About this file

This document is the Metropolitan Atlanta Rapid Transit Authority (MARTA) Criteria for Drawings Standards Manual, a comprehensive technical guide for computer-aided design (CAD) standards and drawing preparation. The manual establishes detailed policies and procedures for creating electronic plans and documents for MARTA projects, covering multiple engineering disciplines including civil, architectural, structural, mechanical, electrical, communication, and fire protection drawings. The manual provides extensive guidelines for file naming conventions, drawing organization, coordinate systems, text styles, line weights, scales, symbols, and drawing revision processes. Updated in October 2021 (Revision 5), the document serves as a definitive reference for internal staff and external consultants to ensure consistency and quality in CAD-generated drawings.

The manual specifies technical requirements for software (primarily AutoCAD 2020), file management, drawing preparation, and submission standards. It outlines requirements for different drawing types across various disciplines, including plan views, sections, elevations, details, and schedules. MARTA retains ownership of all digital model contents and requires precise adherence to its established standards. The document includes quality control provisions, backup and archiving protocols, and closeout requirements for project drawings. Consultants must follow specific guidelines for electronic file submission, including creating PDF, DWG, and TIF images with a one-to-one ratio for each drawing sheet, and ensuring files are error-free through standard checking tools.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Metropolitan Atlanta Rapid Transit Authority

CRITERIA FOR DRAWINGS

STANDARDS

CAD MANUAL

Prepared By: Department of Infrastructure & Department of Safety and Quality Assurance

Date: October 2021

DocuSign Envelope ID: 2E3654C0-E18E-4244-BF59-E26F67535299

Preface

This 2021 updated Criteria for Drawings Standards Manual establishes the Computer Aided

Design (CAD) Standards used by the Metropolitan Atlanta Rapid Transit Authority (MARTA) and was developed to establish policies and procedures, create uniformity and to assist internal and external users of CAD for all work produced for MARTA. This manual is an integral component of drawings and design management for MARTA and replaces all previous versions and is neither a textbook nor a substitute for engineering or drafting knowledge, experience, or judgment. The intent of this manual is to provide guidelines that, if followed, will result in better quality and consistency for electronic plans and documents. The Criteria for Drawings Standards

Manual are for reference only and provided on an “as is” basis. The material is without liability of any kind to the Authority. The standards and procedures provided herein, are based on AutoCAD

Release 2020 and other software used by the Authority. This manual reflects the cross collaboration with Capital Programs, Expansion & Innovation and the Department of Safety and

Quality Assurance.

These standards are neither static nor all-inclusive and thus updates will be made as needed due to any errors found in the manual, new programs, changes in software, software enhancements, or as policy and management dictate.

Every effort has been made to ensure that the manual and information contained herein is as complete and accurate as possible. Suggestions for improvements are strongly encouraged so that subsequent updates will reflect the input and needs of CAD users. Recommendations or suggestions should be sent to MARTA’s Department of Capital Programs, Expansion, and

Innovation and/or the Department of Safety and Quality Assurance at: EngSup@itsmarta.com

Disclaimer:

If upon review of drawings submitted to the Infrastructure Business Unit or the Configuration

Management Business Unit; it is found that the electronic data does not meet these

Guidelines; the Departments shall reserve the right to reject all plans.

mailto:EngSup@itsmarta.com

MARTA Criteria for Drawings Standards Manual 2021 Revision 5 Page 3 of 95

ISSUING

DEPARTMENTS:

Department of Infrastructure

Department of Safety and Quality Assurance

PREPARED BY: Criteria for Drawings Project Team

APPROVED BY:

Ric Edmonds Manager of Configuration Management

Signature Date

Booker Gray Manager of CAD

Gena Majors Deputy Chief of Safety and Quality Assurance

Larry Prescott Assistant General Manager Infrastructure

10/12/2021

10/13/2021

10/20/2021

10/21/2021

MARTA Criteria for Drawings Standards Manual 2021 Revision 5 Page 4 of 95

Document Review and Revision History

Revision Description Date

0-3 General Engineering Consultants Revisions Unknown

4 MARTA controlled and revised October 2008

5 Updated to incorporate current best practices October 2021

The MARTA Criteria for Drawings Standards Manual is owned by the Metropolitan Atlanta Rapid

Transit Authority (MARTA) and will be reviewed during use and updated by MARTA periodically, or as necessary.

MARTA Criteria for Drawings Standards Manual, 2021 Revision 5 Page 5 of 95

TABLE OF CONTENTS

SECTION PAGE

1.0 INTRODUCTION…………………………………………………………………….…………. 13

2.0 POLICY

2.1 GENERAL

2.2 PURPOSE

2.3 RESPONSIBLE PARTIES

2.4 CHANGES/REVISIONS/DISCLAIMERS

2.5 REFERENCE STANDARDS

2.6 ACRONYMS

3.0 GENERAL DEFINITIONS…………………………………………………………………….…16

3.1 DRAWINGS DEFINITIONS

4.0 PROJECT STRUCTURAL

4.1. PROJECT INFORMATION

4.2 PROJECT ORGANIZATION

4.3 TOOL PALETTTES

4.4 DESIGN FILE NAMING CONVENTION

4.5 DESINATION CODES

4.6 DRAWING ORDER

4.7 PROJECT DRAWINGSDEX

4.8 INDEX ORGANIZATION

4.9 COVER SHEET

4.10 TITLE SHEET

4.11 EXISTING CONDITIONS

4.12 GENERAL CAD SOFTWARE

5.0 CAD SHEET SET MANAGEMENT

5.1 GENERAL

5.2 PROJECT AND DRAWING SETUP

5.3 INDEX OF DRAWINGS MODIFICATIONS

MARTA Criteria for Drawings Standards Manual, 2021 Revision 5 Page 6 of 95

6.0 DRAWING CONVENTIONS

6.1 HAND DRAFTING

6.2 MODEL SPACE / PAPER SPACE

6.3 XREFERENCE

6.4 COORDINATES AND USER COORDINATE SYSTEM (UCS)

6.5 TITLE BLOCK DESCRIPTION AND PAPER SIZE PARAMETERS

6.6 TEXT STYLES

6.7 LINE STYLES (including LINE WEIGHT)

6.8 VISUAL / OUTPUT EXAMPLES

6.9 UNIT OF MEASURE - DIMENSIONS

6.10 SCALE

6.11 ABBREVIATIONS AND GRAPHIC SYMBOLS

6.12 DRAWING TITLES

7.0 PLOTTING AND PRINTING

8.0 SECTION, DETAIL AND ELEVATION DESIGNATION

8.1 TRANSIT LINE SECTIONS

8.2 ENGINEERING AND ARCHITECTURAL SECTIONS

8.3 ENGINEERING AND ARCHITECTURAL ELEVATIONS

9.0 PROJECT CYCLE

9.1 GENERAL INFORMATION

9.2 CAD PRODUCED DRAWINGS

9.3 STANDARD DRAWINGS

9.4 REVISIONS DURING ADVERTISING

9.5 REVISIONS AFTER AWARD

9.6 OTHER PROJECT DRAWINGS

9.7 DIRECTIVE DRAWINGS

9.8 REVISION BLOCK

9.9 DRAWING NUMBER BLOCK

9.10 CONFORMED DRAWINGS

MARTA Criteria for Drawings Standards Manual, 2021 Revision 5 Page 7 of 95

9.11 AS-BUILT DRAWINGS

9.12 EXCLUSIONS

9.13 TITLE BLOCK REVISIONS

9.14 CONTRACT MANAGEMENT AT RISK (CMAR) CONTRACT GUIDELINES…

10.0 GENERAL PROJECT DRAWINGS

10.1 CIVIL DRAWINGS

10.1.1 ORGANIZATION………………………………………………………………………..53

10.1.2 ABBREVIATIONS, SYMBOLS AND CIVIL GENERAL NOTES……………………54

10.1.3 PRIMARY MONUMENT CONTROL………………………………………………….54

10.1.4 SITE PLAN………………………………………………………………………………54

10.1.5 TYPICAL SECTIONS……………………………………………………….…………..54

10.1.6 CONSTRUCTION SEQUENCE PLAN…………………………………………………54

10.1.7 PLAN AND PROFILE…………………………………………………………………...54

10.1.8 PROFILES………………………………………………………………………………58

10.1.9 ALIGNMENT DATA……………………………………………………………………59

10.1.10 CONSTRUCTION LAYOUT PLAN…………………………………………………..59

10.1.11 GRADING, PAVING AND DRAINAGE PLAN……………………………………...59

10.1.12 SPECIAL DETAILS AND SECTIONS………………………………………………..60

10.1.13 STORM SEWER PROFILES AND DRAINAGE DETAILS………………………….61

10.1.14 CROSS SECTIONS…………………………………………………………………….61

10.1.15 TRAFFIC CONTROL PLANS………………………………………………………... 61

10.1.16 TRAFFIC SIGNS AND MARKINGS………………………………………………….62

10.1.17 TRAFFIC SIGNAL PLANS……………………………………………………………62

10.1.18 STANDARD DRAWINGS…………………………………………………………….62

10.1.19 OTHER STANDARDS………………………………………………………………...62

10.2 CIVIL DRAWINGS …………… …………………………………………………………62

10.2.1 ORGANIZATION……………………………………………………………………….62

10.2.2 UTILITIES ABBREVIATIONS, SYMBOLS AND GENERAL NOTES……………...62

10.2.3 COMPOSITE PLAN OF EXISTING UTILITIES…………………………………..… 62

MARTA Criteria for Drawings Standards Manual, 2021 Revision 5 Page 8 of 95

10.2.4 JOB SPECIFIC GENERAL NOTES

10.2.5 COMPOSITE PLAN OF UTILITIES REARRANGEMENTS

10.2.6 PROFILES AND DETAILS

10.2.7 MES PLAN AND PROFILES AND DETAILS

10.2.8 STANDARD DRAWINGS

10.3 TRACKWORK DRAWINGS

10.3.1 ORGANIZATION

10.3.2 ABBREVIATIONS, SYMBOLS AND GENERAL NOTES

10.3.3 SITE PLANS

10.3.4 TRACK CHARTS

10.3.5 TYPICAL SECTIONS

10.3.6 ALIGNMENT CONTROL PLANS

10.3.7 VERTICAL ALIGNMENT PLANS

10.3.8 SPECIAL TRACKWORK

10.3.9 DETAILS

10.3.10 TRACKWORK STANDARDS

10.3.11 TRACTION POWER

10.3.12 WAYSIDE SIGNS

10.3.13 STANDARD DRAWINGS

10.3.14 REFERENCE DRAWINGS

10.3.15 INFORMATION DRAWINGS

10.4 ARCHITECTURAL DRAWINGS

10.4.1 GENERAL

10.4.2 ORGANIZATION

10.4.3 ARCHITECTURAL DRAWING CONVENTIONS

10.4.4 FLOOR PLANS

10.4.5 REFLECTED CEILING PLANS

10.4.6 ROOF PLANS

10.4.7 BUILDING SECTIONS

MARTA Criteria for Drawings Standards Manual, 2021 Revision 5 Page 9 of 95

10.4.8 ELEVATIONS

10.4.9 RENDITION OF VALUE AND CONTEXT

10.4.10 GRAPHIC SYMBOLS AND LETTERING

10.4.11 DOOR SCHEDULE AND FINISH SCHEDULES

10.4.12 SCALES

10.5 LANDSCAPING DRAWINGS

10.5.1 ORGANIZATION

10.6 STRUCTURAL DRAWINGS

10.6.1 GENERAL

10.6.2 ORGANIZATION

10.6.3 STRUCTURAL NOTES

10.6.4 SCHEDULE OF SPECIAL INSPECTIONS

10.6.5 SOIL BORING PLAN AND SOIL BORING LOGS

10.6.6 CONSTRUCTION STRUCTURES

10.6.7 UNDERPINNING AND PROTECTION

10.6.8 GENERAL STRUCTURAL ARRANGEMENT

10.6.9 AERIAL AND SUBWAY STRUCTURE CONTROL SCHEDULES

10.6.10 STRUCTURAL PLANS

10.6.11 STRUCTURAL ELEVATIONS, SECTIONS AND DETAILS

10.6.12 STRUCTURAL STEEL FRAMING PLANS

10.6.13 STRUCTURAL STEEL SCHEDULE AND DETAILS

10.6.14 APPURTENANT STRUCTURES

10.6.15 SPECIAL STRUCTURES

10.6.16 MISCELLANEOUS IRON AND STEEL

10.6.17 STANDARD STRUCTURAL DRAWINGS

10.7 MECHANICAL DRAWINGS

10.7.1 GENERAL

10.7.2 ORGANIZATION

10.7.3 MECHANICAL ABBREVIATIONS, SYMBOLS AND GENERAL NOTES

MARTA Criteria for Drawings Standards Manual, 2021 Revision 5 Page 10 of 95

10.7.4 HVAC PLANS

10.7.5 HVAC SECTIONS

10.7.6 HVAC DETAILS

10.7.7 HVAC EQUIPMENT SCHEDULES

10.7.8 HVAC CONTROL DRAWINGS

10.7.9 PLUMBING PLANS

10.7.10 PLUMBING SECTIONS

10.7.11 PLUMBING RISER DIAGRAMS

10.7.12 PLUMBING DETAILS

10.7.13 PLUMBING EQUIPMENT AND FIXTURES SCHEDULES

10.7.14 MAINTENANCE EQUIPMENT PLANS

10.7.15 MAINTENANCE EQUIPMENT SECTIONS

10.7.16 MAINTENANCE EQUIPMENT DETAILS

10.7.17 MAINTENANCE EQUIPMENT SCHEDULES

10.8 ELECTRICAL DRAWINGS

10.8.1 GENERAL

10.8.2 ORGANIZATION

10.8.3 ELECTRICAL STANDARD SYMBOLS

10.8.4 WAYSIDE SYSTEM WIDE DRAWINGS

10.8.5 DETAIL DRAWINGS

10.8.6 CONDUIT, MECH EQUIP CONNECTION & CABLE SCHEDULES

10.8.7 PANEL BOARD SCHEDULES

10.8.8 SITE LIGHTING PLANS AND DETAILS

10.8.9 LIGHT FIXTURE SCHEDULES

10.8.10 STANDARD DRAWINGS

10.9 COMMUNICATION DRAWINGS

10.9.1 GENERAL

10.9.2 ORGANIZATION

MARTA Criteria for Drawings Standards Manual, 2021 Revision 5 Page 11 of 95

10.9.3 COMUNICATION STANDARD SYMBOLS

10.9.4 WAYSIDE SYSTEMWIDE DRAWING

10.9.5 DETAIL DRAWINGS

10.9.6 CONDUIT SCHEDULE

10.9.7 CCTV SCHEDULE

10.9.8 NETWORK SWITCH CABLE

10.9.9 STANDARD DRAWINGS

10.10 FIRE PROTECTION8 DRAWINGS

10.10.1 GENERAL

10.10.2 ORGANIZATION

10.10.3 FIRE PROTECTION ABBREVIATIONS, SYMBOLS, & GENERAL NOTES

10.10.4 FIRE ALARM PLANS

10.10.5 FIRE ALARM SECTIONS

10.10.6 FIRE ALARM DETAILS

10.10.7 FIRE ALARM RISERS & SEOUENCE OF OPERATIONS

10.10.8 CONDUIT SCHEDULE

10.10.9 STANDARD DRAWINGS

10.10.10 FIRE SUPPRESSION PLANS

10.10.11 FIRE SUPPRESSION SECTION

10.10.12 FIRE SUPPRESSION DETAILS

10.10.13 CLEAN AGENT PLANS

10.10.14 CLEAN AGENT ISOMETRIC

10.10.15 EQUIPMENT SCHEDULES

10.11 BUILDING INFORMATION MODELING (BIM) DRAWINGS

10.11.1 SOFTWARE REQUIREMENTS

10.11.2 MODEL OWNERSHIP

11.0 QUALITY CONTROL

12.0 BACKUP & ARCHIVING

MARTA Criteria for Drawings Standards Manual, 2021 Revision 5 Page 12 of 95

13.0 CLOSEOUT REQUIREMENTS

14.0 USER APPENDIX

15.0 LIST OF FIGURES

16.0 LIST OF TABLES

MARTA Criteria for Drawings Standards Manual, 2021 Revision 5 Page 13 of 95

1.0 INTRODUCTION

In an ongoing endeavor to keep pace with changing technology, we are pleased to introduce the fifth (5th) edition of the Criteria for Drawings Standards Manual for the

Metropolitan Atlanta Rapid Transit Authority (MARTA). The MARTA Computer

Aided Drafting (CAD) Standards Manual establishes requirements and procedures for the preparation and submission of CAD based drawings throughout the project life cycle. Adherence to these standards ensures that both MARTA internal staff and consultants receive and produce graphic and tabular data in a consistent and acceptable format. This consistency will improve the compatibility of drawings internally and the efficient exchange of data between MARTA consultants, and client agencies.

A concerted effort has been made to not only simplify the standards, but to also reinforce the requirements in areas critical to our goals. This manual is a guide for consultants performing, or desiring to perform, engineering design and/or drafting services for

MARTA. Guidelines and examples presented in this manual will help consultants produce drawings that are consistent with the format, appearance, and professional standard set by MARTA and in accordance with the requirements of the contract. The goal of this manual is to enhance the standardization of CAD drawings and digital files, while reaffirming compliance with the latest National CAD Standard published by the

National Institute of Building Sciences. This Standard will serve as a foundation for information sharing and enhanced coordination between MARTA, the designer, engineer, contractors, and owner.

This manual should not be considered a substitute for good communication between the team members involved. Effective communication between the consultant’s staff and the Authority’s Project Manager, Project Engineer, CAD/Configuration Managers, and other project team members, will help ensure production of concise, accurate, and complete drawings – on schedule.

The greatest return for CAD and related technology is in the reuse of the digital data for facilities management and as a foundation for future projects. The Criteria for Drawings

Standards Manual remains a dynamic tool that will continue to evolve as we move forward with new and existing design modifications.

Any deviation from this Criteria format must be submitted in writing to MARTA for approval.

MARTA Criteria for Drawings Standards Manual, 2021 Revision 5 Page 14 of 95

2.0 POLICY

The production of digital files by a CAD resource is an important Authority asset. It is the policy of the Metropolitan Atlanta Rapid Transit Authority (MARTA) that CAD Standards and procedures are followed and used by Architects/Engineers (A/E's), vendors and contractors in the creation and delivery of CAD drawings to MARTA. The material presented in this manual must be referred to frequently to ensure that the intended results are obtained.

2.1 GENERAL

MARTA is committed to improving the quality of project delivery through CAD and

Building Information Modeling (BIM) Technology where applicable. Prior to initiating any drawing production work, the Project Manager will schedule a meeting with the vendor/consultant to discuss the specifics of the project, including the Authority’s drawing standards and drawing preparation process. It is recognized that some work performed for the Authority may need to be submitted to other governmental agencies. Those submittals will need to conform to both the Authority’s standards and the agencies’ standards. Where standards conflict, consultants must work with the Project Manager to determine the best course of action to reconcile the conflict. The Authority’s goal is for the Project Team to produce the desired product within scope, schedule, and budget. Consequently, the consultant is always encouraged to contact the Project Manager, or CAD/Configuration

Manager when questions arise, or when clarification or direction is needed, no matter how small the issue.

2.2 PURPOSE

The purpose of this Manual, MARTA BIM User Guide (2016), and the Issued Technical

Document Procedure (CPD-PR-1000) is to standardize drawing information and improve electronic data sharing between disciplines at MARTA and from consultants working for

MARTA.

These criteria establish, define, and clarify procedures and standards to be used for

Metropolitan Atlanta Rapid Transit Authority drawings. The intent of these criteria is to ensure that drawings have a uniform appearance and reflect high quality workmanship.

Drawings shall be prepared in such a manner to depict clearly, and illustrate information when drawings are reduced to half size. Currently, MARTA utilizes 2D drawing formats for procurement of design and/or construction services.

2.3 RESPONSIBLE PARTIES

Project Managers, Engineers, Architects, CAD Technicians, Vendors and Consultants are responsible for ensuring that these criteria are implemented, and drawings show and reflect the information completely and clearly, and without unnecessary embellishment.

MARTA Criteria for Drawings Standards Manual, 2021 Revision 5 Page 15 of 95

These standards do not exempt the professional from performing responsible engineering, surveying, and mapping or architecture. The policies and procedures of the requisite departments at MARTA and best practices take precedence when providing professional services for MARTA. The professional has the final responsibility for the accuracy of all input and output of CAD applications.

2.4 CHANGES/REVISIONS/DISCLAIMERS

Electronic data furnished to MARTA shall use the appropriate naming convention and format for the type of data to be transmitted. It is especially important to clearly communicate what is being transmitted and to describe the format of the transmitted files.

Any file submitted that deviates from the Criteria format must have prior documented approval from MARTA. The change request must be submitted in writing and presented to MARTA CAD & Configuration Management for consideration and approval.

2.5 REFERENCE STANDARDS

The MARTA CAD Standards Manual largely reflects the National CAD Standards, Version 6. In the case of differences between the two Standards, the MARTA CAD

Standards Manual is considered definitive for MARTA projects. The role of an individual assigned to the project determines the level of understanding required of the CAD

Standards. For CAD technicians, designers, and managers, a thorough knowledge of CAD related elements associated with a project is crucial. The Project Manager however is only required to have a general knowledge of CAD Standards and how CAD is used to create and deliver a project.

Both levels of knowledge will be possible using this manual. The CAD system adopted by

MARTA is Autodesk AutoCAD format. All deliverables must be compatible with this format. Throughout this manual terminology and references will be made that are unique to this Autodesk application.

2.6 ACRONYMS

Throughout this manual, the following prescriptive language is intended:

If the word “shall” is used, the described action or policy is a requirement of internal and consultant designers. If the word “should” is used, the described action or policy is recommended as best practice. The designer is strongly encouraged to use the described action or policy, but substitutes will be accepted if the spirit of the requirement is achieved.

If the word “may” is used, the described action or policy has been found to produce a satisfactory result. An action described as “may” will sometimes appear in this manual to accompany a “should” declaration. In this case, either described action is considered equally valid.

MARTA Criteria for Drawings Standards Manual, 2021 Revision 5 Page 16 of 95

3.0 GENERAL DEFINITIONS

TERM DEFINITION

Addendum (Addenda) Written or graphic instruments issued during the bidding period, which modify or interpret the bidding documents, including drawings and specifications, by additions, deletions, clarifications, or corrections. As such, addenda become part of the contract documents when the construction contract is awarded.

Architect A person who engages in the profession of creating the design and plans of buildings, bridges and other structures and advises in their construction.

AutoCAD file Any electronic file with the DWG extension that was created inside of the AutoCAD software package.

CAD Computer Aided Design, the tools utilized for the preparation of designs and drawings.

CADD Computer Aided Design and Drafting-is a subfield of engineering which deals with the design and drafting of objects and materials using specialized software.

CAD Deliverables An electronic representation of drawings required at the initial

Design, Review Submittal, Construction Document Submittal, Bid Documents Submittal, and Record Drawings in compliance with CAD Guidelines and Drawing Submittals contained in the packet.

CAD Manager A person who is responsible for establishing and maintaining the

CAD application software including CAD libraries and procedures for each discipline.

CAD Technician A person who prepares the original drawings or makes changes to the drawings utilizing computer aided drafting software.

Change Order A written order to the contractor, issued after the execution of the contract, authorizing an approved change in the work.

Checker A person, usually a Senior Architect or Senior Engineer, who thoroughly and independently retraces the designer’s process to ensure its adequacy and propriety and who verifies that the drawings and specifications resulting from those processes correctly reflect the Architect or Engineer’s intent.

Configuration Management

(CM)

A business unit within MARTA that manages the master data set of engineering drawings and information relative to MARTA’s infrastructure assets.

Configuration Management

Manager

A person who is responsible for managing the master data set of engineering drawings and associated documents and information relative to MARTA’s infrastructure assets.

MARTA Criteria for Drawings Standards Manual, 2021 Revision 5 Page 17 of 95

Contract Number Number assigned to an individual construction project by

MARTA and used in the administration of contracts with the construction contractor.

Design Office The office that prepares drawings.

TERM DEFINITION

Engineer A person who has scientific training who designs, builds, or maintains structures, buildings, machines, systems, and products.

Frame A subassembly file containing the drawing titles and border. This item is in paper space at the insertion point of 0,0.

MARTA Metropolitan Atlanta Rapid Transit Authority.

“May” The described action or policy produces a satisfactory result.

Model Space One of two primary spaces where AutoCAD objects reside.

Typically, geometric models are placed in this 3D coordinate space.

Paper Space The AutoCAD state for creating a finished layout for printing or plotting (output), opposed to doing drafting or design work.

Space generally allocated for dimension lines, text, and notes.

Production Drawing The plotted contract document prepared as a standalone detail drawing or a drawing assembled from Xreference (External Reference XREF) files.

Project Manager Responsible party for coordinating the work of disciplines and design firms involved in preparation of drawings and specifications.

Project Number Unique number assigned to an individual project and used for administrative activities such as labor charges and the indexing of drawings and specifications.

Record Drawings Every project drawing shall depict construction features including changes made during the construction process and buried and concealed utilities accurately located, as required by the State of

Georgia Standard General Conditions. Contract Changes and

Designer modifications shall be incorporated in the Record Drawings.

Reference Manager An additional Autodesk AutoCAD resource not widely used. CAD

Managers should use this tool to verify compliance to this manual.

It is used by MARTA for that purpose.

“Shall” An emphatic form of the verb that is used whenever a requirement is intended to express a provision that is binding and mandatory.

SSM Sheet Set Manager.

“Should” An expression of strong recommendation of a nonmandatory provision.

Temporary Drawing File A miscellaneous block and/or sketch drawing file not submitted as or contained in a contract document. The file shall be removed from directories before submittal for final archiving.

MARTA Criteria for Drawings Standards Manual, 2021 Revision 5 Page 18 of 95

3.1 DRAWINGS DEFINITIONS

User Coordinate System

(UCS)

A user defined coordinate system that defines the orientation of objects in three-dimensional space. This is required to correctly arrange the lines of any design file in a 0 / 90-axis orientation of the facility or building.

DRAWINGS DEFINITION

As Built Project Drawings modified to reflect the constructed or delivered asset.

Conceptual The scope of work for more refined design efforts.

Conformed Project Drawings modified to reflect revisions by addendum to the bid documents.

Directive Defining the general arrangement or configuration of facilities. They are for the guidance of the Design Office and may not be used as Project Drawings. Technical information can be reproduced as part of Project Drawings.

Information Presented to the contractor for information purposes.

Project Presented to the contractor.

Project Definition The basis for the design of project drawings.

Preliminary Usually prepared during the design phase of the project that mathematically defines the designs presented in the Project

Definition Drawings.

Presentation Prepared to present certain aspects of the project in artistic perspective including renderings, plans, profiles, sections, elevations, and boards of materials.

Red Line One of several means used to convey the information necessary for the preparation of a project drawing from the

Architect/Engineer to CAD Technician.

Reference Presented to the contractor for reference purposes.

Route Location Drawings prepared to define the generalized corridors for future design efforts.

Standard Repetitive facility documents which may be used throughout the MARTA System. Standard Drawings may be used as

Project Drawings. If a modification to a standard drawing is required to fit specific requirements of the project, the

Design Office will prepare a separate drawing to reflect those requirements.

MARTA Criteria for Drawings Standards Manual, 2021 Revision 5 Page 19 of 95

4.0 PROJECT STRUCTURAL

4.1. PROJECT INFORMATION

PRELIMINARY DESIGN

MARTA will coordinate the activities of groups, which are responsible for route location, control surveys, right-of-way acquisition, and utilities relocation insofar as those activities pertain to the Preliminary Design. Those responsible for control surveys will prepare photogrammetric manuscripts in strip form (strip maps).

MARTA will provide this information to the Design Office.

DETAILED DESIGN

For most projects, MARTA will make available to the Design Office, the information defined below. This information may be in hard copy or electronic format. The Design

Office is responsible for converting information provided by MARTA into a format utilized for design production and for converting all information developed during design to the original MARTA format.

a. Strip Maps-The strip maps will show the preliminary horizontal alignment, control points, grid coordinates, control ties, existing topography, and right-of-way limits in the design area, usually at a scale of 1” = 50’.

b. Strip Profiles-The strip profiles will show the preliminary vertical alignment, control elevations, and the ground profile in the design area, usually at a scale of 1” = 50’ horizontal and 1” = 10’ vertical.

c. Sections-Typical sections of the MARTA trackway, at-grade, subway, and aerial, and of each proposed roadway should be prepared. Typical cross sections based on the preliminary alignment will be shown in enough detail to prepare earthwork quantities and to show critical locations.

d. Record of Utilities- A record of all known utilities will be provided. In critical portions of the design area, these utilities will be shown on strip maps and/or strip profiles.

e. Soils Report- A preliminary and/or final soils report will give subsurface information in the design area and show location of borings and boring logs.

f. Recommendations- Recommendations for final route location, design speed and expected super elevation, utility relocation, etc., will be presented in a preliminary design report.

Standard Abbreviations, Symbols and General Notes

The standard nomenclature, which will be used on the

MARTA System. These drawing (s) shall be the first drawing (s) of each design discipline. Additional symbols and/or general notes may be added to these drawing(s), provided they are approved by MARTA.

MARTA Criteria for Drawings Standards Manual-2021 Revision 5 Page 20 of 95

4.2 PROJECT ORGANIZATION

PROJECT DIRECTORY STRUCTURE

1. The CAD Manager or the Manager of Configuration Management will be responsible for establishing and maintaining a rigid directory structure for each project submitted using CAD and/or design analysis software. This directory structure will facilitate:

a. The centralized backup, archiving and retrieval of Project data.

b. The controlled access to Project data.

c. The ability to share data among all Project disciplines.

2. The Project Number is the basis for storage and retrieval of all data. It is very important to assign a legitimate number to the project prior to initiating any CAD work. This number may be the Contract Number, the Project Number, or the Design Work Order

Number. The assigned number should be retained for the duration of the project; any modification to this number should be documented. Figure 12.1 defines the standard directory tree that should be used as the basis for establishing project specific directories. Each project directory is further divided into four (4) top-level directories:

a. The DES or Design is divided into disciplines specific subdirectory for the storage of all discipline specific model or design files that will be shared or referenced by other disciplines.

b. The DRA or Drawing directory will be used to store all contracts and exhibit drawings indexed by specific disciplines. Printing/plotting of signed and sealed deliverable (s).

c. The DOC or document directory will be used to store all documents such as pertinent calculations, correspondences, and spreadsheets.

d. The IMG folder will be used to store Reference Drawings to support and clarify the contract drawings design. These are contract archive image files that will be attached to drawing files. Reference images and drawings will be located in the same folder with the same file name. (ex. AR001.dwg and AR001.tif). All

Reference drawings shall be cataloged by subfolders using their original contract numbers. Refer to CAD and Configuration Management for process and procedure. When Reference drawings apply to a contract the Caveat should be thawed on the title sheet. Reference drawings are supplemental/As-Built drawings provided to support the contract documents.

e. The PLT or document directory will be used to store static plot/print files at the project milestones. Create a TIF and PDF subdirectories, as these are required project deliverables..

*CAD Manager: The folder structure shown on Figure 5-1 shall be followed. MARTA will provide baselines for most infrastructure facilities. This structure is to ensure conformity to our products. Additionally, DES is for design, DRA is for output.

MARTA Criteria for Drawings Standards Manual-2021 Revision 5 Page 21 of 95

MARTA Criteria for Drawings Standards Manual-2021 Revision 5 Page 22 of 95

4.3 TOOL PALETTES (SYMBOLS, LAYERS AND OTHER RESOURCES)

MARTA will provide users with a digital collection of symbols, layers, and a design file naming application, with access via AutoCAD tool palettes. Symbols and layers should not be modified unless approved by MARTA. Any symbols not provided by MARTA should conform to industry standards and be submitted to the Authority for approval.

Users can access the data (including tool palette ATC file) via SharePoint download or via

MARTA’s designated information sharing system. The symbols and layers are displayed in individual folders by discipline.

User folder path ….\MARTA-Tools\Toolpalette:

Follow these steps to set up the tool palette with ATC file:

1. Create a duplicate of the existing AutoCAD.arg profile and rename it to

MARTA. Do not overwrite the existing profile. The goal is to maintain all paths, excluding the ones listed below. This method allows printing and other necessary settings required to work in the current environment to be maintained. Switch between the two profiles as needed.

2. Re-path the “Tool Palettes File Locations” to C:\MARTA-Tools\Toolpalette.

3. Re-path “Action Recording File Locations” to C:\MARTA-

Tools\Toolpalette\MACROS.

4. Import the new macros by typing “ACTMANAGER” into the command line.

Once the GUI opens, close it.

5. Open tool palettes.

4.4 DESIGN FILE NAMING CONVENTION

File management refers to how documents are organized and stored. Its primary purpose is to provide a safe repository for information and to minimize the possibility of information being lost.

The efficient sharing and transfer of information from consultants/contractors to MARTA and vice versa relies on the use of a systematic file naming convention. To avoid conflicting attachment of reference files, there will be no duplicate file names within the project directory structure or copies of the same file within the project directory. It is not permissible to copy the same basemap design files into multiple discipline specific sub-directories. MARTA provides a drop down, design file naming resource tool, inside

Microsoft Excel which can be accessed via SharePoint download or via MARTA’s designated information sharing system. The naming format consist of 5 sets of abbreviations separated by a dash. The sets of abbreviations designate the Engineering discipline, Location, Floor level, Plan type and Contract number.

MARTA Criteria for Drawings Standards Manual-2021 Revision 5 Page 23 of 95

File Naming Convention

Figure 4.4-1

MARTA Criteria for Drawings Standards Manual-2021 Revision 5 Page 24 of 95

4.5 DESIGNATION CODES

1 The two-character codes may be prefixed with a single character to indicate the level of design where:

R = Route Location J = Project Definition D = Demolition

C = Conceptual P = Preliminary Design

Drawings Designation Codes

Table 4.5-1

MARTA Criteria for Drawings Standards Manual-2021 Revision 5 Page 25 of 95

4.6 DRAWING ORDER

All drawings shall be categorized by design discipline in the following order:

a. Civil

b. Trackwork

c. At-Grade Standards

d. Utilities

e. Architectural

f. Architectural Standards

g. Landscaping

h. Structural

i. Mechanical

j. Electrical

k. Communications

l. Fire Protection

m. Reference Drawings

All drawings shall be indexed. Title shall be the same as shown in the title block of each drawing.

4.7 PROJECT DRAWINGS

General Project Drawings (GP) will be arranged first in project sequence and will be followed by all other subsets.

4.8 INDEX ORGANIZATION

a. Cover Sheet

b. Title Sheet

c. Index of Drawings

d. Existing Plans

4.9 COVER SHEET

MARTA will provide the cover sheet in the appropriate format to include the following:

a. Project Title

b. Project Number

c. Date (Month and Year) of submittal

d. Name of Vendor / Contractor

4.10 TITLE SHEET

MARTA will provide the title sheet in the appropriate format to include the following:

a. Project Title

b. General Construction Site Plan

c. Key Map

d. Caveat

e. Title and Signature Blocks for:

i. MARTA

ii. Vendor / Contractor

MARTA Criteria for Drawings Standards Manual-2021 Revision 5 Page 26 of 95

4.11 EXISTING CONDITIONS PLAN

The existing condition plans shall be drawn at a scale of 1” = 50’ and shall be prepared from the strip maps and/or from survey data supplied by MARTA. Data shown on strip maps shall be verified by ground survey at locations where proposed facilities match existing conditions and at other locations to ensure that elevations and dimensions required to prepare the design are shown correctly.

Specific information to be shown includes:

a. Centerline of “R” and “L” track.

b. Centerline stationing of “R” track and station equations at the beginning and end of the Project.

c. Existing contours and spot elevations.

d. Existing buildings, streets, sidewalks, retaining walls, fences, special features and limits of wooded areas. When requested by MARTA, show individual trees.

e. Existing property/right-of-way lines and MARTA provided parcel numbers.

f. Names of buildings and streets.

g. Buildings to be demolished.

h. Limits of flood plains or flood prone areas.

4.12 GENERAL CAD SOFTWARE

The CAD software of record for MARTA is Autodesk AutoCAD. All official project drawings shall be provided in Autodesk's AutoCAD software. The version used shall be compatible with MARTA's version without any additional refinements either manually or electronically once transmitted.

The Criteria requires every plotted drawing sheet to have its own separate electronic drawing file. The Authority uses several additional drafting and design tools to accomplish its goals. All Close Out documents are to be delivered to the MARTA Configuration

Management business unit in Autodesk’s AutoCAD file format.

5.0 CAD SHEET SET MANAGEMENT TOOL

5.1 GENERAL

Autodesk Sheet Set Manager (SSM), drawing management tool, promotes efficiency, through organizing drawings in a logical manner. For example, controlling the specific text in drawings, such as Project Name, Sheet Title and Sheet Number, all from one location, with information displayed on the drawing’s files.

MARTA Criteria for Drawings Standards Manual-2021 Revision 5 Page 27 of 95

Project information is linked by multiple attributes into the Title Block through Sheet Set

Manager (SSM). The attributes must be populated using SSM. Double clicking on the object and editing the block in-place, per normal CAD editing processes breaks the link.

Thus, information will not update when this occurs. The standard list of attributes noted below, shall be controlled by through SSM.

Sheet Set Properties - AutoCAD Screen Shot

Figure 5.1-1

Sheet Set Properties - AutoCAD Screen Shot

Figure 5.1-2

The Sheet Set Manager template will be provided by MARTA CAD Management. It will assist in providing efficiency and will aid in ensuring the successful transfer of drawing files to MARTA Configuration Management. Users can access the data (including tool palette ATC file) via SharePoint download or via MARTA’s designated information sharing system.

MARTA Criteria for Drawings Standards Manual-2021 Revision 5 Page 28 of 95

Cover Sheet (COVER.dwg)

AutoCAD Screen Shot

Figure 5.1-3

Title Sheet (GP001.dwg)

MARTA Criteria for Drawings Standards Manual-2021 Revision 5 Page 29 of 95

Figure 5.1-4

Standard Title Block (TBLOCK.dwt)

MARTA Criteria for Drawings Standards Manual-2021 Revision 5 Page 30 of 95

Figure 5.1-5

Enlargement of Standard Title Block (TBLOCK.dwt)

Figure 5.1-6

For additional title block templates for Information, Reference and Standard drawings refer to the SharePoint download or via MARTA’s designated information sharing system.

MARTA Criteria for Drawings Standards Manual-2021 Revision 5 Page 31 of 95

5.2 PROJECT AND DRAWING SETUP

The Contract Number folder can then be copied to the network and changed per the direction below. NOTE: Maximum filename length with folder structure is 259 characters.

1. Copy the MARTA\Contract Number folder to your network location.

2. Rename the folder to Project Number (example) and open folder.

3. Rename the SSMTemplate.dst to the match (example B12345.dst).

4. Open AutoCAD and then open the .dst file using the Sheet Set Manager tool.

Edit in the Sheet Set Manager Custom Properties these fields:

a. CONTRACT NO

b. DATE (if known)

c. PROJECT TITLE LINE 1, LINE 2, and LINE 3 if required.

5. Open the drawings to ensure the drawing files are linked to the SSM properly.

5.3 INDEX OF DRAWINGS MODIFICATIONS

The drawing index is an automatic function when using the Sheet Set Management tool.

The “Insert Sheet List Table” function has been added and is a right click modification object. This Table should not be modified manually. A template drawing containing the table style “INDEX_TABLE” has been provided. See drawing GP002 in the DRA/GNP folder.

Figure 5.3-1

MARTA Criteria for Drawings Standards Manual-2021 Revision 5 Page 32 of 95

6.0 DRAWING CONVENTIONS

6.1 HAND DRAFTING

Pen or pencil hand generated drawings are only as accurate as the thickness of the instrument's point and the person using these tools. CAD-generated drawings, in contrast, are accurate.

It is the intent of these guidelines to use Computer Aided Drafting (CAD) methods to ensure conformity and consistency to MARTA’s products and services. In the instances where the Authority will accept hand-drafted deliverables, the product shall meet the guideline characteristics stated/shown in these Criteria. Thus, all lettering styles and sizes

(height and weight), symbols and their appearance, and line styles depicting existing elements (shown screened) and proposed elements (shown bold) shall duplicate all instances located within the Criteria for Drawings Manual. Any submittals not meeting the intent of these Criteria requirements are subject to rejection.

6.2 MODEL SPACE / PAPER SPACE

Drafting standards work in conjunction with AutoCAD. This is to ensure the uniform appearance and reproduction quality of CAD data presented on contract plan drawings, standard drawings, and advance the sharing of electronic information. CAD files shall conform to all aspects of this criterion. This includes files created by Photogrammetry, Survey, Architectural Design, Structures, ROW Mapping, Construction, and Geotechnical

Engineering, used to produce drawings information.

1. Design / Model Space- can be either 2D or 3D. A design model can also be used as a reference.

2. Sheet / Paper Space - usually 2D, this space is most commonly used to compose finished and annotated drawings. Drawing is limited to one layout tab. If you are unsure about layout tabs, please contact Engineering Support at

Engsup@itsmarta.com.

AutoCAD allows for the placement of data in a 3-D coordinate space known as Model

Space. Paper Space is an environment for creating finished layouts. Both 2-D and 3-D data can exist in Paper Space, but commands that render 3-D viewports are disabled.

The following guidelines will be used for placement of data on MARTA drawings:

1. Detail drawings–object lines and discipline specific symbols will be shown in

Model Space. Text, tags, call outs, titles, labels, dimensions, annotation, legends, scales, and viewports will be shown in Paper Space.

2. Schedule drawings–all text, tags, call outs, titles, labels, dimensions, annotation, legends, and viewports will be shown in Paper Space.

3. Single Line Diagram drawings – all text, tags, call outs, titles, labels, dimensions, annotation, legends, and viewports will be shown in Paper Space.

4. Section and Elevation drawings – object lines and discipline specific symbols will be shown in Model Space. Text, tags, call outs, titles, labels, dimensions, annotation, legends, scales, and viewports will be shown in Paper Space.

MARTA Criteria for Drawings Standards Manual-2021 Revision 5 Page 33 of 95

5. Plan drawings – all information, usually lines and symbols, including text that will be shared within a discipline or by other disciplines will be shown in model space at a 1:1 scale (a twenty-foot beam must be drawn at twenty feet of length).

Text, tags, call outs, titles, labels, dimensions, annotation, legends, key plans, scales, and viewports will be shown in Paper Space.

Ensure that lines join precisely at their ends. Do not allow them to overlap or fall short.

Lines that do not meet precisely will cause errors when other items that rely on the precision of intersections are created or inserted.

Model Space is for production work. All symbols, lines, and information, which will be externally referenced into other design files/drawings, need to be placed in model space.

The best practice is to leave information THAWED and ON. Utilizing the FREEZE layer control setting in Paper space viewports will control the visibility of the referenced drawing data in the final product. Rule of thumb: If it needs to be coordinated, it is to be modeled to the appropriate layer of detail required to help identify any conflicts.

6.3 XREFERENCE

The XREFERENCE and the OVERLAY command will be used to attach DES plan drawing information to the current drawing file in model space at the insertion point 0, 0.

All external references shall be placed on the XREF layer.

The element information drawn in the DES file shall be controlled by a layer. No element will be forced to a color on a DES file. This is best practice as it pertains to use of

Xreference file.

The visibility and color of the Xreference files can be controlled by setting VISRETAIN equal to 1. This command ensures that when the drawing is opened, all drawing settings are retained as was last saved, regardless of any changes in the Xreference background drawing.

6.4 COORDINATES AND USER COORDINATE SYSTEM (UCS)

Mapping for MARTA projects is typically defined by an adjustment of the State Plane

Coordinate System. North is normally aligned to the top of the drawing. Coordinate values are expressed in millions of feet (@ coordinate location of Five Points Station xy=2228000, 1365000). Drawings depicting transit facilities and buildings are typically oriented along an axis of the facility or building. AutoCAD allows the user to establish a local grid or UCS (User Coordinate System) for orienting drawings in this manner.

The creation of an UCS is explained below. Multiple UCS is allowed in each electronic file, thus no limitations on alignment.

1. Establish the new axis of the drawing by identifying a prominent feature on the background drawing (usually a column grid line).

2. Use the UCS command to specify the origin for the new UCS.

MARTA Criteria for Drawings Standards Manual-2021 Revision 5 Page 34 of 95

Name the UCS so that the preferred alignment can be reestablished as needed.

These parameters can be saved using the command UCS Save. Value should be given the same name, SITE.

6.5 TITLE BLOCK DESCRIPTION AND PAPER SIZE PARAMETERS

Route Location, Conceptual and Project Definition Drawings

All drawings included in these categories will be 22 inches by 72 inches and are subject to half size reduction.

Project Drawings

All Project Drawings will be 22 inches by 34 inches and are subject to half size reduction.

Other Drawings

Except for some special drawings, e.g., Record of Survey Maps, or where the size of the drawing is controlled by other agencies, all drawings will be 22 inches by 34 inches (ANSI Standard Size D) and are subject to half size reduction.

Figure 6.5-1

Date

1. The date to be shown on Project Drawings shall be the submittal date, normally provided by the Project Manager or Manager of CAD. The date shall be shown as follows:

09OCT20

2. The month shall be abbreviated by the first three letters and capitalized. Dates in the revision blocks shall have no spaces and be shown as follows:

10MAY20

Scale

1. The basic scale used on each drawing shall be noted in the title block. On a drawing where various scales are used, the scale box of the title block shall read “AS

NOTED”, and the scale of each view shall be shown directly below the title of the view. Scales shown in the drawing shall be in capital letters as indicated below.

MARTA Criteria for Drawings Standards Manual-2021 Revision 5 Page 35 of 95

2. The scale for a drawing or a drawing view shall be selected to ensure clarity of a print when it has been reduced to one-half the linear dimensions of the original drawing and to allow for reasonable space between views. Within a set of drawings compatible multiples shall be used wherever possible, e.g., 1/8”, 1/4”, 1/2”, 1” =

1’- 0” or 3/l6”, 3/8”, 3/4”, 1-1/2”, 3” = 1’- 0”.

3. If an elevation, section, or detail is shown schematically and it is not intended to specify the scale, the view shall be noted “NTS” under its title.

Graphic scales shall be shown on project or vicinity maps, unless otherwise directed in writing by the Manager of CAD or the Manager of Configuration Management.

Contract Proposal Number

The drawings shall be noted with a project number.

Drawing Number

Each Drawing Number shall be unique and composed of characters and numbers.

The first two characters shall identify the subject of the drawing by the codes identified in Table 4.4-1

Page Number

The Page Number defines the drawing in consecutive numerical order in the set of

Project Drawings. Page numbers shall be assigned for each milestone submittal.

The Cover Sheet page number shall always begin as page 00. The Title Sheet shall be Page No. 01 in each set of Project Drawings.

Design Change Notice Number

The Design Change Notice Number, normally assigned by the Project Manager, shall be shown on all drawings involved in the design revision as follows:

Half Size Reproduction Stamp

An area immediately above the drawing scale block has been reserved for placement of a half size reproduction stamp.

For Approved by, Designed, Drawn, Checked, In Charge, Professional Seal

See Department of Capital Programs and Developments Procedure:

CPD-PR-1000 Issued Technical Document dated February 2019 Revision 0.

Contractor Logos

The contractor and Subcontractor shall be displayed as shown on Auto CAD Screen Shot

Figure 6.5-1. The Contractor on the right and Subcontractor on the left.

MARTA Criteria for Drawings Standards Manual-2021 Revision 5 Page 36 of 95

6.6 TEXT STYLES

MARTA will provide the style fonts suitable for use with AutoCAD drawing files. Most text shall be type with the Shx Font:romans.shx and Big Font:special.shx.

AutoCAD Text Style Dialog Box Screen Shot

Figure 6.6-1

Font Style Sizes (romans.shx)

Table 6.6-1

Big Font Style (special.shx)

Figure 6.6-2

MARTA Criteria for Drawings Standards Manual-2021 Revision 5 Page 37 of 95

6.7 LINE STYLES (including LINE WEIGHT)

Various line styles and weights are typically used to differentiate between elements of objects and to focus attention on key elements within a drawing. Regardless of the line style or weight chosen, all elements must be clearly visible, and text must be easily read when the drawing is printed at its full size as well as when it is scaled for smaller printed formats. Screened or half-tone lines de-emphasize drawing elements. Backgrounds used by another discipline as a background in their drawing is an example. Screened lines in an elevation may represent a distant wing or an existing building.

MARTA will provide the line style suitable for use with AutoCAD drawing files. These elements are custom to MARTA and are preloaded in the .dwt files provided and are automatically set when layer file in imported into .dwg. Partial list shown below:

AutoCAD Line Style Dialog Box Screen Shot

Figure 6.7-1

MARTA Criteria for Drawings Standards Manual-2021 Revision 5 Page 38 of 95

6.8 VISUAL / OUTPUT EXAMPLES

Visual outputs were printed using MARTA provided CBT on 11x17 printer. Parameters:

CL140, Layer=Text., CO=2

Typed using Figure 6.6-2 requirements

Visual Outputs – AutoCAD Screen Shot

Figure 6.8-1

MARTA Criteria for Drawings Standards Manual-2021 Revision 5 Page 39 of 95

Visual outputs were printed using MARTA provided CTB file to PDF.

Visual Outputs – AutoCAD Screen Shot

Figure 6.8-2

6.9 UNIT OF MEASURE - DIMENSIONS

The appropriate unit of measure shall be defined on the drawings for all dimensions.

Indicate feet-and-inches dimension with feet and inch marks. Examples of dimensioning in feet-and-inches are as follows:

Overall dimension 600’-0”

Wall thickness 10”

When the decimal system is used for dimensions, elevations,…