3-Attachment C Fee Schedule.pdf
PDF 523 KB Posted
- Attached to
- Environmental Investigation Firms
- Solicitation number
- 550632
- Issued by
- Wayne County, Detroit City, Michigan
About this file
This is a Fee Schedule document submitted by an environmental investigation firm to the City of Detroit Office of Contracting and Procurement (OCP) on behalf of the Human, Homeless and Family Services Department (HRD) for a three-year environmental services contract in Michigan. The fee schedule outlines firm pricing for a comprehensive range of environmental investigation services including lead inspection and risk assessment reports, lead-based paint hazard clearance inspections, elevated blood lead level (EBL) environmental investigations, dust wipe and water sampling, mold testing and post-remediation services, radon testing, PCB testing, and asbestos inspection and clearance services. Services are provided on a per-housing-unit or per-sample basis with expected turnaround times ranging from 2 business days for verbal results on lead clearances to 28 business days for combination lead inspection and risk assessment reports. The contractor commits to providing reports to HRD within specified timeframes, with verbal results often delivered within 24 to 48 hours of service completion, followed by written reports within 7 business days.
The pricing structure is based on firm, fixed-price quotations for each service type and unit. The schedule includes standard rates for routine environmental assessments and specialized investigations, with additional provisions for hourly rates applied to work not otherwise listed that may be needed during the contract period. This is a grant-funded project, indicating that funding for environmental services will be provided through grant monies rather than direct municipal appropriations. The comprehensive service offerings suggest the City is seeking to address multiple environmental hazards across housing units, with particular emphasis on lead-based paint hazards, blood lead level investigations, and mold remediation services to support housing-related health and safety initiatives.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Type of Service Expected Turnaround Time Unit FIRM PRICE
Lead Inspection Report provided to HRD within 21 business days from request of service
Per housing unit
Updated Risk Assessment.
(A.K.A Re-Evaluation or LI/RA Renewal)
Report provided to HRD within 21 business days from request of service
Per housing unit
Combination Lead Inspection/Risk Assessment Combo. (Dust wipes and soil samples are included)
Report provided to HRD within 28 business days from request of service
Per housing unit
Lead Based Paint Hazard Clearance (Verify all LHR have been addressed, Visual, Dust Samples included)
Verbal results within 2 business days of service and clearance report within 7 business days of final clearance
Per housing unit
Clearance (Interior only) (Verify all LHR have been addressed, Visual, Dust Samples included)
Verbal results within 2 business days of service and clearance report within 7 business days of final clearance
Per housing unit
Lead Services
Docusign Envelope ID: 8E2284C6-CA60-84A9-8008-E7555CAF5D8F
Clearance (Exterior/Visual only)
Verbal results within 2 business days of service and report within 7 business days of final clearance
Per housing unit
Return for failed lead clearances (visual and dust wipes in most cases)
Conduct within 2 business days of request/Verbal results within 24 hours of results/Written report within 7 business days
Per housing unit
EBL Environmental Investigation for blood lead levels of 40 -70 micrograms/dL or more
Report Back Within 48 Hours of investigation
Per housing unit
EBL Environmental Investigation for blood lead levels of 3.5-39 micrograms/dL
Report back within 10 Business Days of Inspection
Per housing unit
Dust Wipe 10-Day Turnaround Per Sample
Dust Wipe 10-Day Turnaround Inspection/Report.
Minimum 8 Samples
Water Sampling (Requested outside of LIRA/EBLL)
26-Day Turnaround Per Sample
Water Sampling (Fixed Fee included with LIRA/EBLL)
26-Day Turnaround Inspection/Report.
All Fixtures
Water Clearance 10-Day Turnaround Inspection/Report.
All Fixtures
Soil Testing 14-Day Turnaround Per Sample
Soil Testing 14-Day Turnaround
Inspection/Report.
Minimum 3 Composite Samples if possible.
Performing a Combination Lead Inspection/Risk Assessment Initially conducted by another firm
Report provided to HRD within 28 business days from request of service
Per housing unit
Performing a Lead Clearance Initially conducted by another firm
Conduct within 48-hours of request/Verbal results within 24-hours of results/Written report within 7 business days of final clearance
Per housing unit
Bulk/Tape Mold Sample Analysis
21-Day Turnaround Per Sample
Air Mold Sample Analysis 21-Day Turnaround Per Sample
Mold Post Remediation Visual and Air Testing.
Includes up to 5 air samples and letter report
15-Business day turnaround from request of service
Per Housing Unit
Mold Services
Mold Testing - Survey and Report. Includes up to 5 air samples and letter report
21-Day Turnaround Per Housing Unit
Radon testing Report back within 22 business days from request of service
Per housing unit
PCB Testing Bulk Samples (7-10 day turnaround; per sample)
Per Housing Unit
PCB TCLP Testing Bulk Sample (7-10 day turnaround; per sample)
(7-10 day turnaround; per sample)
Per Housing Unit
Asbestos Inspection (Survey). Up to 50 samples/layers, beyond 50 samples/layers will be charged per sample/layer.
Report back within 22 business days from request of service
Per Housing Unit
Asbestos Inspection (Isolated Area of House)
Report back within 22 business days from request of service
Per Housing Unit
Asbestos Testing (PLM) 10-Day Turnaround Per Sample
Asbestos Clearance (Post- Abatement Verification)
Verbal results within 24 hours of results and report back within 7 business days of final clearance
Per Housing Unit
Return for Failed Asbestos Clearance
Verbal results within 24 hours of results and report back within 7 business days of final clearance
Per Housing Unit
Radon Services
PCB Services
Asbestos Services
Air Monitoring. For all samples analyzed via PCM/TEM when submitted to approved laboratory
Report back within 21 business days from request of service
Per sample
Air Monitoring (1/2 Day).
Includes onsite analysis of air samples via PCM
Report back within 21 business days from request of service
Per Housing unit
Air Monitoring (Full Day).
Includes onsite analysis of air samples via PCM
Report back within 21 business days from request of service
Per Housing unit
Combined Asbestos Survey and Hazardous/Regulated Materials at a Vacant Home
Report back within 21 business days from request of service
Per Housing unit
Hourly task for work not otherwise listed above that may be needed
Hourly rate will be inclusive of labor, travel, lab costs, overhead, profit, etc.
Hourly
Signature
Air Monitoring Services
Company Name
Print Name
Work Not Otherwise Listed
Combined Asbestos Survey and Hazardous/Regulated Materials at Vacant Homes
Docusign Envelope ID: 8E2284C6-CA60-84A9-8008-E7555CAF5D8F
8/7/2026
8/7/2026
| 2026-08-07T13:18:44+0000 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .