Contract 25 - Rehabilitation of Existing Pump Station

This is a front-end specifications bid set and advertisement for bids issued by the Lake Winola Municipal Authority for the rehabilitation of an existing precast concrete submersible wastewater pumping station. The project encompasses structural, mechanical, and electrical work including construction of an 8-foot diameter off-line manhole for bypass pumping, installation of temporary portable electric and diesel-powered pumps, low-pressure sanitary sewer line connections with isolation valves, Owner-provided pump station structures and equipment installation, force main connections, odor control systems, and electric power and controls. Bidding documents are available online through the PennBid platform at no cost beginning October 1, 2026. A non-mandatory pre-bid meeting is scheduled for October 19, 2026 at 10:00 AM at the pumping station location in Factoryville, Pennsylvania. The final day for site visits and questions is October 22, 2026. Bids are due October 29, 2026 at 11:00 AM Eastern time. The project requires substantial completion within 120 calendar days and final completion within 150 calendar days after the contract commencement date.

Bidders must submit a lump sum bid with a 10 percent bid bond as security, along with required qualifications statements, non-collusion affidavits, public works employment verification forms, and disclosure of lobbying activities. Specific bid items include mobilization at $10,000, additional test pits at an estimated quantity of three, on-site storage allowance of $15,000, and an unanticipated work allowance of $20,000. The project was partially financed through a Commonwealth of Pennsylvania Department of Community and Economic Development grant, making Pennsylvania wage rates, steel procurement act requirements, equal opportunity clauses, and nondiscrimination standards applicable. Bidders and contractors must not be suspended or debarred by Pennsylvania or the federal government. The contract award will be made to the responsible bidder submitting the lowest responsive bid, with notice of award and contract execution required within 15 days of award notification.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lake Winola Municipal Authority

Rehabilitation of Existing Pump Station

Volume No. 1

Front End Specifications

October 1, 2026

TABLE OF CONTENTS

DOCUMENT TITLE PAGES

C-111 ADVERTISEMENT FOR BIDS 2

C-200 INSTRUCTION TO BIDDERS FOR CONSTRUCTION CONTRACT 12

BCL BIDDER’S CHECKLIST 1

IFB-1 INFORMATION TO BE FURNISHED BY BIDDERS – CONTRACT 25 (Structural /Mechanical and Electrical) 3

