3-BRE911312B_Final Plans 03-06-2024.pdf
PDF 12 MB Posted
- Attached to
- Bre911312B Nutrient Reduction Wetland
- Solicitation number
- 009-RFBW-CY24-04
- Issued by
- Black Hawk County, Iowa
About this file
The document is a comprehensive set of construction plans and technical specifications for the Bremer County Wetland Project, involving the Iowa Department of Agriculture and Land Stewardship (IDALS) and the USDA. The project involves constructing a nutrient reduction wetland spanning approximately 17.66 acres in Bremer County, Iowa, with key components including an 8-acre wetland pool, drainage tile installation, embankment construction, and associated infrastructure. The project includes excavation of approximately 6,552 cubic yards, placement of 3,010 cubic yards of earthfill for general dam construction, installation of 2,343 linear feet of 18-inch dual wall HDPE drainage tile, and various structural elements like a water control structure, drawdown structure, and sheet pile weir. The construction is expected to be completed by June 1, 2025, with seeding finalized by June 30, 2025.
The project is funded through state and potentially federal agricultural conservation programs, with a focus on nutrient reduction and watershed management. The estimated quantities include multiple components such as site stripping, seeding (2.5 acres for structure and channel, 6.3 acres for buffer), drain tile investigation and removal (5,603 linear feet), and rip rap placement (430 tons). The design includes specific engineering specifications for tile installation, embankment construction, and erosion control, with careful attention to maintaining existing drainage patterns and minimizing environmental disruption. The wetland is designed with a normal pool elevation of 956.0 feet, an average pool depth of 1.5 feet, and is expected to provide approximately 614 years of estimated sediment storage, though this may be reduced during flood events.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF IOWA
BREMER COUNTY, IA
ENGINEER
SHIVE-HATTERY, INC
ATTN: DAN JENSEN
4125 WESTOWN PARKWAY, SUITE 100
WEST DES MOINES, IOWA 50266
PH: (515) 223-8104
FX: (515) 223-0622
SITE ADDRESS:
2160 230TH ST WAVERLY, IA 50677
CONTACT INFORMATION:
IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP
SARA SMITH, PE.,PHD
502 E. 9TH STREET
DES MOINES, IA, 50319
PH: (515) 422-7335
SARA.SMITH@IOWAAGRICULTURE.GOV
BRE911312B BREMER COUNTY WETLAND
IDALS
PROJECT
LOCATION
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C000
CO
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
-1
9-
BR
E9
2B B
R
EM
ER
C
O U
N
TY
W
ET
LA
N
D
ID
AL
S
BR
EM
ER
C
O
UN
TY
, I
A
P:
\P ro je ct s\
DM
\4
\D el ive ra bl es \D ra wi ng s\
1_ Ci vil \C
- C O
VE
R
SH
EE
T.
dw g 1/
/2
:0
5:
A M
PROJECT DRAWING COORDINATE SYSTEM:
HORIZONTAL: NAD83 IOWA STATE PLANE NORTH ZONE (1401)
VERTICAL: NAVD88
UNITS: U.S. SURVEY FEET
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:
My License Renewal Date is: DECEMBER 31, Printed or typed name:
License Number:
Signature: Date
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT DESCRIBED
BELOW WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL
SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF IOWA.
ALL SHEETS
DANIEL JENSEN
25063
CIVIL ENGINEER
NRCS NEM PART 505 CERTIFICATION
THE SIGNING PROFESSIONALS HEREBY CERTIFY
THAT, TO THE BEST OF THEIR PROFESSIONAL
KNOWLEDGE, JUDGEMENT, AND BELIEF, THESE
PLANS MEET APPLICABLE NRCS STANDARDS.
IO
W A D E P A R T M EN T O F
AGR
I C U L T U R E & L A N D S T EWA R D
SH
IP
PROJECT
LOCATION
BREMER COUNTY
HIGHWAY 3 (230TH ST)
CONSTRUCTION
ENTRANCE
LANDOWNERS
PRIMARY:
STEVEN TEISINGER
PH: (319) 830-6511
SECONDARY:
JANICE ROGERS AND KEVIN KIRCHOFF
PH: (319) 984-9270
AND (319) 404-3333
WAVERLY
TRIPOLI
PLAINFIELD SUMNER
READLYN
DENVER
A B C D E F
A B C D E F
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, Io w a
5.
3.
w w w
.s hi ve -h at te ry .c om
Io w a
Il lin oi s
In di an a
N eb ra sk a
W is co ns in
U S
H
IG
H W
AY
Sheet List Table Sheet Number Sheet Title
C000 COVER SHEET
C001 PROJECT QUANTITIES & NOTES
CD01 EXISTING CONDITIONS AND REMOVALS PLAN
C201 OVERALL SITE PLAN
C202 WETLAND GRADING PLAN
C203 CUT FILL PLAN
C301 WETLAND BERM PROFILE
C302 OUTLET CHANNEL PLAN AND PROFILE
C303 WETLAND TILE PLAN AND PROFILE
C304 DRAWDOWN STUCTURE PLAN & PROFILE
C401 SHEET PILE WEIR
C501 CONSTRUCTION DETAILS
C502 CONSTRUCTION DETAILS
C503 CONSTRUCTION DETAILS
C601 SEEDING PLAN
LANDOWNER
RESIDENCE
M
ID
W
AY
A
VE
DENVER, IA
2 MILES
QUARTER SECTION RUN
THE ENGINEERING JOB CLASS IS IV
03-06-2024
A B C D E F
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, Io w a
5.
3.
w w w
.s hi ve -h at te ry .c om
Io w a
Il lin oi s
In di an a
N eb ra sk a
W is co ns in
IOWA D
EP
A R
TM
E NT O F
A G R I C U L T URE
L A
ND
S
TEWARDSHIP
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C001
PR
O
JE
CT
Q
UA
NT
IT
IE
S
NO
TE
S
G
HK
DJ
J
CO
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
-1
9-
BR
E9
2B B
R
EM
ER
C
O U
N
TY
W
ET
LA
N
D
ID
AL
S
BR
EM
ER
C
O
UN
TY
, I
A
P:
\P ro je ct s\
DM
\4
\D el ive ra bl es \D ra wi ng s\
1_ Ci vil \C
Q
UA
NT
IT
IE
S.
dw g
1/
/2
2:
:2
PM
ESTIMATED QUANTITIES:
GENERAL NOTES:
1. THE LOCATIONS OF UTILITY MAINS, STRUCTURES AND SERVICE
CONNECTIONS PLOTTED ON THIS DRAWING ARE APPROXIMATE ONLY AND
WERE OBTAINED FROM RECORDS MADE AVAILABLE TO SHIVE-HATTERY,
INC. THERE MAY BE OTHER EXISTING UTILITY MAINS, STRUCTURES AND
SERVICE CONNECTIONS NOT KNOWN TO SHIVE-HATTERY, INC. AND NOT
SHOWN ON THIS DRAWING. THE VERIFICATION OF EXISTENCE OF, AND THE
DETERMINATION OF THE EXACT LOCATION OF, UTILITY MAINS,
STRUCTURES AND SERVICE CONNECTIONS SHALL BE THE RESPONSIBILITY
OF THE CONSTRUCTION CONTRACTOR(S).
2. IOWA CODE 480, UNDERGROUND FACILITIES INFORMATION, REQUIRES
VERBAL NOTICE TO IOWA ONE-CALL 1-800-292-8989, NOT LESS THAN 48
HOURS BEFORE EXCAVATING, EXCLUDING WEEKENDS AND HOLIDAYS.
3. THE MEANS OF THE WORK AND THE SAFETY OF THE CONTRACTOR'S
EMPLOYEES ARE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR.
4. NO WORK SHALL BE PERFORMED BEYOND THE PROJECT LIMITS WITHOUT
PRIOR AUTHORIZATION FROM THE OWNER'S REPRESENTATIVE.
5. REPLACE ANY PROPERTY MONUMENTS REMOVED OR DESTROYED BY
CONSTRUCTION. MONUMENTS SHALL BE SET BY A LAND SURVEYOR
REGISTERED TO PRACTICE IN THE STATE OF IOWA.
6. ALL DEBRIS AND TRASH ENCOUNTERED DURING CONSTRUCTION WITHIN
THE PROJECT LIMITS, OR DIRECTED BY THE ENGINEER, SHALL BE
PROPERLY DISPOSED OF.
7. CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION DE-WATERING
THAT IS REQUIRED AT NO ADDITIONAL COST TO THE DIVISION.
8. REPAIR OR REPLACE DAMAGE TO EXISTING FACILITIES (TILE, UTILITIES,
FENCES, ETC.) DESIGNATED TO REMAIN, AT NO ADDITIONAL EXPENSE TO
THE OWNER. ALL AREAS DISTURBED BY CONSTRUCTION, INCLUDING
STAGING AREAS AND HAUL ROUTES, ARE TO BE REWORKED TO THEIR
EXISTING CONDITIONS AND SEEDED AT NO ADDITIONAL COST TO THE
DIVISION IF OUTSIDE OF PROJECT LIMITS AND NOT APPROVED BY
ENGINEER.
9. WORK WHICH DOES NOT CONFORM TO THE REQUIREMENTS OF THE
CONTRACT WILL BE CONSIDERED UNACCEPTABLE. UNACCEPTABLE WORK,
WHETHER THE RESULT OF POOR WORKMANSHIP, USE OF DEFECTIVE
MATERIALS, DAMAGE THROUGH CARELESSNESS OR ANY OTHER CAUSE,
FOUND TO EXIST PRIOR TO THE FINAL ACCEPTANCE OF THE WORK, SHALL
BE REMOVED AND REPLACED IN AN ACCEPTABLE MANNER, AS REQUIRED
BY THE OWNER AT THE CONTRACTOR'S EXPENSE.
10. WORK DONE CONTRARY TO THE INSTRUCTIONS OF THE OWNERS
REPRESENTATIVE, WORK DONE BEYOND THE LINES SHOWN ON THE PLANS
OR ANY EXTRA WORK DONE WITHOUT AUTHORITY WILL NOT BE PAID FOR.
11. A SHRINKAGE FACTOR OF 25% WAS ESTIMATED FOR THIS PROJECT. THE
CONTRACTOR SHALL MAKE CHANGES IN EARTHWORK AS NEEDED TO
ADJUST FOR INACCURACIES INHERENT WITH ESTIMATING THE SHRINKAGE
FACTOR. THESE CHANGES SHALL ONLY BE MADE AFTER CONSULTATION
AND APPROVAL BY THE ENGINEER AND DIVISION.
12. CONTOURS AND SPOT ELEVATIONS SHOWN ARE TO FINISHED GRADE.
13. THE CONTRACTOR SHALL KEEP ALL ROADS OPEN TO THROUGH TRAFFIC
AT ALL TIMES.
14. ALL WORK WITHIN THE PUBLIC RIGHT OF WAY SHALL BE COORDINATED
WITH THE GOVERNING AUTHORITY AND SHALL BE DONE IN ACCORDANCE
WITH THEIR STANDARDS.
15. SUBMIT MANUFACTURER'S CERTIFICATION AND MATERIAL DATA FOR ALL
MATERIALS DELIVERED TO THE PROJECT SITE AS REQUESTED BY THE
OWNERS REPRESENTATIVE.
16. CONSTRUCTION SURVEY STAKING WILL BE PAID FOR BY THE OWNER AND
PROVIDED BY THE ENGINEER. CONTROL POINTS WILL BE SET FOR USE
WITH GPS CONTROLLED GRADING, IF DESIRED. CONTRACTOR SHALL
PRESERVE STAKES TO THE EXTENT FEASIBLE. ANY RE-STAKING COSTS
WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
17. NEITHER SHIVE-HATTERY NOR IDALS GUARANTEE THIS PRACTICE WILL
HOLD A PERMANENT POOL OF WATER.
CULTURAL RESOURCES NOTE:
1. IF A CULTURAL RESOURCE IS IDENTIFIED
DURING CONSTRUCTION, STOP IMMEDIATELY
AND NOTIFY LOCAL NATURAL RESOURCES
CONSERVATION SERVICE OFFICE.
# ITEM DESCRIPTION QUANTITY UNITS
1 SITE STRIPPING & PREPARATION 1 LS
2 CROP DAMAGE 0 AC
3 STRUCTURE & CHANNEL SEEDING 2.5 AC
4 BUFFER SEEDING 6.3 AC
5 MOBILIZATION AND DEMOBILIZATION 1 LS
6 DRAIN TILE INVESTIGATION AND REMOVAL 5,603 LF
7 STEEL SHEET PILING 414 SF
8 EXCAVATION (GENERAL (P)) 6,552 CY
9 EARTHFILL (GENERAL (P)) 963 CY
10 EARTHFILL (GENERAL DAM (P)) 3,010 CY
11 EARTHFILL (DAM CORE (P)) 3,527 CY
12 EARTHFILL (SCARIFY AND RECOMPACT 12" LAYER OF WETLAND BOTTOM (P)): 3,432 CY
13 TOPSOIL PLACEMENT, 6 INCH 4,276 CY
14 TOPSOIL PLACEMENT, 12 INCH 3,122 CY
15 8" CORRURGATED POLYETHYLENE PIPE (PERFORATED) 521 LF
16 12" CORRUGATED PROFILE WALL (DUAL WALL) POLYETHYLENE PIPE 298 LF
17 18" CORRUGATED PROFILE WALL (DUAL WALL) POLYETHYLENE PIPE 2,343 LF
18 12" RISER INLET STRUCTURE, HICKENBOTTOM 1 EA
19 18" CMP DRAWDOWN STRUCTURE 1 EA
20 48" CMP WATER CONTROL STRUCTURE 1 EA
21 12" CMP DRAWDOWN WETLAND OUTLET PIPE 84 LF
22 15" CMP TILE OUTLETS (20 LF EACH) 1 EA
23 24" CMP TILE OUTLETS (20 LF EACH) 1 EA
24 RIP RAP 430 TON
25 2" CLEAN STONE 60 TON
26 CONCRETE GROUT 63 CY
27 POLLUTION CONTROL, SILT FENCE 120 LF
28 POLLUTION CONTROL, TYPE 4 RECP 385 SY
29 FENCE REMOVAL 1 LS
ESTIMATE REFERENCE NOTES:
PROJECT ID BRE911312B-FP ----- LENGTH OF BERM 2179 FEET
LANDOWNERS
TEISINGER, STEVE;
ROGERS, JANICE; &
KIRCHOFF, KEVIN
----- AUXILIARY SPILLWAY ELEVATION NONE FEET
PRELIMINARY OR FINAL DESIGN FINAL DESIGN ----- AUXILIARY SPILLWAY WIDTH NONE FEET
DRAINAGE AREA 409 (TILE); 23.9
(OVERLAND) ACRES WEIR WIDTH 20 FEET
WETLAND POOL AREA 8.0 ACRES DROP HEIGHT 3 FEET
DEEP WATER AREA (>3 FT DEEP) 0.2 ACRES STILLING BASIN LENGTH 30 FEET
NORMAL POOL ELEVATION 956.0 FEET TIME OF CONCENTRATION 0.46 HOURS
AVERAGE POOL DEPTH 1.5 FEET WEIGHTED RUNOFF CURVE
NUMBER 85 -----
MAXIMUM POOL DEPTH 4.1 FEET 25-YEAR STORM DESIGN FLOW 81 CFS
POOL STORAGE 11.8 ACRE-FEET 100-YEAR STORM DESIGN FLOW 116 CFS
BERM ELEVATION 958.25 FEET 100-YEAR FLOOD SURF. ELEVATION 956.65 FEET
BERM STORAGE 36.8 ACRE-FEET ESTIMATED SEDIMENT STORAGE 614 YEARS
TOTAL EASEMENT AREA 17.66 ACRES
NOTE: SEDIMENT STORAGE ESTIMATED FROM OVERLAND FLOW AREA.
ADDITIONAL SEDIMENTATION IS EXPECTED DURING FLOOD EVENTS THAT
WILL REDUCE THE SEDIMENT STORAGE LIFESPAN.
WETLAND DESIGN DATA:
ITEM # SPEC # DESCRIPTION
1 IA CS-001
SITE STRIPPING & PREPARATION : THIS ITEM SHALL BE CONSIDERED FULL COMPENSATION TO REMOVE ANY REMAINING TREES, STUMPS, AND BRUSH FROM WITHIN THE GRADING LIMITS, PROPOSED POOL LIMITS, AND ALONG THE CONSTRUCTION ACCESS ROUTE. SEE SHEET CD01. THIS ITEM ALSO INCLUDES THE REMOVAL AND PROPER OFF-SITE DISPOSAL OF ALL WASTE ENCOUNTERED. THE GRANULAR SURFACING AT THE CONSTRUCTION ENTRANCE IS INCLUDED IN THIS BID ITEM. MANAGEMENT OF THE STORM WATER POLLUTION PREVENTION PLAN IS INCLUDED IN THIS BID ITEM.
2 IA CS-001
CROP DAMAGE: THIS ITEM CONSISTS OF CROP DAMAGE THAT RESULTS FROM CONSTRUCTION ACTIVITIES. IT IS RECOMMENDED CONTRACTOR REMOVE CORN RESIDUE RATHER THAN KNOCK IT DOWN.
PAYMENT FOR CROP DAMAGE WILL BE MADE TO THE NEAREST 0.1 ACRE AS MEASURED BY THE ENGINEER OR THEIR REPRESENTATIVE. THE UNIT RATE FOR CROP DAMAGE WILL BE DETERMINED BY THE DIVISION NEAR THE COMPLETION OF CONSTRUCTION AND ADDED TO THE CONTRACT WITH A CHANGE ORDER. PAYMENT WILL BE MADE TO CONTRACTOR WHO WILL PAY LANDOWNER.
3 IA CS-006 STRUCTURE & CHANNEL SEEDING: THIS ITEM INCLUDES SEEDING FOR ALL EMBANKMENT AND TILE COVER BERM AREAS AND INCLUDES SEEDBED PREP, SEEDING, MULCHING, AND FERTILIZER.
4 IA CS-006 BUFFER SEEDING: THIS ITEM INCLUDES SEEDING FOR ALL AREAS ABOVE NORMAL POOL AND WITHIN EASEMENT BOUNDARY, EXCLUDING THOSE AREAS WHERE STRUCTURE SEEDING IS SPECIFIED. SEE
SEEDING PLAN. NO MULCH OR FERTILIZER SHALL BE APPLIED.
5 CS-008 MOBILIZATION AND DEMOBILIZATION: THIS ITEM SHALL BE CONSIDERED FULL COMPENSATION TO MOBILIZE AND DEMOBILIZE THE CONTRACTOR'S FORCES AND EQUIPMENT FOR THE PROJECT. ALL OTHER WORK NECESSARY TO COMPLETE THE PROJECT AS REPRESENTED HEREIN BUT NOT INCLUDED IN THE ITEMS LISTED BELOW SHALL BE INCIDENTAL TO THIS ITEM.
6 IA CS-009
DRAIN TILE INVESTIGATION AND REMOVAL: THIS ITEM INCLUDES THE EXPLORATORY EXCAVATIONS REQUIRED TO LOCATE AND REMOVE TILES SHOWN ON THE PLANS. THIS IS FULL COMPENSATION FOR
EXCAVATION, BACKFILLING, AND REMOVAL OF THE TILE TRENCHES.
7 IA CS-013 STEEL SHEET PILING: THIS ITEM INCLUDES PROCUREMENT AND INSTALLATION OF THE SHEET PILING AS DETAILED ON SHEET C401 INCLUDING FIELD WELDING, CUTTING, TRIMMING, WALER, BOLTS, NUTS, AND OTHER APPURTENANCES.
8 IA CS-021 EXCAVATION (GENERAL (P)): THIS ITEM INCLUDES THE EXCAVATION OF MATERIAL REQUIRED TO CONSTRUCT THE CORE TRENCH BELOW THE EXISTING GROUND LEVEL, AS DETAILED, ALONG THE
CENTERLINE OF THE DAM EMBANKMENT AS WELL AS ESTABLISHING POOL FINAL GRADE.
9 IA CS-023
EARTHFILL (GENERAL (P)): THIS ITEM INCLUDES THE AMOUNT OF MATERIAL REQUIRED TO CONSTRUCT THE SUBMERGED BERMS AND ADDITIONAL FILL TO BE PLACED OVER TILE COVER BERMS ALONG WITH TOPSOIL FILL IN AREAS OUTSIDE OF EASEMENT. COHESIVE MATERIAL FOUND DURING GENERAL GRADING AND COMPACTED LINER REMOVAL CAN BE USED FOR THESE AREAS. SAND AND GRAVEL FOUND ON SITE SHALL NOT BE USED FOR THIS EARTHFILL. SEE SHEET C201 AND C202 FOR LIMITS OF EXCAVATION AND ASSOCIATED FILL. THE REQUIRED FILL INCLUDES A 25% SHRINKAGE FACTOR.
MEASUREMENT AND PAYMENT FOR PLACEMENT AND COMPACTION OF ALL FILL MATERIAL IS INCLUDED IN THIS ITEM AND WILL BE PAID BASED ON PLAN QUANTITY.
10 IA CS-023
EARTHFILL (GENERAL DAM (P)): THIS ITEM INCLUDES THE EARTHFILL PLACEMENT AND COMPACTION NECESSARY TO CONSTRUCTION THE PORTION OF THE EMBANKMENT THAT IS NOT THE EMBANKMENT CORE. COHESIVE MATERIAL FOUND DURING GENERAL GRADING AND COMPACTED LINER CAN BE USED FOR THIS AREA. SAND AND GRAVEL FOUND ON SITE SHALL NOT BE USED FOR FILL IN THESE AREAS.
SEE SHEET C201 AND C202 FOR LIMITS OF EXCAVATION AND ASSOCIATED FILL. THE REQUIRED FILL INCLUDES A 25% SHRINKAGE FACTOR. MEASUREMENT AND PAYMENT FOR PLACEMENT AND COMPACTION OF ALL FILL MATERIAL IS INCLUDED IN THIS ITEM AND WILL BE PAID BASED ON PLAN QUANTITY.
11 IA CS-023
EARTHFILL (DAM CORE (P)): THIS ITEM INCLUDES THE EARTHFILL PLACEMENT AND COMPACTION NECESSARY TO CONSTRUCT THE EMBANKMENT CORE WITHIN THE EMBANKMENT, INCLUDING THE CORE TRENCH. COHESIVE MATERIAL TAKEN FROM DESIGNATED BORROW AREA SHOULD BE USED FOR THIS AREA. SAND AND GRAVEL SHALL NOT BE USED FOR THIS AREA. SEE SHEET C201 AND C202 FOR LIMITS OF EXCAVATION AND ASSOCIATED FILL. THE REQUIRED FILL INCLUDES A 25% SHRINKAGE FACTOR. MEASUREMENT AND PAYMENT FOR PLACEMENT AND COMPACTION OF ALL FILL MATERIAL IS INCLUDED
IN THIS ITEM AND WILL BE PAID BASED ON PLAN QUANTITY.
12 IA CS-023
EARTHFILL (SCARIFY AND RECOMPACT 12" LAYER OF WETLAND BOTTOM (P)): THIS ITEM INCLUDES SCARIFICATION AND LOOSENING OF A 12 INCH SURFACE LAYER OF SOIL ON THE WETLAND POOL BOTTOM, MOISTURE CONDITIONING, AND COMPACTION OF THE WETLAND BOTTOM TO FORM A SEAL. CONTRACTOR SHALL REMOVE ROCKS LARGER THAN 6 INCHES. NOTIFY ENGINEER IMMEDIATELY IF
SANDY SOILS ARE ENCOUNTERED. ITEM WILL BE PAID BASED ON PLAN QUANTITY.
13 IA CS-026 TOPSOIL PLACEMEN, 6 INCH: THIS ITEM INCLUDES THE STRIPPING, SALVAGE, AND STOCKPILE 6" OF EXISTING MATERIAL FROM ALL AREAS TO BE EXCAVATED OR DISTURBED EXCLUDING THE EMBANKMENT FOOTPRINT AND TILE TRENCH OUTSIDE OF THE EASEMENT. RESPREAD TOPSOIL IN ALL AREAS. ITEM WILL BE PAID BASED ON PLAN QUANTITY.
14 IA CS-026 TOPSOIL PLACEMENT. 12 INCH: THIS ITEM INCLUDES THE STRIPPING, SALVAGE, AND STOCKPILE 12" OF EXISTING MATERIAL FROM THE EMBANKMENT FOOTPRINT AND PROPOSED 18" TILE TRENCH OUTSIDE OF THE EASEMENT. RESPREAD 12" TOPSOIL IN ALL AREAS. ITEM WILL BE PAID BASED ON PLAN QUANTITY.
15 IA CS-046 8" CORRUGATED POLYETHYLENE PIPE (PERFORATED): THIS ITEM INCLUDES THE MATERIAL, EXCAVATION, PLACEMENT, JOINTING, AND BACKFILL OF THE 8" DUAL-WALL NON-PERFORATED HDPE DRAIN TILE.
SEE SHEET C202 FOR LENGTHS, LOCATIONS AND ELEVATIONS.
16 IA CS-046 12" CORRUGATED PROFILE WALL (DUAL WALL) POLYETHYLENE PIPE: THIS ITEM INCLUDES THE MATERIAL, EXCAVATION, PLACEMENT, JOINTING, AND BACKFILL OF THE 12" DUAL-WALL NON-PERFORATED
HDPE DRAIN TILE. SEE SHEET C202 FOR LENGTHS, LOCATIONS AND ELEVATIONS.
17 IA CS-046 18" CORRUGATED PROFILE WALL (DUAL WALL) POLYETHYLENE PIPE: THIS ITEM INCLUDES THE MATERIAL, EXCAVATION, PLACEMENT, JOINTING, AND BACKFILL OF THE 18" DUAL-WALL NON-PERFORATED
HDPE DRAIN TILE. SEE SHEET C202 FOR LENGTHS, LOCATIONS AND ELEVATIONS.
18 IA CS-046
12" RISER INLET STRUCTURE, HICKENBOTTOM: THIS ITEM INCLUDED COSTS FOR MATERIAL AND INSTALLATION OF A 12" HICKENBOTTOM INTAKE AND CONCRETE CONNECTION TO THE EXISTING TILE AS
DETAILED.
19 IA CS-051 18" CMP DRAWDOWN STRUCTURE: THIS ITEM INCLUDES COSTS FOR THE MATERIAL AND INSTALLATION OF 18 INCH ALUMINIZED CMP DRAWDOWN STRUCTURE RISER PIPE, TRASH RACK, AND BASE A
DETAILED.
20 IA CS-051 48" CMP WATER CONTROL STRUCTURE : THIS ITEM INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS FOR THE PLACEMENT OF THE 48" CONCRETE RISER STRUCTURE, FOOTING, STEEL, FABRICATION, PIPE CONNECTIONS, AND TRASH RACK.
21 IA CS-051 12" CMP DRAWDOWN WETLAND OUTLET PIPE: THIS ITEM INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS REQUIRED FOR THE EXCAVATION, PLACEMENT OF THE REINFORCED CONCRETE PIPE, SUPPORT BLOCKS, OUTLET CRADLE , AND BENTONITE BACKFILL.
22 IA CS-051 15" CMP TILE OUTLETS (20 LF EACH): THIS ITEM INCLUDES THE COSTS FOR MATERIAL, EXCAVATION, PLACEMENT, JOINTING, BEDDING, RODENT GUARDS, AND BACKFILLING OF THE 20 LF 8" CMP END SECTION FOR THE PROPOSED FIELD TILE OUTLET TO THE WETLAND. 15" CMP OUTLET SECTIONS ARE FOR 12 INCH TILES.
23 IA CS-051 24" CMP TILE OUTLETS (20 LF EACH): THIS ITEM INCLUDES THE COSTS FOR MATERIAL, EXCAVATION, PLACEMENT, JOINTING, BEDDING, RODENT GUARDS, AND BACKFILLING OF THE 20 LF 10" CMP END SECTION FOR THE PROPOSED FIELD TILE OUTLET TO THE WETLAND. 24" CMP OUTLET SECTIONS ARE FOR 18 INCH TILES.
24 IA CS-061 RIP RAP: THIS ITEM INCLUDES THE EXCAVATION AND PLACEMENT OF CLASS 'E' REVETMENT OVER GEOTEXTILE FABRIC AT THE LOCATIONS SHOWN ON THE PLANS. GEOTEXTILE FABRIC IS INCIDENTAL TO THIS ITEM. QUANTITY DETERMINATION IS BASED ON A UNIT WEIGHT OF 105 POUNDS PER CUBIC FOOT. PROVIDE WEIGHT TICKETS TO OWNER'S REPRESENTATIVE.
25 IA CS-061 2" CLEAN STONE: THIS ITEMS INCLUDES PROCUREMENT, PLACEMENT AND SPREADING OF 2 INCH CLEAN STONE AT THE CONSTRUCTION ENTRANCE AND TO RESTORE THE ACCESS DRIVE AFTER TILE
TRENCHING.
26 IA CS-062
CONCRETE GROUT: GROUT MIX SHALL BE AS SPECIFIED AND SHALL BE PLACED USING A CONCRETE PUMPER. GROUT SHALL FULLY ENCASE THE BOTTOM OF THE RIP RAP BUT NOT FULL TO THE TOP OF THE RIP RAP SO AS TO REDUCE THE ENERGY DISSIPATION CAPABILITIES. GROUT UPSTREAM OF THE WEIR SHALL BE SMOOTH FINISHED 1" BELOW THE CREST. GROUT SHALL ONLY BE PLACED IN THE
PRESENCE OF THE ENGINEER.
27 IA CS-005 POLLTION CONTROL, SILT FENCE: THIS ITEM INCLUDES PROCUREMENT AND INSTALLATION OF SILT FENCE DITCH CHECKS AS SHOWN ON THE PLANS AND AS DETAILED.
28 IA CS-005 POLLTION CONTROL, TYPE 2B RECP: THIS ITEM INCLUDES PROCUREMENT AND INSTALLATION OF TYPE 2B ROLLED EROSION CONTROL PRODUCT. INSTALLATION SHALL BE PER THE MANUFACTURER’S
RECOMMENDATIONS.
29 IA CS-001 FENCE REMOVAL: THIS ITEM INCLUDES REMOVAL AND PROPER OFF SITE DISPOSAL OF EXISTING FENCING AS SHOWN ON THE PLANS. PROTECT ALL PROPERTY MONUMENTS. CONTRACTOR SHALL REPLACE DAMAGED MONUMENTS AT NO ADDITIONAL COST. MONUMENTS MUST BE SET AND RECORDED BY A PROFESSIONAL LAND SURVEYOR.
HIGHWAY 3
955955
5 955
PROJECT GRADING LIMITS AND TILE INSTALLATION LIMITS
AREA = 6.9 ACRES ROW CROP. STRIP AND STOCKPILE 12
INCHES OF TOPSOIL IN EMBANKMENT FOOTPRINT AND
ALONG PROPOSED DIVERSION TILE LENGTH OUTSIDE THE
PROPOSED EASEMENT. STRIP 6 INCHES OF TOPSOIL IN
ALL OTHER DISTURBED AREAS. RESPREAD TOPSOIL
PRIOR TO SEED BED PREPARATION AND SEEDING.
LANDOWNER RESIDENCE. NO
CONTRACTOR TRAFFIC.
EXISTING FIELD
TILE. ABANDON
IN PLACE.
EXISTING STREAM
CENTERLINE
100-YEAR
FLOODPLAIN (FEMA)
LOCATE AND
REMOVE 50' OF
EXISTING TILE
LOCATE, CRUSH, AND BURY ALL TILE WITHIN PROPOSED
WETLAND POOL. FOR TILE RUNNING UNDER THE WETLAND BERM,
REMOVE TILE AND BACKFILL TRENCH WITH CLAY EXTENDING 10
FEET BEYOND THE FOOTPRINT OF THE BERM.
EXISTING
FENCE LINE
12 INCH PLASTIC TILE
INTERCEPT LOCATION.
IE = 959.54
APPROXIMATELY 250
TONS OF EXISTING RIP
RAP. LEAVE IN PLACE.
EXISTING 8 INCH PLASTIC
TILE OUTLET TO CREEK
LOCATE AND REMOVE
EXISTING TILE EXTENDING 10
FEET BEYOND THE
EMBANKMENT FOOTPRINT.
BACKFILL TRENCH WITH
COMPACTED CLAY IN LIFTS.
REMOVE AND DISPOSE OFF SITE
APPROPRIATELY 320 FEET OF
EXISTING FENCE. PROTECT
EXISTING PROPERTY MONUMENTS.
LOCATE EXISTING 5 INCH TILE FOR CONNECTIONS TO PROPOSED TILE WHERE
ELEVATIONS ALLOW. CRUSH AND BURY 10 FEET (MIN) TILE DOWNSTREAM AND
CAP UPSTREAM END OF TILE TO REMAIN. (TYP) 16 LOCATIONS ANTICIPATED.
WHERE ELEVATIONS DO NOT ALLOW, BRIDGE EXISTING TILE OVER OR UNDER
PROPOSED TILE AND MAINTAIN TILE DRAINAGE. COORDINATE WITH ENGINEER.
PROTECT ALL TILE TO REMAIN IN PLACE.
CONTRACTOR RESPONSIBLE FOR REMAIN OF
ANY DAMAGE CAUSED BY CONSTRUCTION AT
NO ADDITIONAL COST TO THE DIVISION.
EXISTING 12 INCH PLASTIC TILE
EXISTING 12 INCH
CONCRETE TILE
EXISTING 12 INCH
CONCRETE TILE
NORTH
A B C D E F
A B C D E F
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, Io w a
5.
3.
w w w
.s hi ve -h at te ry .c om
Io w a
Il lin oi s
In di an a
N eb ra sk a
W is co ns in
IOWA D
EP
A R
TM
E NT O F
A G R I C U L T URE
L A
ND
S
TEWARDSHIP
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d:
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: CD01
EX
IS
TI
NG
CO
ND
IT
IO
NS
A
ND
RE
M O
VA
LS
P
LA
N
G
HK
DJ
J
CO
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
-1
9-
BR
E9
2B B
R
EM
ER
C
O U
N
TY
W
ET
LA
N
D
ID
AL
S
BR
EM
ER
C
O
UN
TY
, I
A
P:
\P ro je ct s\
DM
\4
\D el ive ra bl es \D ra wi ng s\
1_ Ci vil \C
D0
- E
XI
ST
IN
G C
O
ND
IT
IO
NS
A
ND
R
EM
O
VA
LS
.d wg
1/
/2
8:
:2
AM
PROPERTY LINE (APPROX)
EXISTING CONTOUR - MAJOR
EXISTING CONTOUR - MINOR
LEGEND
SURVEY NOTES:
1. LIMITED TOPOGRAPHIC SURVEY COMPLETED BY SHIVE-HATTERY ON
NOVEMBER 3, 2021.
2. SUPPLEMENTAL EXISTING SURFACE INFORMATION SHOWN WAS
BASED ON LIGHT DETECTION AND RANGING (LIDAR) INFORMATION
FROM IOWA DNR (2020).
3. CONTRACTOR SHALL VERIFY CONTROL AND BASE SURFACE PRIOR
TO CONSTRUCTION AND COORDINATE WITH ENGINEER.
COORDINATE SYSTEM AND DATUM:
HORIZONTAL DATUM - NAD83, IOWA STATE PLANE, NORTH ZONE
VERTICAL DATUM - NAVD88
TILE INFORMATION
EXISTING TILE INFORMATION IS APPROXIMATE AND WAS PROVIDED BY
THE LANDOWNER. LIMITED TILE INVESTIGATION WAS COMPLETED ON
NOVEMBER 3, 2021 AND WAS INCORPORATED INTO THESE DRAWINGS.
EXISTING DRAIN TILE
EXISTING FENCE
SOIL BORING SB
EASEMENT BOUNDARY
100-YEAR FLOODPLAIN
SOILS NOTES:
1. STRIP AND STOCKPILE 12 INCHES OF TOPSOIL IN EMBANKMENT
FOOTPRINT AND ALONG PROPOSED DIVERSION TILE LENGTH OUTSIDE
THE PROPOSED EASEMENT. STRIP 6 INCHES OF TOPSOIL IN ALL OTHER
DISTURBED AREAS. RESPREAD ALL TOPSOIL IN DISTURBED AREAS
PRIOR TO SEED BED PREPARATION AND SEEDING IN STRIPPED AREAS.
2. LIMITED SOIL TEST PITS WERE COMPLETED BY SHIVE-HATTERY ON
NOVEMBER 3, 2021. PITS CONSISTED OF OPEN EXCAVATIONS WITH A
BACKHOE EXTENDING TO A DEPTH OF APPROXIMATELY 6 FEET.
3. SOILS CONSIST OF A SURFACE LAYER OF DARK ORGANIC TOPSOIL
FOLLOWED BY A CLAY LAYER. THE CLAY LAYER WAS OBSERVED DOWN
TO DEPTHS OF ABOUT 3 FEET. BELOW THE CLAY A POROUS SAND
LAYER WAS OBSERVED.
4. EXCAVATION WITHIN THE POOL SHALL NOT EXTEND INTO THE SAND
LAYER AND A MINIMUM OF 1 FOOT OF SCARIFIED AND RECOMPACTED
CLAY SHALL REMAIN ON THE ENTIRE EXCAVATION FOOTPRINT.
EXCAVATION DEPTHS SHALL NOT EXCEED 2 FEET BELOW GROUND
WITHIN THE POOL AREA EXCEPT WHERE NOTED.
5. NOTIFY ENGINEER IMMEDIATELY IF SAND IS ENCOUNTERED IN LARGE
QUANTITIES. GRADING MAY REQUIRE MODIFICATION IN THE FIELD
BASED ON SOIL CONDITIONS. COORDINATE WITH THE ENGINEER.
0+00
1+
2+
3+
4+
5+
963.83 964.08
964.11 963.57
963.58 963.21
963.28
964.83
964.73
964.05 964.11 963.96
964.17
964.37
964.09
230TH ST
9600+
1+
2+00
3+00
4+
5+00
5+
0+00
1+00
2+00 3+00
4+00
5+00
5+30.64
951.00
951.71
953.56
953.59
953.61
953.66 953.68
953.76
953.73
953.76
953.81
954.19 953.82953.85
953.91
953.91
953.96
953.95 953.96 953.98
953.98
957 956
955953954956
TILE INTERCEPT LOCATION
12 INCH HDPE TILE
IE = 959.54
EXISTING RIP RAP
LEAVE IN PLACE
LOCATE APPROXIMATELY 15 EXISTING FIELD TILE AND TIE
IN TO NEW MAIN WHERE FEASIBLE. BREAK AND CAP/PLUG
DOWNSTREAM TILE APPROXIMATELY 10 FEET BELOW
CONNECTION POINT. BRIDGE OR PASS UNDER EXISTING
TILE WHERE CONNECTIONS ARE NOT PRACTICAL.
PROTECT ALL FIELD TILE
PROPOSED TO REMAIN.
REMOVE 50 LF OF TILE
DOWNSTREAM OF DIVERSION. PLUG
UPSTREAM END OF TILE TO REMAIN
10 FEET OF TILE REMOVAL
AND PLUG. (TYP.)
100-YEAR
FLOODPLAIN (FEMA)
LANDOWNER RESIDENCE - NO CONSTRUCTION
EQUIPMENT TRAFFIC.
PLACE 30 TONS OF 2 INCH CLEAN STONE
AFTER TILE BACKFILL. MARK TILE WITH 6
FOOT TEE POSTS ON BOTH SIDES OF DRIVE.
EASEMENT BOUNDARY
ACCESS ROUTE FROM MIDWAY AVE. COORDINATE
WITH OWNER AND ADJACENT LANDOWNER. PLACE 30
TONS OF 2 INCH CLEAN STONE TO STABILIZE ACCESS
ENTRANCE AT MIDWAY DRIVE.
PLACE 115 TONS OF CLASS E RIP RAP 2' THICK OVER
GEOTEXTILE. EXCAVATE BELOW GRADE AND PLACE SO
FINISH SURFACE MATCHED EXISTING GRADE. TAMP RIP
RAP WITH EXCAVATOR BUCKET TO LOCK INTO PLACE.
12" TILE OUTLET SECTION, 20 LF OF 15 INCH CMP. IE = 950.5
STABILIZE WITH 15 TONS CLASS E RIP RAP OVER GEOTEXTILE.
EXCAVATE BELOW GRADE AND PLACE SO FINISH SURFACE
MATCHED EXISTING GRADE. TAMP RIP RAP WITH EXCAVATOR
BUCKET TO LOCK INTO PLACE.
NORMAL WATER LEVEL
ELEV: 956.00
AREA = 8.0 ACRES
PROPOSED 18 INCH DUAL
WALL HDPE TILE
LENGTH = 2343 LF
SLOPE= 0.11%
18 INCH TILE OUTLET AT NWL
20 LF OF 24" CMP
INVERT = 957.00
WETLAND AND TILE COVER GRADING LIMITS.
TOP WIDTH = 10 FEET
SIDE SLOPES = 6 TO 1
MAINTAIN 3.0 FEET OF COVER (MIN) OVER TILE.
INTERIOR BERM
ELEV: 955.50
TOP WIDTH = 20 FEET
LOCATE AND CONNECT
EXISTING TILE IF
FEASIBLE.
INSTALL 12 INCH
HICKENBOTTOM INTAKE.
TILE INVERT = 951.0
ACCESS ROUTE
- COORDINATE WITH OWNERFENCELINE
DRAINAGE WATERWAY 10' BOTTOM. GRADE
TO DRAIN TO PROPOSED HICKENBOTTOM
INTAKE.
SHEET PILE OUTLET STRUCTURE.
DROP HEIGHT = 3 FEET
CREST WIDTH = 20 FEET
CREST ELEVATION = 956.00
TOTAL WIDTH = 46 FEET
EXISTING 8 INCH PLASTIC
TILE. ABANDON IN PLACE.
INSTALL 300 LF 12 INCH DUAL
WALL HDPE. DRAIN TO CREEK.
DRAWDOWN
STRUCTURE INTAKE.
SEE DETAIL
WATER CONTROL
STRUCTURE. SEE DETAIL.
WETLAND BERM
ELEVATION = 958.25
TOP WIDTH = 12 FEET
SIDE SLOPE = 4 TO 1
10' WIDE WAVE BENCH
AT NWL. SEE DETAIL.
5% MAXIMUM SLOPE
10' WIDE WAVE BENCH
AT NWL. SEE DETAIL.
5% MAXIMUM SLOPE
INSTALL 521 LF 8 INCH PERFORATED
TILE ALONG WATERWAY TO EDGE OF
EASEMENT. TIE INTO PROPOSED 12
INCH TILE OUTLET WITH TEE.
SCARIFICATION AND RECOMPACTION. EXCAVATION LIMITED TO
APPROXIMATELY 2.0 FEET EXCEPT AT DRAWDOWN STRUCTURE.
DEEPLY (12" MIN) SCARIFY, MOISTURE CONDITION, AND
RECOMPACT EXCAVATION AREA WITH MINIMUM 1' OF SUITABLE
CLAY MATERIAL. WHERE SAND IS ENCOUNTERED IN LARGE
QUANTITIES, OVEREXCAVATE AND REPLACE/RECOMPACT WITH
SUITABLE CLAY MATERIAL. COORDINATE WITH ENGINEER.
SILT FENCE
DITCH CHECKS.TYPE 4 RECP
INTERIOR CHANNEL -
GRADE TO DRAIN ETIRE
WETLAND TO
DRAWDOWN STUCTURE
PLACE 100 TONS OF CLASS E RIP RAP 2' THICK
OVER GEOTEXTILE. EXCAVATE BELOW GRADE
AND PLACE SO FINISH SURFACE MATCHED
EXISTING GRADE. TAMP RIP RAP WITH
EXCAVATOR BUCKET TO LOCK INTO PLACE.
GROUTED CLASS E RIP RAP.
60 TONS (15 CY GROUT) UPSTREAM
100 TONS (48 CY GROUT) DOWNSTREAM
SEE C302
CAP TILE AND PLACE T POST
MARKER AT END OF TILE
EXISTING CONTOUR - MAJOR
EXISTING CONTOUR - MINOR
EXISTING STREAM
NORTH
DESCRIPTION
TOP OF DAM ELEVATION
NORMAL WATER ELEVATION
MAJOR CONTOUR
MINOR CONTOUR
PROPOSED DUAL WALL TILE
EXISTING TILE
WATER LEVEL CONTROL STRUCTURE
A B C D E F
A B C D E F
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, Io w a
5.
3.
w w w
.s hi ve -h at te ry .c om
Io w a
Il lin oi s
In di an a
N eb ra sk a
W is co ns in
IOWA D
EP
A R
TM
E NT O F
A G R I C U L T URE
L A
ND
S
TEWARDSHIP
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d:
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C201
O
VE
RA
LL
S
IT
E
PL
AN
DJ
J
DJ
J
CO
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
-1
9-
BR
E9
2B B
R
EM
ER
C
O U
N
TY
W
ET
LA
N
D
ID
AL
S
BR
EM
ER
C
O
UN
TY
, I
A
P:
\P ro je ct s\
DM
\4
\D el ive ra bl es \D ra wi ng s\
1_ Ci vil \C
1-
G ra di ng
Pl an
.d wg
2/
/2
2:
:4
PM
RIP RAP
LEGEND
DESCRIPTION
100 - YEAR FLOODPLAIN
TILE INVESTIGATION AND REMOVAL
FENCELINE
SITE ACCESS
DESCRIPTION
0+
1+
2+00
3+00
0+00
1+00
2+00 3+00
4+00
5+00
5+30.64
951.00
951.71
953.56
953.59
953.61
953.66 953.68
953.76
953.73
953.76
953.81
954.19
953.82953.85
953.91
953.91
953.96
953.95 953.96 953.98
953.98
957 956
955953954956
NORMAL WATER LEVEL
ELEV: 956.00
AREA = 8.0 ACRES
PROPOSED 18 INCH DUAL
WALL HDPE TILE
LENGTH = 2363 LF
SLOPE= 0.11%
18 INCH TILE OUTLET AT NWL
20 LF OF 24" CMP
INVERT = 957.00
WETLAND AND TILE COVER GRADING LIMITS.
TOP WIDTH = 10 FEET
SIDE SLOPES = 6 TO 1
MAINTAIN 3.0 FEET OF COVER (MIN) OVER TILE.
INTERIOR BERM ELEV: 955.50
TOP WIDTH = 20 FEET
LOCATE AND CONNECT
EXISTING TILE IF FEASIBLE.
INSTALL 12 INCH HICKENBOTTOM
INTAKE. TILE INVERT = 951.0
ACCESS ROUTE -
COORDINATE WITH OWNER
FENCELINE
DRAINAGE WATERWAY 10' BOTTOM. GRADE TO
DRAIN TO PROPOSED HICKENBOTTOM INTAKE.
SHEET PILE OUTLET STRUCTURE.
DROP HEIGHT = 3 FEET
CREST WIDTH = 20 FEET
CREST ELEVATION = 956.00
TOTAL WIDTH = 46 FEET
EXISTING 8 INCH PLASTIC
TILE. ABANDON IN PLACE.
INSTALL 300 LF 12 INCH DUAL
WALL HDPE. DRAIN TO CREEK.
DRAWDOWN STRUCTURE INTAKE
- SEE DETAIL
WATER CONTROL STRUCTURE.
- SEE DETAIL.
WETLAND BERM
ELEVATION = 958.25
TOP WIDTH = 12 FEET
SIDE SLOPE = 4 TO 1
10' WIDE WAVE BENCH AT NWL
SEE DETAIL. 5% MAXIMUM SLOPE
10' WIDE WAVE BENCH
AT NWL. SEE DETAIL.
5% MAXIMUM SLOPE
INSTALL 525 LF 8 INCH PERFORATED TILE ALONG
WATERWAY TO EDGE OF EASEMENT. TIE INTO
PROPOSED 12 INCH TILE OUTLET WITH TEE.
SCARIFICATION AND RECOMPACTION. EXCAVATION LIMITED TO APPROXIMATELY 2.0 FEET
EXCEPT AT DRAWDOWN STRUCTURE. DEEPLY (12" MIN) SCARIFY, MOISTURE CONDITION,
AND RECOMPACT EXCAVATION AREA WITH MINIMUM 1' OF SUITABLE CLAY MATERIAL.
WHERE SAND IS ENCOUNTERED IN LARGE QUANTITIES, OVEREXCAVATE AND
REPLACE/RECOMPACT WITH SUITABLE CLAY MATERIAL. COORDINATE WITH ENGINEER.
SILT FENCE DITCH CHECKS.
TYPE 2B RECP
INTERIOR CHANNEL - GRADE TO
DRAIN ENTIRE WETLAND TO
DRAWDOWN STRUCTURE
PLACE 100 TONS OF CLASS E RIP RAP 2' THICK OVER
GEOTEXTILE. EXCAVATE BELOW GRADE AND PLACE SO
FINISH SURFACE MATCHED EXISTING GRADE. TAMP RIP RAP
WITH EXCAVATOR BUCKET TO LOCK INTO PLACE.
GROUTED CLASS E RIP RAP.
60 TONS (15 CY GROUT) UPSTREAM
100 TONS (48 CY GROUT) DOWNSTREAM
- SEE C302
WHERE EXCAVATION EXCEEDS 2 FEET, CARE SHOULD BE
TAKEN TO MAINTAIN CLAY BOTTOM OF WETLAND. IF SAND IS
ENCOUNTERED, CONTRACTOR SHALL OVEREXCAVATE 2 FEET
AND REPLACE WITH SUITABLE CLAY MATERIAL AND
COMPACT. COORDINATE WITH ENGINEER.
A B C D E F
A B C D E F
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, Io w a
5.
3.
w w w
.s hi ve -h at te ry .c om
Io w a
Il lin oi s
In di an a
N eb ra sk a
W is co ns in
IOWA D
EP
A R
TM
E NT O F
A G R I C U L T URE
L A
ND
S
TEWARDSHIP
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d:
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C202
W
ET
LA
ND
G
RA
DI
NG
PL
AN
DJ
J
DJ
J
CO
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
-1
9-
BR
E9
2B B
R
EM
ER
C
O U
N
TY
W
ET
LA
N
D
ID
AL
S
BR
EM
ER
C
O
UN
TY
, I
A
P:
\P ro je ct s\
DM
\4
\D el ive ra bl es \D ra wi ng s\
1_ Ci vil \C
1-
G ra di ng
Pl an
.d wg
1/
/2
8:
:4
AM
NORTH
8,900.42 sf
0+00
1+
2+
963.83
0+
1+00
2+00
2+36.29
0.05
0.53
1.58
2.42
2.59
0.62
1.48
1.90
1.58
0.02
1.95
1.89
0.24
-1.84
-2.18
-2.75
-1.26
1.46
2.94
-2.81
-1.95
3.62
-0.21
-2.93
-1.63
-0.45
-0.03
3.99
-1.08
-1.15
-0.26
-1.02
-1.19
-1.80
4.04
-1.67
-1.27
-0.58
-1.66
3.86
-1.48
-0.70
-1.40
3.63
-0.90
-1.46
-0.81
-0.90
-0.42
-1.09
3.41
-1.12
-1.06
-0.78
-1.35
-0.53
0.34
-0.55
-0.52
3.32
-0.82
-0.87
-1.17
-0.37
0.64
-0.34
-0.51
3.17
-1.01
-1.14
-1.00
-0.90
0.14
-0.22
2.79
-1.30
-0.77
-1.18
-1.23
-1.03
-0.91
5.30
2.61
-1.47
-1.77
-1.67
-1.29
3.96
1.90
-0.98
1.94
-1.03
2.33
2.27
2.15
1.82
-0.58 -0.80 -1.19 -1.39 -1.36 -1.00 -1.24 -1.29 -1.65
2.38
0.38
0.62
0.92
0.22
0.16
-0.02
0.22
0.18
0.48
-1.44
1.43
1.06
1.18
2.28
1.96
2.10
-1.35
-0.84
1.23
1.11
0.89
-2.02
-1.79
WHERE EXCAVATION EXCEEDS 2 FEET, CARE SHOULD BE
TAKEN TO MAINTAIN CLAY BOTTOM OF WETLAND. IF SAND IS
ENCOUNTERED, CONTRACTOR SHALL OVEREXCAVATE 2 FEET
AND REPLACE WITH SUITABLE CLAY MATERIAL AND
COMPACT. COORDINATE WITH ENGINEER.
A B C D E F
A B C D E F
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, Io w a
5.
3.
w w w
.s hi ve -h at te ry .c om
Io w a
Il lin oi s
In di an a
N eb ra sk a
W is co ns in
IOWA D
EP
A R
TM
E NT O F
A G R I C U L T URE
L A
ND
S
TEWARDSHIP
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d:
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C203
CU
T
FI
LL
P
LA
N G
HK
DJ
J
CO
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
-1
9-
BR
E9
2B B
R
EM
ER
C
O U
N
TY
W
ET
LA
N
D
ID
AL
S
BR
EM
ER
C
O
UN
TY
, I
A
P:
\P ro je ct s\
DM
\4
\D el ive ra bl es \D ra wi ng s\
1_ Ci vil \C
1-
G ra di ng
Pl an
.d wg
1/
/2
8:
:4
AM
ELEVATIONS TABLE
CUT/FILL MINIMUM ELEVATION (FT.) MAXIMUM ELEVATION (FT.) COLOR
CUT -3.1 -2.5
CUT -2.5 -2.0
CUT -2.0 -1.5
CUT -1.5 -1.0
CUT -1.0 -0.5
CUT -0.5 0.0
FILL 0.0 1.0
FILL 1.0 2.0
FILL 2.0 3.0
FILL 3.0 4.0
FILL 4.0 5.3
EARTHWORK TABLE
CLASSIFICATION CUT TOTAL FILL + 25% SHRINK
EARTHFILL, EMBANKMENT, INTERIOR BERMS, TILE
COVER BERMS 6547 6553
NOTES:
1. THIS PLAN SHOWS GRADUATED COLOR SCALES OF RED AND BLUE TO INDICATED LOCATIONS AND DEPTHS OF CUT AND FILL. THOSE WITH COLOR BLINDNESS OR QUESTIONS SHOULD CONTACT THE ENGINEER.
2. ALL EARTHFILL FILL SHALL BE COMPACTED IN MAXIMUM 6" LIFTS. COMPACTION SHALL UTILIZE NRCS
METHOD 1.
3. THE QUANTITIES SHOW IN THE EARTHWORK TABLE ABOVE ARE IN ADDITION TO SPECIFIED QUANTITIES OF TOPSOIL. STRIP AND STOCKPILE 12 INCHES OF TOPSOIL IN EMBANKMENT FOOTPRINT AND ALONG PROPOSED DIVERSION TILE LENGTH OUTSIDE THE PROPOSED EASEMENT. STRIP 6 INCHES OF TOPSOIL IN ALL OTHER DISTURBED AREAS. RESPREAD ALL TOPSOIL IN DISTURBED AREAS PRIOR TO SEED BED
PREPARATION AND SEEDING IN STRIPPED AREAS.
4. EARTHWORK WILL BE PAID BASED ON PLAN QUANTITY AND SHALL BE BALANCED ON SITE WITHIN THE
EASEMENT FOOTPRINT. A 25% SHRINKAGE FACTOR WAS USED FOR CALCULATION PURPOSES.
COORDINATE WITH ENGINEER IF AN ADDITIONAL BORROW SITE OR SPOIL LOCATION ARE NEEDED.
5. AFTER EXCAVATION, THE BOTTOM OF THE POOL SHALL BE DEEPLY SCARIFIED (12 INCHES), MOISTURE CONDITIONED, AND RECOMPACTED TO FORM A SEAL ON THE POOL BOTTOM PRIOR TO RESPREAD OF
TOPSOIL.
6. IF SAND IS ENCOUNTERED IN LARGE QUANTITIES, CONTRACTOR SHALL OVEREXCAVATE 2 FEET OF SANDY MATERIAL (MIN) AND REPLACE SAND MATERIAL WITH COMPACTED CLAY. COORDINATE WITH THE
ENGINEER.
N O
R
TH
0+00 1+00
2+00 3+00
4+00 5+00
6+
7+
8+
9+
+0
+0
+0
+0
+0
+0
16+00 17+00 18+00 19+00 20+00 21+00 22+00
+0
+0
+0
+0
+0
+0
+0
+0
CENTERLINE OF BERM ALIGNMENT. SEE PROFILE.
CENTERLINE ALIGNMENT OF
PROPOSED 18 INCH DUAL WALL
HDPE TILE. SEE PROFILE.
4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00
A B C D E F
A B C D E F
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, Io w a
5.
3.
w w w
.s hi ve -h at te ry .c om
Io w a
Il lin oi s
In di an a
N eb ra sk a
W is co ns in
IOWA D
EP
A R
TM
E NT O F
A G R I C U L T URE
L A
ND
S
TEWARDSHIP
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C301
W
ET
LA
ND
B
ER
M
PR
O
FI
LE
DJ
J
DJ
J
CO
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
-1
9-
BR
E9
2B B
R
EM
ER
C
O U
N
TY
W
ET
LA
N
D
ID
AL
S
BR
EM
ER
C
O
UN
TY
, I
A
P:
\P ro je ct s\
DM
\4
\D el ive ra bl es \D ra wi ng s\
1_ Ci vil \C
O
UT
LE
T
CH
AN
NE
L
PL
AN
A
ND
P
RO
FI
LE
.d wg
1/
/2
8:
:1
AM
NORTH
PROPOSED TOP OF BERM = 958.25
OVER BUILD TO 958.50 (TOP OF TOPSOIL RESPREAD)
TO ACCOMMODATE FUTURE SETTLEMENT
PROPOSED SHEET PILE OUTLET
- SEE C401
EXISTING GROUND. STRIP AND STOCKPILE 12 INCHES OF
TOPSOIL IN ENTIRE BERM FOOTPRINT. RESPREAD
TOPSOIL AFTER BERM CONSTRUCTION.
HORIZONTAL SCALE:VERTICAL SCALE:
0+00 1+00
2+00
3+
4+00
5+00 5+29.68
2+
2+
.29
951.00
951.71
0+
0+
.9
0+
1+00
2+00
3+00
4+00 5+00
ST
AB
IL
IZ
ED
O
U
TL
ET
T
O Q
U
AR
TE
R
S
EC
TI
O
N R
U N
(S
TR
EA
M
PL
AC
E
TO
N
S O
F C
LA
SS
B R
IP
R
AP
O
VE
R
G
EO
TE
XT
IL
E.
' T
H
IC
K.
C
O N
TR
AC
TO
R
S H
AL
L
EX
C
AV
AT
E
AL
L U
N
SU
IT
AB
LE
M
AT
ER
IA
L
BE
LO
W R
IP
R
AP
A
N D
P
LA
C E
FL
U
SH
W
IT
H
E
XI
ST
IN
G G
R
AD
ES
EXISTING DEPRESSIONAL OXBOW
LOCATION. NO CONSTRUCTION TRAFFIC,
DO NOT DISTURB OUTSIDE RIP RAP LIMITS.
STABILIZED OUTLET TO QUARTER SECTION RUN (STREAM). PLACE
115 TONS OF CLASS E RIP RAP OVER GEOTEXTILE. 2' THICK.
CONTRACTOR SHALL EXCAVATE ALL UNSUITABLE MATERIAL
BELOW RIP RAP AND PLACE FLUSH WITH EXISTING GRADES. DO
NOT RESTRICT DRAINAGE CHANNEL. TAMP IN WITH EXCAVATOR
BUCKET TO LOCK IN PLACE. COORDINATE WITH ENGINEER.
PLACE 100 TONS OF CLASS E RIP RAP OVER
GEOTEXTILE. 2' THICK. CONTRACTOR SHALL
EXCAVATE ALL UNSUITABLE MATERIAL BELOW RIP
RAP AND PLACE FLUSH WITH EXISTING GRADES. TAMP
IN WITH EXCAVATOR BUCKET TO LOCK IN PLACE.
GROUTED RIP RAP PLUNGE POOL. PLACE 200 TONS
OF CLASS E RIP RAP 2' THICK. GROUT IN PLACE
WITH 48 CY CONCRETE GROUT. DO NOT CREATE A
SMOOTH SURFACE WITH GROUT. PLACE GROUT TO
FULL THICKNESS AGAINST SHEET PILE WALL.
GROUTED RIP RAP UPSTREAM OF SHEET PILE. PLACE 60
TONS OF CLASS E RIP RAP 2' THICK. GROUT IN PLACE WITH 13
CY CONCRETE GROUT. GROUT SURFACE SHALL BE SMOOTH
AND INSTALLED 1 INCH BELOW SHEET PILE CREST.
DRAWDOWN PIPE RISER. 18 INCH
SLOTTED CMP AND 25 TONS
CLASS 'E' RIP RAP. SEE DETAIL.
12 INCH HICKENBOTTOM INTAKE RISER.
385 SY TYPE 2B RECP. INSTALLED IN OUTLET
CHANNEL IMMEDIATELY FOLLOWING
SEEDING.
12 INCH TILE OUTLET. IE = 950.50 LAST 20 LF SHALL BE 15 INCH ALUMINIZED CMP.
PLACE 15 TONS OF CLASS E RIP RAP OVER GEOTEXTILE. CONTRACTOR SHALL
EXCAVATE ALL UNSUITABLE MATERIAL BELOW RIP RAP AND PLACE FLUSH WITH
EXISTING GRADES. DO NOT RESTRICT DRAINAGE CHANNEL. TAMP IN WITH
EXCAVATOR BUCKET TO LOCK IN PLACE. COORDINATE WITH ENGINEER.
12 INCH ALUMINAIZED
CMP DRAWDOWN PIPE
12 INCH ALUMINAIZED
CMP DRAWDOWN PIPE
12 INCH DUAL WALL HDPE
NON PERFORATED PIPE
=0+00 =1+00 =2+00 =3+00 =4+00 =5+00 =5+30
-0.71%
OXBOW OUTLET/INLET
PLACE 115 TONS OF CLASS E RIP RAP, 2' THICK OVER GEOTEXTILE. SET
OUTLET CREST ELEVATION AT 954.50, 20' WIDE BOTTOM WIDTH (MIN).
TAMP WITH EXCAVATOR TO LOCK INTO PLACE. OVEREXCAVATE
CHANNEL BOTTOM TO OBTAIN SUITABLE BASE. DO NOT RESTRICT
DRAINAGE CHANNEL. SPOIL EXCAVATED MATERIAL IN UPLAND AREA.
OXBOW
NWL = 954.50STABILIZED SLOPE. PLACE 100 TONS OF CLASS E RIP
RAP OVER GEOTEXTILE. 2' THICK. CONTRACTOR SHALL
EXCAVATE ALL UNSUITABLE MATERIAL BELOW RIP RAP
AND PLACE FLUSH WITH EXISTING GRADES. TAMP IN
WITH EXCAVATOR BUCKET TO LOCK IN PLACE.
GROUTED RIP RAP PLUNGE POOL. PLACE 200 TONS OF
CLASS E RIP RAP 2' THICK. GROUT IN PLACE WITH 48 CY
CONCRETE GROUT. GROUT SHALL LOCK IN BASE OF RIP RAP
LEAVING A ROUGH SURFACE FOR ENERGY DISSIPATION. DO
NOT CREATE A SMOOTH SURFACE WITH GROUT. PLACE
GROUT TO FULL THICKNESS AGAINST SHEET PILE WALL.
GROUTED RIP RAP UPSTREAM OF SHEET PILE. PLACE 60 TONS OF
CLASS E RIP RAP 2' THICK OVER NON WOVEN GEOTEXTILE. GROUT IN
PLACE WITH 13 CY CONCRETE GROUT. GROUT SURFACE SHALL BE
SMOOTH AND FINISHED 1 INCH BELOW SHEET PILE CREST.
VEGETATED EXCAVATED CHANNEL.
BOTTOM WIDTH = 20 FEET
SIDE SLOPES 4 TO 1.
STRIP 6" TOPSOIL AND RESPREAD PRIOR TO SEEDING.
AFTER SEEDING, INSTALL TYPE 2B RECP AND STAKE IN
PLACE PER THE MANUFACTURER'S RECOMMENDATIONS. .
SHEET PILE
CREST = 956.00
- REFER TO C401
PLUNGE POOL
TOP OF RIP RAP = 953.00
SHEET PILE BOTTOM = 947.0
- REFER TO C401
FINAL RIP RAP GRADE SHALL MATCH EXISTING BANK SLOPES OR
BE LAID BACK TO 2.5 TO 1 (MIN). DO NOT RESTRICT CHANNEL.
MATCH EXISTING CHANNEL BOTTOM.
DO NOT RESTRICT CHANNEL.
5' (MIN)
EXISTING OXBOW DEPRESSION.
NO CONSTRUCTION TRAFFIC.
PROPOSED
WETLAND BERM
A B C D E F
A B C D E F
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, Io w a
5.
3.
w w w
.s hi ve -h at te ry .c om
Io w a
Il lin oi s
In di an a
N eb ra sk a
W is co ns in
IOWA D
EP
A R
TM
E NT O F
A G R I C U L T URE
L A
ND
S
TEWARDSHIP
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C302
O
UT
LE
T
CH
AN
NE
L
PL
AN
A
ND
P
RO
FI
LE
G
HK
DJ
J
CO
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
-1
9-
BR
E9
2B B
R
EM
ER
C
O U
N
TY
W
ET
LA
N
D
ID
AL
S
BR
EM
ER
C
O
UN
TY
, I
A
P:
\P ro je ct s\
DM
\4
\D el ive ra bl es \D ra wi ng s\
1_ Ci vil \C
O
UT
LE
T
CH
AN
NE
L
PL
AN
A
ND
P
RO
FI
LE
.d wg
1/
/2
8:
:1
AM
N O
R
HORIZONTAL SCALE:VERTICAL SCALE:
0+00
1+00
2+00
3+00 4+00
5+00
6+00
7+00
8+00
9+00
10+00
11+00 12+00 13+00
14+00 15+00
16+00
+0
+0
+0
20+00 21+00
22+00
23+00
24+00 25+00
26+00
963.83 964.08
964.11 963.57
963.58 963.21
963.28
964.83
964.73
964.05 964.11 963.96
964.17
964.37
964.09
CENTERLINE ALIGNMENT OF
PROPOSED 18 INCH DUAL WALL
HDPE TILE. SEE PROFILE.
0+00.00 1+00.00 2+00.00 3+00.00 4+00.00 5+00.00 6+00.00 7+00.00 8+00.00 9+00.00 10+00.00 11+00.00 12+00.00 13+00.00 14+00.00 15+00.00 16+00.00 17+00.00 18+00.00 19+00.00 20+00.00 21+00.00 22+00.00 23+00.00 24+00.00 25+00.00 26+00.00
APPROXIMATE LOCATION
OF EXISTING 5 INCH TILE.
APPROXIMATE LOCATION OF
EXISTING 5 INCH TILE.
LOCATED 12 INCH HDPE TILE. IE = 959.54
CONNECT TO PROPOSED 18 INCH TILE USING
PREFABRICATED WATER TIGHT FITTING AND CONCRETE
COLLAR. NOTIFY ENGINEER IF SIGNIFICANT ADJUSTMENT
IS GRADES ARE ANTICIPATED TO BE REQUIRED.
PROPOSED 18 INCH DUAL WALL TILE @ 0.11% GRADE.
TRENCH SHALL BE PREPARED WITH AN APPROPRIATELY
SIZE TILE SPOON TO ENSURE HAUNCH SUPPORT.
PREFABRICATED BENDS AND FITTINGS REQUIRED ARE
CONSIDERED SUBSIDIARY TO THE TILE BID ITEM.
LAST 20LF SHALL BE 24" CMP,
ALUMINIZED, 16 GA WITH INTERNAL
BAR TYPE RODENT GUARD.
MAINTAIN 3.0 FEET OF COVER OVER PIPE
MOUND SOIL OVER TRENCH AFTER BACKFILL.
66'
(APPROXIMATE
SPACING OF
EXISTING TILE)
TILE COVER BERM
TOP WIDTH = 10 FEET
SLOPES = 4 TO 1
MINUMUM COVER = 3 FEET
PLACE 20 TONS CLASS E RIP RAP
OVER NON WOVEN GEOTEXTILE
FOR TILE OUTLET PROTECTION.
A B C D E F
A B C D E F
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, Io w a
5.
3.
w w w
.s hi ve -h at te ry .c om
Io w a
Il lin oi s
In di an a
N eb ra sk a
W is co ns in
IOWA D
EP
A R
TM
E NT O F
A G R I C U L T URE
L A
ND
S
TEWARDSHIP
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C303
W
ET
LA
ND
T
IL
E
PL
AN
A
ND
P
RO
FI
LE
G
HK
DJ
J
CO
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
-1
9-
BR
E9
2B B
R
EM
ER
C
O U
N
TY
W
ET
LA
N
D
ID
AL
S
BR
EM
ER
C
O
UN
TY
, I
A
P:
\P ro je ct s\
DM
\4
\D el ive ra bl es \D ra wi ng s\
1_ Ci vil \C
O
UT
LE
T
CH
AN
NE
L
PL
AN
A
ND
P
RO
FI
LE
.d wg
1/
/2
8:
:2
AM
NORTH
HORIZONTAL SCALE:VERTICAL SCALE:
TILE CONNECTION NOTES:
1. EXISTING TILE MAP WAS PROVIDED BY THE LANDOWNER. LOCATIONS ARE APPROXIMATE. TILE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR.
2. BASED ON PROVIDED MAP, 5 INCH TILE WERE NOTED TO BE INSTALLED WITH A DRAIN SPACING OF 4 RODS (66 FEET) AND AT A DEPTH OF
APPROXIMATELY 3 FEET.
3. TILE CONNECTIONS SHALL CONSIST OF 20 LF OF NEW 6 INCH TILE TRANSITION FROM EXISTING TILE TO THE PROPOSED 18 INCH TILE. 10 LF (MIN) OF
EXISTING TILE DOWNSTREAM OF CONNECTION SHALL BE REMOVED AND UPSTREAM END OF REMAINING TILE SHALL BE CAPPED.
4. ALL TILES SHALL BE CONNECTED WHERE PRACTICAL. COORDINATE MODIFICATIONS WITH ENGINEER.
0+00.00 1+00.00 2+00.00 3+00.00 4+00.00 5+00.00
6'
15'
25'
12'
TOP
WIDTH
40 LF 12" CMP @ 0.00%
44 LF 12" CMP @ 0.00%
IE = 950.50
IE = 951.00
IE = 951.00
IE = 951.00
DRAWDOWN STRUCTURE
INTAKE RISER.
- SEE DETAIL
WETLAND NWL
ELEV = 956.0
BOTTOM OF EXCAVATION.
MAINTAIN DRAINAGE
TOWARD DRAWDOWN RISER.
EXISTING GRADE
SCARIFY, MOISTURE CONDITION,
AND RECOMPACT 12" LAYER ON
BOTTOM OF WETLAND POOL.
- SEE LIMITS ON SHEET C201.
STRIP, STOCKPILE, AND
RESPREAD 12" (MIN) TOPSOIL IN
EMBANKMENT FOOTPRINT.
TRANSITION FROM CMP TO DUAL WALL HDPE. INSTALL
FERNCO CONNECTION AND ENCASE IN CONCRETE.
- SEE TILE CONNECTION DETAIL.
12 INCH HICKENBOTTOM INTAKE INSTALLED
IN DRAINAGE WATERWAY LOW POINT. TIE
INTO PROPOSED 12 INCH PILE. BACKFILL
WITH 2" CLEAN STONE. SEE DETAIL.
20 TONS CLASS E RIP RAP OVER GEOTEXTILE.
2' THICK. MATCH EXISTING CHANNEL GRADES.
DO NOT RESTRICT CHANNEL FLOW.
6X6 CMP ANTI SEEP COLLARS
- SEE DETAIL.
LAST 20 LF SHALL BE 15" CMP,
ALUMINIZED, 16 GA WITH INTERNAL
BAR TYPE RODENT GUARD.
298 LF 12" HDPE @ 0.16%
+0
+0
8+
9+
3+
4+00
5+00 5+29.68
1+00
951.00
951.71
0+
1+00
2+00
3+00
4+00
5+00
CENTER LINE ALIGNMENT OF DRAWDOWN PIPE. SEE PROFILE
HORIZONTAL SCALE:
VERTICAL SCALE:
A B C D E F
A B C D E F
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, Io w a
5.
3.
w w w
.s hi ve -h at te ry .c om
Io w a
Il lin oi s
In di an a
N eb ra sk a
W is co ns in
IOWA D
EP
A R
TM
E NT O F
A G R I C U L T URE
L A
ND
S
TEWARDSHIP
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C304
DR
AW
DO
W
N
ST
UC
TU
RE
P
LA
N
PR
O
FI
LE
G
HK
DJ
J
CO
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
-1
9-
BR
E9
2B B
R
EM
ER
C
O U
N
TY
W
ET
LA
N
D
ID
AL
S
BR
EM
ER
C
O
UN
TY
, I
A
P:
\P ro je ct s\
DM
\4
\D el ive ra bl es \D ra wi ng s\
1_ Ci vil \C
O
UT
LE
T
CH
AN
NE
L
PL
AN
A
ND
P
RO
FI
LE
.d wg
1/
/2
:3 2:
A
M
N O
R
=15+50 =16+00 =16+50
20' 6'6'
10'10' 26'
7' 7'
46'
BOLTED WALER OPTION DETAIL
C401
B
SHEET PILE GENERAL NOTES:
SHEET PILE CENTERLINE PROFILE
B B
B - B
B - B
8"
*NOTE: SHEET PILE BEYOND NOT SHOWN.
1. DESIGN SHEET PILE AREA IS 414 SF AFTER TRIMMING
2. SHEET PILING REQUIREMENTS DESIGN BASIS - SKYLINE STEEL/NUCOR SCZ14 OR ENGINEER APPROVED
EQUAL
2.1. MINIMUM SECTION MODULUS OF 14.36 IN3 PER FOOT OF WALL.
2.2. MINIMUM GRADE OF STEEL IS 50 KSI
2.3. MINIMUM MOMENT OF INERTIA OF 71.82 IN4 PER FOOT OF WALL.
2.4. MINIMUM THICKNESS OF 0.250"
2.5. ALL SHEET PILING SHALL MEET ASTM A-572 GR50.
2.6. ALL BOLTS SHALL MEET ASTM A307 GRADE A.
2.7. ALL WASHERS SHALL MEET ASTM F436.
2.8. ALL NUTS SHALL MEET ASTM A563.
3. CONTRACTOR SHALL SUBMIT DETAILED SHOP DRAWINGS OF PROPOSED SHEET PILE SYSTEM FOR
APPROVAL BY ENGINEER.
4. SHEET PILE ATTACHMENT TO WALER:
4.1. SHEET PILE WALER/PILE CAP MAY BE BOLTED OR WELDED. SEE DETAILS FOR OPTIONS.
4.2. BOLTED WALER OPTION
4.2.1. ALL BOLTS WILL BE 1'' DIAMETER WITH 2 WASHERS. BOLT SHALL BE EXTENDED AT A MINIMUM OF 3 8 ''
BEYOND THE NUT.
4.2.2. ALL HOLES SHALL BE FIELD DRILLED TO 1 1
16" DIAMETER. TORCH, PLASMA CUTTING, OR OTHER
METHODS RESULTING IN AN IMPERFECT HOLE WILL NOT BE PERMITTED.
4.2.3. THE WALER SHALL BE PLACED ON THE DOWNSTREAM SIDE OF THE WEIR.
4.3. WELDED PILE CAP OPTION
4.3.1. AT THE CONTRACTORS OPTION, A WELDED PILE CAP MAY BE INSTALLED IN LIEU OF THE BOLTED
WALER. SEE PILE CAP OPTION DETAIL.
4.3.2. WELDING SHALL BE IN ACCORDANCE WITH THE STRUCTURAL WELDING CODE, AWS D1.1, LATEST
EDITION, AND SHALL BE PERFORMED BY CERTIFIED WELDERS ONLY USING E70XX ELECTRODES.
5. ANY HOLES LEFT IN SHEET PILE SHALL BE CLOSED OFF.
6. AFTER SHEETING AND WALER INSTALLATION, ALL SHEETING IS TO BE CUT TO CONFORM WITH THE 3:1 SIDE SLOPE OF THE WEIR, MEET DESIGN ELEVATIONS, AND TO REMOVE ANY DAMAGE CAUSED BY DRIVING.
7. STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED IN ACCORDANCE WITH THE LATEST SPECIFICATION OF AISC. FABRICATOR SHALL SUBMIT SHOP DRAWINGS AND FABRICATE AFTER ENGINEER'S
REVIEW AND APPROVAL.
8. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE ALLOWABLE CONSTRUCTION LIVE LOADS.
9. PROVIDE ALL NECESSARY TEMPORARY BRACING, SHORING, GUYING, OR OTHER MEANS TO AVOID EXCESSIVE STRESSES AND TO HOLD STRUCTURAL ELEMENTS IN PLACED DURING CONSTRUCTION.
10. A TEMPORARY BERM TO HOLD / GUIDE SHEETPILE DURING CONSTRUCTION IS RECOMMENDED.
11. NOTIFY ENGINEER IMMEDIATELY IF BEDROCK IS ENCOUNTERED PRIOR TO INSTALLATION OF SHEET PILE TO
DESIGN DEPTHS.
SECTION E-E
E
E
WELDED PILE CAP OPTION DETAIL
C401
A
SHEET PILE SPLICEC10X15.3 WALER
1" DIAMETER BOLT WITH 2
WASHERS. 1 BOLT TO BE PLACED
ON EACH SIDE OF SPLICE
C10X15.3 WALER
1 116'' DIAMETER HOLE (BOLTED OPTION)
WALER SPLICE
4" FILLET WELD
ALL AROUND
PL 3 8x8x8
MITER CUT AND
WELD PILE CAP
AT TRAPEZOIDAL
WEIR CORNERS
FILLET WELD EACH
SHEET PILE SECTION
TO CAP ANGLE.
PL 38 X 2 X CONTINUOUS
(2) L5 X 5 X 38 STEEL
ANGLES ALONG ENTIRE
SHEET PILE LENGTH.
16" FILLET WELD,
CONTINUOUS, BOTH SIDES
TOP OF BERM
ELEV = 958.25
PROPOSED DOWNSTREAM GRADES
BOTTOM OF PLUNGE POOL
EXISTING GRADE
SHEET PILE WEIR
414 SF AFTER TRIMMING.
A B C D E F
A B C D E F
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, Io w a
5.
3.
w w w
.s hi ve -h at te ry .c om
Io w a
Il lin oi s
In di an a
N eb ra sk a
W is co ns in
IOWA D
EP
A R
TM
E NT O F
A G R I C U L T URE
L A
ND
S
TEWARDSHIP
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C401
SH
EE
T
PI
LE
W
EI
R
DJ
J
DJ
J
CO
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
-1
9-
BR
E9
2B B
R
EM
ER
C
O U
N
TY
W
ET
LA
N
D
ID
AL
S
BR
EM
ER
C
O
UN
TY
, I
A
P:
\P ro je ct s\
DM
\4
\D el ive ra bl es \D ra wi ng s\
1_ Ci vil \C
1-
Sh ee tP ile
.d wg
1/
/2
9:
:3
AM
WEIR CREST
ELEV = 956.00
EXISTING SOIL SURFACE
16" HOLES LOCATED AS SHOWN,
PRE-PUNCHED BY SIGN
FABRICATOR. FASTEN SIGN TO
POSTS WITH 3/8" DIA. STEEL BOLT &
NUT SET, SEE BOLT, WASHER, &
NUT FASTENER DETAIL THIS SHEET
(4 SETS REQ'D. PROVIDED AND
INSTALLED BY CONTRACTOR).
SIGN PANEL TO BE 0.080" THICK
ALUMINUM SUBSTRATE WITH 3M (OR
EQUAL) ENGINEER GRADE REFLECTIVE
SHEETING. SIGN PANELS FURNISHED BY
THE DIVISION OF SOIL CONSERVATION.
SIGN PANEL INSTALLED BY CONTRACTOR.
BACKFILL WITH CONCRETE
(PREFERRED), CLEAN STONE
(ACCEPTABLE), OR HAND-TAMPED
EARTH IN SMALL LIFTS (SUBJECT
TO ENGINEER'S APPROVAL)
2 EACH OF 4"x4"x12'
PRESSURE-TREATED POST
(TYP.). POSTS SEALED WITH
THOMPSON'S WATER SEAL OR
EQUAL. POSTS, SEALANT, AND
INSTALLATION PROVIDED BY
CONTRACTOR.
SIGNAGE NOTES:
1. DIVISION WILL FURNISH SIGN PANEL. CONTRACTOR IS RESPONSIBLE FOR PROVIDING POSTS, HARDWARE, AND INSTALLATION.
2. ALL EXPOSED WOOD SHALL BE SEALED WITH THOMPSON'S WATER SEAL OR EQUAL MEETING ASTM D-4446-08.
3. ALL STEEL HARDWARE PIECES SHALL BE GALVANIZED OR RUST RESISTANT.
4. NYLON AND STEEL WASHERS SHALL BE USED AS SHOWN ON THE BOLT, WASHER, NUT FASTENER
DETAIL ABOVE.
5. CLEAR UTILITIES WITH IOWA ONE-CALL (800) 292-8989 BEFORE EXCAVATING FOR POSTS.
6. SECURE DIVISION AND LANDOWNER APPROVAL FOR SIGN LOCATION BEFORE INSTALLATION.
7. COSTS FOR POSTS, HARDWARE, WOOD SEALANT AND SIGN INSTALLATION SHALL BE INCIDENTAL TO
MOBILIZATION.
8. CONTRACTOR SHALL INSTALL SIGN POSTS USING A PLYWOOD OR OTHER SUITABLE TEMPLATE TO MAINTAIN ACCURATE POST SPACING AND ALIGNMENT DURING BACKFILLING OF THE POST HOLES. TO AVOID BENDING OF THE SIGN PANELS, POSTS SHALL NOT BE INSTALLED OR BACKFILLED WITH SIGN
PANELS ATTACHED.
9. ONE (1) PROJECT SIGN IS REQUIRED UNLESS NOTED OTHERWISE.
TOP
PANEL
9"
30"
48" 9"
3" (T
YP
BOLT, WASHER, &
NUT
FASTENER DETAIL
NOT TO SCALE
STEEL
WASHER
HEAD
NYLON WASHER
AGAINST FACE OF SIGN
STEEL WASHER
BACK OF POST NUT
TH
IC
KN
ES
S
FO
R
SI
G N
P
O
ST
A B C D E F
A B C D E F
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, Io w a
5.
3.
w w w
.s hi ve -h at te ry .c om
Io w a
Il lin oi s
In di an a
N eb ra sk a
W is co ns in
IOWA D
EP
A R
TM
E NT O F
A G R I C U L T URE
L A
ND
S
TEWARDSHIP
NWL = 954.50
ELEV = 954.50
OXBOW
DEPRESSION
EXISTING CHANNEL
2.
0'
10.00'
PLACE 200 TONS OF CLASS 'E'
REVETMENT OVER NON-WOVEN
GEOTEXTILE FABRIC
NOTE: EXTEND OVERFLOW REVETMENT WIDTH
(APPROXIMATELY 35') TO TIE INTO PROPOSED
GRADES AT ELEVATION 955.50. CHANNEL BOTTOM
SHALL BE 20' MINIMUM WIDTH AT 954.50.
ELEV = 954.50
ELEV = 952.50
5.00'
D2 OXBOW OUTLET TO STREAM
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C501
CO
NS
TR
UC
TI
O
N
DE
TA
IL
S G
HK
DJ
J
CO
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
-1
9-
BR
E9
2B B
R
EM
ER
C
O U
N
TY
W
ET
LA
N
D
ID
AL
S
BR
EM
ER
C
O
UN
TY
, I
A
P:
\P ro je ct s\
DM
\4
\D el ive ra bl es \D ra wi ng s\
1_ Ci vil \C
1-
CO
NS
TR
UC
TI
O
N
DE
TA
IL
S.
dw g 2/
2/
1:
:2
AM
NWL = 956.00
PROPOSED GROUND
EXISTING GROUND (VARIES)
ELEV = 955.75
10' MINIMUM
REFER TO GRADING PLAN
WAVE BENCH
A1 WAVE PROTECTION BENCH AT NWL
ELEV = 956.25
EXISTING GROUND
TIE INTO EXISTING TILE AS
DETAILED -
FIELD VERIFY LOCATION
AND DEPTHSNWL = 956.00
PROPOSED GROUND
LAST 20 LF SHALL BE CMP
WITH RODENT GUARD
1 SIZE LARGER THAN PROPOSED TILE
PE FIELD TILE -
SEE PLANS FOR LENGTHS AND
LOCATIONS
PROPOSED GROUND
CONCRETE CONNECTION
MATCH INVERTS
A4 TYPICAL TILE DAYLIGHT
MATCH INVERTS
D
2D INSTALL APPROPRIATELT SIZED FERNCO OR
APPROVED EQUIVALENT COUPLER AND
CONCRETE COLLAR OF 3,000 PSI MINIMUM STRENGTH
CONCRETE, MINIMUM 2D WIDE CENTERED ON JOINT,
MIN 6'' THICKNESS FOR FULL 2D WIDTH. THICKNESS
CAN TAPER DOWN BEYOND THE 2D WIDTH.
FlowFlow
NEW SECTION OF TILE
EXISTING TILE
A2 FIELD TILE REPAIR CONNECTION
IE = 957.00
D4 PROJECT SIGN
FILTER FABRIC
24" THICK
CLASS E
RIP RAP
20' 3'
954.50
A
A
SECTION A-A
W es to w n Pk w y, S ui te
W es t D es
M oi ne s, Io w a
5.
3.
w w w
.s hi ve -h at te ry .c om
Io w a
Il lin oi s
In di an a
N eb ra sk a
W is co ns in
IOWA D
EP
A R
TM
E NT O F
A G R I C U L T URE
L A
ND
S
TEWARDSHIP
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C502
CO
NS
TR
UC
TI
O
N
DE
TA
IL
S
DJ
J
DJ
J
CO
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
-1
9-
BR
E9
2B B
R
EM
ER
C
O U
N
TY
W
ET
LA
N
D
ID
AL
S
BR
EM
ER
C
O
UN
TY
, I
A
P:
\P ro je ct s\
DM
\4
\D el ive ra bl es \D ra wi ng s\
1_ Ci vil \C
1-
CO
NS
TR
UC
TI
O
N
DE
TA
IL
S.
dw g 1/
/2
2:
:1
PM
SECTIONAL ELEVATION A-A
RISER DETAIL
#4 BARS @ 12''
OC BOTH WAYS
48" CIRCULAR
CORRUGATED METAL RISER
RIM = 958.50
CHANNEL IRON FOR
CHECK BOARDS -
SEE DETAIL
7.0'
CAST IN PLACE
BOTTOM STOP
LOG MINIMUM 3''
NOTES:
1) PROVIDE STRUCTURE SHOP DRAWINGS FOR ENGINEERS REVIEW AND
APPROVAL BEFORE FABRICATION OF WATER CONTROL STRUCTURE.
2) WATER CONTROL STRUCTURE TO BE PRE FABRICATED CORRUGATED
METAL RISER STRUCTURE WITH WATERTIGHT SEALS AT SECTION JOINTS
AND PIPE PENETRATIONS.
3) STOP LOG CHANNEL IS TO BE ANCHORED TO THE WALLS AND FLOOR
PRIOR TO PLACING CONCRETE INVERT.
4) POUR CONCRETE INVERT AFTER STOP LOG CHANNEL IS INSTALLED.
CAST BOTTOM STOP LOG INTO PLACE WITH THREE 12" DIA "J BOLTS".
5) PROVIDE MATCHING PADLOCKS FOR ALL LOCKING STRUCTURES.
PROVIDE OWNER WITH FOUR KEYS.FLAT LOCKABLE CIRCULAR LID
WITH HINGE BY HAALA INDUSTRIES OR
APPROVED EQUIVALENT (PS48-58S)
A2 WATER CONTROL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .