Contract Summary

This is a Request for Qualifications and Proposals (RFQ/P) issued by the Ontario-Montclair School District for construction services using the lease-leaseback delivery method. The solicitation covers seven distinct projects across two elementary schools: four projects at Euclid Elementary School (basement classroom conversion, TK/kindergarten playground installation, courtyard roof tile replacement, and artificial turf playfield installation) and three projects at Monte Vista Elementary School (window replacement with exterior painting and parking lot asphalt replacement, shade structure installation, and marquee sign installation). The total estimated project cost is $6,000,000. Contractors must hold a current Class B California Contractor's License, maintain a staffed office within 75 miles of the district, and prequalify through the district's prequalification process. The deadline for submitting prequalification questionnaires and proposals is December 10, 2026, and December 21, 2026, respectively. Voluntary site visits are scheduled for December 3, 2026, beginning at Monte Vista Elementary School. Tentative board approval of the selected contractor is targeted for late January 2027. The construction schedule requires project completion by July 30, 2027, for Euclid projects and most Monte Vista projects, with the window replacement/painting/asphalt project extending to July 30, 2028. The anticipated lease period following construction completion is approximately twelve months.

The compensation structure involves a Guaranteed Project Cost (GPC) to be finalized after the subcontractor procurement process. Contractors must submit detailed pricing for preliminary services, general conditions staffing, markups on subcontractor and self-performed work, change order markups, bonding and insurance costs, and a financing charge for lease payments. The district will conduct a best value evaluation process with potential scoring of proposals (minimum 750 of 850 points required), interviews, and reference checks. Contractors must comply with skilled and trained workforce requirements under Public Contract Code Section 2600 and Education Code Section 17407.5. The solicitation requires contractors to demonstrate extensive experience with California K-12 public school construction, the Division of the State Architect, and alternative delivery methods. Contractors cannot have conflicts of interest and must provide evidence of bonding capacity from a surety. The district reserves the right to reject any response and is not obligated to award a contract as a result of this process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMSD – RFQ/P– LLB Contractors: Euclid and Monte Vista Projects Page 1

Ontario-Montclair School District 950 West D. Street

Ontario, California 91762

November 12, 2026

REQUEST FOR QUALIFICATIONS AND PROPOSALS FOR

CONSTRUCTION SERVICES (LEASE-LEASEBACK)

FOR

EUCLID ELEMENTARY SCHOOL

BASEMENT CLASSROOM CONVERSION, TK/KINDER PLAYGROUND INSTALLATION

COURTYARD ROOF TILE REPLACEMENT AND ARTIFICIAL TURF PLAYFIELD INSTALLATION

PROJECTS

MONTE VISTA ELEMENTARY SCHOOL

WINDOW REPLACEMENT, EXTERIOR PAINTING, PARKING LOT ASPHALT REPLACEMENT,

SHADE STRUCTURE INSTALLATION AND MARQUEE SIGN INSTALLATION

RFQ/P #C-267-523

The Ontario-Montclair School District (“District”) issues this Request for Qualifications and Proposals (“RFQ/P”) to request the submission of:

• A completed prequalification questionnaire (“Prequalification Questionnaire(s)”); and

• A proposal (“Proposal(s)”)

(collectively, “Response(s)”) from qualified firms, associations, persons, or professional organizations (“Contractor(s)” or “Firm(s)”) to perform construction services and preliminary (preconstruction) services pursuant to the lease-leaseback delivery method.

Project. The district is soliciting Services (defined below) for seven (7) projects:

1) Euclid Basement Conversion

2) Euclid TK/Kindergarten Playground Installation

3) Euclid Quad Roof Tile Replacement

4) Euclid Artificial Turf at Playfield Installation

5) Monte Vista Window Replacement, Painting, and Asphalt Replacement

6) Monte Vista Shade Structure Installation

7) Monte Vista Marquee Sign Installation (“Projects”). The Projects description and draft construction schedule is included in Attachment 1.

The successful Contractor will LATER finalize a guaranteed project cost (“GPC”) pursuant to the required process in the District’s Form of Lease-Leaseback Contract attached hereto as Attachment 3 (“Contract”) (including the required Subcontractor Procurement Process in Exhibit H to the Facilities Lease in the Contract).

OMSD – RFQ/P– LLB Contractors: Euclid and Monte Vista Projects Page 2

CONTRACTORS THAT INTEND TO SUBMIT A RESPONSE MUST MEET THE FOLLOWING CRITERIA:

• Prequalify through the District’s prequalification process; and

• Hold a Class B Contractors License, which is current, valid, and in good standing with the California

Contractor's State License Board; and

• A Firm can be located anywhere, but it must maintain a staffed office within 75 miles of the district.

Responses. Interested Contractors are invited to submit a Response as described below.

Prequalification Questionnaire. All Contractors must complete the Prequalification Questionnaire by the date and time indicated in the RFQ/P Schedule set forth below. The Prequalification Questionnaire can be accessed at: https://www.omsd.net/main-purchasing/bidding

Proposal. Proposals must be received by the date and time indicated in the RFQ/P Schedule. All submittals shall be uploaded in .pdf format to https://omsd.bonfirehub.com/portal/?tab=openOpportunities

Site Visit. There will be a voluntary site visit(s) on the dates and at the times indicated in the RFQ/P Schedule.

Questions. Questions regarding this RFQ/P must be in writing and uploaded at https://omsd.bonfirehub.com/portal/?tab=openOpportunities by the date indicated in the RFQ/P Schedule.

Contractors are directed to not contact any other person regarding this RFQ/P. ATTEMPTS BY A CONTRACTOR TO CONTACT ANY OTHER PERSON OR VISIT A DISTRICT SITE MAY RESULT IN DISQUALIFICATION OF THAT

CONTRACTOR.

RFQ/P Addenda. If the District issues addenda to this RFQ/P, Contractors are solely responsible for and must acknowledge receipt of addenda in the Contractor’s Proposal. Failure to acknowledge and respond to any addenda issued by the district may, in the district’s sole discretion, render the Contractor’s Proposal to be deemed non-responsive and rejected.

List of Attachments. The following attachments are part of this RFQ/P:

Attachment 1 Project Description (per project) and Construction Schedule

Attachment 2 Contractor Certifications to be Submitted with Proposal

Attachment 3 District’s Form of Lease-Leaseback Contract - DRAFT

RFQ/P Schedule. All Contractors must adhere to the following schedule (“RFQ/P Schedule”). The district reserves the right to modify this RFQ/P Schedule and will issue an addendum if it modifies this RFQ/P Schedule.

Event / Occurrence Time / Date / Deadline Advertisement

November 13. 2026 November 20, 2026

VOLUNTARY Site Visit(s) at Project site:

Monte Vista Elementary School, 4900 Orchard St., Montclair, CA 91763 Euclid Elementary School, 1120 Euclid Ave., Ontario, CA 91762

NOTE: Contractors should arrive at the school site at least 5 minutes before the scheduled commencement of the site visit(s). Parking is limited to street parking.

December 3, 2026 @ 10:00 pm.

Starting at Monte Vista

Deadline for Contractors to submit questions regarding this RFQ/P December 10, 2026 District to issue addenda (if applicable) December 15, 2026 https://www.omsd.net/main-purchasing/bidding https://nam10.safelinks.protection.outlook.com/?url=https%3A%2F%2Fomsd.bonfirehub.com%2Fportal%2F%3Ftab%3DopenOpportunities&data=05%7C02%7CBrooke.Murray%40omsd.net%7C5e96563ba45546d4c15908de94e0d90e%7Caa5442ad41524fd6baae3b019a18ce92%7C0%7C0%7C639111890592743973%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=v7O7X7HtC8Yqc%2BY%2FFdK%2FUr2p11HgauVI%2F%2Fcxevjf%2FPM%3D&reserved=0 https://nam10.safelinks.protection.outlook.com/?url=https%3A%2F%2Fomsd.bonfirehub.com%2Fportal%2F%3Ftab%3DopenOpportunities&data=05%7C02%7CBrooke.Murray%40omsd.net%7C5e96563ba45546d4c15908de94e0d90e%7Caa5442ad41524fd6baae3b019a18ce92%7C0%7C0%7C639111890592743973%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=v7O7X7HtC8Yqc%2BY%2FFdK%2FUr2p11HgauVI%2F%2Fcxevjf%2FPM%3D&reserved=0

OMSD – RFQ/P– LLB Contractors: Euclid and Monte Vista Projects Page 3

Deadline for contractors to submit Prequalification Questionnaires December 10, 2026 District to notify Contractor of prequalification status December 15, 2026

DEADLINE FOR CONTRACTORS TO SUBMIT PROPOSAL December 21, 2026, by 10:00 am

If District conducts interviews, District will send out notifications on January 4, 2027 District Interview date January 7, 2027 Tentative Board approval of selected Contractor TBD (Late January)

Thank you for your interest in working with the district.

OMSD – RFQ/P– LLB Contractors: Euclid and Monte Vista Projects Page 4

1. General Information.

1.1. General Services. The District invites qualified Contractors to submit a Response related to their ability to provide the Services, as more fully indicated herein. Contractors must have extensive experience with the Office of Public-School Construction (“OPSC”), California Building Standards Code (Title 24, California Code of Regulations), Department of Toxic Substances Control, and the Division of the State Architect (“DSA”). Contractors must have extensive experience in the construction of public-school facilities, working with public school district representatives, working with architects, contractors and other school facility related consultants, and establishing project scope, project budgets, and bidding procedures under both the Public Contract Code’s formal bidding process and under alternative construction delivery methods.

1.2. Lease-Leaseback Structure. A District lease-leaseback project may be funded from various sources, and any agreement reached will conform to the statutory framework for the lease-leaseback delivery method. (Ed. Code, § 17406.) The Contractor will be responsible for financing a portion of the construction of the Project. During construction, the District shall pay tenant improvement payments. Once the Project is complete, the Contractor shall subsequently lease the constructed facilities back to the District for a pre-determined monthly lease payment amount and lease period, plus interest. The District anticipates that the lease period will be approximately twelve (12) months for the Project. If a Contractor has questions regarding the payment structure for the Project, please review Exhibit C of the Facilities Lease of the District’s Contract (Attachment 3).

1.3. Skilled and Trained Workforce. The selected Contractor and its subcontractors at every tier are required to use a “skilled and trained workforce” for the Project, at the minimum percentages defined in Public Contract Code section 2600, et seq. and Education Code section 17407.5 (collectively, “SWF Statutes”), to perform all work that falls within an apprentice able occupation in the building and construction trades. A Contractor awarded the Project will be required to provide monthly reports demonstrating compliance by itself and its subcontractors at every tier with the skilled and trained workforce requirements as prescribed by the SWF Statutes. If a Contractor has questions regarding the skilled and trained workforce for the Project, please review the “Skilled and Trained Workforce Requirements” section in Exhibit D of the Facilities Lease in the Contract (Attachment 3).

1.4. Scope of Services. The selected Contractor must be willing and able to, in good faith, perform any and all services as set forth in the Contract and as further described in Attachment 1 (“Services”). If the Project or a phase of the Project requires Preliminary Services, the Contractor will first enter into the Preliminary Services Agreement (Exhibit L of the Facilities Lease of the Contract (Attachment 3)), which shall be incorporated into the Contract. After the Contractor’s performance of some or all of those Preliminary Services, the District and Contractor shall amend the Contract to include a GPC for the Project pursuant to the Subcontractor Procurement Process (Exhibit H of the Facilities Lease of the Contract (Attachment 3)) and other requirements in the Contract.

OMSD – RFQ/P– LLB Contractors: Euclid and Monte Vista Projects Page 5

PREQUALIFICATION

2. Prequalification.

2.1. Contractor Prequalification. Contractors must submit their Prequalification Questionnaires by the date and time indicated in the RFQ/P Schedule. A Contractor must maintain its prequalification status for the duration of the time that it performs Services on the Project.

Contractors that have prequalified within a year of the deadline for the submittal of Proposals set forth in the RFQ/P Schedule do NOT need to submit the Prequalification Questionnaire.

The Prequalification Questionnaire can be accessed through the WEBLINK ABOVE.

2.2. MEP Subcontractor Prequalification. Mechanical, electrical, and plumbing subcontractors performing work under the following license classifications: C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and/or C-46 (“MEP Subcontractors”) are not required to prequalify at this time.

The District will require MEP Subcontractors to prequalify during Preliminary Services at or before the Subcontractor Procurement Process and before the Contractor provides its GPC to construct the Project. Even so, Contractors are encouraged to direct MEP Subcontractors to prequalify as soon as possible so that the MEP Subcontractors may get qualified to bid to perform on the Project. A subcontractor can prequalify now by submitting the District’s Prequalification Questionnaire at the WEBLINK ABOVE.

PROPOSALS

3. Format and Contents of Proposal. Contractor’s Proposal must demonstrate Contractor’s qualifications, be concise, well-organized, tabbed consistent with the structure below, and shall be no longer than fifty (50) pages, inclusive of résumés, forms, and pictures. Each Contractor’s Proposal must address all areas indicated below:

3.1. Table of Contents. A table of contents of the material contained in the Proposal.

3.2. Letter of Interest. A dated Letter of Interest must be submitted, including the legal name of the

Contractor, address, telephone, email(s), and the name, title, and signature of the person authorized to submit the Proposal on behalf of the Contractor. The Letter of Interest should provide a brief statement of the Contractor’s experience and should indicate the unique background and qualities of the Contractor, its personnel, and what will make the Contractor a good fit for work in the District.

3.3. Executive Summary. An executive summary that outlines the Contractor’s history, and, if a joint venture, of each participating entity, Contractor’s philosophy, along with a brief summary of the Contractor’s qualifications.

3.4. Past Projects: Contractor’s K-12 Experience/Lease-Leaseback Experience. Describe the

Contractor’s experience and expertise performing projects for California K-12 public school districts for the past seven (7) years. Provide the following information for all projects Contractor has completed or is currently performing. You may limit your response to the ten (10) most-recently completed projects. Indicate in your Proposal which of these projects were performed pursuant to a lease-leaseback structure or other alternative (not design-bid-build) structure. This requirement is in addition to any past-project requirements in the Prequalification Questionnaire.

OMSD – RFQ/P– LLB Contractors: Euclid and Monte Vista Projects Page 6

Project name/identification:

Project address/location:

Project owner, contact person, and telephone:

Project architect name and telephone number:

If Contractor was a subcontractor, name of general contractor and telephone number:

Scope of work:

Original completion date:

Date completed:

Initial contract value (as of time of contract award):

Final contract value:

Delivery Method (lease-leaseback, design-build, etc.):

Was there a project labor/stabilization/workforce agreement or a local capacity/local participation policy or program?

Other project information:

3.5. Construction Schedule.

3.5.1. Discuss the Contractor’s ability to prepare and meet achievable construction schedules for construction projects, Contractor’s schedule management procedures, and how the Contractor has successfully handled potential and actual delays.

3.5.2. Discuss the Contractor’s ability to meet the construction schedule for the Project set forth in Attachment 1.

3.6. Proposed Personnel/Contractor Team. Please specifically identify and include the resumes of key personnel who would be performing Services for the District. Specifically, define the role of each person and outline his or her individual experience and responsibilities. Indicate personnel who will serve as primary contact(s) for the District and each person’s availability to provide services to the District. Contractor should describe the experience the personnel have on previous projects, if any. Describe how Contractor’s personnel will work with District staff during Preliminary Services (if any) and construction services to ensure that Contractor effectively and efficiently completes the Project. The District expects that key personnel identified by Contractor will perform services on the Project but recognizes Contractor might have turnover in staff.

3.7. Contractor’s Ability to Perform Preliminary Services. Describe the Contractor’s ability and past experience performing the Preliminary Services as identified in the Contract (see Exhibit L to the Facilities Lease in the Contract (Attachment 3)). Specifically discuss Contractor’s demonstrated success performing Preliminary Services. Identify subconsultants, if any, that Contractor expects will perform Preliminary Services for Contractor. The District reserves the right to adjust the scope of the Preliminary Services at the time of execution of the Preliminary Services Agreement in the Contract for the Project.

3.8. Cost Savings / Value Engineering. The District is seeking Contractors that have direct experience and/or can demonstrate an aptitude to “value engineer” or analyze a project’s plans, components, and features, and find more efficient and cost-effective methods or alternatives.

Describe Contractor’s specific experience providing value engineering on Contractor’s past projects, including amounts saved on previous projects, if possible. Describe generally the type of suggestions, recommendations, alternatives or other valuation determinations that the Contractor could implement on any project.

3.9. Budget. Discuss the Contractor’s ability to manage costs and stay within budgets on comparable projects.

OMSD – RFQ/P– LLB Contractors: Euclid and Monte Vista Projects Page 7

3.10. Contractor’s Experience with Skilled and Trained Workforce Requirements.

3.10.1. Describe Contractor’s experience complying with the skilled and trained workforce requirements of the SWF Statutes. Include a description of any disputes or claims arising out of the Contractor’s compliance/non-compliance with the SWF Statutes, including any penalties assessed against Contractor or any of its subcontractors by the Labor Commissioner.

3.10.2. Include a copy of the form that you and your subcontractors intend to use to demonstrate compliance with the SWF Statutes. The District reserves the right to have the Contractor utilize a District-provided form.

3.11. Subcontractor Procurement. The District will require the selected Contractor(s) to solicit and procure subcontractors pursuant to the Subcontractor Procurement Process in Exhibit H to the Facilities Lease in the Contract (Attachment 3) after the performance of Preliminary Services.

3.11.1. Describe how Contractor expects the open-book process for the solicitation of subcontractors to proceed, and the District and Contractor’s role during this process.

3.11.2. Describe how Contractor ensures that any self-performed work is competitively priced with other subcontractors.

3.11.3. Describe the Contractor’s process for ensuring that all subcontractor bid packages are full and complete, and how Contractor minimizes scope gaps.

3.11.4. Expressly indicate Contractor’s agreement to abide by the District’s Subcontractor

Procurement Process on the Project.

3.12. Contractor’s Current Work Commitments. Specify the current and projected workload of Contractor. If applicable, provide a statement of all recent, current, or anticipated contractual obligations that relate in any way to similar work for the District that may have a potential to impede Contractor’s ability to provide the Services for the Project. Please provide a list of projects for which Contractor is currently performing services, and those projects for which the Contractor is under contract, or anticipates being under contract, during the next two (2) years.

3.13. Bonding Capacity. Indicate Contractor’s limitation or surety restrictions related to the size of projects that Contractor can contract for and can effectively perform. Provide a letter from your surety or broker that states Contractor’s current bonding capacity.

3.14. Conflicts of Interest. Contractors cannot submit, propose, bid, contract, subcontract, consult, or have any other economic interests in a project to which the Contractor may provide Services.

Please identify whether the Contractor has any conflicts of interest preventing it from performing the Services.

3.15. Safety. Discuss the Contractor’s safety program, the content and frequency of its safety meetings, the basis for its current experience modification rate (“EMR”) number, its Injury and Illness Prevention Program and who the Contractor’s safety officer would be and his/her qualifications for that position. Please provide documentation showing the Contractor’s current EMR number; this requirement is cumulative of any requirement in the Prequalification Questionnaire requiring Contractor to provide EMR information.

OMSD – RFQ/P– LLB Contractors: Euclid and Monte Vista Projects Page 8

3.16. References. Contractor may include letters of reference or testimonials. Contractor should limit letters of references or testimonials to a maximum of ten (10).

3.17. Lease-Leaseback Contract. If Contractor has any comments or objections to the Contract attached hereto as Attachment 3, it must provide those comments or objections, with specificity, in its Proposal. PLEASE NOTE: The District will not consider any changes to the Contract if they are not submitted with the Contractor’s Proposal. Any changes made to the Contract as a result of Contractor’s comments to the Proposal shall not be subject to renegotiation.

3.18. Additional Information. Provide additional information about the Contractor as it may relate to Contractor’s Proposal.

3.19. Compensation. A general description of the scope of the Project for construction and preliminary (preconstruction) services is set forth in Attachment 1. Contractor shall provide all the following cost information: (1) to perform the Preliminary Services and (2) that it will charge as part of the construction services. Please complete the table below, inclusive of all items as set forth in the Contract.

COMPENSATION AND PRICING

Item Amount

Cost to Perform Preliminary Services

Staffing that would be part of Preliminary Services

Project Manager (hourly rate)

Constructability Reviewer (hourly rate)

Estimator (hourly rate)

Scheduler (hourly rate)

Other: ____________________

Cost of General Conditions (Including General Requirements)

Staffing that would be part of General Conditions

Project Executive (hourly rate)

Project Manager (hourly rate)

Project Superintendent (hourly rate)

Project Engineer (hourly rate)

Other: ____________________

Mark-up on Subcontractor work

OMSD – RFQ/P– LLB Contractors: Euclid and Monte Vista Projects Page 9

Mark-up on self-performed work

Mark-up on Subcontractor change order work *

Mark-up on self-performed change order work *

Fee / overhead & profit (as a percentage of direct costs), if any in addition to the “Mark-ups” indicated above

Bond & insurance cost (as a percentage of direct costs) (no Builders Risk Coverage)

Builder’s Risk Insurance cost – NO Earthquake or Flood (as a percentage of direct costs)

Builder’s Risk Insurance cost – JUST Earthquake and Flood (i.e., added premium) (as a percentage of direct costs)

Other costs (identify in sufficient detail for evaluation, either as a lump sum or a percentage of direct costs)

$____ or _____%

Financing Charge ** (The Contractor’s charge for interest on the Lease Payments the District must pay.)

* Change Order Mark-Up. Contractor must agree to utilize this same mark-up percentage for change orders during the entire Project.

** Financing. Financing Cost. The District shall make Lease Payments to the Contractor over a twelve (12) month period after completion of the Project. Those Lease Payments will be part of the GPC and are anticipated to be no more than five percent (5%) of the GPC. State the Contractor’s proposed interest charge (financing percentage) for the Project for those Lease Payments for twelve (12) months.

USE ADDITIONAL SHEETS AS NECESSARY

3.19.1. Preliminary Services. In the space indicated above, provide a not-to-exceed amount to perform the required Preliminary Services (preconstruction services) for the entire Project. Provide staffing costs that will remain fixed throughout the duration of the Project.

3.19.2. General Conditions. In the space indicated above, provide an amount for the general conditions and general requirements. Attach a detailed list of ALL items that Contractor would include in its general conditions or general requirements on the Project. Provide staffing costs that will remain fixed throughout the duration of the Project.

3.19.3. Subcontractor Default Insurance (SDI) or Subcontractor Bonds. If Contractor will charge for one or more of these items or similar items, describe that item in detail and provide that cost as part of “Other costs” in the table above, either as a dollar amount or percentage.

3.19.4. Final GPC. At the conclusion of the Subcontractor Procurement Process for the Project, or a Phase if applicable, the Contractor and the District shall finalize the GPC for the

OMSD – RFQ/P– LLB Contractors: Euclid and Monte Vista Projects Page 10

Project, or each Phase if applicable, and the Parties District will amend the Contract to authorize the construction and to incorporate or adjust the GPC as necessary.

3.19.5. Certifications to be Submitted with Proposal. Contractors must complete and submit with their Proposals the Certifications (Attachment 2).

DISTRICT’S EVALUATION

4. District’s Evaluation / Best Value Selection Process. The District will evaluate Contractor’s Responses based on a best value determination process. The District wishes to retain a Contractor that has the financial strength, management and expertise to deliver the Project within a proposed schedule and within an established budget and a proven track record for cost-efficient and timely work.

4.1. STEP 1 (Prequalification). Contractors must be prequalified pursuant to the District’s prequalification process. This is a “pass” or “fail” STEP.

4.2. STEP 2 – STEP 4 (Responses, Interviews & References). The District will evaluate each Contractor’s Proposal based on the process indicated below. To move on to the next STEP in the evaluation process, the Contractor must receive the minimum required points in the previous STEP. The District may elect to finish the evaluation process after scoring Proposals (STEP 2), or may elect to conduct interviews (STEP 3) and/or contact and score references (STEP 4), each in the District’s sole discretion. The District will select the Contractor(s) for the Project that receive the highest best value score for the Project at the STEP at which the District ends its evaluation.

4.3. Scoring. The following table indicates how the District will score STEPS 2 – 4. Only Contractors that receive the minimum qualification points at each STEP will move to the next STEP. The District may, at its sole discretion, interview some or all of the Contractor(s) that submit a Response and/or contact references of Contractor(s).

STEP 1:

Scoring of Prequalification Questionnaire

Only prequalified Contractors will proceed to STEP 2.

STEP 2:

Scoring of Proposals

Minimum points required in STEP 2 for Contractors to proceed to STEP 3: 750 points.

Total maximum possible points from STEP 2: 850 points.

The District reserves the right to select Contractors to include in the District’s pool at this step.

STEP 3:

Scoring of Interviews (Optional)

The District will only interview Contractors (if it conducts interviews of Contractors) that have the required minimum score after STEP 2. The District, at its discretion, may elect to forego conducting interviews. If the District conducts interviews, then the following shall apply:

Minimum points required in STEP 3 for Contractors to qualify: 250 points.

Total maximum possible points from STEP 3: 300 points.

STEP 4:

Scoring of Reference

The District will only contact references (if it conducts reference checks) of Contractors that have the required minimum score after STEP 2. The District, at its discretion, may elect to forego conducting reference

OMSD – RFQ/P– LLB Contractors: Euclid and Monte Vista Projects Page 11

Checks (Optional) checks. If the District conducts reference checks, then the following shall apply:

Minimum points required in STEP 4 for Contractors to qualify: 100 points.

Total maximum possible points from STEP 4: 130 points

DISTRICT’S BEST VALUE DETERMINATION

The District’s best value determination is based on the prequalified Contractors that receive the most points from scoring as follows:

• If the District does not conduct interviews and does not conduct reference checks, the

District shall use the points from STEP 2 as the basis for its best value determination.

• If the District conducts interviews and does not conduct reference checks, the District shall use the points from STEP 3 as the basis for its best value determination, assuming the Contractor has the minimum number of required points.

• If the District conducts reference checks and does not conduct interviews, the District shall use the points from STEP 2 added with the points from STEP 4 as the basis for its best value determination, assuming the Contractor has the minimum number of required points.

• If the District conducts interviews and conducts reference checks, the District may choose to do either in any order it determines. The District shall use the points from STEP 3 or the points from STEP 2 added with the points or STEP 4, whichever occurs last, as the basis for its best value determination, assuming the Contractor has the minimum number of required points for both STEPS.

District staff reserve the right to create a panel of evaluators to score Contractors, and then average those scores at each STEP to determine Contractors’ scores.

4.4. Notification. The District will notify Contractor(s) of their status upon completion of the process via email from the District as listed in the RFQ/P Schedule.

4.5. During the evaluation of the Responses, contact shall only be through the individual identified in the RFQ/P. Contractor(s) shall neither contact nor lobby evaluators during the evaluation process. Attempts by a Contractor to contact and/or influence the District may result in disqualification of that Contractor.

4.6. The District reserves the right to reject any Response as non-responsive, and to not contract with any Contractor for any Services in a subsequent proposal. The District makes no representation that participation in the RFQ/P process will lead to an award of contract or any consideration whatsoever. The District reserves the right to seek Responses from or to contract with any Contractor not participating in this process. The District shall in no event be responsible for the cost of preparing any Response. The District reserves the right to adjust the structure of the project(s) and to request a successful Contractor provide initial pricing information, fee(s) for preliminary services, general conditions, partial construction services, etc., for a project or a phase within a project.

OMSD – RFQ/P– LLB Contractors: Euclid and Monte Vista Projects Page 12

4.7. All Responses will become the property of the District and subject to the California Public Records Act, Government Code sections 7920.000, et seq. Those elements in a Response that are trade secrets as that term is defined in Civil Code section 3426.1 (d) or otherwise exempt by law from disclosure and which are prominently marked as “Trade Secret,” “Confidential,” or “Proprietary” may not be subject to disclosure. The District shall not be liable or responsible for the disclosure of any such records including, without limitation, those so marked if disclosure is deemed to be required by law or by an order of a Court. A Contractor that indiscriminately identifies all or most of its Response as exempt from disclosure without justification may be deemed non-responsive. In the event the District is required to defend an action on a Public Records Act request for any of the contents of a Response marked “Trade Secret,” “Confidential,” or “Proprietary,” the Contractor agrees, by submission of its Response, to defend and indemnify the District from all costs and expenses, including attorneys’ fees, in any action or liability arising under the Public Records Act.

5. District’s Appeal Process.

5.1. A Contractor may appeal the District’s “best value” determination. If a Contractor decides to appeal the District’s determination, it must follow the following procedure. Failure of a Contractor to timely follow all appeal steps shall be a waiver of the Contractor’s right to appeal the District’s determination.

5.1.1. The Contractor shall submit, in writing, within two (2) business days after receipt of notice of the District’s determination (“Action”), a written request for a response from the District to explain the District’s determination.

5.1.2. Within two (2) business days from receipt of the District’s response to the Contractor’s request, Contractor(s) may request in writing a meeting, which will be restricted to no more than two (2) persons from the Contractor to have a discussion with District staff regarding that Contractor’s Response. All meetings will take place via a virtual conference, teleconference, or an in-person meeting, at the District’s sole discretion.

Contractor may submit with the request any and all information that it believes supports a finding that District’s Action should be changed.

5.1.3. If the Contractor continues to contest the District’s Action after that meeting with

District staff, then the Contractor may address the Board at the next public noticed meeting of the District’s governing board (“Board”), pursuant to the Board’s procedures for public comment. In order for a Contractor to preserve its right to challenge the District’s Action, the Contractor must address the Board at the next public noticed meeting of the Board after the Contractor’s meeting with District staff.

5.2. The above appeals process does not apply to the prequalification process, which will be done pursuant to the process in the Prequalification Questionnaire, if any.

OMSD – RFQ/P– LLB Contractors: Euclid and Monte Vista Projects Page 13

ATTACHMENT 1

PROJECT DESCRIPTIONS AND CONSTRUCTION SCHEDULE

EUCLID ELEMENTARY SCHOOL

BASEMENT CLASSROOM CONVERSION

KINDERGARTEN PLAYGROUND INSTALLATION

COURTYARD ROOF TILE REPLACEMENT

ARTIFICIAL TURF PLAYFIELD INSTALLATION

MONTE VISTA ELEMENTARY SCHOOL

WINDOW REPLACEMENT

EXTERIOR PAINTING

PARKING LOT ASPHALT REPLACEMENT

SHADE STRUCTURE INSTALLATION

MARQUEE SIGN INSTALLATION

Preliminary Services (Preconstruction):

The District requires the following Preliminary Services (preconstruction services), which are described in detail in Attachment A to Exhibit L to the Facilities Lease in the Contract. A summary of the required Preliminary Services for the Project is as follows:

1. General Services.

• Contractor shall attend regular meetings during Project development between the Architect, the District, District site personnel, and any other applicable consultants of the District as required to discuss the Project, including budget, scope, and schedule.

• Contractor shall prepare and update the preliminary Project schedule.

• Contractor shall prepare and update the components of the Guaranteed Project Cost and shall be primarily in control of ensuring that the Project can and is constructed for no more than that amount.

2. Review of Design Documents.

• Contractor shall review Project design and provide the following:

o Value-engineering. Contractor shall prepare a value-engineering report for District review and approval.

o Constructability Review. Contractor shall prepare a detailed interdisciplinary constructability review within thirty (30) days of receipt of the plans from the District.

• Confirm Modifications to Design Drawings. If the District accepts Contractor’s comments, including the value-engineering and/or constructability review comments, Contractor shall review the design documents to confirm that those comments are properly incorporated into the final design documents. The comments accepted will be issued as a DSA addendum.

3. Construction Schedule and Phasing Plan. Contractor shall prepare a preconstruction schedule to guide the design team through to bid dates.

4. Construction Planning and Bidding.

• Contractor shall review the drawings and specifications to eliminate areas of conflict and overlap in the work to be performed by various subcontractors, and with a view to eliminating change order requests by the Architect or subcontractors.

• Contractor shall prepare appropriate subcontractor bid packages.

5. Bidding for Subcontractor Work.

• Contractor shall solicit and procure Subcontractors pursuant to the Subcontractor Procurement

OMSD – RFQ/P– LLB Contractors: Euclid and Monte Vista Projects Page 14

Process attached to the Facilities Lease as Exhibit H.

• Finalizing the GPC. After Contractor completes the Subcontractor Procurement Process as set forth in

Exhibit H to the Facilities Lease and the District approves the Subcontractor bids and self-performed construction work, if any, Contractor shall prepare a final proposed GPC as set forth in Exhibit C to the Facilities Lease.

Estimated Construction Cost:

Euclid Basement Modernization DSA # 04-125769 $1.300,000 Euclid TK/Kinder Playground Project DSA # 04-125930 $425,000 Euclid Quad Tile Replacement Project DSA # 04-125633 $300,000 Euclid Artificial Turf Replacement DSA # 04-125867 $300,000

Monte Vista Window Replacement, Exterior Painting and Asphalt DSA # 04-125376 $3,300,000 Monte Vista Shade Structure DSA # TBD $225,000 Monte Vista Marquee Sign DSA # DSA # TBD $150,000

Total Estimated GMP $6,000,000

Project Summary: Complete construction of the Project consistent with the DSA-approved Plans and Specifications and the Contract Documents. The Project’s Plans and Specifications may be found at:

https://omsd.bonfirehub.com/projects

DSA Number Per Project Euclid Basement Modernization DSA # 04-125769 Euclid TK/Kinder Playground Project DSA # 04-125930 Euclid Quad Tile Replacement Project DSA # 04-125633 Euclid Artificial Turf Replacement DSA # 04-125867

Monte Vista Window Replacement, Exterior Painting and Asphalt DSA # 04-125376 Monte Vista Shade Structure DSA # TBD Monte Vista Marquee Sign DSA # TBD

Construction Services Schedule: If the District issues a Notice to Proceed for construction of this scope of the Project on or before February 1 then the Project shall be completed by the following milestone dates.

Euclid Basement Modernization July 30, 2027 Euclid TK/Kinder Playground Project July 30, 2027 Euclid Quad Tile Replacement Project July 30, 2027 Euclid Artificial Turf Replacement July 30, 2027

Monte Vista Window Replacement, Exterior Painting and Asphalt July 30, 2028 4 Months per building Monte Vista Shade Structure July 30, 2027 Monte Vista Marquee Sign December 30, 2027

Design Team:

Euclid Projects Monte Vista Projects Architect: SGH Architect Architect Construction Manager: District District Project Inspector: Stephen Payte Stephen Payte https://omsd.bonfirehub.com/projects

OMSD – RFQ/P– LLB Contractors: Euclid and Monte Vista Projects Page 15

Plan Status:

Euclid Basement Modernization Pending DSA Approval Euclid TK/Kindergarten Playground Project Submitted to DSA in November Euclid Quad Tile Replacement Project Pending DSA Approval Euclid Artificial Turf Replacement S Submitted to DSA in December

Monte Vista Window Replacement, Exterior Painting and Asphalt Pending DSA Approval Monte Vista Shade Structure Pending DSA Submittal Monte Vista Marquee Sign Pending DSA Submittal

Scope of work:

Euclid Basement Modernization The scope of work includes converting the existing basement space into two classrooms, including a standard full-size classroom and a half-size classroom. This work also includes upgrades to ramps, slopes, and paving as it relates to the ADA path of travel.

Euclid TK/Kindergarten Playground Project The scope of work includes the installation of a new TK/Kinder playground in the existing quad. This work will need to be coordinated with the tile roof replacement. The equipment will be owner-furnished, contractor-installed.

Euclid Quad Tile Replacement Project The scope of work includes the removal of existing tile in the quad of Building A and its replacement with new tile.

This work will need to be coordinated with the TK/ Kinder Playground replacement.

Euclid Artificial Turf Replacement The scope of work includes removal of existing turf and installation of new artificial turf at the playfield. The turf will be owner-furnished and contractor-installed.

Monte Vista Window Replacement, Exterior Painting and Asphalt Site Work: Includes upgrades to the site-wide path of travel, providing a code-compliant path to all buildings impacted by the scope of work. The work also includes upgrades to the parking lot and drop-off zones.

Additionally, the scope of work includes asphalt replacement in the north parking lot, including the fire lane. This includes revisions to gates and access entry points on the site. We will also be creating a new trash enclosure location at the north end of the parking lot.

The building improvements include the demolition of existing window and door systems, the installation of upgraded windows and doors with hardware upgrades. Additionally, it includes ADA upgrades to restrooms identified as needing upgrades in the approved drawings. Lastly, the scope of work includes exterior painting of all buildings.

Monte Vista Shade Structure Installation of a new shade structure and ADA upgrades to the path of travel as they relate to the project.

Monte Vista Marquee Sign Installation of a new pole-mounted marquee sign.

Other items required for this project are as follows:

Coordination of move services.

Temporary storage containers.

Off-site parking for contractors, as the site and community have limited parking.

All systems operational to allow the school to operate, as the campus will be occupied

OMSD – RFQ/P– LLB Contractors: Euclid and Monte Vista Projects Page 16

ATTACHMENT 2

CONTRACTOR CERTIFICATIONS TO BE SUBMITTED WITH PROPOSAL

NONCOLLUSION DECLARATION (Public Contract Code § 7106)

TO BE EXECUTED BY CONTRACTOR AND SUBMITTED WITH PROPOSAL

The undersigned declares:

I am the _____________________________________________________ [PRINT YOUR TITLE] of _____________________________________________________ [PRINT FIRM NAME], the party making the foregoing bid.

The Proposal is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The Proposal is genuine and not collusive or sham. The Contractor has not directly or indirectly induced or solicited any other Contractor to put in a false or sham Proposal. The Contractor has not directly or indirectly colluded, conspired, connived, or agreed with any Contractor or anyone else to put in a sham Proposal, or to refrain from proposing. The Contractor has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Proposal price of the Contractor or any other Contractor, or to fix any overhead, profit, or cost element of the Proposal price, or of that of any other Contractor. All statements contained in the Proposal are true. The Contractor has not, directly or indirectly, submitted his or her proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, Proposal depository, or to any member or agent thereof, to effectuate a collusive or sham Proposal, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a Contractor that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Contractor.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on the following date:

Date:

Proper Name of Contractor:

Signature:

By: (Print Name)

Title:

OMSD – RFQ/P– LLB Contractors: Euclid and Monte Vista Projects Page 17

IRAN CONTRACTING ACT CERTIFICATION (Public Contract Code § 2204)

Pursuant to Public Contract Code (“PCC”) section 2204, an Iran Contracting Act certification is required for solicitations of goods or services of one million dollars ($1,000,000) or more.

Contractor shall complete ONLY ONE of the following three paragraphs.

1. Contractor’s Total Base Proposal is less than one million dollars ($1,000,000).

OR

2. Contractor’s Total Base Proposal is one million dollars ($1,000,000) or more, but Contractor is not on the current list of persons engaged in investment activities in Iran created by the California Department of General Services (“DGS”) pursuant to PCC § 2203(b), and Contractor is not a financial institution extending twenty million dollars ($20,000,000) or more in credit to another person, for 45 days or more, if that other person will use the credit to provide goods or services in the energy sector in Iran and is identified on the current list of persons engaged in investment activities in Iran created by DGS.

OR

3. Contractor’s Total Base Proposal is one million dollars ($1,000,000) or more, but the District has given prior written permission to Contractor to submit a proposal pursuant to PCC 2203(c) or (d). A copy of the written permission from the District is included with Proposal.

I certify that I am duly authorized to legally bind the Contractor to this certification, that the contents of this certification are true, and that this certification is made under the laws of the State of California.

Date:

Proper Name of Contractor:

Signature:

By: (Print Name)

Title:

OMSD – RFQ/P– LLB Contractors: Euclid and Monte Vista Projects Page 18

ATTACHMENT 3

DRAFT DISTRICT’S FORM OF LEASE-LEASEBACK CONTRACT

(Separate attachment ‘C-267-523 LLB Contract Form Reference Only’)