This is a construction document set for the Euclid Language Academy Synthetic Turf project located at 1120 S Euclid Avenue, Ontario, California 91762, under the Ontario-Montclair School District. The project scope consists of replacing existing natural turf with synthetic turf at the school's playfield. The construction documents include site plans, grading plans, demolition plans, detail sheets, and landscape modification plans prepared by SGH Architects (Architect of Record), FPL and Associates, Inc. (Civil Engineer), and Silver Bar Studio (Landscape). The project must comply with the 2025 California Administrative Code (CAC), California Building Code (CBC), California Fire Code (CFC), and other Title 24 regulations. All work is subject to Division of State Architect (DSA) approval and oversight, requiring a DSA-certified Class 3 Project Inspector employed by the District and a DSA-accepted Testing Laboratory. Deferred submittal items and any substitutions affecting DSA-regulated items require prior DSA approval before fabrication and installation. The contractor must provide a detailed Site Safety Plan within ten calendar days of receiving the Notice to Proceed, complying with California Fire Code Section 3303.1.1 and DSA Bulletin 24-05.

The project includes removal and disposal of existing natural turf, irrigation systems, and athletic equipment footings; excavation and preparation of the field subgrade; installation of synthetic turf with supporting infrastructure including an 8-inch perforated subdrain system, 1-inch by 12-inch flat drainage pipes spaced at 20-foot intervals, concrete mow curbs, and irrigation modifications. The site is located in California Climate Zone 10 and is not within a designated Fire Hazard Severity Zone. Grading work will disturb less than one acre and is not subject to NPDES General Permit compliance. The contractor bears sole responsibility for verifying earthwork quantities and underground utility locations prior to demolition and trenching. A field infiltration test per ASTM F2898-11 must be conducted after permeable aggregate base installation to verify a minimum infiltration rate of 4-6 inches per hour, with testing costs and any necessary corrections at no additional cost to the owner. All construction must maintain compliance with stormwater best management practices, dust control requirements, and local ordinances governing grading, drainage, and environmental health considerations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE AND STANDARDS

APPLICABLE CODES

• 2025 CALIFORNIA ADMINISTRATIVE CODE (CAC), PART 1, TITLE 24 CCR

• 2025 CALIFORNIA BUILDING CODE (CBC), PART 2, TITLE 24 CCR

• 2025 CALIFORNIA ELECTRICAL CODE (CEC) , PART 3, TITLE 24 CCR

• 2025 CALIFORNIA MECHANICAL CODE (CMC), PART 4, TITLE 24 CCR

• 2025 CALIFORNIA PLUMBING CODE (CPC), PART 5, TITLE 24 CCR

• 2025 CALIFORNIA ENERGY CODE (CEC), PART 6, TITLE 24 CCR

• 2025 CALIFORNIA FIRE CODE (CFC), PART 9, TITLE 24 CCR

• 2025 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN), PART 11, TITLE 24 CCR

• 2025 CALIFORNIA REFERENCED STANDARDS CODE, PART 12, TITLE 24 CCR

• TITLE 19 CCR, PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS

APPLICABLE STANDARDS

FOR A LIST OF APPLICABLE STANDARDS, INCLUDING CALIFORNIA AMENDMENTS TO THE NFPA STANDARDS, REFER TO CBC CHAPTER 35 AND CFC CHAPTER 80

1. ALL WORK SHALL CONFORM TO TITLE 24, CALIFORNIA CODE OF REGULATIONS (CCR) PARTS 1 TO 6, 9, 11 AND 12.

2. FABRICATION AND INSTALLATION OF DEFERRED SUBMITTAL ITEMS SHALL NOT BE STARTED UNTIL CONTRACTOR’S DRAWINGS, SPECIFICATIONS, AND ENGINEERING CALCULATIONS FOR THE ACTUAL SYSTEMS TO BE INSTALLED HAVE BEEN ACCEPTED AND SIGNED BY THE ARCHITECT OR STRUCTURAL ENGINEER AND APPROVED BY THE DSA. LIST DEFERRED SUBMITTAL ITEMS FOR THIS PROJECT.

3. CHANGES TO THE APPROVED DRAWINGS AND SPECIFICATIONS SHALL BE MADE BY AN ADDENDUM OR A CONSTRUCTION CHANGED DOCUMENT (CCD) APPROVED BY THE DIVISION OF THE STATE ARCHITECT, AS

REQUIRED BY SECTION 4-338, PART 1, TITLE 24, CCR.

4. ALL SUBSTITUTIONS AFFECTING DSA REGULATED ITEMS SHALL BE CONSIDERED AS A CONSTRUCTION CHANGE DOCUMENT (CCD) OR ADDENDA, AND SHALL BE APPROVED BY DSA PRIOR TO FABRICATION AND INSTALLATION SECTION 4-338, PART 1, TITLE 24, CCR. SUBSTITUTIONS SHALL BE FOR ANY MATERIAL, SYSTEM OR PRODUCT THAT WOULD OTHERWISE BE REGULATED BY DSA.

5. A “DSA CERTIFIED” CLASS __3__ PROJECT INSPECTOR EMPLOYED BY THE DISTRICT (OWNER) AND APPROVED BY THE DSA SHALL PROVIDE CONTINUOUS INSPECTION OF THE WORK. THE DUTIES OF THE

INSPECTOR ARE DEFINED IN SECTION 4-342, PART 1, TITLE 24, CCR.

6. A DSA ACCEPTED TESTING LABORATORY DIRECTLY EMPLOYED BY THE DISTRICT (OWNER) SHALL CONDUCT

ALL THE REQUIRED TESTS AND INSPECTIONS FOR THE PROJECT.

7. THE INTENT OF THESE DRAWINGS AND SPECIFICATIONS IS THAT THE WORK OF THE ALTERATION, REHABILITATION OR RECONSTRUCTION IS TO BE IN ACCORDANCE WITH TITLE 24, CCR. SHOULD ANY EXISTING CONDITIONS SUCH AS DETERIORATION OR NON-COMPLYING CONSTRUCTION BE DISCOVERED WHICH IS NOT COVERED BY THE CONTRACT DOCUMENTS WHEREIN THE FINISHED WORK WILL NOT COMPLY WITH TITLE 24, CCR, A CONSTRUCTION CHANGE DOCUMENT (CCD), OR A SEPARATE SET OF PLANS AND SPECIFICATIONS, DETAILING AND SPECIFYING THE REQUIRED WORK SHALL BE SUBMITTED TO AND APPROVED BY DSA BEFORE PROCEEDING WITH THE WORK. (SECTION 4-317(C), PART 1, TITLE 24, CCR).

8. GRADING PLANS, DRAINAGE IMPROVEMENTS, ROAD AND ACCESS REQUIREMENTS AND ENVIRONMENTAL

HEALTH CONSIDERATIONS SHALL COMPLY WITH ALL LOCAL ORDINANCES.

9. A COPY OF CCR TITLE 24, PARTS 1-6, 9, 11 AND 12 SHALL BE KEPT ON SITE DURING CONSTRUCTION.

10. A COPY OF THE APPROVED DRAWINGS, SPECIFICATIONS, ADDENDUMS AND CONSTRUCTION CHANGE

DOCUMENTS SHALL BE KEPT ON SITE DURING CONSTRUCTION.

11. FIRE SAFETY DURING DEMOLITION AND CONSTRUCTION SHALL COMPLY WITH CBC CHAPTER 33 AND CFC

CHAPTER 33

12. THE CONTRACTOR SHALL PROVIDE CLEAN, SANITARY, TEMPORARY TOILET FACILITIES FOR THE CONSTRUCTION PERSONNEL. UNDER NO CIRCUMSTANCES SHALL CONSTRUCTION PERSONNEL BE ALLOWED TO UTILIZE THE PERMANENT SITE FACILITIES. ALL TEMPORARY FACILITIES SHALL BE REMOVED FROM THE

SITE AT THE CONCLUSION OF CONSTRUCTION.

13. ALL ADDENDA MUST BE SIGNED BY ARCHITECT AND APPROVED BY DSA. (CAC, SECTION 4-338 (B)).

14. CONSTRUCTION CHANGE DOCUMENTS (CAC, SECTION 4-338(C)) MUST BE SIGNED BY ALL THE FOLLOWING:

• A/E OF RECORD

• STRUCTURAL ENGINEER (WHEN APPLICABLE)

• DELEGATED PROFESSIONAL ENGINEER (WHEN APPLICABLE)

• DSA

15. THE PROJECT INSPECTOR AND TESTING LAB MUST BE EMPLOYED BY THE OWNER AND APPROVED BY ALL

OF THE FOLLOWING:

• A/E OF RECORD

• STRUCTURAL ENGINEER (WHEN APPLICABLE)

• DSA

DSA REGULATIONS NOTES

CLIENT:

NAME:

ADDRESS:

PHONE:

CONTACT:

EMAIL:

PROJECT DIRECTORY

ONTARIO-MONTCLAIR SCHOOL DISTRICT

1120 S EUCLID AVE

ONTARIO, CA, 91762

909-418-6369

BROOKE MURRAY

BROOKE.MURRAY@OMSD.NET

CIVIL:

NAME:

ADDRESS:

PHONE:

CONTACT:

EMAIL:

FPL AND ASSOCIATES, INC.

30 CORPORATE PARK, SUITE 401

IRVINE, CA, 92606

949-252-1688

RON CANEDY

RON.CANEDY@FPLANDASSOCIATES.COM

ARCHITECT:

NAME:

ADDRESS:

PHONE:

CONTACT:

EMAIL:

SGH ARCHITECTS

160 VIA VERDE, SUITE 210

SAN DIMAS, CA, 91773

909-201-0045

XIANG LIU

XLIU@SGHARCH.COM

LANDSCAPE:

NAME:

ADDRESS:

PHONE:

CONTACT:

EMAIL:

SILVER BAR STUDIO

P.O. BOX 5008-373

MARIPOSA, CA, 95338

714-928-5107

CRAIG DUNCAN

CRAIG@SILVERBARSTUDIO.COM

PROJECT SCOPE OF WORK CONSIST OF:

REPLACE EXISTING NATURAL TURF FIELD WITH SYNTHETIC TURF.

SCHOOL SITE INFORMATION:

CALIFORNIA CLIMATE ZONE 10

THE SCHOOL SITE IS NOT LOCATED WITHIN A DESIGNATED FIRE HAZARD SEVERITY ZONE (FHSZ).

PROJECT SCOPE OF WORK

VICINITY MAP

PROJECT LOCATION

SHEET INDEXSTATEMENT OF GENERAL CONFORMANCE

APPLICATION No.:

THE DRAWINGS IDENTIFIED AS FOLLOWS:

HAVE BEEN PREPARED BY OTHER DESIGN PROFESSIONALS OR CONSULTANTS WHO ARE LICENSED AND AUTHORIZED TO PREPARE SUCH DRAWINGS (PLANS) IN THIS STATE. THEY HAVE BEEN EXAMINED BY ME FOR:

1. DESIGN INTENT AND APPEARS TO MEET THE APPROPRIATE REQUIREMENTS OF TITLE 24, CALIFORNIA

CODE OF REGULATORS AND THE PROJECT SPECIFICATIONS PREPARED BY ME, AND

2. COORDINATION WITH MY DRAWINGS (PLANS) AND SPECIFICATIONS AND IS ACCEPTABLE FOR

INCORPORATION INTO THE CONSTRUCTION OF THIS PROJECT.

PER TITLE 24, PART 1, SECTION 4-316(B): THIS STATEMENT OF GENERAL CONFORMANCE SHALL NOT BE CONSTRUED AS RELIEVING ME OF MY RIGHTS, DUTIES, AND RESPONSIBILITIES UNDER SECTIONS 17302 AND 81138 OF THE EDUCATION CODE AND SECTIONS 4-336, 4-341 AND 4-344 OF TITLE 24, PART 1.

SIGNATURE

PRINT NAME LICENSE NUMBER EXPIRATION DATE

ALL DRAWING SHEETS INCLUDED IN THIS SET NOT BEARING MY STAMP AND SIGNATUREX

DRAWING SHEETS DENOTED IN THE SHEET INDEX AS FOLLOWS:

DRAWING SHEETS INCLUDED UNDER THE FOLLOWING PC APPROVAL(S):

DATE

FILE No. :

04-125867

36-46

11/19/2026

MICHAEL STEPHENS C 26450 05/31/2027

XX-XXXXXX XX-XXXXXX

THE CONTRACTOR SHALL PROVIDE TO THE ARCHITECT, WITHING TEN (10) CALENDAR DAYS FOLLOWING THE CONTRACTOR'S RECEIPT OF THE NOTICE TO PROCEED, A WRITTEN SITE SAFETY PLAN ON THE CONTRACTOR'S LETTERHEAD AND SIGNED BY THE CONTRACTOR'S RESPONSIBLE MANAGING OFFICER (RMO), IN COMPLIANCE WITH THE CURRENT AND ADOPTED CALIFORNIA FIRE CODE SECTION 3303.1.1 AS

WELL AS DSA BU 24-05.

SITE SAFETY PLANS SHALL INCLUDE THE FOLLOWING AS APPLICABLE (THE LIST IS NOT EXHAUSTIVE OR

COMPREHENSIVE, AND IS ONLY PROVIDED FOR CONTRACTOR CONVENIENCE):

1. NAME AND CONTACT INFORMATION OF SITE SAFETY DIRECTOR.

2. DOCUMENTATION OF THE TRAINING OF THE SITE SAFETY DIRECTOR AND FIRE WATCH PERSONNEL.

3. PROCEDURES FOR REPORTING EMERGENCIES.

4. FIRE DEPARTMENT VEHICLE ACCESS ROUTES.

5. LOCATION OF FIRE PROTECTION EQUIPMENT, INCLUDING PORTABLE FIRE EXTINGUISHERS,

STANDPIPES, FIRE DEPARTMENT CONNECTIONS AND FIRE HYDRANTS.

6. SMOKING AND COOKING POLICIES, DESIGNATED AREAS TO BE USED WHERE APPROVED, AND

SIGNAGE LOCATIONS IN ACCORDANCE WITH SECTION 3305.8.

7. LOCATION AND SAFETY CONSIDERATIONS FOR TEMPORARY HEATING EQUIPMENT.

8. HOT WORK PERMIT PLAN.

9. PLANS FOR CONTROL OF COMBUSTIBLE WASTE MATERIAL.

10. LOCATIONS AND METHODS FOR STORAGE AND USE OF FLAMMABLE AND COMBUSTIBLE LIQUIDS

AND OTHER HAZARDOUS MATERIALS.

11. PROVISIONS FOR SITE SECURITY.

12. CHANGES THAT AFFECT THIS PLAN.

13. OTHER SITE-SPECIFIC INFORMATION REQUIRED BY THE FIRE CODE OFFICIAL.GUARD POSTS OR

OTHER APPROVED MEANS SHALL COMPLY WITH SECTION 312. CFC 507.5.6

SITE SAFETY PLAN

GENERAL

G0.01 TITLE SHEET

G0.02 SYMBOLS AND ABBREVIATIONS

G1.11 SITE PLAN - ACCESSIBILITY SITE PLAN

CIVIL

C0.00 SITE IMPROVEMENT PLAN TITLE SHEET

C1.00 SITE DEMOLITION PLAN

C2.00 GRADING PLAN

C3.00 DETAIL SHEET

* FOR ALL DRAWINGS MARKED WITH AN ASTERISK, REFER TO

"STATEMENT OF GENERAL CONFORMANCE" ON COVER SHEET G0.01

P R

O

JE

C T

N U

M B

E R

D A

T E

D

E

LT

A

D E

S C

R

IP

T

IO

N

P R

O

JE

C T

S T

A T

U S

S H

E E

T

IS

S U

E D

S G

H A

R C

H

IT

E C

T S

IN

C

A

LL

R

IG

H

T S

R E

S E

R V

E D

S E

A

LS

C

O N

S U

LT

A

N T

A#04-125867

/4

/2

5:

:4

P

M C

:\U se rs \v ba lit on \D oc um en ts

\E

LA

_O M

S D

_S yn th et ic _T ur f_

R

C C

_v ba lit on

K

LT

U J.

rv t

-9

-0

T

IT

LE

S

H E

E T

G0.01

E U

C

LI

D L

A N

G U

A G

E A

C A

D E

M Y

S

Y N

T H

E T

IC

T

U R

F

S E

U C

L

ID

A V

E

O N

T A

R

IO

C

A

O N

T A

R

IO

-M O

N T

C L A

IR

S

C H

O O

L D

IS

T

R

IC

T

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

/1

3/

ONTARIO-MONTCLAIR SCHOOL DISTRICT

EUCLID LANGUAGE ACADEMY -

SYNTHETIC TURF

1120 S EUCLID AVE, ONTARIO, CA 91762

CONSTRUCTION DOCUMENTS

ARCHITECTURAL

A1.11 OVERALL SITE PLAN

A1.31 SITE PLAN - ENLARGED

TOTAL

LANDSCAPE

L1.01 PLAYFIELD MODIFICATION PLAN

NORTH

I

I

I

I I

I

I

I

I I I

PATH OF TRAVEL NOTES:

1. ACCESSIBLE PATH OF TRAVEL:

ACCESSIBLE PATH OF TRAVEL AS INDICATED ON PLANS IS A BARRIER FREE ACCESS ROUTE WITHOUT AN ABRUPT LEVEL CHANGES EXCEEDING 1/2" IF BEVELED AT 1:2 MAXIMUM SLOPE OR VERTICAL LEVEL CHANGES NOT EXCEEDING 1/4" MAXIMUM AND AT LEAST 48" IN WIDTH. SURFACE IS STABLE, FIRM, AND SLIP RESISTANT. CROSS SLOPE DOES NOT EXCEED 2% AND SLOPE IN THE DIRECTION OF TRAVEL IS LESS THAN 5% UNLESS OTHERWISE INDICATED. ACCESSIBLE PATH OF TRAVEL SHALL BE MAINTAINED FREE OF OVERHANGING OBSTRUCTIONS TO 80" MINIMUM AND PROTRUDING OBJECTS GREATER THAN 4" PROJECTION FROM WALL ABOVE 27" AND LESS THAN 80". ARCHITECT SHALL VERIFY THAT THERE ARE NO

BARRIERS IN THE PATH OF TRAVEL.

2. DESIGN PROFESSIONAL IN GENERAL RESPONSIBLE CHARGE STATEMENT:

THE POT IDENTIFIED IN THESE CONSTRUCTION DOCUMENTS IS COMPLIANT WITH THE CURRENT

CALIFORNIA BUILDING CODE ACCESSIBILITY PROVISIONS FOR PATH OF TRAVEL REQUIREMENTS FOR ALTERATIONS AND STRUCTURAL REPAIRS. AS PART OF THE DESIGN OF THIS PROJECT, THE POT WAS EXAMINED AND ANY ELEMENTS, COMPONENTS OR PORTIONS OF THE POT THAT WERE DETERMINED TO BE NON COMPLIANT 1) HAVE BEEN IDENTIFIED AND 2) THE CORRECTIVE WORK NECESSARY TO BRING THEM INTO COMPLIANCE HAS BEEN INCLUDED WITHIN THE SCOPE OF THIS PROJECT'S WORK THROUGH DETAILS, DRAWINGS, AND SPECIFICATIONS INCORPORATED INTO THESE CONSTRUCTION DOCUMENTS.

ANY NONCOMPLIANT, COMPONENTS OR PORTIONS OF THE POT THAT WILL NOT BE CORRECTED BY THIS PROJECT BASED ON VALUATION THRESHOLD LIMITATIONS OR A FINDING OF UNREASONABLE HARDSHIP

ARE SO INDICATED IN THESE CONSTRUCTION DOCUMENTS.

3. DURING CONSTRUCTION, IF POT ITEMS WITHIN THE SCOPE OF THE PROJECT REPRESENTED AS CODE COMPLIANT ARE FOUND TO BE NONCONFORMING BEYOND REASONABLE CONSTRUCTION TOLERANCES, THEY SHALL BE BROUGHT INTO COMPLIANCE WITH THE CBC AS PART OF THIS PROJECT BY MEANS OF A

"CONSTRUCTION CHANGE DOCUMENT"

4. GATES IN THE ACCESSIBLE PATH OF TRAVEL SHALL COMPLY WITH ALL DOOR REQUIREMENTS STATED IN CBC SECTION 1010 AND 11B-404 FOR DOOR WIDTH, CLEARANCE, LANDINGS, DOOR HARDWARE, EXIT

DEVICE, DOOR OPERATING FORCE AND SURFACES.

5. EXISTING PATH-OF TRAVEL FROM LIMITS OF PROPOSED PROJECT TO THE EXISTING PUBLIC RIGHT- OF-WAY CONDITIONS WERE EXAMINED AND FOUND COMPLIANT WITH THE CURRENT CODE REQUIREMENTS IN THE

FIELD BY ARCHITECT OF RECORD ON AUGUST 04, 2026, INCLUDING:

• SLOPE AND CROSS SLOPE OF EXISTING RAMPS ALONG THE P.O.T

• HANDRAILS AND EDGE PROTECTION AT RAMPS ALONG P.O.T

• LEVEL LANDINGS AT RAMPS ALONG THE P.O.T

• CHANGES IN LEVEL AT ALL SIDEWALKS ALONG P.O.T

PATH OF TRAVEL LEGEND:

PATH OF TRAVEL STATION MARKER

X.X%

X.X%

X.X%

X.X%

CROSS SLOPE

RUNNING SLOPE

PERCENTAGE INDICATED

REPRESENTS THE HIGH

END OF THE SLOPE

ACCESSIBLE PATH OF TRAVEL

(E) ACCESSIBLE PATH OF TRAVEL A#04-125769

**ACCESSIBLE PATH OF TRAVEL VERIFIED IN FIELD WITH SMART LEVEL ON AUGUST 04, 2026 - RUNNING SLOPE ALONG (E) PATH OF TRAVEL DO NOT EXCEED 4.8% AND CROSS SLOPES DO NOT EXCEED 2.0%.

PLEASE REFER TO "PATH OF TRAVEL" NOTES INCLUDED ON THIS SHEET FOR ADDITIONAL INFORMATION.

(E) ACCESSIBLE PATH OF TRAVEL A#04-118364

ACCESSIBILITY CLEARANCES

60" DIA. ACCESSIBLE

TURN AROUND

(E) RESTROOMS

(E

P O

R T

A B

LE

A #0

4-

N .I.

C

(E

P O

R T

A B

LE

A #0

4-

N .I.

C

(E

P O

R T

A B

LE

A #0

4-

N .I.

C

(E

P O

R T

A B

LE

A #0

4-

N .I.

C

(E

P O

R T

A B

LE

A #0

4-

N .I.

C

(E

P O

R T

A B

LE

A #0

4-

N .I.

C

(E

P O

R T

A B

LE

A #0

4-

N .I.

C

(E

P O

R T

A B

LE

A #0

4-

N .I.

C

(E

P O

R T

A B

LE

A #0

4-

N .I.

C

(E

P O

R T

A B

LE

A #0

4-

N .I.

C

(E

P O

R T

A B

LE

A #0

4-

N .I.

C

(E

P O

R T

A B

LE

A #0

4-

N .I.

C

(E) P2 PORTABLE

A#04-103526

N.I.C.

(E) P3 PORTABLE

A#04-103526

N.I.C.

(E

P O

R T

A B

LE

A #0

4-

N .I.

C

(E

P O

R T

A B

LE

A #0

4-

N .I.

C

(E) MULTI-PURPOSE ROOM

A#04-106275

N.I.C.

(E) PLAYGROUND

N.I.C.

P A

L M

A V

E

R A L S T O N S T R E E T

E U

C L

D

E N

U E

(E) P1 PORTABLE

A#04-122968

N.I.C.

B E L M O N T S T R E E T

(E) HARD COURTS

N.I.C.

(E) DRINKING FOUNTAIN

A# 04-116267

(E) BLDG A

A# 2710 A# 60455 A# 04-101953 A# 04-116732

V A

N

N O

P

R K

I N

G

(E) SAFE DISPERSAL AREA

A#04-117377

(E) SAFE DISPERSAL AREA

A#04-122968

(E) GIRLS RR

A# 04-106275

(E) BOYS RR

A# 04-106275

(E) STAFF

UNISEX

A# 04-106275

B

G

U

1.4%

1.5%

1.8%

0.4%

0.2%

0.6%

1.01%

1.4%

2.55%

0.6%

0.18%

(E) PARKING ANALYSIS

(E) PARKING LOT:

PARKING PROVIDED:

a. ACCESSIBLE STANDARD STALLS: 1 SPACE

b. VAN ACCESSIBLE STALLS: 1 SPACE

c. STANDARD PARKING STALLS: 44 SPACES

TOTAL PROVIDED STALLS: 46 SPACES

CODE REQUIRED ACCESSIBLE PARKING SPACES (PER CBC TABLE 11B-208.2):

REQUIRED ACCESSIBLE PARKING STALLS: 2 SPACES

a. ACCESSIBLE STANDARD STALLS: 1 SPACE

b. VAN ACCESSIBLE STALLS (CBC 11B-208.2.4): 1 SPACE

KEYNOTES

DESCRIPTION

P R

O

JE

C T

N U

M B

E R

D A

T E

D

E

LT

A

D E

S C

R

IP

T

IO

N

P R

O

JE

C T

S T

A T

U S

S H

E E

T

IS

S U

E D

S G

H A

R C

H

IT

E C

T S

IN

C

A

LL

R

IG

H

T S

R E

S E

R V

E D

S E

A

LS

C

O N

S U

LT

A

N T

A#04-125867

/4

/2

5:

:4

P

M C

:\U se rs \v ba lit on \D oc um en ts

\E

LA

_O M

S D

_S yn th et ic _T ur f_

R

C C

_v ba lit on

K

LT

U J.

rv t

-9

-0

S

IT

E P

LA

N

A

C C

E S

S

IB

IL

IT

Y S

IT

E

P

LA

N

G1.11

E U

C

LI

D L

A N

G U

A G

E A

C A

D E

M Y

S

Y N

T H

E T

IC

T

U R

F

S E

U C

L

ID

A V

E

O N

T A

R

IO

C

A

O N

T A

R

IO

-M O

N T

C L A

IR

S

C H

O O

L D

IS

T

R

IC

T

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

/1

3/

CONSTRUCTION DOCUMENTS

:SCALE1" = 20'-0"

SITE PLAN - ACCESSIBILITY

TELEPHONE MANHOLE

STORM DRAIN MANHOLE

WATER VALVE

T E

EPB

W G

TELEPHONE VAULT

ELECTRIC VAULT

ELECTRIC PULLBOX

LIGHT

GUY WIRE

WATER VAULT

GAS VAULT

WATER METER

GAS METER

GAS VALVE

T

S

D

SEWER CLEANOUT

FIRE HYDRANT

SEWER MANHOLE

FINISHED SURFACE

FLOW DIRECTION

FINISHED FLOOR

TREE

INVERT

CURB FACE

FS

FF

INV

CF

BLOCK WALL

CHAIN LINK FENCE

SIGN POST

MAIL BOX

WROUGHT IRON FENCE

LEGEND

OVERHANG POST

IRRIGATION VALVE

TRASH ENCLOSURE

SLOPE

GRATE

ICV

T

(E)CONTOUR ELEVATION(939.0)

DESIGNATION

C0.00 SITE IMPROVEMENT PLAN TITLE SHEET

SHEET INDEX

SHEET

C1.00 SITE DEMOLITION PLAN

BASIS OF BEARINGS

C3.00 DETAIL SHEET

SI

TE

IM

PR

O

VE

M

EN

T

PL

AN

T

IT

LE

S H

EE

T

A CAD GEOMETRIC ELECTRONIC FILE SHALL BE MADE AVAILABLE TO THE CONTRACTOR

UPON REQUEST FOR THE CONTRACTOR'S SURVEYOR TO LAYOUT THE CONSTRUCTION

STAKING OF THE PROJECT. THE SURVEYOR OR CONTRACTOR WILL NEED TO SIGN A

WAIVER FORM BEFORE RELEASE OF ANY CAD ELECTRONIC DRAWINGS.

HORIZONTAL CONTROL

SITE IMPROVEMENT PLANS

FOR

EUCLID LANGUAGE ACADEMY

TURF REPLACEMENT

VAULTVLT

IRRIGTION CONTROL VALVE

INVERT

IRON PIPE

HIGH POINT

GAS VALVE

FINISH SURFACE

EDGE OF PAVEMENT

END OF CURVE

FIRE DEPARTMENT CONNECTION

FIRE HYDRANT

FLOWLINE

GRADE BREAK

GUARD POST

GUY ANCHOR

BACK OF WALK

CHAIN LINK FENCE

DETECTOR CHECK VALVE

CURB FACE HEIGHT

DRINKING FOUNTAIN

DESCRIBED

DROP INLET

CONCRETE

CENTERLINE

ASPHALT PAVEMENT

BEGINNING OF CURVE

ASBESTOS CEMENT PIPE (TRANSITE)

BUILDING

ABANDONED

CLF

FL

IP

INV

HP

ICV

GV

GA

FS

GP

GB

CF

DCV

DESC

CONC

FDC

DF

DI

EC

EP

FH

BLDG

ABND

ACP

BW

BC

AC

UDG

UTIL

WM

W VLT

VIF

WV

TCO

TS

TG

TYP.

TW

RR

SDMH

SL

SMH

TC

TELE

N.I.C.

PIV

RCE

PP

P

TRAFFIC SIGN

TOP OF GRATE

WATER METER

TOP OF WALL

WATER VAULT

WATER VALVE

TOP OF CLEANOUT

VERIFY IN FIELD

UNDERGROUND CONDUIT

UTILITY

TYPICAL

POWER POLE

TOP OF CURB

STREET LIGHT

TELEPHONE

NOT IN CONTRACT

POST INDICATOR VALVE

STORM DRAIN MANHOLE

SEWER MANHOLE

REGISTERED CIVIL ENGINEER

PROPERTY LINE

RAILROAD

ABBREVIATIONS

LP

L T & T

MH

NG

LIP

L

LIGHT POLE

LIP OF GUTTER

LEAD TACK AND TAG

NATURAL GROUND

MANHOLE

LENGTH

STANDARD PLANS FOR PUBLIC WORKS

CONSTRUCTION (2021 EDITION).

S.P.P.W.C.

HOSE BIBBHB

SW SIDEWALK

EXISTINGEX

S SLOPE

STANDARD SPECIFICATIONS FOR

PUBLIC WORKS CONSTRUCTION

(GREEN BOOK), 2024 EDITION

S.S.P.W.C.

P.C.C. PORTLAND CEMENT CONRETE

L

CL

SD STORM DRAIN

CATCH BASINCB

2. SEDIMENT FROM AREAS DISTURBED BY CONSTRUCTION SHALL BE RETAINED ON

SITE USING STRUCTURAL CONTROLS TO THE MAXIMUM EXTENT PRACTICABLE.

3. STOCKPILES OF SOIL SHALL BE PROPERLY CONTAINED TO MINIMIZE SEDIMENT

TRANSPORT FROM THE SITE TO STREETS, DRAINAGE FACILITIES OR ADJACENT

PROPERTIES VIA RUNOFF, VEHICLE TACKING, OR WIND.

4. ALL REMOVABLE EROSION PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END

OF EACH WORKING DAY WHEN THE 5-DAY RAIN PROBABILITY FORECAST EXCEEDS 50%.

5. RUNOFF FROM EQUIPMENT AND VEHICLE WASHING SHALL BE CONTAINED AT

CONSTRUCTION SITES UNLESS TREATED TO REDUCE OR REMOVE SEDIMENT AND

OTHER POLLUTANTS.

6. ALL CONSTRUCTION CONTRACTOR AND SUBCONTRACTOR PERSONNEL ARE TO BE

MADE AWARE OF THE REQUIRED BEST MANAGEMENT PRACTICES AND GOOD

HOUSEKEEPING MEASURES FOR THE PROJECT SITE AND ANY ASSOCIATED

CONSTRUCTION STAGING AREAS.

7. AT THE END OF EACH DAY OF CONSTRUCTION ACTIVITY ALL CONSTRUCTION

DEBRIS AND WASTE MATERIALS SHALL BE COLLECTED AND PROPERLY DISPOSED

IN TRASH OR RECYCLE BINS.

8. CONSTRUCTION SITES SHALL BE MAINTAINED IN SUCH A CONDITION THAT AN

ANTICIPATED STORM DOES NOT CARRY WASTES OR POLLUTANTS OFF THE SITE.

DISCHARGES OF MATERIAL OTHER THAN STORMWATER ONLY WHEN NECESSARY

FOR PERFORMANCE AND COMPLETION OF CONSTRUCTION PRACTICES AND WHERE

THEY DO NOT: CAUSE OR CONTRIBUTE TO A VIOLATION OF ANY WATER QUALITY

STANDARD; CAUSE OR THREATEN TO CAUSE POLLUTION, CONTAMINATION, OR

NUISANCE; OR CONTAIN A HAZARDOUS SUBSTANCE IN A QUANTITY REPORTABLE

UNDER FEDERAL REGULATIONS 40 CFR PARTS 117 AND 302.

9. POTENTIAL POLLUTANTS INCLUDE BUT ARE NOT LIMITED TO: SOLID OR LIQUID

CHEMICAL SPILLS; WASTES FROM PAINTS, STAINS, SEALANTS, GLUES, LIMES,

PESTICIDES, HERBICIDES, WOOD PRESERVATIVES AND SOLVENTS; ASBESTOS

FIBERS, PAINT FLAKES OR STUCCO FRAGMENTS; FUELS, OILS, LUBRICANTS, AND

HYDRAULIC, RADIATOR OR BATTERY FLUIDS; FERTILIZERS, VEHICLE/EQUIPMENT

WASH WATER AND CONCRETE WASH WATER; CONCRETE, DETERGENT OR

FLOATABLE WASTES; WASTES FROM ANY ENGINE/EQUIPMENT STEAM CLEANING

OR CHEMICAL DEGREASING AND SUPERCHLORINATED POTABLE WATER LINE

FLUSHING. DURING CONSTRUCTION, PERMITTEE SHALL DISPOSE OF SUCH

MATERIALS IN A WASHOUT BIN OR SPECIFIED AND CONTROLLED TEMPORARY AREA

ON-SITE PHYSICALLY SEPARATED FROM POTENTIAL STORMWATER RUNOFF, WITH

ULTIMATE DISPOSAL IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL

REQUIREMENTS.

10. DEWATERING OF CONTAMINATED GROUNDWATER, OR DISCHARGING

CONTAMINATED SOILS VIA SURFACE EROSION IS PROHIBITED. DEWATERING OF

NON-CONTAMINATED GROUNDWATER REQUIRES A NATIONAL POLLUTANT

DISCHARGE ELIMINATION SYSTEM PERMIT FROM THE RESPECTIVE STATE

REGIONAL WATER QUALITY CONTROL BOARD.

11. GRADED AREAS ON THE PERMITTED AREA PERIMETER MUST DRAIN AWAY FROM

THE FACE OF SLOPES AT THE CONCLUSION OF EACH WORKING DAY. DRAINAGE IS

TO BE DIRECTED TOWARD DESILTING FACILITIES.

12. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS

TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATER CREATES A

HAZARDOUS CONDITION.

13. THE CONTRACTOR SHALL INSPECT THE EROSION CONTROL WORK AND INSURE THAT

THE WORK IS IN ACCORDANCE WITH THE APPROVED PLANS.

14. THE GENERAL CONTRACTOR SHALL NOTIFY ALL SUBCONTRACTORS & MATERIAL SUPPLIERS:

THAT DUMPING OF CHEMICALS INTO THE STORM DRAIN SYSTEM OR THE WATERSHED

IS PROHIBITED.

15. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE

AT ALL TIMES DURING THE RAINY SEASON. NECESSARY MATERIALS SHALL BE

AVAILABLE ON SITE AND STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE

RAPID CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS IMMINENT.

1. APPROPRIATE BMP'S FOR CONSTRUCTION-RELATED MATERIALS, WASTE, SPILLS OR

RESIDUES SHALL BE IMPLEMENTED AND RETAINED ON SITE TO MINIMIZE

TRANSPORT FROM THE SITE TO STREETS, DRAINAGE FACILITIES, OR ADJOINING

PROPERTY BY WIND OR RUNOFF.

STORM WATER POLLUTION CONTROL NOTES:

EROSION & SEDIMENTAL CONTROL BMPsNON-STORMWATER MANAGEMENT &

NS-8 - VEHICLE AND EQUIPMENT CLEANING

NS-7 - POTABLE WATER/IRRIGATION

NS-2 - DEWATERING OPERATIONS

NS-1 - WATER CONSERVATION PRACTICES

NS-12 - CONCRETE CURING

NS-10 - VEHICLE AND EQUIPMENT MAINTENANCE

NS-6 - ILLICIT CONNECTION/DISCHARGE

EC-1 - SCHEDULING

EC-11 - SLOPE DRAINS

EC-7 - GEOTEXTILES & MATS

EC-9 - EARTH DIKES AND DRAINAGE SWALES

EC-2 - PRESERVATION OF EXISTING VEGETATION

NS-14 - MATERIAL AND EQUIPMENT USE

NS-13 - CONCRETE FINISHING

NS-3 - PAVING AND GRINDING OPERATIONS

THE FOLLOWING BMPs AS OUTLINED IN, BUT NOT LIMITED TO, THE STORMWATER BEST MANAGEMENT PRACTICE HANDBOOK, CONSTRUCTION, CALIFORNIA STORMWATER QUALITY ASSOCIATION, 2023 EDITION, MAY APPLY DURING CONSTRUCTION (ADDITIONAL MEASURES MAY BE REQUIRED IF DEEMED APPROPRIATE BY INSPECTOR):

SE-2 - SEDIMENT BASIN

SE-8 - SANDBAG BARRIER

SE-9 - STRAW BALE BARRIER

SE-4 - CHECK DAM

SE-10 - STORM DRAIN INLET PROTECTION

TC-1 - STABILIZED CONSTRUCTION ENTRANCE/EXIT

SE-7 - STREET SWEEPING AND VACUUMING

WE-1 - WIND EROSION CONTROL

SE-6 - GRAVEL BAG BERM

TC-2 - STABILIZED CONSTRUCTION ROADWAY

SE-5 - FIBER ROLLS

SE-1 - SILT FENCE

SE-3 - SEDIMENT TRAP

TC-3 - ENTRANCE/OUTLET TIRE WASH

MATERIAL MANAGEMENT BMPs

WM-1 - MATERIAL DELIVERY AND STORAGE

WM-9 - SANITARY/SEPTIC WASTE MANAGEMENT

WM-2 - MATERIAL USE

WM-4 - SPILL PREVENTION AND CONTROL

WM-7 - CONTAMINATED SOIL MANAGEMENT

WM-8 - CONCRETE WASTE MANAGEMENT

WM-10 - LIQUID WASTE MANAGEMENT

WM-5 - SOLID WASTE MANAGEMENT

WM-3 - STOCKPILE MANAGEMENT

WM-6 - HAZARDOUS WASTE MANAGEMENT

GENERAL NOTES FOR GRADING

1. ALL WORK SHALL CONFORM WITH THE "GREENBOOK" STANDARD SPECIFICATIONS FOR PUBLIC WORKS

CONSTRUCTION (SSPWC), 2024 EDITION AND THE LATEST REVISIONS THERETO, THE WORK AREA TRAFFIC CONTROL HANDBOOK (W.A.T.C.H. MANUAL), A.D.A, TITLE 24 REQUIREMENTS, AND 2025 C.B.C. UNLESS SPECIFIED OTHERWISE IN

THE CONTRACT SPECIFICATIONS.

2. A COPY OF THE DIVISION OF STATE ARCHITECT APPROVED GRADING PLANS MUST BE IN THE POSSESSION OF A

RESPONSIBLE PERSON AND AVAILABLE AT THE JOB SITE AT ALL TIMES.

3. AT LEAST TWO (2) WORKING DAYS PRIOR TO COMMENCING CONSTRUCTION, THE CONTRACTOR SHALL CONTACT THE REGIONAL NOTIFICATION CENTER (UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA - U.S.A. AT 811) TO OBTAIN AN INQUIRY IDENTIFICATION NUMBER AND TO REQUEST THE UTILITY OWNERS TO MARK OR OTHERWISE INDICATE THE LOCATION OF THEIR SUBSURFACE FACILITIES. THE CONTRACTOR SHALL DETERMINE THE LOCATION AND DEPTH OF ALL UTILITIES, INCLUDING ALL SERVICE CONNECTIONS, WHICH HAVE BEEN MARKED BY THE RESPECTIVE OWNERS AND WHICH MAY AFFECT OR BE AFFECTED BY ITS OPERATIONS. THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT ALL UTILITIES AND ALL STRUCTURES FOUND AT THE SITE.

4. ALL PERMITS NECESSARY PRIOR TO BEGINNING CONSTRUCTION SHALL BE OBTAINED BY THE CONTRACTOR.

5. THROUGHOUT ALL PHASES OF CONSTRUCTION, INCLUDING SUSPENSION OF WORK, UNTIL FINAL ACCEPTANCE OF THE PROJECT, THE CONTRACTOR SHALL KEEP THE WORK SITE CLEAN AND FREE FROM RUBBISH AND DEBRIS. THE CONTRACTOR SHALL ALSO ABATE DUST NUISANCE BY CLEANING, SWEEPING AND SPRINKLING WITH WATER AND USING DUST FENCES OR OTHER METHODS AS DIRECTED BY THE CONSTRUCTION MANAGER OR FIELD INSPECTOR

THROUGHOUT THE CONSTRUCTION OPERATION AND SHALL INCORPORATE IN BASE BID.

6. THE CONTRACTOR SHALL KEEP A STRICT RECORD OF ALL CHANGES THAT OCCUR DURING CONSTRUCTION PRACTICES AND SUBMIT THIS RECORD TO THE SCHOOL DISTRICT & DSA CERTIFIED AS "RECORD DRAWING" PLANS.

7. ALL DAMAGE CAUSED TO PUBLIC STREETS, INCLUDING HAUL ROUTES, ALLEYS, SIDEWALKS, CURBS OR STREET FURNISHINGS, OR TO PRIVATE PROPERTY SHALL BE REPAIRED AT THE SOLE EXPENSE OF THE CONTRACTOR TO THE

ENGINEER'S SATISFACTION.

8. THE CONTRACTOR SHALL REMOVE AND REPLACE ANY BROKEN OR DAMAGED SIDEWALK, CURB, GUTTER OR ASPHALT PAVING AND TURF (PATCH, REPAIR OR OVERLAY) CAUSED BY THEIR WORK ON THIS PROJECT AT THE

DIRECTION OF THE OWNER.

9. ALL UNDERGROUND SEWER, STORM DRAIN, AND WATER PIPELINES, ELECTRIC POWER, TELEPHONE OR CABLE TV CONDUITS AND CABLE AND GAS PIPELINES SHALL BE INSTALLED PRIOR TO CONSTRUCTION OF CURBS, GUTTERS, SIDEWALKS AND PAVEMENT.

10. WHERE JOINING THE EXISTING PAVEMENT, SAWCUT TO SOUND PAVEMENT AND OVERLAY AS REQUIRED TO PROVIDE PROPER GRADE AND 2% MAX. CROSS-SLOPE OR 5% MAX. RUNNING SLOPE AS NOTED ON PLANS. ANY UNSOUND

PAVEMENT SHALL BE REPLACED AS REQUIRED BY THE ENGINEER.

11. AT LEAST TWO (2) WORKING DAYS BEFORE COMMENCING EXCAVATION, THE CONTRACTOR SHALL POTHOLE AND EXPOSE THE EXISTING UTILITIES AT ALL CROSSINGS AND AT THE POINT OF TIE-IN; THEN CONTACT THE ENGINEER TO

VERIFY THE ELEVATION OF THE EXISTING FACILITIES.

12. ALL AREAS TO RECEIVE COMPACTED FILL SHALL BE INSPECTED AND APPROVED BY THE SOILS ENGINEER AFTER REMOVAL OF UNSUITABLE MATERIAL AND EXCAVATION OF KEYWAYS AND BENCHES, AND PRIOR TO PLACEMENT OF

SUBSURFACE DRAINAGE SYSTEMS OR ANY FILLS.

13. ALL EXCAVATED BACK SLOPES AND KEYS FOR BUTTRESS FILLS MUST BE EXAMINED BY THE ENGINEERING GEOLOGIST AND SOILS ENGINEER TO INSURE ALL POTENTIAL PLANES OF FAILURE HAVE BEEN EXPOSED IN THE

EXCAVATION AND WILL BE ADEQUATELY SUPPORTED BY THE PROPOSED BUTTRESS FILLS.

14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING STORM DAMAGE PREVENTION MEASURES OR EROSION CONTROL DEVICES AND/OR TO PERFORM CERTAIN GRADING TO PREVENT SOIL OR EXCESS RUNOFF FROM FLOWING INTO PUBLIC STREETS OR ADJACENT PROPERTIES. IN THE EVENT OF SUCH AN OCCURRENCE, CLEANUP SHALL COMMENCE IMMEDIATELY. SHOULD CITY FORCES OR THE CITY CONTRACTOR PERFORM ANY CLEANUP RESULTING FROM THIS DEVELOPMENT, THE CONTRACTOR SHALL PAY THE COST INCURRED WITHIN TEN (10) WORKING DAYS

UPON RECEIPT OF BILLING.

15. EITHER WATER OR DUST PALLIATIVE, OR BOTH, MUST BE APPLIED FOR THE ALLEVIATION OR PREVENTION OF EXCESSIVE DUST RESULTING FROM THE LOADING OR TRANSPORTATION OF EARTH FROM OR TO THE PROJECT SITE

OR PRIVATE AND PUBLIC ROADWAYS.

16. NO OVERSIZE OR OVERWEIGHT LOADS ARE PERMITTED WITHOUT A SEPARATE MOVING PERMIT.

17. ALL EQUIPMENT USED TO HAUL EXCAVATION OR FILL MATERIAL FROM OR TO THE SITE SHALL FOLLOW A DESIGNATED ROUTE OR ROUTES IN GOING TO AND FROM THE SITE. THE CONTRACTOR SHALL BE ENTITLED TO THE DESIGNATION OF A ROUTE PROVIDING ACCESS TO A SPECIFIED PLACE OTHER THAN THE SITE, AFTER SHOWING TO THE SATISFACTION OF THE CITY BUILDING OFFICIAL THAT SUCH SPECIFIED PLACE IS A PLACE WHERE EXCAVATION MATERIAL MAY BE REASONABLY DEPOSITED OR FILL MATERIAL MAY BE OBTAINED. A SEPARATE ENCROACHMENT PERMIT IS REQUIRED WHEN IT IS NECESSARY TO FLAG TRAFFIC OR INSTALL ANY TRAFFIC CONTROL DEVICES ON

CITY RIGHT-OF-WAY.

18. ANY EARTH ROCK, GRAVEL, SAND, STONE OR OTHER EXCAVATED MATERIAL DEPOSITED OR CAUSED TO ROLL, FLOW OR WASH UPON ANY PUBLIC PLACE OR PRIVATE PROPERTY SHALL BE REMOVED FROM SUCH PUBLIC PLACE OR PRIVATE PROPERTY BY THE END OF THE WORKDAY BY THE CONTRACTOR RESPONSIBLE FOR THE DEPOSITION. IF AN ADVERSE CONDITION IS CAUSED BY DEPOSIT, THE CONDITION SHALL BE CORRECTED IMMEDIATELY.

19. EVERY EFFORT SHOULD BE MADE TO ELIMINATE THE DISCHARGE OF NON-STORMWATER FROM THE PROJECT SITE

AT ALL TIMES.

20. ALL TRUCKS HAULING DIRT, SAND, OIL, OR OTHER LOOSE MATERIALS ARE TO BE COVERED OR SHOULD MAINTAIN AT LEAST TWO FEET OF FREEBOARD IN ACCORDANCE WITH THE REQUIREMENTS OF CVC SECTION 23114.

21. ADJUST UTILITY BOXES TO BE FLUSH WITH ULTIMATE FINISH SURFACE IN PAVING SCOPE OF WORK AREAS.

22. CONTRACTOR SHALL HIRE A LICENSED SURVEYOR TO STAKE ALL CATCH BASINS, STORM DRAIN PIPE, SAW-CUT LINES, BUILDING PADS, FINISH FLOORS, SWALES AND GRADE BREAKS. TWO STAKES SHALL BE PROVIDED FOR ALL

CATCH BASINS.

23. IN ORDER TO MITIGATE THE IMPACTS ON CULTURAL RESOURCES OR LANDSCAPING, IF CULTURAL MATERIAL SUGGESTIVE OF PREHISTORIC OR HISTORIC ORIGIN IS ENCOUNTERED, WORK IN THE VICINITY OF THE FIND SHALL BE STOPPED, AND THE OWNER SHALL BE NOTIFIED. GRADING, CONSTRUCTION OR LANDSCAPING SHALL NOT RESUME UNTIL THE FIND IS EVALUATED AND IT IS DETERMINED WHETHER THE MATERIAL IS ARCHAEOLOGICALLY SIGNIFICANT

AND ADDITIONAL MITIGATION IS REQUIRED.

24. NO PERSON SHALL, WHEN HAULING ANY EARTH, SAND, GRAVEL, ROCK, STONE OR OTHER EXCAVATED MATERIAL OR DEBRIS OVER ANY PUBLIC STREET, ALLEY OR OTHER PUBLIC PLACE, ALLOW SUCH MATERIAL TO BLOW OR SPILL OVER UPON SUCH STREET, ALLEY OR PUBLIC PLACE OR ADJACENT PRIVATE PROPERTY OR ANY WATER BODIES, CREEKS OR STREAMS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CLEANUP AND REMOVAL OF ANY CONSTRUCTION OR SOILS MATERIALS DEPOSITED ON THE PUBLIC RIGHT-OF-WAY, PUBLIC WATERS OR ADJACENT

PRIVATE PROPERTY.

25. ALL GRADING AND CONSTRUCTION ACTIVITIES SHALL COMPLY WITH COUNTY OF LOS ANGELES CODE, TITLE 12, SECTION 12.12.030 THAT CONTROLS AND RESTRICTS NOISE FROM THE USE OF CONSTRUCTION AND GRADING

EQUIPMENT FROM THE HOURS OF 8:00 PM TO 6:30 AM, AND ON SUNDAYS AND HOLIDAYS.

26. ALL CONSTRUCTION/DEMOLITION, GRADING, AND STORAGE OF BULK MATERIALS MUST COMPLY WITH THE LOCAL AQMD RULE 403 FOR FUGITIVE DUST. INFORMATION ON RULE 403 IS AVAILABLE AT AQMD'S WEBSITE

HTTP://WWW.AVAQMD.COM.

GENERAL NOTES TO CONTRACTOR

1. THE CONTRACTOR'S ATTENTION IS DIRECTED TO SECTION 7-10, PUBLIC CONVENIENCE AND SAFETY, OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GREENBOOK), IN REGARDS TO SAFETY ORDERS.

2. SCOPE OF WORK:

A. PROVIDE ALL LABOR, SUPERVISION, MATERIALS, EQUIPMENT & FACILITIES NECESSARY TO FURNISH, FABRICATE, DELIVER, STORE AND INSTALL ALL WORK NOTED ON THE DRAWINGS.

B. THE CONTRACTOR SHALL FURNISH & INSTALL ALL WORK NECESSARY TO MAKE A COMPLETE SYSTEM WHETHER OR NOT SUCH DETAILS ARE MENTIONED IN THESE SPECIFICATIONS OR SHOWN ON THE PLANS, BUT WHICH ARE OBVIOUSLY NECESSARY TO MAKE A COMPLETE SYSTEM, EXCEPTING ONLY THOSE PORTIONS THAT ARE SPECIFICALLY MENTIONED HEREIN OR PLAINLY MARKED ON THE ACCOMPANYING DRAWINGS AS BEING INSTALLED

UNDER ANOTHER SECTION OF THE SPECIFICATION.

3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO VERIFY AVAILABLE SPACES FOR INSTALLING THE WORK.

4. COORDINATION: THE DRAWINGS ARE DIAGRAMMATIC & INTENDED TO SHOW SCOPE. CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES TO PROVIDE BEST ARRANGEMENT OF ALL DUCT, PIPES, CONDUIT, ETC.

5. WORKMANSHIP: THE WORK SHALL BE ACCOMPLISHED BY THE USE OF COMPETENT MECHANICS SKILLED IN THEIR TRADE. THE ENGINEER AND ARCHITECT SHALL HAVE THE RIGHT TO INTERPRET COMPLIANCE OF WORKMANSHIP

WITH THE CONTRACT DOCUMENTS.

6. MATERIALS: ALL MATERIALS, APPLIANCES & EQUIPMENT SHALL BE NEW & THE BEST OF THEIR RESPECTIVE KIND.

FREE FROM ALL DEFECTS AND OF THE MAKE, BRAND, AND QUANTITY SPECIFIED.

7. CLEAN-UP: UPON COMPLETION OF THE WORK UNDER THIS SECTION THE CONTRACTOR SHALL REMOVE ALL SURPLUS MATERIALS. EQUIPMENT & DEBRIS INCIDENTAL TO THIS WORK & LEAVE THE PREMISES CLEAN AND ORDERLY TO THE

SATISFACTION OF THE ARCHITECT / OWNER.

BACK FLOW VALVEBFV

& TUBE STEEL FENCING

GROUND WELL

C0.00

THE BASIS OF BEARINGS FOR THIS SURVEY IS THE CALIFORNIA STATE PLANE COORDINATE

SYSTEM: SPC 0405, ZONE V BASED LOCALLY ON CONTINUOUS OPERATING REFERENCE

STATIONS (CORS):"P589" "JPLM" AND "BILL" NAD 83 (2011) EPOCH 2010.00

VERTICAL CONTROL FOR THIS SURVEY IS AS ESTABLISHED BY STATIC GPS BASED ONNAVD88

GEOID18 THE CORS STATIONS LISTED UNDER THE BASIS OF BEARINGS SHOWN HEREON.

BENCHMARK

C2.00 GRADING PLAN

CONTRACTOR SHALL COMPLY WITH CBC AND CFC CH 33 - FIRE SAFETY DURING

CONSTRUCTION AND DEMOLITION. REFER TO DSA BULLETIN 24-05 FOR FURTHER

INFORMATION

EARTHWORK NOTICE TO CONTRACTOR: NO EARTHWORK ANALYSIS HAS BEEN

COMPLETED WITH RESPECT TO VOLUMES OF SOILS TO BE EXCAVATED, PLACED, OR

IMPORTED IN ORDER TO PROVIDE THE FINISHED GRADES SHOWN ON THE PLANS. THE

CONTRACTOR IS SOLELY RESPONSIBLE FOR VERIFYING THE EARTHWORK QUANTITIES

NECESSARY TO COMPLETE THE PROJECT.

CONSTRUCTION STORM WATER NOTE:

GRADING WORK ASSOCIATED WITH THIS PROJECT WILL DISTURB LESS THAN 1 ACRE OF

SOIL AND THUS SHALL NOT BE SUBJECT TO COMPLY WITH THE NPDES GENERAL PERMIT

FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION AND LAND

DISTURBANCE ACTIVITIES (GENERAL PERMIT) ORDER WQ 2022-0057-DWQ.

NOTE TO CONTRACTOR: BEFORE DEMOLITION OR TRENCHING OCCURS, THE

CONTRACTOR SHALL COMPLETE AN UNDERGROUND UTILITY MAPPING SURVEY OF THE

ENTIRE LIMITS OF WORK TO DETERMINE WHERE EXISTING UTILITIES ARE AND WHERE

POSSIBLE UNDERGROUND CONFLICTS MAY OCCUR. PROVIDE SURVEY TO OWNER.

NOTE TO CONTRACTOR: THE REMOVAL AND DISPOSAL OF EXISTING HARDSCAPE &

SOFTSCAPE, TO FACILITATE THE TRENCHING OF NEW UNDERGROUND UTILITIES, VAULTS,

VALVES, DRAIN INLETS, MANHOLES, ETC. SHOWN IN THE ENTIRE PLAN SET IS THE

RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH ALL SUB-CONTRACTORS.

NOTE TO CONTRACTOR: WHERE NEW CONCRETE FLATWORK JOINS EXISTING

CONCRETE FLATWORK, INSTALL AN EXPANSION JOINT PER DETAIL AA/C3.00. NEW

CONCRETE MUST MEET BE FLUSH WITH EXISTING CONCRETE.

PR

OJ

EC

T

NU

MB

ER

DA

TE

DE

LT

A:

DE

SC

RI

PT

IO

N:

PR

OJ

EC

T

ST

AT

US

SH

EE

T

IS

SU

ED

S

GH

A

RC

HI

TE

CT

S

IN

C.

A

LL

R

IG

HT

S

RE

SE

RV

ED

SE

AL

S:

CO

NS

UL

TA

NT

A#04-125867

-9

-0

EU

CL

ID

LA

NG

UA

GE

A

CA

DE

MY

TU

RF

R

EP

LA

CE

ME

NT

S E

U C

LI

D

A

VE

, O N

TA

R

IO

, C

A

O N

TA

R

IO

-M

O N

TC

LA

IR

S

C H

O O

L D

IS

TR

IC

T

CO

NS

TR

UC

TIO

N

DO

CU

ME

NT

S

/13 /26

CONSTRUCTION DOCUMENTS

FPL FPL and Associates, Inc.

PL

OT

D

AT

E:

/26 /20

2:

P

M

PL

OT

B

Y:

Je ss ica

Z ia

L

AS

T

SA

VE

D

BY

: j es sic a.z ia

S :\J ob s\2

1 -

S

GH

\E uc lid E

S\ Ci vil \T ur f\E uc lid

T ur f- C0

.00 T itl e S he et

.d wg

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text Exp. 09-30-27

AutoCAD SHX Text No. C 34971

AutoCAD SHX Text Traffic Transportation Civil

AutoCAD SHX Text Irvine, CA 92606

AutoCAD SHX Text 30 Corporate Park, Suite 401

AutoCAD SHX Text Phone: 949-252-1688

I

I

I I I I I

I I I

I

SCALE: 1" = 10'

C1.00

PROTECT EXISTING IMPROVEMENT IN PLACE.

SITE DEMOLITION NOTES:

R1

P

HATCH LEGEND:

= CLEAR AND GRUB LANDSCAPE

= EXISTING BUILDING

R1

GENERAL DEMOLITION NOTES

REMOVAL OF LANDSCAPING SHALL INCLUDE ROOTS AND ORGANIC MATERIAL.3.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR A SITE INSPECTION TO FIELD VERIFY

AND FULLY ACKNOWLEDGE THE EXTENT OF THE DEMOLITION WORK. ALL ITEMS TO BE

REMOVED SHALL BE MARKED BY THE CONTRACTOR PRIOR TO DEMOLITION.

5.

DAMAGE TO ANY EXISTING UTILITIES AND SERVICES WHICH ARE TO REMAIN SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL REPAIR AND/OR REPLACE IN

KIND.

6.

TEMPORARY EROSION CONTROL MEASURES SHALL BE IMPLEMENTED TO PREVENT

DEBRIS AND UNSUITABLE MATERIALS FROM ENTERING STORM DRAIN, SANITARY SEWERS

AND STREETS.

7.

DUST CONTROL SHALL BE IMPLEMENTED DURING DEMOLITION.8.

THE CONTRACTOR SHALL VERIFY THE LOCATION AND QUANTITY OF EXISTING SURFACE

STRUCTURES AND SHALL BE SOLELY RESPONSIBLE FOR ANY UNIDENTIFIED UTILITIES,

IMPROVEMENTS, TREES, ETC,. TO BE DEMOLISHED AND REMOVED WITHIN THE

DEMOLITION LIMIT LINE, INCLUDING APPURTENANT FOUNDATIONS OR SUPPORTS.

2.

THE CONTRACTOR SHALL PREPARE HIS OWN UNDERGROUND UTILITY MAPPING SURVEY

OF THE SITE AND MARK, WITH PAINT, THE LOCATIONS OF ALL EXISTING UTILITIES FOUND

PRIOR TO DEMOLITION.

10.

THE CONTRACTOR SHALL DEMOLISH AND REMOVE ALL LANDSCAPING IRRIGATION

SYSTEMS WITHIN THE DEMOLITION LIMIT LINE UNLESS DESIGNATED TO REMAIN IN PLACE

ON THE PLANS. WHERE THE DEMOLITION IMPACTS EXISTING LANDSCAPE TO REMAIN,

MODIFY THE EXISTING IRRIGATION SYSTEM, INCLUDING ADDING IRRIGATION HEADS AS

NECESSARY TO MAINTAIN COMPLETE AND FULL COVERAGE OF EXISTING PLANNING.

11.

THE CONTRACTOR SHALL BACKFILL SOIL IN THE EXCAVATED TREE ROOT PITS AND THE

TRENCHES FOR REMOVED EXISTING UNDERGROUND STRUCTURES, UTILITIES, AND

IMPROVEMENTS.

13.

THE CONTRACTOR SHALL NOT ABANDON-IN-PLACE ANY EXISTING UNDERGROUND

STRUCTURE, UTILITY, OR IMPROVEMENT SO DESIGNATED FOR REMOVAL ON THE PROJECT

PLANS UNLESS DIRECTED TO BY THE OWNER.

14.

CONTRACTOR TO SAWCUT ALL EXISTING A.C. AND CONCRETE PAVEMENT AT DEMOLITION LIMIT

LINE. CONTRACTOR SHALL REMOVE CONCRETE PAVING, CURB & GUTTER TO THE NEAREST JOINT.

15.

CONTRACTOR SHALL REPLACE ALL EXISTING IMPROVEMENTS OUTSIDE THE DEMOLITION

LIMIT LINE THAT ARE DAMAGED DURING CONSTRUCTION TO MATCH EXISTING, INCLUDING

PERMANENT TRENCH RESURFACING.

16.

CONTRACTOR SHALL FIELD VERIFY THAT THE REMOVAL OF EXISTING UTILITIES WILL NOT

IMPACT AREA OPERATIONS.

17.

CONTRACTOR IS RESPONSIBLE TO KEEP ALL UTILITES OPERATIONAL THAT SERVES

FACILITIES OUTSIDE THE SCOPE OF THE DEMOLITION ZONE. CONTRACTOR IS ALSO

RESPONSIBLE TO REROUTE UTILITIES IF NECESSARY TO COMPLETE DEMOLITION.

19.

ALL ITEMS, SHOWN ON THIS PLAN TO BE REMOVED, SHALL BE VERIFIED BY THE

CONTRACTOR PRIOR TO DEMOLITION. THE CONTRACTOR SHALL MEET WITH THE

SCHOOLS REPRESENTATIVE PRIOR TO CLEARING AND GRUBBING.

1.

CONTRACTOR SHALL INSTALL A TEMPORARY MINIMUM 6' HIGH CHAIN LINK CONSTRUCTION

FENCE, WITH GREEN SCREEN, AROUND PERIMETER OF DEMOLITION AREA.

20.

ALL EXISTING DRAINAGE STRUCTURES ON SITE SHALL BE PROTECTED AND REMAIN

FUNCTIONAL DURING DEMOLITION AND THROUGH THE CONSTRUCTION PERIOD. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO THESE STRUCTURES, OR

DAMAGE CAUSED TO ADJACENT PROPERTIES DUE TO THE OBSTRUCTION OF THESE

STRUCTURES.

21.

ALL CONCRETE & CMU BLOCK WALLS & PLANTERS SHOWN ON THIS PLAN AND INDICATED

TO BE REMOVED SHALL INCLUDE ALL FOOTINGS & FOUNDATIONS IN THEIR REMOVAL.

4.

9.

BEFORE EXCAVATING ANY TRENCH 5 FEET OR MORE IN DEPTH, THE CONTRACTOR SHALL

SUBMIT A DETAILED PLAN TO THE CONSTRUCTION OR PROJECT MANAGER SHOWING THE

DESIGN OF SHORING, BRACING, SLOPING, OR OTHER PROVISIONS TO BE MADE FOR THE

WORKERS' PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE EXCAVATION OF

SUCH TRENCH. IF THE PLAN VARIES FROM THE SHORING SYSTEM STANDARDS, THE PLAN

SHALL BE PREPARED BY A REGISTERED CIVIL ENGINEER. NO EXCAVATION SHALL START UNTIL

THE CONSTRUCTION OR PROJECT MANAGER HAS ACCEPTED THE PLAN AND THE CONTRACTOR

HAS OBTAINED A PERMIT FROM THE STATE DIVISION OF INDUSTRIAL SAFETY.

18.

CONTRACTOR SHALL NOT DAMAGE ANY PUBLIC SIDEWALK DURING THE COURSE OF HIS WORK.12.

CONTRACTOR SHALL COMPLY WITH CALIFORNIA FIRE CODE CHAPTER 33 - FIRE SAFETY

DURING CONSTRUCTION AND DEMOLITION.

= PROTECT EXISTING CONCRETE PAVEMENT

CLEAR AND GRUB EXISTING TURF & REMOVE ANY BELOW GRADE IRRIGATION PIPES.

SI

TE

D

EM

OL

IT

IO

N

PL

AN

CONTRACTOR SHALL COMPLY WITH CBC AND CFC CH 33 - FIRE SAFETY DURING

CONSTRUCTION AND DEMOLITION. REFER TO DSA BULLETIN 24-05 FOR FURTHER

INFORMATION

EARTHWORK NOTICE TO CONTRACTOR: NO EARTHWORK ANALYSIS HAS BEEN

COMPLETED WITH RESPECT TO VOLUMES OF SOILS TO BE EXCAVATED, PLACED, OR

IMPORTED IN ORDER TO PROVIDE THE FINISHED GRADES SHOWN ON THE PLANS. THE

CONTRACTOR IS SOLELY RESPONSIBLE FOR VERIFYING THE EARTHWORK QUANTITIES

NECESSARY TO COMPLETE THE PROJECT.

CONSTRUCTION STORM WATER NOTE:

GRADING WORK ASSOCIATED WITH THIS PROJECT WILL DISTURB LESS THAN 1 ACRE OF

SOIL AND THUS SHALL NOT BE SUBJECT TO COMPLY WITH THE NPDES GENERAL PERMIT

FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION AND LAND

DISTURBANCE ACTIVITIES (GENERAL PERMIT) ORDER WQ 2022-0057-DWQ.

NOTE TO CONTRACTOR: BEFORE DEMOLITION OR TRENCHING OCCURS, THE

CONTRACTOR SHALL COMPLETE AN UNDERGROUND UTILITY MAPPING SURVEY OF THE

ENTIRE LIMITS OF WORK TO DETERMINE WHERE EXISTING UTILITIES ARE AND WHERE

POSSIBLE UNDERGROUND CONFLICTS MAY OCCUR. PROVIDE SURVEY TO OWNER.

NOTE TO CONTRACTOR: THE REMOVAL AND DISPOSAL OF EXISTING HARDSCAPE &

SOFTSCAPE, TO FACILITATE THE TRENCHING OF NEW UNDERGROUND UTILITIES, VAULTS,

VALVES, DRAIN INLETS, MANHOLES, ETC. SHOWN IN THE ENTIRE PLAN SET IS THE

RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH ALL SUB-CONTRACTORS.

PR

OJ

EC

T

NU

MB

ER

DA

TE

DE

LT

A:

DE

SC

RI

PT

IO

N:

PR

OJ

EC

T

ST

AT

US

SH

EE

T

IS

SU

ED

S

GH

A

RC

HI

TE

CT

S

IN

C.

A

LL

R

IG

HT

S

RE

SE

RV

ED

SE

AL

S:

CO

NS

UL

TA

NT

A#04-125867

-9

-0

EU

CL

ID

LA

NG

UA

GE

A

CA

DE

MY

TU

RF

R

EP

LA

CE

ME

NT

S E

U C

LI

D

A

VE

, O N

TA

R

IO

, C

A

O N

TA

R

IO

-M

O N

TC

LA

IR

S

C H

O O

L D

IS

TR

IC

T

CO

NS

TR

UC

TIO

N

DO

CU

ME

NT

S

/13 /26

CONSTRUCTION DOCUMENTS

FPL FPL and Associates, Inc.

PL

OT

D

AT

E:

/26 /20

2:

P

M

PL

OT

B

Y:

Je ss ica

Z ia

L

AS

T

SA

VE

D

BY

: j es sic a.z ia

S :\J ob s\2

1 -

S

GH

\E uc lid E

S\ Ci vil \T ur f\E uc lid

T ur f- C1

.00 D em ol iti on

P lan

.d wg

(E)MULTIPURPOSE ROOM

R2 REMOVE & DISPOSE OF EXISTING TREE AND ROOTS.

R3 REMOVE & DISPOSE OF REDWOOD HEADER.

R4 REMOVE & DISPOSE OF BACKSTOP.

(E)BUILDING

R5 REMOVE & DISPOSE OF EXISTING STORM DRAIN INLET.

R6 REMOVE & DISPOSE OF EXISTING STORM DRAIN PIPE.

R7 ABANDON UTILITY.

AutoCAD SHX Text P

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text P

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text P

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text P

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text P

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text P

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text P

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text P

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text P

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text P

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text P

AutoCAD SHX Text

CONC

AutoCAD SHX Text P

AutoCAD SHX Text

CONC

AutoCAD SHX Text P

AutoCAD SHX Text

CONC

AutoCAD SHX Text P

AutoCAD SHX Text

CONC

AutoCAD SHX Text P

AutoCAD SHX Text

CONC

AutoCAD SHX Text P

AutoCAD SHX Text

CONC

AutoCAD SHX Text P

AutoCAD SHX Text

CONC

AutoCAD SHX Text P

AutoCAD SHX Text

FENCE

AutoCAD SHX Text P

AutoCAD SHX Text

FENCE

AutoCAD SHX Text R5

AutoCAD SHX Text P

AutoCAD SHX Text

PULLBOX

AutoCAD SHX Text P

AutoCAD SHX Text

CONC PAD & FLAG POLE

AutoCAD SHX Text R1

AutoCAD SHX Text R1

AutoCAD SHX Text R1

AutoCAD SHX Text P

AutoCAD SHX Text

RAMP

AutoCAD SHX Text P

AutoCAD SHX Text

RAMP

AutoCAD SHX Text P

AutoCAD SHX Text

RAMP

AutoCAD SHX Text R2

AutoCAD SHX Text R3

AutoCAD SHX Text R3

AutoCAD SHX Text R3

AutoCAD SHX Text R3

AutoCAD SHX Text R3

AutoCAD SHX Text R3

AutoCAD SHX Text R3

AutoCAD SHX Text R3

AutoCAD SHX Text R3

AutoCAD SHX Text R3

AutoCAD SHX Text R4

AutoCAD SHX Text R3

AutoCAD SHX Text

ICV

AutoCAD SHX Text

ICV

AutoCAD SHX Text

ICV

AutoCAD SHX Text

3'(U) BRACKET

AutoCAD SHX Text

ICV

AutoCAD SHX Text

2'(U) BRACKET

AutoCAD SHX Text

2'(U) BRACKET

AutoCAD SHX Text

(W)VALVE BOX

AutoCAD SHX Text

(SD)DRAIN INLET

AutoCAD SHX Text

(E)VAULT

AutoCAD SHX Text

(E)GRN

AutoCAD SHX Text

(SD)DRAIN INLET INVERT DEPTH AT 0'-11" FROM TOP OF GRATE

AutoCAD SHX Text

4" PVC

AutoCAD SHX Text

(E)2 DROPS, 1 GRN

AutoCAD SHX Text

2'(U) BRACKET

AutoCAD SHX Text

(W)RISER

AutoCAD SHX Text

(E)2 DROPS, 1 GRN

AutoCAD SHX Text

(E)GRN

AutoCAD SHX Text

2'(E) BRACKET

AutoCAD SHX Text

EMPTY (E)PULL BOX

AutoCAD SHX Text

(E)VAULT, FULL OF DEBRIS

AutoCAD SHX Text

(SD)DRAIN INLET

AutoCAD SHX Text P

AutoCAD SHX Text

SCO

AutoCAD SHX Text R6

AutoCAD SHX Text R6

AutoCAD SHX Text R5

AutoCAD SHX Text R7

AutoCAD SHX Text R7

AutoCAD SHX Text R6

AutoCAD SHX Text R6

AutoCAD SHX Text P

AutoCAD SHX Text

STORM DRAIN

AutoCAD SHX Text R6

AutoCAD SHX Text P

AutoCAD SHX Text

STORM DRAIN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Exp. 09-30-27

AutoCAD SHX Text No. C 34971

AutoCAD SHX Text Traffic Transportation Civil

AutoCAD SHX Text Irvine, CA 92606

AutoCAD SHX Text 30 Corporate Park, Suite 401

I I I

(936.5)

(937.0)

(937.5)

(936.0)

(936.0)

(936.0)

(936.5)

(937.0)

(937.5)

(938.0)

(938.5)

(939.0)

(936.5)

(937.0)

(937.5)

(938.0)

(938.5)

(939.0)

936.0

936.0

937.0

937.5

938.0

938.5

939.0

936.5

937.0

937.5

938.0

938.5

939.0

939.5

936.5

936.5

C2.00

HATCH LEGEND:

= EXISTING BUILDING

= PROTECT EXISTING CONCRETE PAVEMENT

GR

AD

IN

G

PL

AN

CONTRACTOR SHALL COMPLY WITH CBC AND CFC CH 33 - FIRE SAFETY DURING

CONSTRUCTION AND DEMOLITION. REFER TO DSA BULLETIN 24-05 FOR FURTHER

INFORMATION

EARTHWORK NOTICE TO CONTRACTOR: NO EARTHWORK ANALYSIS HAS BEEN

COMPLETED WITH RESPECT TO VOLUMES OF SOILS TO BE EXCAVATED, PLACED, OR

IMPORTED IN ORDER TO PROVIDE THE FINISHED GRADES SHOWN ON THE PLANS. THE

CONTRACTOR IS SOLELY RESPONSIBLE FOR VERIFYING THE EARTHWORK QUANTITIES

NECESSARY TO COMPLETE THE PROJECT.

CONSTRUCTION STORM WATER NOTE:

GRADING WORK ASSOCIATED WITH THIS PROJECT WILL DISTURB LESS THAN 1 ACRE OF

SOIL AND THUS SHALL NOT BE SUBJECT TO COMPLY WITH THE NPDES GENERAL PERMIT

FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION AND LAND

DISTURBANCE ACTIVITIES (GENERAL PERMIT) ORDER WQ 2022-0057-DWQ.

NOTE TO CONTRACTOR: BEFORE DEMOLITION OR TRENCHING OCCURS, THE

CONTRACTOR SHALL COMPLETE AN UNDERGROUND UTILITY MAPPING SURVEY OF THE

ENTIRE LIMITS OF WORK TO DETERMINE WHERE EXISTING UTILITIES ARE AND WHERE

POSSIBLE UNDERGROUND CONFLICTS MAY OCCUR. PROVIDE SURVEY TO OWNER.

NOTE TO CONTRACTOR: THE REMOVAL AND DISPOSAL OF EXISTING HARDSCAPE &

SOFTSCAPE, TO FACILITATE THE TRENCHING OF NEW UNDERGROUND UTILITIES, VAULTS,

VALVES, DRAIN INLETS, MANHOLES, ETC. SHOWN IN THE ENTIRE PLAN SET IS THE

RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH ALL SUB-CONTRACTORS.

NOTE TO CONTRACTOR: WHERE NEW CONCRETE FLATWORK JOINS EXISTING

CONCRETE FLATWORK, INSTALL AN EXPANSION JOINT PER DETAIL AA/C3.00. NEW

CONCRETE MUST MEET BE FLUSH WITH EXISTING CONCRETE.

PROTECT EXISTING IMPROVEMENT IN PLACE.

W1

CONSTRUCTION NOTES:

P

CONSTRUCT ARTIFICIAL TURF PER DETAIL 1/C3.00.

A ADJUST EXISTING IMPROVEMENT TO BE FLUSH WITH ADJACENT FINISH SURFACE.

CONSTRUCT QUICK COUPLING VALVE & BOX PER DETAIL W1/C3.00.

= PROPOSED ARTIFICIAL TURF

SCALE: 1" = 10'

W2 CONSTRUCT 1.5" SCHEDULE 80 P.V.C. PIPE & FITTINGS PER APPLICABLE

TRENCHING DETAIL ON SHEET C3.00.

2 CONSTRUCT CONCRETE MOW CURB AROUND ARTIFICIAL TURF PER DETAIL 2/C3.00.

3 CONSTRUCT 8" PERFORATED HDPE PIPE PERIMETER SUBDRAIN PER DETAIL 3/C3.00.

4 CONSTRUCT 8" SDR-35 PVC OR HDPE SOLID PIPE PER APPLICABLE TRENCHING DETAIL

ON SHEET C3.00.

5 CONSTRUCT 1" HIGH X 12" WIDE HDPE FLAT DRAINAGE PIPE PER DETAIL 1/C3.00. SPACE

PIPE AT 20' ON CENTER.

CONNECT FLAT DRAINAGE PIPE INTO 8" PERFORATED SUBDRAIN PIPE PER DETAIL

5/C3.00.

CONNECT TO EXISTING STORM DRAIN PIPE WITH APPLICABLE FITTINGS AND COUPLINGS.

W3 CONNECT TO EXISTING WATER LINE WITH APPLICABLE FITTINGS AND COUPLINGS.

PR

OJ

EC

T

NU

MB

ER

DA

TE

DE

LT

A:

DE

SC

RI

PT

IO

N:

PR

OJ

EC

T

ST

AT

US

SH

EE

T

IS

SU

ED

S

GH

A

RC

HI

TE

CT

S

IN

C.

A

LL

R

IG

HT

S

RE

SE

RV

ED

SE

AL

S:

CO

NS

UL

TA

NT

A#04-125867

-9

-0

EU

CL

ID

LA

NG

UA

GE

A

CA

DE

MY

TU

RF

R

EP

LA

CE

ME

NT

S E

U C

LI

D

A

VE

, O N

TA

R

IO

, C

A

O N

TA

R

IO

-M

O N

TC

LA

IR

S

C H

O O

L D

IS

TR

IC

T

CO

NS

TR

UC

TIO

N

DO

CU

ME

NT

S

/13 /26

CONSTRUCTION DOCUMENTS

FPL FPL and Associates, Inc.

PL

OT

D

AT

E:

/26 /20

2:

P

M

PL

OT

B

Y:

Je ss ica

Z ia

L

AS

T

SA

VE

D

BY

: j es sic a.z ia

S :\J ob s\2

1 -

S

GH

\E uc lid E

S\ Ci vil \T ur f\E uc lid

T ur f - C

2.0 0 G ra di ng P lan .d wg

NOTE TO CONTRACTOR: ALL EXISTING UNDERGROUND UTILITIES TO BE

PROTECTED IN PLACE UNLESS NOTED OTHERWISE.

UNDERGROUND UTILITY LINETYPE LEGEND

E E

SS SS

SD SD

W W

STORM DRAIN

ELECTRICAL/POWER

SANITARY SEWER

DOMESTIC WATER

U U U U UNKNOWN UTILITY

THE UNDERGROUND UTILITY INFORMATION SHOWN HEREON IS

BASED ON INFORMATION OBTAINED AFTER PERFORMING A

NON-INTRUSIVE GEOPHYSICAL SURVEY. CERTAIN RESTRICTIONS

SUCH AS PHYSICAL OBSTRUCTIONS, UNAVAILABLE UTILITY ACCESS

POINTS OR UNFAVORABLE SOIL CONDITIONS FOR RADAR IMAGING

MAY HAVE PREVENTED A COMPLETE IDENTIFICATION OF SOME

UTILITIES OR SUBSTRUCTURES. CERTAIN PORTIONS OF SEWER

CLEANOUTS WERE NOT ACCESSIBLE TO PERFORM CAMERA

INVESTIGATION. ADDITIONALLY, UNLESS OTHERWISE NOTED AS A

MANHOLE OR POTHOLE "DIP", THE UTILITY LOCATIONS AND

ELEVATIONS SHOWN HEREON ARE APPROXIMATE. THIS PLAN DOES

NOT REPRESENT A COMPLETE INVENTORY OF ACTIVE, INACTIVE

OR ABANDONED IN-PLACE UTILITIES ON SITE. CONTRACTOR IS

ADVISED TO CONTACT 811 AND POTHOLE TO FIELD-VERIFY

UTILITIES IN ADVANCE OF ANY PROPOSED IMPROVEMENT PLAN.

UNDERGROUND UTILITY MAPPING NOTES:

FIELD INFILTRATION TEST NOTE TO CONTRACTOR:

1. AFTER INSTALLATION OF THE PERMEABLE AGGREGATE BASE, AND PRIOR TO

INSTALLATION OF THE SYNTHETIC TURF, THE CONTRACTOR SHALL PAY FOR

AND TEST THE FINISHED BASE FOR INFILTRATION PER ASTM F2898 - 11

(REAPPROVED 2019) STANDARD TEST METHOD FOR PERMEABILITY OF

SYNTHETIC TURF SPORTS FIELD BASE STONE AND SURFACE SYSTEM BY

NON-CONFINED AREA FLOOD TEST METHOD.

2. THE TEST IS TO BE PERFORMED BY A REGISTERED GEOTECHNICAL ENGINEER,

CERTIFIED AGRONOMIST, OR OTHER QUALIFIED INDEPENDENT TESTING

PROFESSIONAL. TEST IN AT LEAST 3 AREAS OF EACH CONTIGUOUS PERMEABLE

AGGREGATE BASE AS DETERMINED BY THE OWNER'S REPRESENTATIVE.

3. THE PERMEABLE AGGREGATE BASE IS TO HAVE AN INFILTRATION RATE OF A

MINIMUM 4 - 6 INCHES PER HOUR.

4. CONTRACTOR SHALL PROVIDE THE RESULTS OF THE TEST TO THE OWNERS

REPRESENTATIVE.

5. IF THE PERMEABLE AGGREGATE BASE DOES NOT MEET THE REQUIRED

INFILTRATION RATE, CONTRACTOR SHALL CORRECT OR REINSTALL THE

NON-CONFORMING SECTIONS TO THE REQUIRED GRADE, CROSS-SECTION AND

DENSITY.

6. TESTING FEES AND CORRECTIONS TO AND/OR REINSTALLATION OF THE

PERMEABLE AGGREGATE BASE ARE AT NO ADDITIONAL COST TO THE OWNER.

AutoCAD SHX Text P

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text P

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text P

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text P

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text P

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text P

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text P

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text P

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text P

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text P

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text P

AutoCAD SHX Text

CONC

AutoCAD SHX Text P

AutoCAD SHX Text

CONC

AutoCAD SHX Text P

AutoCAD SHX Text

CONC

AutoCAD SHX Text P

AutoCAD SHX Text

CONC

AutoCAD SHX Text P

AutoCAD SHX Text

CONC

AutoCAD SHX Text P

AutoCAD SHX Text

CONC

AutoCAD SHX Text P

AutoCAD SHX Text

CONC

AutoCAD SHX Text P

AutoCAD SHX Text

FENCE

AutoCAD SHX Text P

AutoCAD SHX Text

FENCE

AutoCAD SHX Text A

AutoCAD SHX Text

PULLBOX

AutoCAD SHX Text P

AutoCAD SHX Text

CONC PAD & FLAG POLE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

RAMP

AutoCAD SHX Text P

AutoCAD SHX Text

RAMP

AutoCAD SHX Text P

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

3'(U) BRACKET

AutoCAD SHX Text

ICV

AutoCAD SHX Text

2'(U) BRACKET

AutoCAD SHX Text

2'(U) BRACKET

AutoCAD SHX Text

(W)VALVE BOX

AutoCAD SHX Text

(E)VAULT

AutoCAD SHX Text

(E)GRN

AutoCAD SHX Text

(SD)DRAIN INLET INVERT DEPTH AT 0'-11" FROM TOP OF GRATE

AutoCAD SHX Text

4" PVC

AutoCAD SHX Text

(E)2 DROPS, 1 GRN

AutoCAD SHX Text

2'(U) BRACKET

AutoCAD SHX Text

(W)RISER

AutoCAD SHX Text

(E)2 DROPS, 1 GRN

AutoCAD SHX Text

(E)GRN

AutoCAD SHX Text

2'(E) BRACKET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 20.00'

AutoCAD SHX Text 20.00'

AutoCAD SHX Text 20.00'

AutoCAD SHX Text 20.00'

AutoCAD SHX Text 20.00'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text W3

AutoCAD SHX Text W3

AutoCAD SHX Text W1

AutoCAD SHX Text W1

AutoCAD SHX Text W2

AutoCAD SHX Text W2

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Exp. 09-30-27

AutoCAD SHX Text No. C 34971

AutoCAD SHX Text Traffic…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .