2-North Yard Storage Upgrades Plans.pdf
PDF 2 MB Posted
- Solicitation number
- 269-2026-2033
- Issued by
- Mecklenburg County, Charlotte City, North Carolina
About this file
This is a set of electrical infrastructure design plans prepared by HNTB North Carolina, P.C. for the North Yard Storage Site Construction Project, a City of Charlotte facility intended to support CATS (Charlotte Area Transit System) storage operations. The project encompasses electrical infrastructure upgrades including the installation of a new 100-ampere panel "NYS" (208/120V, 3-phase, 4-wire), conduit systems, receptacles, and associated electrical equipment to support the secured and monitored storage facility. The plans specify Schedule 40 PVC conduit with 24 inches minimum cover for underground installations, rigid galvanized steel for exposed conduit, and include detailed site plans showing conduit routing, junction boxes, and connection points from the existing Duke Energy utility transformer to new and existing panels. All electrical materials and devices must be label-listed by a North Carolina approved third-party testing agency and comply with applicable codes. The plans were prepared and approved on August 20, 2025, and include eight drawing sheets covering site plans, riser diagrams, panel schedules, and optional lighting additions.
The plans establish specific installation requirements including identification labels at every receptacle cover plate indicating originating panel and circuit number, ground fault protection for receptacles in wet areas, and photocell-controlled lighting with automatic on-off switching capability. The optional lighting addition component is noted as subject to further discussion with the contractor to determine optimal aerial and conduit runs to reduce voltage drop and costs. Contractors are required to verify the location of existing utilities and equipment prior to installation, coordinate device locations with the City's representative, and field verify amperage ratings and wire sizes of all circuit breakers in panel NYDP for inclusion in as-built documentation. The design includes provisions for future installation of gate motor controls and access control systems being installed under separate contracts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-Bid Form - North Yard Storage Site.xlsx | XLSX spreadsheet | |
| 6-ITB 269-2026-2033 North Yard Storage Site Construction Project.docx | DOCX document | |
| 5-00 55 00 CBI Program.pdf | ||
| 1-A. Bonfire Instructions Procurement Portal FINAL.pdf | ||
| 7-North Yard Storage Design Special Provisions.pdf | ||
| 4-00 60 00 BID Forms.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWN BY:
CHECKED BY:
NO. DWN CHK APR
NORTH YARD STORAGEPREPARED BY:
APPROVED BY:DATE REVISION BY
DATE:
SHEET:
DRAWING NO.:
PROJECT NO.: n/a
CBS
CBS
CMR
CLM
08/20/25
HNTB NORTH CAROLINA, P.C.
101 SOUTH TRYON STREET, SUITE 3610
CHARLOTTE, NC 28280
(704) 372-8020
NC LICENSE NO: C-1554
NYS-000
TITLE SHEET
NORTH YARD STORAGE
ELECTRICAL INFRASTRUCTURE
ELECTRICAL INFRASTRUCTURE
PROJECT LOCATION
NO. DWN CHK APR
NORTH YARD STORAGEPREPARED BY:
APPROVED BY:DATE REVISION BY
DATE:
SHEET:
DRAWING NO.:
PROJECT NO.: n/a
CBS
CBS
CMR
CLM
8/20/25
HNTB NORTH CAROLINA, P.C.
101 SOUTH TRYON STREET, SUITE 3610
CHARLOTTE, NC 28280
(704) 372-8020
NC LICENSE NO: C-1554
NYS-001
INDEX
SHEET
NO.
DRAWING
NO. DESCRIPTION REVISION
0 1 2 3 4 5
0 NYS-000 TITLE SHEET
1 NYS-001 INDEX
2 NYS-002 GENERAL NOTES, ABBREVIATIONS, & SYMBOLS
3 NYS-003 SITE PLAN (SHEET 1 OF 2)
4 NYS-004 SITE PLAN (SHEET 2 OF 2)
5 NYS-005 RISER DIAGRAM
6 NYS-006 PANEL SCHEDULES
7 NYS-007 OPTIONAL LIGHTING ADDITION
8 NYS-008 OPTIONAL LIGHTING ADDITION CALCULATIONS
NO. DWN CHK APR
NORTH YARD STORAGEPREPARED BY:
APPROVED BY:DATE REVISION BY
DATE:
SHEET:
DRAWING NO.:
PROJECT NO.: n/a
CBS
CBS
CMR
CLM
8/20/25
HNTB NORTH CAROLINA, P.C.
101 SOUTH TRYON STREET, SUITE 3610
CHARLOTTE, NC 28280
(704) 372-8020
NC LICENSE NO: C-1554
NYS-002
GENERAL NOTES, SYMBOLS, & ABBREVIATIONS
ABBREVIATIONS AND ACRONYMS
JB
X X
OE OE
ELECTRICAL INFRASTRUCTURE
ABBREVIATIONS AND ACRONYMS
18"
6"
24" MIN.
11x18 (POWER)
TYPICAL PULLBOX ELEVATION
UP TO (12) CONDUITS
TOP
OF
GRADE
TYPICAL STUB UP INSTALLATION
CAP CONDUIT TO DETER
ACCUMULATING OF RAIN
WATER
CONDUIT STUB-UP
BOOTLEG TO CONNECT TO CONDUIT
STUB-UP WHERE REQUIRED.
GRADE
24x24 (COMMS)
EXISTING CATS
LIGHTING
X
X X
X X
X
X X
X X
X X
X
X X X X X
XXXXXX
PARKING
LOT
(ASPHALT)
PANEL "NYY"
X X
X
EXISTING CATS LIGHTING
TRENCHING (AVOID)
EXISTING CATS LIGHTING
ASPHALT
LOT
ASPHALT
LOT
SOFTSCAPE
SOFTSCAPE
SOFTSCAPE
SOFTSCAPE
DRIVEWAY
(CONCRETE)
SIGNAL
HOUSE
SL
ID
IN
G
G
AT
E
SLIDING GATE
TO DUKE ENERGYEXISTING CATS
LIGHTING
CONNEX BOX
SUBSTATION
DRIVEWAY
ENTRY
X X
EX
IS
TI
N
G
SL
ID
IN
G G
AT
E
X X
X X X X X X X X X X X X X X X X X X X X X X
TWO VERTICAL
PIVOTING FENCES
CCTV
POLE
EXISTING DUKE
ENERGY TRENCHING
FOR SERVICE CONNECTION
SOFT
SCAPE
SOFTSCAPE
SIDEWALK
(CONCRETE)PARKING
LOT
DRIVEWAY
(CONCRETE)
(CONCRETE)
EXISTING
GATE MOTOR
EXISTING
GATE MOTOR
EXISTING
GATE
MOTOR
(E) PANEL "NYDP"
(208/120V 3Ø-4W)
COMMS ROOM
DRAINAGE
RAVINE
SOFTSCAPE
GRAVEL
SOFTSCAPEASPHALT
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
JB
JB
JB
JB
JB
JB
XFMR
M
INSTALL (1) 1-1/4" SCH 40 PVC CONDUIT (EA)
FOR 3 QUADPLEX OUTLETS
(N) PANEL "NYS"
(208/120V 3Ø-4W)
NYS-5
NYS-2
GEN
ASPHALT
LOT
X X
X X
X
X X X X X X X X X X X
NEW PEDESTRIAN
GATE
EXISTING
PEDESTRIAN
GATE
COMMS JB
24"X24" MIN
JB
POWER JB
11"X18" MIN
DRAWN BY:
CHECKED BY:
NO. DWN CHK APR
NORTH YARD STORAGEPREPARED BY:
APPROVED BY:DATE REVISION BY
DATE:
SHEET:
DRAWING NO.:
PROJECT NO.: n/a
CBS
CBS
CMR
CLM
8/20/25
HNTB NORTH CAROLINA, P.C.
101 SOUTH TRYON STREET, SUITE 3610
CHARLOTTE, NC 28280
(704) 372-8020
NC LICENSE NO: C-1554
SCALE: 1/32" = 1'
NOTES:
1.) PROVIDE SCHEDULE 40 PVC WITH 24" MINIMUM OF COVER WHERE RACEWAY IS LOCATED
BELOW GRADED SURFACES.
2.) EXPOSED CONDUIT SHALL BE RIGID GALVANIZED STEEL.
3.) CONDUITS ARE TO STUB UP 6" IN THE CENTER OF THE EQUIPMENT, BE TIGHTLY GROUPED, SHALL BE SECURELY CAPPED IMMEDIATELY AFTER INSTALL, AND SHALL BE BE PROTECTED FROM
DAMAGE. CONDUITS SHALL HAVE PULL STRINGS PROVIDED.
4.) ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES, AND EQUIPMENT SHALL BE LABEL-LISTED
BY A NORTH CAROLINA APPROVED THIRD PARTY TESTING AGENCY.
5.) AS-BUILT INFORMATION IS SHOWN AS REFERENCE. CONTRACTOR MUST VERIFY LOCATION
OF EXISTING UTILITIES AND EQUIPMENT PRIOR TO INSTALL.
6.) RECEPTACLE ON A DEDICATED 20A CIRCUIT SHALL BE RATED 20A. PROVIDE GROUND FAULT
PROTECTION FOR ALL RECEPTACLES LOCATED IN WET AREAS.
7.) PROVIDE IDENTIFICATION LABEL ACCORDING TO SPECIFICATIONS AT EVERY RECEPTACLE
COVER PLATE INDICATING ORIGINATING PANEL AND CIRCUIT NUMBER SO THAT LABEL CAN BE
CLEARLY READ WHILE DEVICE IS IN USE WITH STANDARD PLUGS INSERTED. LABEL SHALL
DISTINCTLY IDENTIFY DEDICATED RECEPTACLES.
8.) COORDINATE DEVICE LOCATIONS WITH CITY'S REPRESENTATIVE.
NYS-003
SITE PLAN
(SHEET 1 OF 2)
M
AT
H C
LI
N
E
(S
EE
S H
EE
T
4)
ELECTRICAL INFRASTRUCTURE
SITE PLAN CONDUIT SCHEDULE
CONDUIT
ID FROM TO
CONDUIT CONDUCTORS
NOTESSIZE TYPE SIZE GND
1 PANEL NYDP PANEL NYS 1-1/4" RGS (3) #1 AWG #6 AWG SWAP TO PVC ONCE
OUTSIDE OF BUILDING.
2 PANEL NYDP PANEL NYS 1-1/4" SCH. 40 PVC (3) #1 AWG #6 AWG
3 PANEL NYS MOTOR STUB UP 1" SCH. 40 PVC - - MOTOR TO BE INSTALLED IN
FUTURE.
4 PANEL NYS MOTOR STUB UP 1" SCH. 40 PVC - - MOTOR TO BE INSTALLED IN
FUTURE.
5 PANEL NYS OUTLETS (3) 1-1/4" SCH. 40 PVC #8, #6, #4 AWG * #6 AWG *THE FURTHER THE OUTLET, THE
LARGER THE WIRE REQUIRED.
6 JB NEAR GEN NEW JB (2) 1-1/4" SCH. 40 PVC - -
JB BY GEN IS FROM COMMS ROOM.
MANY FREE CONDUIT SPACES TO USE.
INSTALLING 2ND CONDUIT AS SPARE.
7 NEW JB MOTOR STUB UP 3/4" SCH. 40 PVC - - ACCESS CONTROL BEING
INSTALLED IN OTHER CONTRACT
8 NEW JB ACCESS CONTROL
PANEL STUB UP 3/4" SCH. 40 PVC - - ACCESS CONTROL BEING
INSTALLED IN OTHER CONTRACT
9 NEW JB MOTOR STUB UP 3/4" SCH. 40 PVC - - ACCESS CONTROL BEING
INSTALLED IN OTHER CONTRACT
10 NEW JB ACCESS CONTROL
PANEL STUB UP (3) 3/4" SCH. 40 PVC - -
INSTALLING 3 CONDUITS FROM THE NEW
JB TO TERMINATE AT DIFFERENT SPOTS
SEEN IN CONDUIT IDS: 10, 11, 12
11 ACCESS CONTROL
PANEL STUB UP
PEDESTRIAN ACCESS
PANEL STUB UP (2) 3/4" SCH. 40 PVC - - ACCESS CONTROL BEING
INSTALLED IN OTHER CONTRACT
12 PEDESTRIAN ACCESS
PANEL STUB UP
NEW PEDESTRIAN
GATE 3/4" SCH. 40 PVC - - STUB UP SHOULD BE RIGHT BY GATE TO RUN
WIRES TO MAGLOCK OR OTHER MEANS OF
ELECTRIC LOCKING MECHANISM
M
AT
H C
LI
N
E
(S
EE
S H
EE
T
8)
EXISTING CATS
LIGHTING
X X
X X
X X
X X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ASPHALT
LOTASPHALT
LOT
ASPHALT
LOT
CCTV
POLE
INSTALL (1) 1-1/4" SCH 40 PVC CONDUIT (EA)
FOR 3 QUADPLEX OUTLETS
NYS-2NYS-6 NYS-4
DRAWN BY:
CHECKED BY:
NO. DWN CHK APR
PREPARED BY:
APPROVED BY:DATE REVISION BY
DATE:
SHEET:
DRAWING NO.:
PROJECT NO.: n/a
CBS
CBS
CMR
CLM
8/20/25
HNTB NORTH CAROLINA, P.C.
101 SOUTH TRYON STREET, SUITE 3610
CHARLOTTE, NC 28280
(704) 372-8020
NC LICENSE NO: C-1554
SCALE: 1/32" = 1'
M
AT
H C
LI
N
E
NORTH YARD STORAGE
SITE PLAN
(2 OF 2)
NYS-004
004ELECTRICAL INFRASTRUCTURE
NOTES:
1.) PROVIDE SCHEDULE 40 PVC WITH 24" MINIMUM OF COVER WHERE RACEWAY IS LOCATED
BELOW GRADED SURFACES.
2.) EXPOSED CONDUIT SHALL BE RIGID GALVANIZED STEEL.
3.) CONDUITS ARE TO STUB UP 6" IN THE CENTER OF THE EQUIPMENT, BE TIGHTLY GROUPED, SHALL BE SECURELY CAPPED IMMEDIATELY AFTER INSTALL, AND SHALL BE BE PROTECTED FROM
DAMAGE. CONDUITS SHALL HAVE PULL STRINGS PROVIDED.
4.) ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES, AND EQUIPMENT SHALL BE LABEL-LISTED
BY A NORTH CAROLINA APPROVED THIRD PARTY TESTING AGENCY.
5.) AS-BUILT INFORMATION IS SHOWN AS REFERENCE. CONTRACTOR MUST VERIFY LOCATION
OF EXISTING UTILITIES AND EQUIPMENT PRIOR TO INSTALL.
6.) RECEPTACLE ON A DEDICATED 20A CIRCUIT SHALL BE RATED 20A. PROVIDE GROUND FAULT
PROTECTION FOR ALL RECEPTACLES LOCATED IN WET AREAS.
7.) PROVIDE IDENTIFICATION LABEL ACCORDING TO SPECIFICATIONS AT EVERY RECEPTACLE
COVER PLATE INDICATING ORIGINATING PANEL AND CIRCUIT NUMBER SO THAT LABEL CAN BE
CLEARLY READ WHILE DEVICE IS IN USE WITH STANDARD PLUGS INSERTED. LABEL SHALL
DISTINCTLY IDENTIFY DEDICATED RECEPTACLES.
8.) COORDINATE DEVICE LOCATIONS WITH CITY'S REPRESENTATIVE.
208Y/120V
UTILITY
XFMR
M
FROM
DUKE
ENERGY
EXISTING
C/T's
EXISTING
PANEL
"NYDP"
EXISTING
GRADE FIRST FLOOR
INTERIOREXTERIOR INTERIOR EXTERIOR
GRADE
NEW
PANEL
"NYS"
WIRE SIZING TABLE
CALLOUT WIRE SIZE GROUND CONDUIT
1 (3) #1 AWG #6 AWG 1 1/4" RGS
2 (3) #1 AWG #6 AWG 1 1/4" PVC
DRAWN BY:
CHECKED BY:
NORTH YARD STORAGEPREPARED BY:
APPROVED BY:
DATE:
SHEET:
DRAWING NO.:
PROJECT NO.: n/a
CBS
CBS
CMR
CLM
8/20/25
HNTB NORTH CAROLINA, P.C.
101 SOUTH TRYON STREET, SUITE 3610
CHARLOTTE, NC 28280
(704) 372-8020
NC LICENSE NO: C-1554
NYS-005
NO. DWN CHK APRDATE REVISION BY
RISER DIAGRAM
#6G
NOTES:
1.) PROVIDE FABRICATED METAL STRUCTURAL SUPPORT
ASSEMBLY FOR NEW PANEL. ENSURE SUPPORT IS PROPERLY
GROUNDED.
2.) PROVIDE ENCLOSURE RATED FOR OUTDOOR EQUIPMENT
THAT IS NEMA 3R OR RATED SUITABLE FOR ENVIRONMENT
WHERE INSTALLED.
3.) SIMPLIFIED RISER DIAGRAM SHOWN FOR SCOPE OF WORK.
FULL FACILITY RISER DIAGRAM AVAILABLE UPON REQUEST.
NORTH YARD STORAGEPREPARED BY:
APPROVED BY:
DATE:
SHEET:
DRAWING NO.:
PROJECT NO.: n/a
CBS
CBS
CMR
CLM
8/20/25
HNTB NORTH CAROLINA, P.C.
101 SOUTH TRYON STREET, SUITE 3610
CHARLOTTE, NC 28280
(704) 372-8020
NC LICENSE NO: C-1554
NYS-006
NO. DWN CHK APRDATE REVISION BY
PANEL SCHEDULES
NOTES:
1.) ALL EQUIPMENT SHALL BE SELECTIVELY COORDINATED WITH
UPSTREAM AND DOWNSTREAM BREAKERS.
2.) COORDINATE BREAKER AND WIRING SIZES WITH EQUIPMENT
MANUFACTURERS.
3.) CONTRACTORS SHALL FIELD VERIFY THE AMPERAGE RATING
AND WIRE SIZES OF ALL CIRCUIT BREAKERS IN PANEL NYDP AND
UPDATE DRAWING APPROPRIATELY FOR USE IN AS-BUILTS.
NYS-11
4X X
X X
X
X X X X
PARKING
LOT
(ASPHALT)
ASPHALT
LOT
ASPHALT
LOT
ASPHALT
(N) PANEL "NYS"
(208/120V 3Ø-4W)
New Light Fixtures (TYP) Existing Light Posts (TYP)
ASPHALT
OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X
XXXXXXXXXXXXXXXXXXXXXXXXXX
(E) ANTENNA POLE
(LCP AND PHOTOCELL
INSTALLED HERE)
OE OE OE OE OE OE OE OE
INSTALL (1) 3/4" SCH 40 PVC CONDUIT
TO CONNECT LIGHTING
TO "NYS" PANEL
NYS-13,15
TO REST OF LIGHTING
ASPHALT
LOT
OE
X
X
X X
X
X X
X
X X
X
OEOEOEOEOEOEOE OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE
X
X
X
X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
New Light Fixtures (TYP) Existing Light Posts (TYP)
TO REST OF LIGHTING
ASPHALT
LOT
ASPHALT
LOT
OE
208Y/120V
UTILITY
XFMR
M
FROM
DUKE
ENERGY
EXISTING
C/T's
PANEL
"NYDP"
EXISTING
GRADE FIRST FLOOR
INTERIOREXTERIOR INTERIOR EXTERIOR
GRADE
NEW
100A
PANEL
"NYS"
WIRE SIZING TABLE
CALLOUT WIRE SIZE GROUND CONDUIT
1 (3) #1 AWG #6 AWG 1 1/4" RGS
2 (3) #1 AWG #6 AWG 1 1/4" PVC
LIGHTING
CONTROL PANEL
"LCPS"
PHOTOCELL
LIGHTING CONTROL NOTES:
1.) PROVIDE 'PC' PHOTOCELL WITH 5 YEAR WARRANTY.
MOUNT PHOTOCELL NEAR CONTROL PANEL FACING NORTH
AND SHIELD FROM ARTIFICIAL LIGHT SOURCES. ADJUST
SENSITIVITY AS REQUIRED BY OWNER. SET PHOTOCELL SO
THAT ON AND OFF SWITCHING WILL OCCUR WHEN THE
ILLUMINATION LEVEL OF ±10 FOOT-CANDLES IS DETECTED
BY THE PHOTOCELL DEVICE.
2.) PROVIDE AND MOUNT CONTACTOR IN NEMA 1
ENCLOSURE WITHIN CONTROL PANEL. MOUNT SELECTOR
SWITCH WITHIN CONTROL PANEL ADJACENT TO
CONTACTOR ENCLOSURE. ALL LIGHTING CONTROL
COMPONENTS SHALL BE IN A SINGLE NEMA 3R ENCLOSURE
WITH HINGED DOOR INSTALLED DIRECTLY NEXT TO NEW
PANEL NYS. PROVIDE PERMANENT NAMEPLATE ON DOOR
TO READ "STORAGE YARD LIGHTING CONTROL"
3.) AUTO OFF-ON SWITCH SHALL ALLOW MANUAL OVERRIDE
OF THE AUTOMATIC CONTROL SYSTEM. SWITCH SHALL BE
MOUNTED WITHIN CONTROL PANEL.
4.) PROVIDE MECHANICALLY HELD LIGHTING CONTACTOR
IN NEMA 1 ENCLOSURE WITH 30A BALLAST RATED
CONTACTS AND 120V COIL. CONTACTOR SHALL BE OPEN
TYPE. PROVIDE NUMBER OF POLES TO SERVE LOADS
SHOWN. CONNECT ALL STORAGE YARD LIGHTING
THROUGH LIGHTING CONTACTOR. LIGHTING CONTACTOR
SHALL BE CONTROLLED BY RELAY PANEL LCPS THROUGH
COMMON PHOTOCELL.
} 208V
CIRCUIT
NYS-13,15
SPARE
SPARE
SPARE
SPARE
LC
PC
LC
ON
OFF
AUTO
120 VOLTSH N
NOTE 4
NOTE 4
NOTE 3
NOTE 1
NOTE 2
DRAWN BY:
CHECKED BY:
NO. DWN CHK APR
PREPARED BY:
APPROVED BY:DATE REVISION BY
DATE:
SHEET:
DRAWING NO.:
PROJECT NO.: n/a
CBS
CBS
CMR
CLM
8/20/25
HNTB NORTH CAROLINA, P.C.
101 SOUTH TRYON STREET, SUITE 3610
CHARLOTTE, NC 28280
(704) 372-8020
NC LICENSE NO: C-1554
NORTH YARD STORAGE
OPTIONAL LIGHTING ADDITION
LIGHTING SITE PLAN AND RISER DIAGRAM
NYS-007
007ELECTRICAL INFRASTRUCTURE
SCALE: 1/128" = 1' M
AT
H C
LI
N
E
M
AT
H C
LI
N
E
M
AT
H C
LI
N
E
SCALE: 1/64" = 1'
NOTES:
1.) PROVIDE SCHEDULE 40 PVC WITH 24" MINIMUM OF COVER WHERE
RACEWAY IS LOCATED BELOW GRADED SURFACES.
2.) EXPOSED CONDUIT SHALL BE RIGID GALVANIZED STEEL.
3.) CONDUITS ARE TO STUB UP 6" IN THE CENTER OF THE EQUIPMENT, BE
TIGHTLY GROUPED, SHALL BE SECURELY CAPPED IMMEDIATELY AFTER INSTALL,
AND SHALL BE BE PROTECTED FROM DAMAGE. CONDUITS SHALL HAVE PULL
STRINGS PROVIDED.
4.) ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES, AND EQUIPMENT SHALL
BE LABEL-LISTED BY A NORTH CAROLINA APPROVED THIRD PARTY TESTING
AGENCY.
5.) COORDINATE FINAL DEVICE LOCATIONS WITH CITY'S REPRESENTATIVE.
6.) AS-BUILT INFORMATION IS SHOWN AS REFERENCE. CONTRACTOR MUST
VERIFY LOCATION OF EXISTING UTILITIES AND EQUIPMENT PRIOR TO INSTALL.
7.) LIGHTING ADDITION IS OPTIONAL AND CURRENT OPTIONAL DESIGN IS UP
FOR FURTHER DISCUSSION WITH THE CONTRACTOR TO DETERMINE OPTIMAL
AERIAL AND CONDUIT RUNS TO REDUCE VOLTAGE DROP AND COSTS.
RISER DIAGRAM W/ ADDITIONAL LIGHTING (NTS)
NO. DWN CHK APR
PREPARED BY:
APPROVED BY:DATE REVISION BY
DATE:
SHEET:
DRAWING NO.:
PROJECT NO.: n/a
CBS
CBS
CMR
CLM
8/20/25
HNTB NORTH CAROLINA, P.C.
101 SOUTH TRYON STREET, SUITE 3610
CHARLOTTE, NC 28280
(704) 372-8020
NC LICENSE NO: C-1554
NORTH YARD STORAGE
OPTIONAL LIGHTING ADDITION
LIGHTING SITE PLAN AND RISER DIAGRAM
NYS-008
008ELECTRICAL INFRASTRUCTURE
NOTES:
1.) ALL EQUIPMENT SHALL BE SELECTIVELY COORDINATED WITH
UPSTREAM AND DOWNSTREAM BREAKERS.
2.) COORDINATE BREAKER AND WIRING SIZES WITH EQUIPMENT
MANUFACTURERS.
3.) CONTRACTORS SHALL FIELD VERIFY THE AMPERAGE RATING
AND WIRE SIZES OF ALL CIRCUIT BREAKERS IN PANEL NYDP AND
UPDATE DRAWING APPROPRIATELY FOR USE IN AS-BUILTS.
| Sheets and Views |
| Site Plan-COVER |
| Site Plan-INDEX |
| Site Plan-NOTES |
| Site Plan-PHASE 1 |
| Site Plan-PHASE 1 (2) |
| Riser Diagram-Layout1 |
| Riser Diagram-Layout1 (2) |
| Site Plan-OPTIONAL |
| Site Plan-OPTIONAL CALCS |
File details come from the government source that posted it. Updated .