NCA NON-COLLUSION AFFIDAVIT 1

SS STATEMENT OF SURETY 1

CA CONTRACTOR’S AFFIDAVIT 1

PWEVF PUBLIC WORKS EMPLOYMENT VERIFICATION FORM 1

SF -LLL DISCLOSURE OF LOBYING ACTIVITIES 2

C-410-1 BID FORM – CONTRACT 25 (Structural / Mechanical and Electrical) 7

C-430 BID BOND (PENAL SUM FORM) 2

C-451 QUALIFICATIONS STATEMENT 12

C-510 NOTICE OF AWARD 1

C-520-1 AGREEMENT BETWEEN OWNER AND CONTRACTOR – CONTRACT 25

(Structural/ Mechanical and Electrical) 7

C-610 PERFORMANCE BOND 4

C-615 PAYMENT BOND 4

C-700 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT 70

C-800 SUPPLEMENTARY CONDITIONS OF THE CONSTRUCTION CONTRACT 20

CFA COMMONWEALTH OF PA DEPT. OF COMMUNITY AND ECONOMIC

DEVELOPMENT – ECONOMIC DEVELOPMENT AND COMMUNITY

DEVELOPMENT INITIATIVES PROGRAM GRANT CONTRACT 29

PAWD PA WAGE DETERMINATION 6

PA SSPA-1 PA STEEL PROCUREMENT ACT FAQ 2

PA SSPA-2 PA STEEL PROCURMENT ACT 3

PA SSPA-3 PA STEEL PRCURMENT ACT EXEMPTION LIST 5

ND/SH NONDISCRIMINATION/SEXUAL HARASSMENT CLAUSE 2

PS PROJECT SIGN 1

C-550 NOTICE TO PROCEED 1

C-620 CONTRACTOR’S APPLICATION FOR PAYMENT 4

C-940 WORK CHANGE DIRECTIVE 1

C-941 CHANGE ORDER 1

C-942 FIELD ORDER 1

C-625 CERTIFICATE OF SUBSTANTIAL COMPLETION 1

C-626 NOTICE OF ACCEPTABILITY OF WORK 1

Lake Winola Municipal Authority Z057000570

C-111

ADVERTISEMENT FOR BIDS

EJCDC® C-111, Advertisement for Bids for Construction Contract.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

ADVERTISEMENT FOR BIDS

LAKE WINOLA MUNICIPAL AUTHORITY

P.O. BOX 59, LAKE WINOLA, PA 18625

REHABILITATION OF EXISTING PUMP STATION

CONTRACT 25

General Notice

Lake Winola Municipal Authority (Owner) is requesting Bids for the construction of the following Project:

REHABILITATION OF EXISTING PUMP STATION

CONTRACT 25 – STRUCTURAL, MECHANICAL, AND ELECTRICAL WORK

Contracts Nos. 25 Consists of rehabilitation of an existing precast concrete submersible wastewater pumping station, including construction of an 8’ diameter off-line manhole for bypass pumping; bypass pumping operation; temporary portable electric powered pump; temporary diesel powered backup pump; low pressure sanitary sewer line connection to off-line manhole with isolation valves; installation of Owner-provided pump station structures, pumps, piping, valves, and fittings; force main connection to rehabilitated pump station; odor control system; and electric power and controls for electric service for bypass pumping operation and rehabilitated pump station power and controls.

Bids will be received online via the PennBid Program and all documents and solicitation details are available at no cost at https://pennbid.procureware.com. Documents will be available on or after Thursday, October 1, 2026 and a non-mandatory pre-bid meeting will be held on Monday, October 19, 2026 at 10:00 AM at the Lake Winola Municipal Authority’s Wastewater Pumping Station located along Mislevy Road, Factoryville, PA 18419, approximately ¼ mile north of the intersection with Dalton Road.

To arrange a site visit, prospective Bidders may contact Lake Winola Municipal Authority, via email @ lwmauth@gmailcom. The last day for questions regarding the project or to make a site visit is Thursday, October 22, 2026. Bids are due on Thursday, October 29, 2026 at 11:00 AM Eastern time on line PennBid.

A Bid Bond drawn to the order of the Lake Winola Municipal Authority in the amount equal to ten percent (10%) of the bid must be submitted with the proposal as bid security.

This project was financed in part by a grant from the Commonwealth of Pennsylvania, Department of Community and Economic Development.

PA Wage rates, PA Steel Procurement Act, Equal Opportunity Clause (41 CFR 60-1.4(b)), and Nondiscrimination/Sexual Harassment requirements also apply to this project. A contract will not be awarded to any firm that is suspended or debarred by the Commonwealth of Pennsylvania or the federal government.

Obtaining the Bidding Documents

Information and Bidding Documents for the Project can be found at the following designated website:

https://pennbid.net

Bidding Documents may be downloaded from the designated website. Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The https://pennbid.procureware.com/

EJCDC® C-111, Advertisement for Bids for Construction Contract.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website.

Instructions to Bidders.

For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

This Advertisement is issued by:

Owner: Lake Winola Municipal Authority By: Carmen Caputo Title: Chairman Date: 10/1/2026

C-200

INSTRUCTION TO BIDDERS FOR CONSTRUCTION CONTRACT

EJCDC® C-200, Instructions to Bidders for Construction Contract.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

TOC Page1 of 1

INSTRUCTIONS TO BIDDERS FOR CONSTRUCTION CONTRACT

TABLE OF CONTENTS

Page

Article 1— Defined Terms

Article 2— Bidding Documents

Article 3— Qualifications of Bidders

Article 4— Pre-Bid Conference

Article 5— Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;

Other Work at the Site

Article 6— Bidder’s Representations and Certifications

Article 7— Interpretations and Addenda

Article 8— Bid Security

Article 9— Contract Times

Article 10— Substitute and “Or Equal” Items

Article 11— Subcontractors, Suppliers, and Others

Article 12— Preparation of Bid

Article 13— Basis of Bid

Article 14— Submittal of Bid

Article 15— Modification and Withdrawal of Bid

Article 16— Opening of Bids

Article 17— Bids to Remain Subject to Acceptance

Article 18— Evaluation of Bids and Award of Contract

Article 19— Bonds and Insurance

Article 20— Signing of Agreement

Article 21— Sales and Use Taxes

Article 22— Contracts to Be Assigned

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

ARTICLE 1—DEFINED TERMS

1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:

A. Issuing Office—The office from which the Bidding Documents are to be issued, and which registers plan holders.

ARTICLE 2—BIDDING DOCUMENTS

2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents (together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.

2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.

2.03 Owner has established a Bidding Documents Website as indicated in the Advertisement or invitation to bid. Owner recommends that Bidder register as a plan holder with the Issuing Office at such website, and obtain a complete set of the Bidding Documents from such website. Bidders may rely that sets of Bidding Documents obtained from the Bidding Documents Website are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by Owner.

2.04 Plan rooms (including construction information subscription services, and electronic and virtual plan rooms) may distribute the Bidding Documents, or make them available for examination.

Those prospective bidders that obtain an electronic (digital) copy of the Bidding Documents from a plan room are encouraged to register as plan holders from the Bidding Documents Website or Issuing Office. Owner is not responsible for omissions in Bidding Documents or other documents obtained from plan rooms, or for a Bidder’s failure to obtain Addenda from a plan room.

2.05 Electronic Documents

A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding Documents are available, such documents will be made available to the Bidders as Electronic Documents in the manner specified.

1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by Adobe Acrobat Reader. It is the intent of the Engineer and Owner that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because the Owner and Engineer cannot totally control the transmission and receipt of Electronic Documents nor the Contractor’s means of reproduction of such documents, the Owner and Engineer cannot and do not guarantee

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.

B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in Paragraph 2.06.A above. However, Bidder assumes all risks associated with differences arising from transmission/receipt of Electronic Documents versions of Bidding Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.

C. After the Contract is awarded, the Owner will provide or direct the Engineer to provide for the use of the Contractor documents that were developed by Engineer as part of the Project design process, as Electronic Documents in native file formats.

1. Electronic Documents that are available in native file format include:

a. Grading plans.

2. Release of such documents will be solely for the convenience of the Contractor. No such document is a Contract Document.

3. Unless the Contract Documents explicitly identify that such information will be available to the Successful Bidder (Contractor), nothing herein will create an obligation on the part of the Owner or Engineer to provide or create such information, and the Contractor is not entitled to rely on the availability of such information in the preparation of its Bid or pricing of the Work. In all cases, the Contractor shall take appropriate measures to verify that any electronic/digital information provided in Electronic Documents is appropriate and adequate for the Contractor’s specific purposes.

4. In no case will the Contractor be entitled to additional compensation or time for completion due to any differences between the actual Contract Documents and any related document in native file format.

ARTICLE 3—QUALIFICATIONS OF BIDDERS

3.01 Bidder is to submit the following information with its Bid to demonstrate Bidder’s qualifications to perform the Work:

A. Written evidence establishing its qualifications such as financial data, previous experience, and present commitments.

B. A written statement that Bidder is authorized to do business in the state where the Project is located, or a written certification that Bidder will obtain such authority prior to the Effective Date of the Contract.

