Summary of Bid Set Drawings for Lake Winola Municipal Authority Pump Station Rehabilitation

This document is a comprehensive set of bid drawings prepared by engineering consultants for the Lake Winola Municipal Authority (LWMA) located in Overfield Township, Wyoming County, Pennsylvania, detailing the rehabilitation of an existing wastewater pumping station under Contract 25. The project encompasses structural, mechanical, and electrical work including construction of an 8-foot diameter offline manhole for bypass pumping operations, installation of owner-provided pump station structures, pumps, piping, valves, fittings, force main connections, odor control systems, and electrical power and controls. The drawing set contains 18 total drawings and was issued for bids on October 1, 2026, with bids due on October 29, 2026, at 11:00 AM Eastern time through the PennBid program. A non-mandatory pre-bid meeting was scheduled for October 19, 2026, at 10:00 AM at the pump station site on Mislevy Road near Factoryville, Pennsylvania, with the final date for site visits and questions set for October 22, 2026. Prospective bidders can arrange site visits by contacting LWMA via email.

The drawings establish the technical specifications and requirements for construction activities, including erosion and sediment control measures, utility protection protocols, grading specifications, and survey control datum using State Plane Coordinates NAD83 Pennsylvania North Zone with vertical control referenced to NAVD88. A Bid Bond equal to ten percent of the bid amount must be submitted with proposals as bid security. The contractor is responsible for obtaining all required permits beyond those obtained by the owner, including permit extensions and modifications, and must comply with OSHA, Federal, State, and local codes. The project includes a temporary construction easement of 2,250 square feet (0.0517 acres) and a limit of disturbance of 9,511 square feet (0.2183 acres). The existing pump station has a top-of-concrete elevation of 1060.92 feet, and the project involves coordination with the Wyoming County Conservation District and adherence to Pennsylvania One Call System requirements for utility locating at least three working days prior to excavation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LWMA, PUMP STATION

OVERFIELD TOWNSHIP

WYOMING COUNTY, PENNSYLVANIA

PROJECT LOCATION MAP

MUNICIPALITY_U.S.G.S._QUADRANGLE

LAKE WINOLA MUNICIPAL AUTHORITY

OVERFIELD TOWNSHIP, WYOMING COUNTY, PENNSYLVANIA

WASTEWATER TREATMENT PLANT

REHABILITION OF EXISTING PUMP STATION

Plymouth Meeting, PA. 19462 920 Germantown Pike, Suite 200

CONTRACT NO. 25

S:

\5

7F

IL

ES

ER

VE

R\

Pr oj ec ts

\C la rk s S um m it\ La ke W in ol a W

W

TP

\S H

EE

TS

\L W

M A

- C O

VE

R

SH

EE

T.

dw g, /2 9/

:2

9:

P M

, A ut oC

AD

P D

F (H ig h

Q ua lit y

Pr in t).

pc

AutoCAD SHX Text

PROJECT SITE:

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text 2,000

AutoCAD SHX Text 1,000

AutoCAD SHX Text 2,000

AutoCAD SHX Text 4,000

AutoCAD SHX Text 6,000

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: 1" = 2,000'

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

SET CONTAINS 18 DWGS.

AutoCAD SHX Text Z057000570

AutoCAD SHX Text

ISSUED FOR PERMITS:

AutoCAD SHX Text

RICHARD BRYCE KRESGE JR., P.E. PE 053031E

AutoCAD SHX Text 06/15/2026

AutoCAD SHX Text

LAKE WINOLA MUNICIPAL AUTHORITY (LWMA), SITE

AutoCAD SHX Text

ISSUED FOR BIDS:

AutoCAD SHX Text 10/01/2026

AutoCAD SHX Text 10/01/2026

LAKE WINOLA MUNICIPAL AUTHORITY

P.O. BOX 59, LAKE WINOLA, PA 18625, (570) 378-3744

OVERFIELD TOWNSHIP, WYOMING COUNTY, PENNSYLVANIA

X

R/W

C/E

X

UE UE UE UE

LOD

STOCKPILE

B. WQM Permit Application No. XXXXXX

SB

S:

\5

7F

IL

ES

ER

VE

R\

Pr oj ec ts

\C la rk s S um m it\ La ke W in ol a W

W

TP

\D W

G\

PU

M P-

ST

AT

IO

N

\1

N

O

TE

S

- F

R.

dw g, /2 9/

:3

0:

P M

, A ut oC

AD

P D

F (H ig h

Q ua lit y

Pr in t).

pc

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

ISSUED FOR

AutoCAD SHX Text

DATE

AutoCAD SHX Text

ENGR.

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESIGN ENGR.

AutoCAD SHX Text

PROJECT ENGR.

AutoCAD SHX Text

PROJECT MGR.

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

RC

AutoCAD SHX Text 06/01/2026

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text Z057000570

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text 920 Germantown Pike, Suite 200 Plymouth Meeting, PA 19462

AutoCAD SHX Text

RC

AutoCAD SHX Text

TLW

AutoCAD SHX Text

TLW

AutoCAD SHX Text

CONTRACT #25

AutoCAD SHX Text

RBK

AutoCAD SHX Text

SUBMISSION TO DEP

AutoCAD SHX Text 06/15/2026

AutoCAD SHX Text

ISSUED FOR BIDS

AutoCAD SHX Text 10/015/2026

AutoCAD SHX Text

PROPERTY LINE

AutoCAD SHX Text

RIGHT-OF-WAY LINE

AutoCAD SHX Text

EASEMENT LINE (C/E = CONSTRUCTION EASEMENT)

AutoCAD SHX Text

MAJOR CONTOUR LINE

AutoCAD SHX Text

MINOR CONTOUR LINE

AutoCAD SHX Text

BUILDING OUTLINE F.L. = FLOOR ELEVATION

AutoCAD SHX Text

FENCE LINE

AutoCAD SHX Text

EDGE OF PAVE

AutoCAD SHX Text

EDGE OF GRAVEL

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

UNDERGROUND ELECTRIC

AutoCAD SHX Text

LIMIT OF DISTURBANCE

AutoCAD SHX Text

ROCK CONSTRUCTION ENTRANCE

AutoCAD SHX Text

EXISTING TREE DRIP LINE

AutoCAD SHX Text

SINGLE POLE SIGN

AutoCAD SHX Text

STOCKPILE AREA

AutoCAD SHX Text

COMPOST SOCK 18"

AutoCAD SHX Text

CONSTRUCTION ENTRANCE

AutoCAD SHX Text PROJECT GENERAL REQUIREMENTS AND NOTES GENERAL 1. All referenced plans, specifications, codes or other information are to be included as part of All referenced plans, specifications, codes or other information are to be included as part of referenced plans, specifications, codes or other information are to be included as part of referenced plans, specifications, codes or other information are to be included as part of plans, specifications, codes or other information are to be included as part of plans, specifications, codes or other information are to be included as part of specifications, codes or other information are to be included as part of specifications, codes or other information are to be included as part of codes or other information are to be included as part of codes or other information are to be included as part of or other information are to be included as part of or other information are to be included as part of other information are to be included as part of other information are to be included as part of information are to be included as part of information are to be included as part of are to be included as part of are to be included as part of to be included as part of to be included as part of be included as part of be included as part of included as part of included as part of as part of as part of part of part of of of the design documents. All contractors, including subcontractors, shall be fully aware of design documents. All contractors, including subcontractors, shall be fully aware of design documents. All contractors, including subcontractors, shall be fully aware of documents. All contractors, including subcontractors, shall be fully aware of documents. All contractors, including subcontractors, shall be fully aware of All contractors, including subcontractors, shall be fully aware of All contractors, including subcontractors, shall be fully aware of All contractors, including subcontractors, shall be fully aware of contractors, including subcontractors, shall be fully aware of contractors, including subcontractors, shall be fully aware of including subcontractors, shall be fully aware of including subcontractors, shall be fully aware of subcontractors, shall be fully aware of subcontractors, shall be fully aware of shall be fully aware of shall be fully aware of be fully aware of be fully aware of fully aware of fully aware of aware of aware of of of these documents prior to bidding and construction. 2. Any discrepancies found in the design documents shall be brought in writing to the attention Any discrepancies found in the design documents shall be brought in writing to the attention discrepancies found in the design documents shall be brought in writing to the attention discrepancies found in the design documents shall be brought in writing to the attention found in the design documents shall be brought in writing to the attention found in the design documents shall be brought in writing to the attention in the design documents shall be brought in writing to the attention in the design documents shall be brought in writing to the attention the design documents shall be brought in writing to the attention the design documents shall be brought in writing to the attention design documents shall be brought in writing to the attention design documents shall be brought in writing to the attention documents shall be brought in writing to the attention documents shall be brought in writing to the attention shall be brought in writing to the attention shall be brought in writing to the attention be brought in writing to the attention be brought in writing to the attention brought in writing to the attention brought in writing to the attention in writing to the attention in writing to the attention writing to the attention writing to the attention to the attention to the attention the attention the attention attention attention of the responsible engineer immediately. 3. No substitutions and/or changes shall be allowed unless requested and approved in writing No substitutions and/or changes shall be allowed unless requested and approved in writing substitutions and/or changes shall be allowed unless requested and approved in writing substitutions and/or changes shall be allowed unless requested and approved in writing and/or changes shall be allowed unless requested and approved in writing and/or changes shall be allowed unless requested and approved in writing changes shall be allowed unless requested and approved in writing changes shall be allowed unless requested and approved in writing shall be allowed unless requested and approved in writing shall be allowed unless requested and approved in writing be allowed unless requested and approved in writing be allowed unless requested and approved in writing allowed unless requested and approved in writing allowed unless requested and approved in writing unless requested and approved in writing unless requested and approved in writing requested and approved in writing requested and approved in writing and approved in writing and approved in writing approved in writing approved in writing in writing in writing writing writing by the responsible engineer. 4. All work shall be performed in strict accordance with OSHA, Federal, State and local codes All work shall be performed in strict accordance with OSHA, Federal, State and local codes work shall be performed in strict accordance with OSHA, Federal, State and local codes work shall be performed in strict accordance with OSHA, Federal, State and local codes shall be performed in strict accordance with OSHA, Federal, State and local codes shall be performed in strict accordance with OSHA, Federal, State and local codes be performed in strict accordance with OSHA, Federal, State and local codes be performed in strict accordance with OSHA, Federal, State and local codes performed in strict accordance with OSHA, Federal, State and local codes performed in strict accordance with OSHA, Federal, State and local codes in strict accordance with OSHA, Federal, State and local codes in strict accordance with OSHA, Federal, State and local codes strict accordance with OSHA, Federal, State and local codes strict accordance with OSHA, Federal, State and local codes accordance with OSHA, Federal, State and local codes accordance with OSHA, Federal, State and local codes with OSHA, Federal, State and local codes with OSHA, Federal, State and local codes OSHA, Federal, State and local codes OSHA, Federal, State and local codes Federal, State and local codes Federal, State and local codes State and local codes State and local codes and local codes and local codes local codes local codes codes codes and requirements. CONSTRUCTION 1. All components of construction not specifically called for or detailed on the drawings, but are All components of construction not specifically called for or detailed on the drawings, but are components of construction not specifically called for or detailed on the drawings, but are components of construction not specifically called for or detailed on the drawings, but are of construction not specifically called for or detailed on the drawings, but are of construction not specifically called for or detailed on the drawings, but are construction not specifically called for or detailed on the drawings, but are construction not specifically called for or detailed on the drawings, but are not specifically called for or detailed on the drawings, but are not specifically called for or detailed on the drawings, but are specifically called for or detailed on the drawings, but are specifically called for or detailed on the drawings, but are called for or detailed on the drawings, but are called for or detailed on the drawings, but are for or detailed on the drawings, but are for or detailed on the drawings, but are or detailed on the drawings, but are or detailed on the drawings, but are detailed on the drawings, but are detailed on the drawings, but are on the drawings, but are on the drawings, but are the drawings, but are the drawings, but are drawings, but are drawings, but are but are but are are are required, necessary and considered good practice for construction shall be included. 2. The Wyoming County Conservation District (WCCD) must be notified prior to any earth The Wyoming County Conservation District (WCCD) must be notified prior to any earth Wyoming County Conservation District (WCCD) must be notified prior to any earth Wyoming County Conservation District (WCCD) must be notified prior to any earth County Conservation District (WCCD) must be notified prior to any earth County Conservation District (WCCD) must be notified prior to any earth Conservation District (WCCD) must be notified prior to any earth Conservation District (WCCD) must be notified prior to any earth District (WCCD) must be notified prior to any earth District (WCCD) must be notified prior to any earth (WCCD) must be notified prior to any earth (WCCD) must be notified prior to any earth must be notified prior to any earth must be notified prior to any earth be notified prior to any earth be notified prior to any earth notified prior to any earth notified prior to any earth prior to any earth prior to any earth to any earth to any earth any earth any earth earth earth disturbance. All required erosion and sediment control measures must be installed and All required erosion and sediment control measures must be installed and All required erosion and sediment control measures must be installed and All required erosion and sediment control measures must be installed and required erosion and sediment control measures must be installed and required erosion and sediment control measures must be installed and erosion and sediment control measures must be installed and erosion and sediment control measures must be installed and and sediment control measures must be installed and and sediment control measures must be installed and sediment control measures must be installed and sediment control measures must be installed and control measures must be installed and control measures must be installed and measures must be installed and measures must be installed and must be installed and must be installed and be installed and be installed and installed and installed and and and operating prior to any earth disturbance, and maintained per WCCD requirements for the prior to any earth disturbance, and maintained per WCCD requirements for the prior to any earth disturbance, and maintained per WCCD requirements for the to any earth disturbance, and maintained per WCCD requirements for the to any earth disturbance, and maintained per WCCD requirements for the any earth disturbance, and maintained per WCCD requirements for the any earth disturbance, and maintained per WCCD requirements for the earth disturbance, and maintained per WCCD requirements for the earth disturbance, and maintained per WCCD requirements for the disturbance, and maintained per WCCD requirements for the disturbance, and maintained per WCCD requirements for the and maintained per WCCD requirements for the and maintained per WCCD requirements for the maintained per WCCD requirements for the maintained per WCCD requirements for the per WCCD requirements for the per WCCD requirements for the WCCD requirements for the WCCD requirements for the requirements for the requirements for the for the for the the the duration of the project. Refer to the Soil Erosion and Sediment Control Notes for additional of the project. Refer to the Soil Erosion and Sediment Control Notes for additional of the project. Refer to the Soil Erosion and Sediment Control Notes for additional the project. Refer to the Soil Erosion and Sediment Control Notes for additional the project. Refer to the Soil Erosion and Sediment Control Notes for additional project. Refer to the Soil Erosion and Sediment Control Notes for additional project. Refer to the Soil Erosion and Sediment Control Notes for additional Refer to the Soil Erosion and Sediment Control Notes for additional Refer to the Soil Erosion and Sediment Control Notes for additional Refer to the Soil Erosion and Sediment Control Notes for additional to the Soil Erosion and Sediment Control Notes for additional to the Soil Erosion and Sediment Control Notes for additional the Soil Erosion and Sediment Control Notes for additional the Soil Erosion and Sediment Control Notes for additional Soil Erosion and Sediment Control Notes for additional Soil Erosion and Sediment Control Notes for additional Erosion and Sediment Control Notes for additional Erosion and Sediment Control Notes for additional and Sediment Control Notes for additional and Sediment Control Notes for additional Sediment Control Notes for additional Sediment Control Notes for additional Control Notes for additional Control Notes for additional Notes for additional Notes for additional for additional for additional additional additional requirements. 3. Slopes shall be graded to a maximum of 2 horizontal to 1 vertical or as safely allowed by Slopes shall be graded to a maximum of 2 horizontal to 1 vertical or as safely allowed by shall be graded to a maximum of 2 horizontal to 1 vertical or as safely allowed by shall be graded to a maximum of 2 horizontal to 1 vertical or as safely allowed by be graded to a maximum of 2 horizontal to 1 vertical or as safely allowed by be graded to a maximum of 2 horizontal to 1 vertical or as safely allowed by graded to a maximum of 2 horizontal to 1 vertical or as safely allowed by graded to a maximum of 2 horizontal to 1 vertical or as safely allowed by to a maximum of 2 horizontal to 1 vertical or as safely allowed by to a maximum of 2 horizontal to 1 vertical or as safely allowed by a maximum of 2 horizontal to 1 vertical or as safely allowed by a maximum of 2 horizontal to 1 vertical or as safely allowed by maximum of 2 horizontal to 1 vertical or as safely allowed by maximum of 2 horizontal to 1 vertical or as safely allowed by of 2 horizontal to 1 vertical or as safely allowed by of 2 horizontal to 1 vertical or as safely allowed by 2 horizontal to 1 vertical or as safely allowed by 2 horizontal to 1 vertical or as safely allowed by horizontal to 1 vertical or as safely allowed by horizontal to 1 vertical or as safely allowed by to 1 vertical or as safely allowed by to 1 vertical or as safely allowed by 1 vertical or as safely allowed by 1 vertical or as safely allowed by vertical or as safely allowed by vertical or as safely allowed by or as safely allowed by or as safely allowed by as safely allowed by as safely allowed by safely allowed by safely allowed by allowed by allowed by by by the soil conditions. Each lift should be compacted to 95% of the standard proctor. Fill soil conditions. Each lift should be compacted to 95% of the standard proctor. Fill soil conditions. Each lift should be compacted to 95% of the standard proctor. Fill conditions. Each lift should be compacted to 95% of the standard proctor. Fill conditions. Each lift should be compacted to 95% of the standard proctor. Fill Each lift should be compacted to 95% of the standard proctor. Fill Each lift should be compacted to 95% of the standard proctor. Fill lift should be compacted to 95% of the standard proctor. Fill lift should be compacted to 95% of the standard proctor. Fill should be compacted to 95% of the standard proctor. Fill should be compacted to 95% of the standard proctor. Fill be compacted to 95% of the standard proctor. Fill be compacted to 95% of the standard proctor. Fill compacted to 95% of the standard proctor. Fill compacted to 95% of the standard proctor. Fill to 95% of the standard proctor. Fill to 95% of the standard proctor. Fill 95% of the standard proctor. Fill 95% of the standard proctor. Fill of the standard proctor. Fill of the standard proctor. Fill the standard proctor. Fill the standard proctor. Fill standard proctor. Fill standard proctor. Fill proctor. Fill proctor. Fill Fill Fill material should contain sufficient moisture so that if formed in to a ball it will not crumble, should contain sufficient moisture so that if formed in to a ball it will not crumble, should contain sufficient moisture so that if formed in to a ball it will not crumble, contain sufficient moisture so that if formed in to a ball it will not crumble, contain sufficient moisture so that if formed in to a ball it will not crumble, sufficient moisture so that if formed in to a ball it will not crumble, sufficient moisture so that if formed in to a ball it will not crumble, moisture so that if formed in to a ball it will not crumble, moisture so that if formed in to a ball it will not crumble, so that if formed in to a ball it will not crumble, so that if formed in to a ball it will not crumble, that if formed in to a ball it will not crumble, that if formed in to a ball it will not crumble, if formed in to a ball it will not crumble, if formed in to a ball it will not crumble, formed in to a ball it will not crumble, formed in to a ball it will not crumble, in to a ball it will not crumble, in to a ball it will not crumble, to a ball it will not crumble, to a ball it will not crumble, a ball it will not crumble, a ball it will not crumble, ball it will not crumble, ball it will not crumble, it will not crumble, it will not crumble, will not crumble, will not crumble, not crumble, not crumble, crumble, crumble, yet not be so wet that water can be squeezed out. 4. The contractor is responsible for the protection of all trees, bushes, and other landscaping The contractor is responsible for the protection of all trees, bushes, and other landscaping contractor is responsible for the protection of all trees, bushes, and other landscaping contractor is responsible for the protection of all trees, bushes, and other landscaping is responsible for the protection of all trees, bushes, and other landscaping is responsible for the protection of all trees, bushes, and other landscaping responsible for the protection of all trees, bushes, and other landscaping responsible for the protection of all trees, bushes, and other landscaping for the protection of all trees, bushes, and other landscaping for the protection of all trees, bushes, and other landscaping the protection of all trees, bushes, and other landscaping the protection of all trees, bushes, and other landscaping protection of all trees, bushes, and other landscaping protection of all trees, bushes, and other landscaping of all trees, bushes, and other landscaping of all trees, bushes, and other landscaping all trees, bushes, and other landscaping all trees, bushes, and other landscaping trees, bushes, and other landscaping trees, bushes, and other landscaping bushes, and other landscaping bushes, and other landscaping and other landscaping and other landscaping other landscaping other landscaping landscaping landscaping adjacent to the construction area. All damaged landscaping shall be inspected by a licensed to the construction area. All damaged landscaping shall be inspected by a licensed to the construction area. All damaged landscaping shall be inspected by a licensed the construction area. All damaged landscaping shall be inspected by a licensed the construction area. All damaged landscaping shall be inspected by a licensed construction area. All damaged landscaping shall be inspected by a licensed construction area. All damaged landscaping shall be inspected by a licensed area. All damaged landscaping shall be inspected by a licensed area. All damaged landscaping shall be inspected by a licensed All damaged landscaping shall be inspected by a licensed All damaged landscaping shall be inspected by a licensed damaged landscaping shall be inspected by a licensed damaged landscaping shall be inspected by a licensed landscaping shall be inspected by a licensed landscaping shall be inspected by a licensed shall be inspected by a licensed shall be inspected by a licensed be inspected by a licensed be inspected by a licensed inspected by a licensed inspected by a licensed by a licensed by a licensed a licensed a licensed licensed licensed arborist and repaired or replaced in kind at the expense of the contractor. 5. All excavation to be unclassified. All excavation to be unclassified. 6. Final grading restoration to be at same elevation as existed prior to construction except Final grading restoration to be at same elevation as existed prior to construction except grading restoration to be at same elevation as existed prior to construction except grading restoration to be at same elevation as existed prior to construction except restoration to be at same elevation as existed prior to construction except restoration to be at same elevation as existed prior to construction except to be at same elevation as existed prior to construction except to be at same elevation as existed prior to construction except be at same elevation as existed prior to construction except be at same elevation as existed prior to construction except at same elevation as existed prior to construction except at same elevation as existed prior to construction except same elevation as existed prior to construction except same elevation as existed prior to construction except elevation as existed prior to construction except elevation as existed prior to construction except as existed prior to construction except as existed prior to construction except existed prior to construction except existed prior to construction except prior to construction except prior to construction except to construction except to construction except construction except construction except except except where shown by proposed contours. 7. The Limit of Disturbance (LOD) line shown is to be the used as the earth disturbance limit. The Limit of Disturbance (LOD) line shown is to be the used as the earth disturbance limit. Limit of Disturbance (LOD) line shown is to be the used as the earth disturbance limit. Limit of Disturbance (LOD) line shown is to be the used as the earth disturbance limit. of Disturbance (LOD) line shown is to be the used as the earth disturbance limit. of Disturbance (LOD) line shown is to be the used as the earth disturbance limit. Disturbance (LOD) line shown is to be the used as the earth disturbance limit. Disturbance (LOD) line shown is to be the used as the earth disturbance limit. (LOD) line shown is to be the used as the earth disturbance limit. (LOD) line shown is to be the used as the earth disturbance limit. line shown is to be the used as the earth disturbance limit. line shown is to be the used as the earth disturbance limit. shown is to be the used as the earth disturbance limit. shown is to be the used as the earth disturbance limit. is to be the used as the earth disturbance limit. is to be the used as the earth disturbance limit. to be the used as the earth disturbance limit. to be the used as the earth disturbance limit. be the used as the earth disturbance limit. be the used as the earth disturbance limit. the used as the earth disturbance limit. the used as the earth disturbance limit. used as the earth disturbance limit. used as the earth disturbance limit. as the earth disturbance limit. as the earth disturbance limit. the earth disturbance limit. the earth disturbance limit. earth disturbance limit. earth disturbance limit. disturbance limit. disturbance limit. limit. limit. No construction activities are permitted outside the LOD. 8. The contractor is fully responsible for adherence to the Preparedness, Prevention and The contractor is fully responsible for adherence to the Preparedness, Prevention and contractor is fully responsible for adherence to the Preparedness, Prevention and contractor is fully responsible for adherence to the Preparedness, Prevention and is fully responsible for adherence to the Preparedness, Prevention and is fully responsible for adherence to the Preparedness, Prevention and fully responsible for adherence to the Preparedness, Prevention and fully responsible for adherence to the Preparedness, Prevention and responsible for adherence to the Preparedness, Prevention and responsible for adherence to the Preparedness, Prevention and for adherence to the Preparedness, Prevention and for adherence to the Preparedness, Prevention and adherence to the Preparedness, Prevention and adherence to the Preparedness, Prevention and to the Preparedness, Prevention and to the Preparedness, Prevention and the Preparedness, Prevention and the Preparedness, Prevention and Preparedness, Prevention and Preparedness, Prevention and Prevention and Prevention and and and Contingency (PPC) plan as listed in the project plans and specifications. 9. Existing and temporary plant systems must be protected and maintained in working condition Existing and temporary plant systems must be protected and maintained in working condition and temporary plant systems must be protected and maintained in working condition and temporary plant systems must be protected and maintained in working condition temporary plant systems must be protected and maintained in working condition temporary plant systems must be protected and maintained in working condition plant systems must be protected and maintained in working condition plant systems must be protected and maintained in working condition systems must be protected and maintained in working condition systems must be protected and maintained in working condition must be protected and maintained in working condition must be protected and maintained in working condition be protected and maintained in working condition be protected and maintained in working condition protected and maintained in working condition protected and maintained in working condition and maintained in working condition and maintained in working condition maintained in working condition maintained in working condition in working condition in working condition working condition working condition condition condition until all connections are transferred to the new systems. The existing pipe may require all connections are transferred to the new systems. The existing pipe may require all connections are transferred to the new systems. The existing pipe may require connections are transferred to the new systems. The existing pipe may require connections are transferred to the new systems. The existing pipe may require are transferred to the new systems. The existing pipe may require are transferred to the new systems. The existing pipe may require transferred to the new systems. The existing pipe may require transferred to the new systems. The existing pipe may require to the new systems. The existing pipe may require to the new systems. The existing pipe may require the new systems. The existing pipe may require the new systems. The existing pipe may require new systems. The existing pipe may require new systems. The existing pipe may require systems. The existing pipe may require systems. The existing pipe may require The existing pipe may require The existing pipe may require The existing pipe may require existing pipe may require existing pipe may require pipe may require pipe may require may require may require require require inspection internally by the owner using a camera to confirm all existing connections are internally by the owner using a camera to confirm all existing connections are internally by the owner using a camera to confirm all existing connections are by the owner using a camera to confirm all existing connections are by the owner using a camera to confirm all existing connections are the owner using a camera to confirm all existing connections are the owner using a camera to confirm all existing connections are owner using a camera to confirm all existing connections are owner using a camera to confirm all existing connections are using a camera to confirm all existing connections are using a camera to confirm all existing connections are a camera to confirm all existing connections are a camera to confirm all existing connections are camera to confirm all existing connections are camera to confirm all existing connections are to confirm all existing connections are to confirm all existing connections are confirm all existing connections are confirm all existing connections are all existing connections are all existing connections are existing connections are existing connections are connections are connections are are are shown and included in the scope of work. 10. Construction materials, equipment, and supplies may not be stored in floodplains and/or Construction materials, equipment, and supplies may not be stored in floodplains and/or materials, equipment, and supplies may not be stored in floodplains and/or materials, equipment, and supplies may not be stored in floodplains and/or equipment, and supplies may not be stored in floodplains and/or equipment, and supplies may not be stored in floodplains and/or and supplies may not be stored in floodplains and/or and supplies may not be stored in floodplains and/or supplies may not be stored in floodplains and/or supplies may not be stored in floodplains and/or may not be stored in floodplains and/or may not be stored in floodplains and/or not be stored in floodplains and/or not be stored in floodplains and/or be stored in floodplains and/or be stored in floodplains and/or stored in floodplains and/or stored in floodplains and/or in floodplains and/or in floodplains and/or floodplains and/or floodplains and/or and/or and/or wetlands. UTILITIES 1. All underground utilities shown are based on surface evidence and information obtained from All underground utilities shown are based on surface evidence and information obtained from underground utilities shown are based on surface evidence and information obtained from underground utilities shown are based on surface evidence and information obtained from utilities shown are based on surface evidence and information obtained from utilities shown are based on surface evidence and information obtained from shown are based on surface evidence and information obtained from shown are based on surface evidence and information obtained from are based on surface evidence and information obtained from are based on surface evidence and information obtained from based on surface evidence and information obtained from based on surface evidence and information obtained from on surface evidence and information obtained from on surface evidence and information obtained from surface evidence and information obtained from surface evidence and information obtained from evidence and information obtained from evidence and information obtained from and information obtained from and information obtained from information obtained from information obtained from obtained from obtained from from from existing plans and records. Variations and/or additional utilities may exist. The contractor plans and records. Variations and/or additional utilities may exist. The contractor plans and records. Variations and/or additional utilities may exist. The contractor and records. Variations and/or additional utilities may exist. The contractor and records. Variations and/or additional utilities may exist. The contractor records. Variations and/or additional utilities may exist. The contractor records. Variations and/or additional utilities may exist. The contractor Variations and/or additional utilities may exist. The contractor Variations and/or additional utilities may exist. The contractor Variations and/or additional utilities may exist. The contractor and/or additional utilities may exist. The contractor and/or additional utilities may exist. The contractor additional utilities may exist. The contractor additional utilities may exist. The contractor utilities may exist. The contractor utilities may exist. The contractor may exist. The contractor may exist. The contractor exist. The contractor exist. The contractor The contractor The contractor The contractor contractor contractor is solely responsible for verifying the actual locations by contacting the PA One Call System solely responsible for verifying the actual locations by contacting the PA One Call System solely responsible for verifying the actual locations by contacting the PA One Call System responsible for verifying the actual locations by contacting the PA One Call System responsible for verifying the actual locations by contacting the PA One Call System for verifying the actual locations by contacting the PA One Call System for verifying the actual locations by contacting the PA One Call System verifying the actual locations by contacting the PA One Call System verifying the actual locations by contacting the PA One Call System the actual locations by contacting the PA One Call System the actual locations by contacting the PA One Call System actual locations by contacting the PA One Call System actual locations by contacting the PA One Call System locations by contacting the PA One Call System locations by contacting the PA One Call System by contacting the PA One Call System by contacting the PA One Call System contacting the PA One Call System contacting the PA One Call System the PA One Call System the PA One Call System PA One Call System PA One Call System One Call System One Call System Call System Call System System System and the individual utility companies at least three (3) working days prior to any excavation. the individual utility companies at least three (3) working days prior to any excavation. the individual utility companies at least three (3) working days prior to any excavation. individual utility companies at least three (3) working days prior to any excavation. individual utility companies at least three (3) working days prior to any excavation. utility companies at least three (3) working days prior to any excavation. utility companies at least three (3) working days prior to any excavation. companies at least three (3) working days prior to any excavation. companies at least three (3) working days prior to any excavation. at least three (3) working days prior to any excavation. at least three (3) working days prior to any excavation. least three (3) working days prior to any excavation. least three (3) working days prior to any excavation. three (3) working days prior to any excavation. three (3) working days prior to any excavation. (3) working days prior to any excavation. (3) working days prior to any excavation. working days prior to any excavation. working days prior to any excavation. days prior to any excavation. days prior to any excavation. prior to any excavation. prior to any excavation. to any excavation. to any excavation. any excavation. any excavation. excavation. excavation. Additional excavation of test pits may be required for determining the precise location of a excavation of test pits may be required for determining the precise location of a excavation of test pits may be required for determining the precise location of a of test pits may be required for determining the precise location of a of test pits may be required for determining the precise location of a test pits may be required for determining the precise location of a test pits may be required for determining the precise location of a pits may be required for determining the precise location of a pits may be required for determining the precise location of a may be required for determining the precise location of a may be required for determining the precise location of a be required for determining the precise location of a be required for determining the precise location of a required for determining the precise location of a required for determining the precise location of a for determining the precise location of a for determining the precise location of a determining the precise location of a determining the precise location of a the precise location of a the precise location of a precise location of a precise location of a location of a location of a of a of a a a buried utility. 2. All existing utility (water, sewer, gas, electric, drainage, etc.) locations and elevations must be All existing utility (water, sewer, gas, electric, drainage, etc.) locations and elevations must be verified by the contractor prior to fabrication and construction of replacement of connected by the contractor prior to fabrication and construction of replacement of connected by the contractor prior to fabrication and construction of replacement of connected the contractor prior to fabrication and construction of replacement of connected the contractor prior to fabrication and construction of replacement of connected contractor prior to fabrication and construction of replacement of connected contractor prior to fabrication and construction of replacement of connected prior to fabrication and construction of replacement of connected prior to fabrication and construction of replacement of connected to fabrication and construction of replacement of connected to fabrication and construction of replacement of connected fabrication and construction of replacement of connected fabrication and construction of replacement of connected and construction of replacement of connected and construction of replacement of connected construction of replacement of connected construction of replacement of connected of replacement of connected of replacement of connected replacement of connected replacement of connected of connected of connected connected connected utilities. 3. The contractor is solely responsible for the protection of all utilities crossing or adjacent to The contractor is solely responsible for the protection of all utilities crossing or adjacent to contractor is solely responsible for the protection of all utilities crossing or adjacent to contractor is solely responsible for the protection of all utilities crossing or adjacent to is solely responsible for the protection of all utilities crossing or adjacent to is solely responsible for the protection of all utilities crossing or adjacent to solely responsible for the protection of all utilities crossing or adjacent to solely responsible for the protection of all utilities crossing or adjacent to responsible for the protection of all utilities crossing or adjacent to responsible for the protection of all utilities crossing or adjacent to for the protection of all utilities crossing or adjacent to for the protection of all utilities crossing or adjacent to the protection of all utilities crossing or adjacent to the protection of all utilities crossing or adjacent to protection of all utilities crossing or adjacent to protection of all utilities crossing or adjacent to of all utilities crossing or adjacent to of all utilities crossing or adjacent to all utilities crossing or adjacent to all utilities crossing or adjacent to utilities crossing or adjacent to utilities crossing or adjacent to crossing or adjacent to crossing or adjacent to or adjacent to or adjacent to adjacent to adjacent to to to the construction area per the requirements of the utility owner. Any damaged utilities must construction area per the requirements of the utility owner. Any damaged utilities must construction area per the requirements of the utility owner. Any damaged utilities must area per the requirements of the utility owner. Any damaged utilities must area per the requirements of the utility owner. Any damaged utilities must per the requirements of the utility owner. Any damaged utilities must per the requirements of the utility owner. Any damaged utilities must the requirements of the utility owner. Any damaged utilities must the requirements of the utility owner. Any damaged utilities must requirements of the utility owner. Any damaged utilities must requirements of the utility owner. Any damaged utilities must of the utility owner. Any damaged utilities must of the utility owner. Any damaged utilities must the utility owner. Any damaged utilities must the utility owner. Any damaged utilities must utility owner. Any damaged utilities must utility owner. Any damaged utilities must owner. Any damaged utilities must owner. Any damaged utilities must Any damaged utilities must Any damaged utilities must Any damaged utilities must damaged utilities must damaged utilities must utilities must utilities must must must be inspected by the utility owner and repaired as necessary per the utility owner’s inspected by the utility owner and repaired as necessary per the utility owner’s inspected by the utility owner and repaired as necessary per the utility owner’s by the utility owner and repaired as necessary per the utility owner’s by the utility owner and repaired as necessary per the utility owner’s the utility owner and repaired as necessary per the utility owner’s the utility owner and repaired as necessary per the utility owner’s utility owner and repaired as necessary per the utility owner’s utility owner and repaired as necessary per the utility owner’s owner and repaired as necessary per the utility owner’s owner and repaired as necessary per the utility owner’s and repaired as necessary per the utility owner’s and repaired as necessary per the utility owner’s repaired as necessary per the utility owner’s repaired as necessary per the utility owner’s as necessary per the utility owner’s as necessary per the utility owner’s necessary per the utility owner’s necessary per the utility owner’s per the utility owner’s per the utility owner’s the utility owner’s the utility owner’s utility owner’s utility owner’s owner’s owner’s s requirements and at the expense of the contractor. 4. Any utilities requiring relocation, either permanent or temporary, shall be completed by the Any utilities requiring relocation, either permanent or temporary, shall be completed by the utilities requiring relocation, either permanent or temporary, shall be completed by the utilities requiring relocation, either permanent or temporary, shall be completed by the requiring relocation, either permanent or temporary, shall be completed by the requiring relocation, either permanent or temporary, shall be completed by the relocation, either permanent or temporary, shall be completed by the relocation, either permanent or temporary, shall be completed by the either permanent or temporary, shall be completed by the either permanent or temporary, shall be completed by the permanent or temporary, shall be completed by the permanent or temporary, shall be completed by the or temporary, shall be completed by the or temporary, shall be completed by the temporary, shall be completed by the temporary, shall be completed by the shall be completed by the shall be completed by the be completed by the be completed by the completed by the completed by the by the by the the the contractor per the requirements and inspection of the utility owner. 5. All required connections from the constructed or replaced utility systems to the existing All required connections from the constructed or replaced utility systems to the existing required connections from the constructed or replaced utility systems to the existing required connections from the constructed or replaced utility systems to the existing connections from the constructed or replaced utility systems to the existing connections from the constructed or replaced utility systems to the existing from the constructed or replaced utility systems to the existing from the constructed or replaced utility systems to the existing the constructed or replaced utility systems to the existing the constructed or replaced utility systems to the existing constructed or replaced utility systems to the existing constructed or replaced utility systems to the existing or replaced utility systems to the existing or replaced utility systems to the existing replaced utility systems to the existing replaced utility systems to the existing utility systems to the existing utility systems to the existing systems to the existing systems to the existing to the existing to the existing the existing the existing existing existing systems and laterals shall be completed per the requirements of the utility owner. Each and laterals shall be completed per the requirements of the utility owner. Each and laterals shall be completed per the requirements of the utility owner. Each laterals shall be completed per the requirements of the utility owner. Each laterals shall be completed per the requirements of the utility owner. Each shall be completed per the requirements of the utility owner. Each shall be completed per the requirements of the utility owner. Each be completed per the requirements of the utility owner. Each be completed per the requirements of the utility owner. Each completed per the requirements of the utility owner. Each completed per the requirements of the utility owner. Each per the requirements of the utility owner. Each per the requirements of the utility owner. Each the requirements of the utility owner. Each the requirements of the utility owner. Each requirements of the utility owner. Each requirements of the utility owner. Each of the utility owner. Each of the utility owner. Each the utility owner. Each the utility owner. Each utility owner. Each utility owner. Each owner. Each owner. Each Each Each Each connection location, depth, and condition to be verified by contractor and confirmed by the location, depth, and condition to be verified by contractor and confirmed by the location, depth, and condition to be verified by contractor and confirmed by the depth, and condition to be verified by contractor and confirmed by the depth, and condition to be verified by contractor and confirmed by the and condition to be verified by contractor and confirmed by the and condition to be verified by contractor and confirmed by the condition to be verified by contractor and confirmed by the condition to be verified by contractor and confirmed by the to be verified by contractor and confirmed by the to be verified by contractor and confirmed by the be verified by contractor and confirmed by the be verified by contractor and confirmed by the verified by contractor and confirmed by the verified by contractor and confirmed by the by contractor and confirmed by the by contractor and confirmed by the contractor and confirmed by the contractor and confirmed by the and confirmed by the and confirmed by the confirmed by the confirmed by the by the by the the the utility owner per PA One Call requirements and exploratory excavation as required. 6.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .