This is a Fee Schedule document submitted by an environmental investigation firm to the City of Detroit Office of Contracting and Procurement (OCP) on behalf of the Human, Homeless and Family Services Department (HRD) for a three-year environmental services contract in Michigan. The fee schedule outlines firm pricing for a comprehensive range of environmental investigation services including lead inspection and risk assessment reports, lead-based paint hazard clearance inspections, elevated blood lead level (EBL) environmental investigations, dust wipe and water sampling, mold testing and post-remediation services, radon testing, PCB testing, and asbestos inspection and clearance services. Services are provided on a per-housing-unit or per-sample basis with expected turnaround times ranging from 2 business days for verbal results on lead clearances to 28 business days for combination lead inspection and risk assessment reports. The contractor commits to providing reports to HRD within specified timeframes, with verbal results often delivered within 24 to 48 hours of service completion, followed by written reports within 7 business days.

The pricing structure is based on firm, fixed-price quotations for each service type and unit. The schedule includes standard rates for routine environmental assessments and specialized investigations, with additional provisions for hourly rates applied to work not otherwise listed that may be needed during the contract period. This is a grant-funded project, indicating that funding for environmental services will be provided through grant monies rather than direct municipal appropriations. The comprehensive service offerings suggest the City is seeking to address multiple environmental hazards across housing units, with particular emphasis on lead-based paint hazards, blood lead level investigations, and mold remediation services to support housing-related health and safety initiatives.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Type of Service Expected Turnaround Time Unit FIRM PRICE

Lead Inspection Report provided to HRD within 21 business days from request of service

Per housing unit

Updated Risk Assessment.

(A.K.A Re-Evaluation or LI/RA Renewal)

Report provided to HRD within 21 business days from request of service

Per housing unit

Combination Lead Inspection/Risk Assessment Combo. (Dust wipes and soil samples are included)

Report provided to HRD within 28 business days from request of service

Per housing unit

Lead Based Paint Hazard Clearance (Verify all LHR have been addressed, Visual, Dust Samples included)

Verbal results within 2 business days of service and clearance report within 7 business days of final clearance

Per housing unit

Clearance (Interior only) (Verify all LHR have been addressed, Visual, Dust Samples included)

Verbal results within 2 business days of service and clearance report within 7 business days of final clearance

Per housing unit

Lead Services

Docusign Envelope ID: 8E2284C6-CA60-84A9-8008-E7555CAF5D8F

Clearance (Exterior/Visual only)

Verbal results within 2 business days of service and report within 7 business days of final clearance

Per housing unit

Return for failed lead clearances (visual and dust wipes in most cases)

Conduct within 2 business days of request/Verbal results within 24 hours of results/Written report within 7 business days

Per housing unit

EBL Environmental Investigation for blood lead levels of 40 -70 micrograms/dL or more

Report Back Within 48 Hours of investigation

Per housing unit

EBL Environmental Investigation for blood lead levels of 3.5-39 micrograms/dL

Report back within 10 Business Days of Inspection

Per housing unit

Dust Wipe 10-Day Turnaround Per Sample

Dust Wipe 10-Day Turnaround Inspection/Report.

Minimum 8 Samples

Water Sampling (Requested outside of LIRA/EBLL)

26-Day Turnaround Per Sample

Water Sampling (Fixed Fee included with LIRA/EBLL)

26-Day Turnaround Inspection/Report.

All Fixtures

Water Clearance 10-Day Turnaround Inspection/Report.

All Fixtures

Soil Testing 14-Day Turnaround Per Sample

Soil Testing 14-Day Turnaround

Inspection/Report.

Minimum 3 Composite Samples if possible.

Performing a Combination Lead Inspection/Risk Assessment Initially conducted by another firm

Report provided to HRD within 28 business days from request of service

Per housing unit

Performing a Lead Clearance Initially conducted by another firm

Conduct within 48-hours of request/Verbal results within 24-hours of results/Written report within 7 business days of final clearance

Per housing unit

Bulk/Tape Mold Sample Analysis

21-Day Turnaround Per Sample

Air Mold Sample Analysis 21-Day Turnaround Per Sample

Mold Post Remediation Visual and Air Testing.

Includes up to 5 air samples and letter report

15-Business day turnaround from request of service

Per Housing Unit

Mold Services

Mold Testing - Survey and Report. Includes up to 5 air samples and letter report

21-Day Turnaround Per Housing Unit

Radon testing Report back within 22 business days from request of service

Per housing unit

PCB Testing Bulk Samples (7-10 day turnaround; per sample)

Per Housing Unit

PCB TCLP Testing Bulk Sample (7-10 day turnaround; per sample)

(7-10 day turnaround; per sample)

Per Housing Unit

Asbestos Inspection (Survey). Up to 50 samples/layers, beyond 50 samples/layers will be charged per sample/layer.

Report back within 22 business days from request of service

Per Housing Unit

Asbestos Inspection (Isolated Area of House)

Report back within 22 business days from request of service

Per Housing Unit

Asbestos Testing (PLM) 10-Day Turnaround Per Sample

Asbestos Clearance (Post- Abatement Verification)

Verbal results within 24 hours of results and report back within 7 business days of final clearance

Per Housing Unit

Return for Failed Asbestos Clearance

Verbal results within 24 hours of results and report back within 7 business days of final clearance

Per Housing Unit

Radon Services

PCB Services

Asbestos Services

Air Monitoring. For all samples analyzed via PCM/TEM when submitted to approved laboratory

Report back within 21 business days from request of service

Per sample

Air Monitoring (1/2 Day).

Includes onsite analysis of air samples via PCM

Report back within 21 business days from request of service

Per Housing unit

Air Monitoring (Full Day).

Includes onsite analysis of air samples via PCM

Report back within 21 business days from request of service

Per Housing unit

Combined Asbestos Survey and Hazardous/Regulated Materials at a Vacant Home

Report back within 21 business days from request of service

Per Housing unit

Hourly task for work not otherwise listed above that may be needed

Hourly rate will be inclusive of labor, travel, lab costs, overhead, profit, etc.

Hourly

Signature

Air Monitoring Services

Company Name

Print Name

Work Not Otherwise Listed

Combined Asbestos Survey and Hazardous/Regulated Materials at Vacant Homes

Docusign Envelope ID: 8E2284C6-CA60-84A9-8008-E7555CAF5D8F

8/7/2026

8/7/2026

2026-08-07T13:18:44+0000
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .