditions, and requirements of this Subcontract, including any changes to the description of the work, and to issue any notices and approvals required by this Subcontract. Certain changes to this subcontract may be made only by the University Procurement Representative without subcontractor agreement or negotiation prior to the change. Such changes may include: changes of an administrative nature, directed changes pursuant to the clause incorporated herein entitled:
“CHANGES,” unilateral modifications authorized by clauses other than the Changes clause, and termination notices. Apart from the University Procurement Representative’s authority to issue unilateral changes, the parties may mutually agree to make changes in the work ordered, or modify any other term or condition of the subcontract, resulting in an amendment to the subcontract, but only by a written modification signed by the authorized representatives of both parties.
B. Requester
TBD is the Requester for this Subcontract. This individual is designated to monitor performance of the work and to interpret and clarify the technical requirements, but is not authorized to make changes to the work or to modify any of the terms and conditions of this Subcontract, including those related to the completion schedule or pricing.
(Contact Information will be entered herein.)
C. Closeout The Subcontractor shall, as a condition of full payment, assist the University after the completion of the work in accomplishing the administrative closeout of this Subcontract, including, as necessary or required, the furnishing of documentation and reports, the disposition of property, the disclosure of any inventions, the execution of any required documents (including an mailto:aphelp@lbl.gov
Subcontract No. TBD Page 5
Assignment and Release form if this form is an incorporated document), the performance of any audits, and the settlement of any interim or disallowed costs.
ARTICLE 4 - FURNISHED AND ACQUIRED PROPERTY
The University will not furnish any U.S. Government Property for use under this Subcontract and no Subcontractor Acquired Property is anticipated. The Subcontractor is not authorized to acquire, fabricate, or provide any tangible personal property items for use under this Subcontract without the University Procurement Representative's advanced written approval via Subcontract modification. The Subcontractor is required to notify the University prior to purchasing any Subcontractor Acquired Property and assumes the risk of not being reimbursed for property if approvals are not provided by the University in advance via Subcontract modification.
ARTICLE 5 – SHIPPING REQUIREMENTS
A. Shipping Terms The shipping terms are Delivered Duty Paid (DDP) (per Incoterms 2020) – for foreign Suppliers -or DOB Destination – for domestic Suppliers - to the delivery address. All shipments shall be shipped via a U.S. flag air carrier or U.S. ocean vessel and a U.S. licensed common carrier selected by the Subcontractor, at the University’s expense.
B. Shipping Address All shipments shall be shipped to the following address:
Lawrence Berkeley National Laboratory For the U.S. Department of Energy One Cyclotron Road, Building 69
C. Customs Clearance (as reference for any foreign Subcontractor) To facilitate customs clearance, 48 hours prior to vessel departure Subcontractor shall email or fax interfreight copies of the following documents to Aeronet Worldwide (broker identified below) and the University Procurement Representative (identified in the Subcontract):
• Bill of Lading
• Commercial Invoice
• Packing List
Aeronet Worldwide 1755 Rollins Road Burlingame, CA 94010 Phone: (650) 259-2155 Fax: (650) 259-2150 Email: SFOimport@aeronet.com
ARTICLE 6 – REPORTS
Subcontract No. TBD Page 6
A. Type of Reports The Subcontractor shall prepare and submit the following reports to the University:
1. Monthly Progress Reports
Monthly progress reports shall be submitted by the fifth business day of each month. The progress reports may be informal letter summaries in a format approved by the University representatives. These reports shall contain a description of work performed during the report period and the work planned for the succeeding periods, and related financial information, including incurred and projected expenditures.
2. Final Report
A final report shall be submitted upon completion of the work and contain a comprehensive summary of the work performed and all accomplishments. The form and content of the final report shall be acceptable to the Requester, TBD. If so requested, a draft copy of the Report shall be provided to Requester, TBD for review prior to final submittal.
B. Submittal
Reports shall be separately submitted to the following recipients at the following email or mailing address:
Attention: [Intended Recipient; see below] One Cyclotron Rd., Mail Stop [see below]
Recipient Email Requester TBD@lbl.gov Arielle Anoop AAnoop@lbl.gov
ARTICLE 7 – APPROVAL OF TECHNICAL DATA
If this Subcontract requires the Subcontractor to furnish any drawings, specifications, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance or test data, or other technical data for approval by the University prior to Subcontractor performance, the approval of the data by the University shall not relieve the Subcontractor from responsibility for any errors or omissions in such data or from responsibility for complying with the requirements of this Subcontract, except as specified below.
Any work done prior to such approval shall be at the Subcontractor's risk.
Unless otherwise specified, the University requires a period of 10 working days from date of receipt to review and approve the data. If the University does not approve the data within the allotted time period, the parties will establish a new time period for review and approval of the data and, if necessary, the delivery schedule or completion date will be equitably adjusted.
If the data includes any variations from the Subcontract requirements, the Subcontractor shall describe such variations in writing at the time of submission of the data. If the University approves any such
Subcontract No. TBD Page 7 variation(s), a change order to the Subcontract shall be issued by the University and, if appropriate, a bilateral modification to the Subcontract shall be negotiated.
ARTICLE 8 – PRELIMINARY INSPECTION
The University reserves the right to observe and witness all phases of the manufacturing of the items, including design, fabrication, assembly, testing, and inspection, conducted at the Subcontractor's facility or at any of its sub-tier subcontractors' facilities.
Preliminary in-process and source inspections may be performed at the Subcontractor's facility or at any of its sub-tier subcontractors' facilities. The inspection shall allow the University to verify that the Subcontractor has met the requirements of this Subcontract. Prior to University inspection, the Subcontractor shall perform a complete inspection and document the results. The Subcontractor shall present this documentation to the University at the time of the preliminary inspection. Such preliminary inspection does not waive the right of the University to inspect and accept or reject at the destination. The University reserves the right to subcontract with a qualified third party to conduct on its behalf any or all of the University inspections.
ARTICLE 9 - ENVIRONMENTALLY PREFERABLE PRODUCTS AND SERVICES
The University is subject to several interacting initiatives and federal and DOE requirements related to sustainability, including waste reduction, Recycled Content Products (EPA Designated Products), Biobased (BioPreferred®), energy efficient products (EnergyStar®), environmentally preferable and energy efficient electronics (EPEAT® and Federal Energy Management Program (FEMP) Designated Products), Non-Ozone Depleting Alternative Products (SNAP) and Water Efficient Plumbing Products (EPA Watersense®). The University also implements State of California requirements on packaging and electronic waste recycling.
The subcontractor must deliver products and services in compliance with this article which implements the requirements of DOE’s Sustainable Acquisition Program, as well as other federal- and state-mandated sustainability requirements.
In the performance of this Subcontract, the Subcontractor must specify, furnish, and use environmentally preferable products and services (i.e., products and services with a lesser or reduced effect on human health and the environment), to the maximum possible extent consistent with the Subcontract requirements herein, the General Provisions, and the intended end use of the products or services. The University generally considers the requirements practicable unless a specific program exception applies. Refer to SFTool.gov/Vendor Resources for links to sustainability resources and information on environmental programs the University and its suppliers/subcontractors are required to comply with, including exceptions.
DOE Order 436.1.A. In addition to the above programs, DOE Order 436.1.A requires:
The subcontractor must maximize, to the extent feasible, the procurement of materials and operations with lower embodied emissions and alternatives to ozone-depleting substances and high global warming potential hydrofluorocarbons.
The subcontractor must minimize, to the extent feasible, the supply of products and services determined by the EPA to be contaminants of emerging concern (CEC), including pharmaceuticals and personal care products and CECs found therein. The subcontractor shall provide Safer Choice labeled products under https://sftool.gov/learn/about/652/vendor-resources#sftoolpages
Subcontract No. TBD Page 8 this subcontract, as applicable. The subcontractor is encouraged to visit https://www.epa.gov/saferchoice for updated lists of qualifying products.
The subcontractor must minimize the supply of products with toxic and hazardous characteristics, and minimize the generation of toxic and hazardous waste, to the maximum extent practicable.
E-Waste Recycling Requirements. All recyclers of electronic equipment must be e-Steward certified by the Basel Action Network (BAN).
For any equipment removed by the subcontractor and scheduled to be refurbished or recycled, the subcontractor must attest that those actions will be handled by a refurbisher or recycler that is third-party certified to one of the known electronics recycling certification programs that is used in the United States, the Responsible Recycling Standard (R2) or the E-Stewards Standard.
Information on environmentally preferable products and services is also available at:
https://www.epa.gov/contracts/greening-government-procurement. State of California sustainable procurement information can be found at: https://ucop.edu/procurement-services/for-suppliers/sustainable-procurement/sustainable-procurement-training-resources.html
Questions regarding these sustainable acquisition requirements may be directed to the University Sustainable Procurement Representative (Business-Assurance-Sustainable@lbl.gov).
ARTICLE 10 – FIRST ARTICLE APPROVAL
A. The Subcontractor shall deliver to the University for testing the first article as per Section 5.1.3.2 of the SOW within 12 weeks after Final Design Review Approval.
B. The shipping documentation shall contain this Subcontract number and the item identification.
The characteristics that the first article must meet and the testing requirements are specified elsewhere in this Subcontract.
C. Within 21 calendar days after receiving the first article, the University shall notify the Subcontractor, in writing, of the conditional approval, approval, or disapproval of the first article.
The notice of conditional approval or approval shall not relieve the Subcontractor from complying with all requirements of the specifications and all other terms and conditions of this Subcontract.
A notice of conditional approval shall state any further action required of the Subcontractor. A notice of disapproval shall cite reasons for the disapproval.
D. If the first article is disapproved, the Subcontractor, upon the University's request, shall submit an additional first article for testing. After each request, the Subcontractor shall make any necessary changes, modifications, or repairs to the first article or select another unit for first article testing.
All costs related to these tests are to be borne by the Subcontractor, including any and all costs for additional tests following a disapproval. The Subcontractor shall furnish any additional first article under the terms and conditions and within the time specified by the University. The University shall act on the first article within the time specified in paragraph C, above. The University reserves the right to require an equitable adjustment of the Subcontract price for any extension of the delivery schedule or for any additional costs to the University related to these tests.
E. If the Subcontractor fails to deliver any first article on time, or the University disapproves any first article, the Subcontractor shall be deemed to have failed to make delivery within the meaning of the termination for default provisions of this Subcontract.
https://www.epa.gov/saferchoice https://www.epa.gov/contracts/greening-government-procurement https://ucop.edu/procurement-services/for-suppliers/sustainable-procurement/sustainable-procurement-training-resources.html https://ucop.edu/procurement-services/for-suppliers/sustainable-procurement/sustainable-procurement-training-resources.html mailto:Business-Assurance-Sustainable@lbl.gov
Subcontract No. TBD Page 9
F. If the University does not act within the time specified in paragraph C or D, above, the University shall, upon timely written request from the Subcontractor, equitably adjust the delivery or performance dates and/or the Subcontract price, and any other subcontractual term affected by the delay.
G. Before first article approval, the University may authorize, in writing, the Subcontractor to acquire specific materials or components or to commence production to the extent essential to meet the delivery schedules. Until first article approval is granted, only costs for the first article and costs incurred under such authorization are allocable to this Subcontract for (1) progress payments, or
(2) termination settlements if the Subcontract is terminated for the convenience of the University.
If first article tests reveal deviations from Subcontract requirements, the Subcontractor shall, at the location designated by the University, make the required changes or replace all items produced under this Subcontract at no change in the Subcontract price.
H. The Subcontractor shall produce both the first article and the production quantity at the same facility.
I. The Subcontractor shall remove and dispose of any first article from the University test facility at the Subcontractor’s expense if the first article is not included in the subcontract purchased quantity or is rejected by the University.
ARTICLE 11 – INCORPORATED DOCUMENTS
The following documents are hereby incorporated as a part of this Subcontract. The order of precedence for each document must be as specified in the Entire Agreement and Order of Precedence clause in the General Provisions. Any other documents not incorporated herein by specific reference are excluded from this Subcontract. The documents marked with an asterisk are available at http://procurement.lbl.gov/supplier-forms/.
• AL-1720-3469 Rev. A “SR Photon Absorbers Statement of Work” dated May 22, 2024 inclusive of the Applicable Documents outlined within Section 9. (Documents can be viewed via GDrive Access for the sole purpose of replying to this Request for Quote. Please see RFQ AA-2024-05.pdf for details.)
https://drive.google.com/drive/folders/1EuJPSjfaF7Cpykfv0ICR-xNS9gOPeRp0?usp=sharing
ARTICLE 12 – GENERAL PROVISIONS
The following General Provisions are incorporated by reference into this Subcontract and are available at: http://procurement.lbl.gov/welcome-to-procurement-property/become-a-supplier/general-provisions/.
A. General Provisions for Commercial Supplies & Services, dated 12/22/23 or
General Provisions for Commercial Supplies & Services (Foreign), dated 12/22/23.
B. The clauses listed in the referenced General Provisions shall be applicable to this Subcontract, based on the value of the Subcontract, the status of the Subcontractor, or the nature and location of the Services, as indicated in the General Provisions.
http://procurement.lbl.gov/supplier-forms/ http://procurement.lbl.gov/welcome-to-procurement-property/become-a-supplier/general-provisions/
Subcontract No. TBD Page 10
(END OF SCHEDULE OF ARTICLES)
ARTICLE 9 - ENVIRONMENTALLY PREFERABLE PRODUCTS AND SERVICES