C. Bidder’s state or other contractor license number, if applicable.

D. Subcontractor and Supplier qualification information.

E. Other required information regarding qualifications.

F. Public works employment verification.

G. Information to be furnished by Bidders form.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

H. Non collusion affidavit.

I. Disclosure of lobbying activities.

3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.

3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.

ARTICLE 4—PRE-BID CONFERENCE

4.01 A non-mandatory pre-bid conference will be held at the time and location indicated in the Advertisement or invitation to bid. Representatives of Owner and Engineer will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference; however, attendance at this conference is not required to submit a Bid.

4.02 Information presented at the pre-Bid conference does not alter the Contract Documents. Owner will issue Addenda to make any changes to the Contract Documents that result from discussions at the pre-Bid conference. Information presented, and statements made at the pre-bid conference will not be binding or legally effective unless incorporated in an Addendum.

ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S

SAFETY PROGRAM; OTHER WORK AT THE SITE

5.01 Site and Other Areas

A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.

5.02 Existing Site Conditions

A. Subsurface and Physical Conditions; Hazardous Environmental Conditions

1. The Supplementary Conditions identify the following (if any) regarding existing conditions at or adjacent to the Site:

a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.

b. Those drawings known to Owner of existing physical conditions at or adjacent to the Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain Technical Data.

c. Reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.

d. Technical Data contained in such reports and drawings.

2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.

3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.

B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.

5.03 Other Site-related Documents

A. In addition to the documents regarding existing Site conditions referred to in Paragraph 5.02.A, the following other documents relating to conditions at or adjacent to the Site are known to Owner and made available to Bidders for reference: None

Owner will make copies of these other Site-related documents available to any Bidder on request.

B. Owner has not verified the contents of these other Site-related documents, and Bidder may not rely on the accuracy of any data or information in such documents. Bidder is responsible for any interpretation or conclusion Bidder draws from the other Site-related documents.

C. The other Site-related documents are not part of the Contract Documents.

D. Bidders are encouraged to review the other Site-related documents, but Bidders will not be held accountable for any data or information in such documents. The requirement to review and take responsibility for documentary Site information is limited to information in (1) the Contract Documents and (2) the Technical Data.

E. No other Site-related documents are available.

5.04 Site Visit and Testing by Bidders

A. Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site.

B. A Site visit is scheduled following the pre-bid conference.

C. Bidders visiting the Site are required to arrange their own transportation.

D. All access to the Site other than during a regularly scheduled Site visit must be coordinated through the following Owner or Engineer contact for visiting the Site: ATLAS Technical Consultants, LLC (Engineer) – Attn: Richard Kresge, Phone (570) 587-3339. Bidder must conduct the required Site visit during normal working hours.

E. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

F. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder general access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site. Bidder is responsible for establishing access needed to reach specific selected test sites.

G. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.

H. Bidder must fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

5.05 Owner’s Safety Program

A. Site visits and work at the Site may be governed by an Owner safety program. If an Owner safety program exists, it will be noted in the Supplementary Conditions.

5.06 Other Work at the Site

A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.

ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS

6.01 Express Representations and Certifications in Bid Form, Agreement

A. The Bid Form that each Bidder will submit contains express representations regarding the Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations and certifications, and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.

B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.

ARTICLE 7—INTERPRETATIONS AND ADDENDA

7.01 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents.

7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows:

A. Submit all Bidder requests for information through PennBid’s website.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.

7.04 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract Documents unless set forth in an Addendum that expressly modifies or supplements the Contract Documents.

ARTICLE 8—BID SECURITY

8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 10 percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents.

8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.

8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.

8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.

ARTICLE 9—CONTRACT TIMES

9.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.

9.02 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.

ARTICLE 10—SUBSTITUTE AND “OR EQUAL” ITEMS

10.01 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.

ARTICLE 11—SUBCONTRACTORS, SUPPLIERS, AND OTHERS

11.01 The apparent Successful Bidder, and any other Bidder so requested, must submit to Owner a list of the Subcontractors or Suppliers proposed for the following portions of the Work within five days after Bid opening. The successful bidder and all subcontractors must not be disbarred for performing work by the State or Federal government:

A. All work covered under Contracts 25.

11.02 If requested by Owner, such list must be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor or Supplier. Contractor and subcontractors may not be disbarred by the Commonwealth of Pennsylvania or Federal Government. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor or Supplier, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder will submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.

ARTICLE 12—PREPARATION OF BID

12.01 The Bid Form is included with the Bidding Documents.

A. All blanks on the PennBid website Bid Form must be completed. A record paper copy of the bid form must also be completed in ink and the Bid Form signed in ink. Erasures or alterations must be initialed in ink by the person signing the Bid Form. A Bid price must be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.

B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”

12.02 If Bidder has obtained the Bidding Documents as Electronic Documents, then Bidder shall prepare its Bid on a paper copy of the Bid Form printed from the Electronic Documents version of the Bidding Documents. The printed copy of the Bid Form must be clearly legible, printed on 8½ inch by 11-inch paper and as closely identical in appearance to the Electronic Document version of the Bid Form as may be practical. The Owner reserves the right to accept Bid Forms which nominally vary in appearance from the original paper version of the Bid Form, providing that all required information and submittals are included with the Bid.

12.03 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown.

12.04 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership must be shown.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

12.05 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.

12.06 A Bid by an individual must show the Bidder’s name and official address.

12.07 A Bid by a joint venture must be executed by an authorized representative of each joint ventures in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.

12.08 All names must be printed in ink below the signatures.

12.09 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.

12.10 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.

12.11 The Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.

12.12 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the Project is located, the Bid must contain evidence of Bidder’s licensure, or Bidder must certify in writing that it will obtain such licensure within the time for acceptance of Bids and attach such certification to the Bid. Bidder’s state contractor license number, if any, must also be shown on the Bid Form.

ARTICLE 13—BASIS OF BID

13.01 Base Bid with Alternates

A. Bidders must submit a Bid on a lump sum basis for the base Bid and include a separate price for each alternate described in the Bidding Documents and as provided for in the Bid Form.

The price for each alternate will be the amount added to or deleted from the base Bid if Owner selects the alternate.

B. In the comparison of Bids, alternates will be applied in the same order of priority as listed in the Bid Form.

13.02 Allowances

A. For cash allowances the Bid price must include such amounts as the Bidder deems proper for Contractor's overhead, costs, profit, and other expenses on account of cash allowances, if any, named in the Contract Documents, in accordance with Paragraph 13.02.B of the General Conditions.

ARTICLE 14—SUBMITTAL OF BID

14.01 The Bidding Documents include one separate unbound copy of the Bid Form, and, if required, the Bid Bond Form. The unbound copy of the Bid Form is to be completed and submitted electronically

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

through the PennBid website, with follow up Bid security and the other documents required to be submitted under the terms of Article 2 of the Bid Form.

14.02 A Bid must be submitted no later than the date and time prescribed in the Advertisement or invitation to bid and follow up documentation must be enclosed in a plainly marked package with the Project title, and, if applicable, the designated portion of the Project for which the Bid is submitted, the name and address of Bidder, and must be accompanied by the Bid security and other required documents.

14.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.

ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID

15.01 An unopened Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.

15.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.

15.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, the Bidder may withdraw its Bid, Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

and the Bid security will be returned. Thereafter, if the Work is rebid, the Bidder will be disqualified from further bidding on the Work.

ARTICLE 16—OPENING OF BIDS

16.01 Bids will be opened at the time and place indicated in the advertisement or invitation to. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.

ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE

17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT

18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.

18.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.

18.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then Owner will reject the Bid as nonresponsive.

18.04 If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid.

18.05 Evaluation of Bids

A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.

B. In the comparison of Bids, alternates will be applied in the same order of priority as listed in the Bid Form. To determine the Bid prices for purposes of comparison, Owner will announce to all bidders a “Base Bid plus alternates” budget after receiving all Bids, but prior to opening them. For comparison purposes alternates will be accepted, following the order of priority established in the Bid Form, until doing so would cause the budget to be exceeded. After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alternate Bids for which Owner determines funds will be available at the time of award.

18.06 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.

18.07 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.

ARTICLE 19—BONDS AND INSURANCE

19.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation.

19.02 Article 8, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process.

ARTICLE 20—SIGNING OF AGREEMENT

20.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within 10 days thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.

ARTICLE 21—SALES AND USE TAXES

21.01 Owner is exempt from Pennsylvania state sales and use taxes on materials and equipment to be incorporated in the Work. (Exemption No. 232169986). Said taxes must not be included in the Bid. Refer to Paragraph SC-7.10 of the Supplementary Conditions for additional information.

ARTICLE 22—CONTRACTS TO BE ASSIGNED (NONE)

BCL /1

BCL

BIDDER'S CHECK LIST

BIDDER'S CHECK LIST

LAKE WINOLA MUNICIPAL AUTHORITY Z057000570

BCL /1

The following items must be submitted with the Bid Submission Package. The Contractor shall submit this Cheklist, and Initial each item attesting that each required form has been submitted.

Item Forms Required Initial

1 Initialed Bidder’s Checklist

2 Bid Form - signed, sealed, if applicable, and titles.

Bid Guarantee (Bid Bond, signed and emboss sealed by Contractor, if applicable, and Surety, or Certified Check)

Certified copy of "Power of Attorney" for Attorney-In-Fact who signed the Bid Bond signed by an officer of the Surety, dated (date must be even with the Bid Bond) and embossed with Surety's Seal. (Surety Company’s Form)

5 Non-collusion Affidavit

6 Qualifications Statement

7 Information to be Furnished by the Bidder (IFB)

8 Public Works Employment Verification Form (PWEV)

9 Disclosure of Lobying Activities (SF-LLL)

By submitting a Bid, the Bidder acknowledges that he has read and will comply with the insurance amounts and coverages as stated in the General Conditions.

IFB23/1

IFB - 1

INFORMATION TO BE FURNISHED BY THE BIDDER

IFB25/1

(NOTICE: This Form must be executed in ink or typed)

(Bidder's Name)

For Contract No. 25 STRUCTURAL, MECHANICAL AND ELECTRICAL WORK

Job Title: CONTRACT 25 – REHABILITATION OF EXISTING PUMP STATION

Owner Lake Winola Municipal Authority Lower Mill City Road P.O. Box 59 Lake Winola, PA 18625-0059

To: ATLAS Technical Consultants, LLC

1001 Lackawanna Trail Clarks Summit, PA 18411

Attention: Contract Administrator

GENERAL

A. This Section is to be submitted with the Bidding Documents.

PART A - LIST OF INTENDED SUBCONTRACTORS

Subcontractor (Name and Address) Work To Be Performed

NOTE:

1. The Owner in no way implies acceptance of the intended Subcontractor(s) by acceptance of bids.

2. The Contractor will not be permitted to substitute Subcontractors not listed on this form without written approval of the Owner.

IFB25/2

PART B - LIST OF INTENDED MANUFACTURERS

1. The undersigned proposes to furnish the following equipment contingent upon its conformity to the Specifications and its review by the Engineer.

The Manufacturer's name must be stated. Use of the words "as specified" or similar wording will not be acceptable in lieu of a manufacturer's name.

2. Only one manufacturer's name shall be listed. If Bidder in contravention of this instruction names more than one manufacturer, the Owner will consider only the name of the first manufacturer listed. The Owner also reserves the right to reject all manufacturers named by the Bidder whose products do not meet the requirements of the Specifications.

UNIT

SPEC

SECTION

VENDOR

Temporary Pump System 01501

Notes:

1. If listed equipment is indicated to be furnished by a manufacturer not specified, the Owner in no way implies acceptance of such listed equipment by acceptance of the Bids.

2. The Contractor shall not substitute manufacturer's names not listed on this form without written approval of the Owner, following Engineer’s review of the APPLICATION FOR REVIEW bound herein.

IFB25/3

(We) (I), the undersigned agree that the Subcontractors and manufacturers listed above will perform the noted work and furnish the listed equipment, subject to the Owner’s acceptance.

Name: _____________________________________ Date: ________________ (Sign)

Name: Title:_________________ (Type) (Type)

A preliminary approved Equipment Manufacturer's list will be incorporated as part of the Contract Documents and will be subject to detailed review by the Engineer after submittal of the Shop Drawings. The components, if accepted, are to be purchased by the Contractor under the original bid price.

NCA

NON-COLLUSION AFFIDAVIT

NCA/1

NON-COLLUSION AFFIDAVIT

COMMONWEALTH OF PENNSYLVANIA Lake Winola Municipal Authority ss:

COUNTY OF WYOMING Rehabilitation of Existing Pump Station

I, , of , in the County of and the

State of ____________, of full age, being duly sworn according to law on my oath depose and say that:

I am of the firm of the Bidder making the Proposal for the above named project, and that I executed the said Proposal with full authority so to do; that said Bidder has not, directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free, competitive Bidding in connection with the above named project; and that all statements contained in said Proposal and in this affidavit are true and correct, and made with full knowledge that the LAKE WINOLA MUNICIPAL AUTHORITY relies upon the truth of the statements contained in said Proposal and in the statements contained in this affidavit in awarding the contract for the said project.

I further warrant that no person or selling agency has been employed or retained to solicit or secure such contract upon an agreement or understanding for a commission, percentage, brokerage or contingent fee, except bona fide employees or bona fide established commercial or selling agencies maintained by

(Name of Contractor)

(Also type or print name of affiant under signature)

Subscribed and sworn to before me this day of 20___.

Notary Public of

My commission expires , 20 __.

SS

STATEMENT OF SURETY COMPANY

STATEMENT OF SURETY COMPANY

LAKE WINOLA MUNICIPAL AUTHORITY Z0570000570

SS/1

IN ACCORDANCE with the provisions of the CONTRACT dated between the (Owner) and (Contractor)

, the (Surety)

, SURETY on the Labor and Material Payment BOND of after a careful examination of the books and records of said CONTRACTOR or after receipt of an affidavit from CONTRACTOR, which examination of affidavit satisfies SURETY that all claims, for labor and materials have been satisfactorily settled, hereby approved by the final payment of the said

CONTRACTOR

and by these presents witnesseth that payment to the CONTRACTOR of the final estimates shall not relieve surety of any of its obligations to

(Owner) as set forth in the said SURETY COMPANY'S BOND.

IN WITNESS WHEREOF, said SURETY has hereunto set its hand and seal this ________________ day of ________________, 20___

ATTEST:

(SEAL) BY:

(President)

NOTE: This statement, if executed by any person other than the President or Vice President of the Company, must be accompanied by a certificate of even date showing authority conferred upon the person so signing to execute such instruments on behalf of the Company represented.

CA/1

CA

CONTRACTOR'S AFFIDAVIT

CA/1

CONTRACTOR'S AFFIDAVIT

STATE OF:

COUNTY OF:

Before me, the undersigned, a (Notary Public, Justice of the Peace or Alderman) in and for said County and State, personally appeared

(Individual, Partner or duly authorized representative of Corporate Contractor) who being duly sworn according to law, deposes and says that all labor, material and outstanding claims and indebtedness of whatever nature arising out of the performance of the CONTRACT of the (Owner) with have been paid in full.

(Individual, Partner, or duly authorized representative of Corporate Contractor)

Sworn to and subscribed before me this ____________________ day of

____________________, 20 ______

Notary Public (Seal)

PWEVF

Public Works Employment Verification Form

Street Address 2

City State Zip Code

Doing Business As:

(if different from Legal Name)

Commonwealth of Pennsylvania Public Works Employment Verification Form

Complete and return the form to the contracting Public Body prior to the award of the contract.

Company Legal Name: ___________________________________________________________

Mailing Address: ______________________________________________________

Check one: Contractor Subcontractor

Contracting Public Body: _________________________________________________________

Contract/Project Number: ________________________________________________________

Project Description: _____________________________________________________________

Project Location: _______________________________________________________________

Date Enrolled in E-Verify (MM/DD/YYYY): ___________________________________________ As a contractor/subcontractor for the above referenced public works contract, I hereby affirm that as of today’s date, __________________________, our company is in compliance with the Public Works Employment Verification Act (‘the Act’) through utilization of the federal E-Verify Program (EVP) operated by the United States Department of Homeland Security. To the best of my/our knowledge, all employees hired are authorized to work in the United States.

It is also agreed to that all public works contractors/subcontractors will utilize the federal EVP to verify the employment eligibility of each new hire within five (5) business days of the employee start date throughout the duration of the public works contract. Documentation confirming the use of the federal EVP upon each new hire shall be maintained in the event of an investigation or audit.

I,____________________________________________, authorized representative of the company above, attest that the information contained in this verification form is true and correct and understand that the submission of false or misleading information in connection with the above verification shall be subject to sanctions provided by law.

Authorized Representative Signature Date of Signature

Printed Name: _________________________________________________________________

Phone Number: ______________________ Email: ____________________________________

Street Address 1

SF-LLL

DISCLOSURE OF LOBBYING ACTIVITIES

DISCLOSURE OF LOBBYING ACTIVITIES

Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352

(See Reverse for public burden disclosure.)

Approved by OMB No. 0348-0046

1. Type of Federal Action: 2. Status of Federal Action: 3. Report Type:

a. contract

b. grant

c. cooperative agreement

d. loan

e. loan guarantee

f. loan insurance

a. bid/offer/application

b. initial award

c. post-award

a. initial filing

b. material change

For Material Change Only:

year quarter date of last report

Federal Use Only:

Authorized for Local Reproduction Standard Form LLL (Rev. 7-97)

4. Name and Address of Reporting Entity:

6. Federal Department/Agency:

5. If Reporting Entity in No. 4 is a Subawardee, Enter Name and Address of Prime:

Congressional District, If known:

8. Federal Action Number, If known:

7. Federal Program Name/Description:

9. Award Amount, If known:

b. Individuals Performing Services (Including address if different from No. 10a) (last name, first name, MI):

10. a. Name and Address of Lobbying Registrant (If individual, last name, first name, MI):

11.

Signature:

Print Name:

Title:

Telephone No.: Date:

Information requested through this form is authorized by title 31 U.S.C.

section 1352. This disclosure of lobbying activities is a material representation of fact upon which reliance was placed by the tier above when this transaction was made or entered into. This disclosure is required pursuant to 31 U.S.C. 1352. This information will be reported to the Congress semi-annually and will be available for public inspection.

Any person who fails to file the required disclosure shall be subject to a civil penalty of not less that $10,000 and not more than $100,000 for each such failure.

Prime Subawardee

Tier , if known:

Congressional District, If known:

CFDA Number, if applicable:

INSTRUCTIONS FOR COMPLETION OF SF-LLL, DISCLOSURE OF LOBBYING ACTIVITIES

This disclosure form shall be completed by the reporting entity, whether subawardee or prime Federal recipient, at the initiation or receipt of a covered Federal action, or a material change to a previous…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .