3-Bid Form - North Yard Storage Site.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 269-2026-2033
- Issued by
- Mecklenburg County, Charlotte City, North Carolina
About this file
This is a bid form for the North Yard Storage Site Construction Project Re-Bid, a North Carolina state and local contract opportunity for CATS (likely a transit authority). The project encompasses site improvement construction at the North Yard Annex facility, which will serve as a secured and monitored storage area. The scope of work includes gate assemblies, underground conduit installation, electrical work consisting of a 208/120V 100-amp subpanel and associated receptacles, access control systems, site fencing with power, conduit trenching, utility locating services, and commissioning and testing. An add-alternate includes a storage yard light fixture upgrade featuring two new Lithonia RSXF1 LED flood fixtures per pole on ten existing wood poles, mechanical lighting contactor installation, and aerial and underground lighting conductor installation. Additional miscellaneous items include mobilization at five percent of total construction costs, communications and signal pull boxes, sub-base materials, asphalt repair, and de-mobilization.
The bid form requests pricing for all line items on a lump sum or unit price basis, with quantities specified for certain components such as conduit (150 linear feet), power conductors (350 linear feet), and aerial lighting conductors (2,000 linear feet). The form requires bidders to calculate subtotals for construction, then apply taxes and insurance at 8.5 percent, bonds at 3 percent, permits and fees at 5 percent, and contingency at 25 percent to arrive at a total bid amount. All pricing fields on the submitted form are currently blank with zero dollar values, indicating this is a template awaiting bidder completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form PROJECT: CATS North Yard Annex Site Improvement
| North Yard Annex Site Improvement | Qty | Unit | Unit Price | Total | Comments | |
| Construction | ||||||
| - Gate Assemblies | ||||||
| - U/G Conduit | 1 | LS | 0.00 | |||
| - Site Fence Line Power | 0.00 | |||||
| - (1) 208/120V - 100Amp SubPanel | 1 | LS | 0.00 | |||
| - (1) New 70A Breaker in Existing Panel | 1 | LS | 0.00 | |||
| - (1) 120V 20 Amp Quad Weatherproof Receptacles | 1 | LS | 0.00 | |||
| - (3) Fence Line 120V 20 Amp Quad Weatherproof Receptacles | 1 | LS | 0.00 | |||
| - SCH 40 PVC Conduit Raceway and Junction Boxes per Site Plan | 1 | LS | 0.00 | |||
| - Access Control Conduit Rough-In's Per Site Plan | 1 | LS | 0.00 | |||
| - Conduit Trenching Per Site Plan | 1 | INC | 0.00 | |||
| - Utility Locating Service | 1 | LS | 0.00 | |||
| - ADD ALTERNATE: Storage Yard Light Fixture Upgrade | 0.00 | ADD ALTERNATE | ||||
| - (2) New Lithonia RSXF1 LED Flood Fixtures per Pole (20) Total, Installed on (10) Existing Wood Poles | 0 | LS | 0.00 | |||
| - (1) New Mechanical Lighting Contactor with photocell | 0 | LS | 0.00 | |||
| - Lift Equipment to Energize (10) Existing Incandescent Light Fixtures | 0 | LS | 0.00 | |||
| - U/G Conduit | 150 | LF | 0.00 | |||
| - U/G Power Conductors | 350 | LF | 0.00 | |||
| - Furnish & Install Aerial Lighting Conductors | 2000 | LF | 0.00 | |||
| - Gates Access Controls | ||||||
| - U/G Conduit | 1 | LS | 0.00 | |||
| - Miscellaneous Expenditures | ||||||
| - Mobilization (5% of total construction) | 1 | LS | 0.00 | |||
| - Comms, Signal & Power Pull Boxes W/Lids | 4 | LS | 0.00 | |||
| - Circuits, Tags & Labeling | 1 | LS | 0.00 | |||
| - Sub-base Materials (#57 Stone) | 5 | CY | 0.00 | |||
| - Misc. Asphalt Repair & Replacement | 1 | EA | 0.00 | |||
| - Commissioning & Testing | 1 | LS | 0.00 | |||
| - De-Mobilization | 1 | LS | 0.00 |
| Subtotal | ||
| Construction Subtotal | 0.00 | |
| Taxes & Insurances @ 8.5% | 0.00 | |
| Bonds @ 3% | 0.00 | |
| Permits & Fees @ 5% | 0.00 | |
| Contingency @ 25% | 0.00 |
Total Bid 0.00