3-B-Grounds Maintenance Cost Proposal Form (3 year), 1.21.26.xlsx
XLSX spreadsheet 97 KB Posted
- Solicitation number
- SB26019
- Issued by
- Utah
About this file
This is a Grounds Maintenance Cost Proposal Form for a three-year contract issued by the State of Utah Division of Facilities Construction and Management (DFCM) for grounds maintenance services at the Price Department of Natural Resources and Public Safety facility. The solicitation requests bids for comprehensive grounds maintenance services including spring and fall clean-up and preparation, routine grounds maintenance and year-round services, fertilization, annual flower planting, flowers with cost-plus fees, and sprinkler repair services. Contractors must submit pricing proposals for all three contract years, with detailed cost breakdowns provided in the designated yellow cells of the form. The contract term is three years with evaluation and award pending completion of the competitive bidding process.
Pricing proposals must be submitted using either hourly rates, lump sum fees, or percentage-based fees, depending on the specific service line item. Contractors may propose hourly rates with total hours, weekly fees, lump sum fees per application, or percentage markups on material costs, with flexibility to select the most appropriate pricing method for each service category. The evaluation methodology awards points based on comparative cost rankings across all bidding contractors, with the lowest-cost bidder receiving maximum points for each service line item and subsequent bidders receiving proportional points on a 10% spread scale. Service line items are assigned specific point values ranging from 4 to 20 points, with past performance and spring and fall clean-up services receiving the highest point allocations of 20 points each. Contractors must complete all required fields on the cost proposal form to be considered for evaluation and award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Grounds Cost Proposal 1.21.2026
DFCM GROUNDS MAINTENANCE 3 YEAR COST PROPOSAL FORM
| Contractors are to fill in ALL YELLOW cells, except where there is an option to provide a hourly rate or a fee only one is required. |
| Contractor Name: |
| U3P Reference #: |
| Service Location(s): |
| Contract Year | Services: Details regrding what is required for each service is provided in the solicitation in the Grounds Maintenance Scope of Work: 'Standard Grounds Service Specifications and General Services', items 1 - 6. | Hourly Rate | Total Hours | Lump Sum Fee | % Fee | Routine Grounds Maintenance Including Year Round Services | ||
| 1 | Spring Clean-up and Preparation | OR | ||||||
| Fall Clean-up and Preparation | OR | Hours/Week: | ||||||
| Fertilization - Lump Sum Fee per Application | AND | |||||||
| Annual Flower Planting Hourly Rate | Weekly Fee: | |||||||
| Flowers: Cost + Fee, Contractor is to provide only the fee (mark-up) as a percentage | 35.0% | OR | ||||||
| Sprinkler Repair Hourly Rate | Hourly Rate: | |||||||
| Other: | *Hide this row unless needed according to FM* | OR | OR |
| 2 | Spring Clean-up and Preparation Hourly Rate | OR | |||
| Fall Clean-up and Preparation Hourly Rate | OR | Hours/Week: | |||
| Fertilization - Lump Sum Fee per Application | AND | ||||
| Annual Flower Planting Hourly Rate | Weekly Fee: | ||||
| Flowers: Cost + Fee, Contractor is to provide only the fee (mark-up) as a percentage | OR | ||||
| Sprinkler Repair Hourly Rate | Hourly Rate: | ||||
| Other Hourly Rate: | *Hide this row unless needed according to FM* | OR | OR |
| 3 | Spring Clean-up and Preparation Hourly Rate | OR | |||
| Fall Clean-up and Preparation Hourly Rate | OR | Hours/Week: | |||
| Fertilization - Lump Sum Fee per Application | AND | ||||
| Annual Flower Planting Hourly Rate | Weekly Fee: | ||||
| Flowers: Cost + Fee, Contractor is to provide only the fee (mark-up) as a percentage | OR | ||||
| Sprinkler Repair Hourly Rate | Hourly Rate: | ||||
| Other Hourly Rate: | *Hide this row unless needed according to FM* | OR | OR |
| Evaluation of Cost Proposals | |
| For each year the cost proposed for each service line item will be averaged to provide one cost. Each service line item will be ranked against other bidding contractors (1,2,3,etc.). For each service line item, the contractor ranked '1' will receive the maximum points for that item. All other contractors will be assigned points with a 10% spread between rankings. Example: The maximum point value for service line item #1 is 20 points. The contractor with the lowest hourly rate will receive a ranking of '1' for that line item and will receive 20 points. The contractor with the second lowest bid will be ranked '2' and will receive 90% of the possible 20 points for that line item, etc. The point values for each service line item are provided below. | |
| Service Line Item Point Values | |
| 20 | Past Performance Rating |
| 20 | Spring Clean-up and Preparation |
| 20 | Fall Clean-up and Preparation |
| 8 | Routine Grounds Maintenance Including Year Round Services |
| 4 | Fertilization - Lump Sum Fee per Application |
| 4 | Annual Flower Planting Hourly Rate |
| 4 | Flowers: Cost + Fee, Contractor is to provide only the 'fee' as a percentage |
| 4 | Sprinkler Repair Hourly Rate |
image1.png
File details come from the government source that posted it. Updated .