3-Attchment B Scope of Work Rotomill Only.docx
DOCX document 17 KB Posted
- Attached to
- UDOT Region 1 Roto Mill Projects
- Solicitation number
- UDOT260190CN
- Issued by
- Utah
About this file
This is a Scope of Work document issued by the Utah Department of Transportation (UDOT) Region 1 for roto mill services across seven locations in northern Utah. The project involves roto milling 2 to 3 inches of asphalt pavement at multiple state routes to address cracking and rutting. The specific locations and milling requirements are: SR 30 (Mile Post 52.8-53.8, Snowville) for 292,723 square feet at 2 inches; SR 218 (Mile Post 0.5-1.5, Logan) for 113,690 square feet at 2 inches; SR 38 (Mile Post 4.8-5.2, Brigham) for 52,715 square feet at 2 inches; SR 134 at three locations in Ogden totaling 32,313 square feet (12,038 and 5,702 square feet at 2 inches, and 15,206 square feet at 3 inches); and SR 65 (Mile Post 12.5, Morgan) for 5,069 square feet at 3 inches. The contractor will be responsible for providing the roto mill equipment and any other machinery required for the milling process. All work must be completed by June 25, 2026, and the contractor must coordinate with UDOT crews regarding schedules and project sequencing, as the seven projects will likely not occur consecutively.
UDOT will assume responsibility for traffic control, hauling of roto mill tailings, cleanup, repaving, and any roadway damage occurring during construction. All work must conform to current UDOT Standard Specifications and Standard Drawings and occur within the UDOT right-of-way. The contract will be awarded to the lowest responsive and responsible bidder based on a daily machine rate, as this pricing structure accommodates the variable and non-sequential nature of the seven planned projects. The IFB (Solicitation #UDOT260190CN) may result in a purchase order for the detailed projects and potentially additional projects if funding becomes available. Some project locations may be reduced if funding constraints arise. The bidder selection process prioritizes cost efficiency through competitive daily rate bidding.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-Agency-Contract-GoodsServices-Combined-9.16.24 (2).docx | DOCX document | |
| 1-7. Submittal Form- Vendor Set Up Form 2024-06-27 .pdf | ||
| 4-Attchment C Bid Sheet.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work Rotomill (ONLY) Project Rotomill (only) project for Region One 7 locations Description:
There is cracking and rutting in the existing pavement which is in need of repair. This project is to Rotomill 2-3 inches of asphalt pavement. This will be a rotomill only project, contractor will be responsible for providing the Rotomill as well as any other equipment needed for the milling process.
| · Rotomill 2” cut estimated total 292,723 Sq. Ft. | SR 30 M.P. 52.8 to 53.8. | |
| · Rotomill 2” cut estimated total 113,690 Sq. Ft. | SR 218 M.P. 0.5 to 1.5. | |
| · Rotomill 2” cut estimated total 52,715 Sq. Ft. | SR 38 M.P. 4.8 to 5.2. | |
| · Rotomill 2” cut estimated total 12,038 Sq. Ft. | SR 134 M.P. 9.25 to 9.4. | |
| · Rotomill 2” cut estimated total 5,702 Sq. Ft. | SR 134 M.P. 9.1 to 9.2. | |
| · Rotomill 3” cut estimated total 15,206 Sq. Ft. | SR 134 M.P. 10.7 to 10.9. | |
| · Rotomill 3” cut estimated total 5,069 Sq. Ft. | SR 65 M.P. | 12.5 |
UDOT crews will be responsible for providing all traffic control, trucks to haul Rotomill tailings, all clean-up and re-paving of milled locations. UDOT crews will also be responsible for any roadway damage caused during construction.
Locations:
| SR 30 Mile Post 52.8 to 53.8 | Snowville, Ut | |
| SR 218 Mile Post 0.5 to 1.5 | Logan, Ut | |
| SR 38 Mile Post 4.8 to 5.2 | Brigham, Ut | |
| SR 134 Mile Post 9.25 to 9.4 | Ogden, Ut | |
| SR 134 Mile Post 9.1 to 9.2 | Ogden, Ut | |
| SR 134 Mile Post 10.7 to 10.9 | Ogden, Ut SR 65 Mile Post 12.5 | Morgan |
All work to be done within the UDOT Right of Way. All work to be done in conformance to current UDOT Standard Specifications and Standard Drawings.
Contractor will coordinate with UDOT crews, dates and times etc... to allow UDOT paving crews to follow up behind rotomill with clean up and re-paving duties.
There are 7 projects planed but these projects will most likely not be back to back. There is a possibility that UDOT will be able to coordinate a few projects together.
Therefore, a daily mill rate for the machine is what will need to be submitted.
This contract may result in a Purchase Order for the projects detailed in scope. May also include other projects if funds become available.
Award will be given to the lowest daily rate bidder.
Work must be completed by June 25TH, 2026 pending whether conditions. Please note some locations may be reduced if funding constraints arise.