1_ AE50620 Addendum 1.pdf

PDF 411 KB Posted

Attached to
AE50620 Final Design Services for the Campbellton Rapid Project
Solicitation number
PE-97100-NONST-2025-000000119
Issued by
Fulton County, Georgia

About this file

This document is Addendum 1 for a Request for Statement of Qualifications (AE50620) issued by the Metropolitan Atlanta Rapid Transit Authority (MARTA) for final design services of the Campbellton Bus Rapid Transit (BRT) project. The project involves professional architectural and engineering consulting services to advance corridor final design from 15-30% completion, spanning three segments: from Barge Road Park and Ride to Campbellton Road, a Transit Hub at Greenbriar Mall, and along Campbellton Road to the Oakland City Station. The Statement of Qualifications response deadline remains unchanged at April 24, 2025, at 2:00 P.M. local time, with the selected contractor expected to provide comprehensive design services including architectural and engineering design support, transit systems engineering, rendering, specifications, construction drawings, document management, design reviews, cost estimating, and value engineering review.

The scope of work requires the contractor to deliver design documents compliant with MARTA's current Architectural and Computer Aided Design and Drafting (CADD) standards, which can be accessed on MARTA's website. The project will rely on previously completed preliminary design work, and the selected contractor will be responsible for leading the design team and managing the progression of design documents from preliminary stages to 100% completion. While specific financial details are not elaborated in this addendum, the document indicates that more specific information about work orders will be negotiated with the selected contractor following the qualifications review process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

February 28, 2025

TO ALL PLAN HOLDERS

SUBJECT: ADDENDUM NUMBER 1

REQUEST FOR STATEMENT OF QUALIFICATIONS NUMBER AE50620

FINAL DESIGN SERVICES FOR THE CAMPBELLTON RAPID PROJECT

Transmitted herewith is Addendum Number 1 to the subject Statement of Qualifications. Please note that the deadline for receipt of Statement of Qualifications continues to remain unchanged as April 24, 2025 at 2:00 P.M. local time. The Request for Statement of Qualifications is hereby modified as follows:

1. Revisions to existing text are identified by a vertical line in the right margin of the line in which a revision occurs.

2. The pages replaced by this Addendum are identified by a number “A-1” in the top right corner of the replaced pages.

REVISED/MODIFIED PAGES

(i) Exhibit A: Scope of Work, Page 75

3. Acknowledge receipt of this Addendum in the space provided within the Request for

Statement of Qualifications (Form 2); failure to acknowledge receipt may subject the Proponent to disqualification.

METROPOLITAN ATLANTA RAPID TRANSIT AUTHORITY

Sincerely, Jacqueline Holland Senior Director of Contracts, Procurement and Material

JH/md

Attachment cc: File, AE50620 MARTA Website

Docusign Envelope ID: C9649382-8505-4B1D-8B4B-9EB8A037C06E

“A‐1”

P a g e 75 | AE50620 FINAL DESIGN SERVICES FOR THE CAMPBELLTON RAPID PROJECT

EXHIBIT A

SCOPE OF WORK

1.0. OVERVIEW:

The purpose of this Contract is to secure professional architectural and engineering consulting services for the Campbellton Bus Rapid Transit (BRT) project final design. Contractor shall lead the team as the prime design contractor and specifically manage the scope of services focused on advancing corridor final design (preliminary to 100% completion).

The proposed BRT alignment is broken into three (3) segments.

Segment 1 follows the 15% proposed alignment from the Barge Road Park and Ride to the Campbellton Road and Mt. Gilead Rd intersection.

Segment 2 is the 15% Transit Hub at Greenbriar Mall.

Segment 3 follows the 30% proposed alignment along Campbellton Road from Mt. Gilead Road to the MARTA Oakland City Station.

The following Scope of Work is intended to be a general outline of the work and not an all‐inclusive description of the professional and technical services that may be required to complete the project.

More specific information will be included in Work Orders negotiated with the selected Contractor.

1.1. PROJECT SCOPE OF SERVICES

The Contractor shall provide project management, final design, and permitting assistance in preparation for construction of the Campbellton BRT corridor. The Contractor will rely on previous work completed in the preliminary design process for the project.

The Contractor shall be required to provide Architectural and Engineering Facility and Systems Design Services which shall be delivered in accordance with MARTA's Design Criteria. Design documents must comply with MARTA’s most current Architectural and Computer Aided Design and Drafting ("CADD") standards manuals and criteria which may be found on MARTA’s website at itsmarta.com, click on “More”, then “Current Opportunities” in the following links: CADD Standards. and

Criteria‐for‐Drawings‐Standards‐CAD‐Manual. Services rendered by the Contractor shall include, but are not limited to, the following:

1. Architectural and Engineering Design Support Services.

2. Transit Systems and Engineering Design Support Services.

3. Rendering and animation of design.

4. Final design specification/ project manual.

5. Permittable Signed and Sealed Construction Drawings.

6. Document Configuration Management.

a. Document Control.

b. Quality Control.

7. Design Reviews.

8. Cost Estimating.

9. Value Engineering review.

Docusign Envelope ID: C9649382-8505-4B1D-8B4B-9EB8A037C06E

AE 50620 - Request for Statement of Qualifications Addendum No 1 (002).pdf
AE50620 Addendum No. 1.docx.pdf

File details come from the government source that posted it. Updated .