3-87N-0794-02 REDBUD MULTI-USE PATH PHASE 2 Attachment 3 Redbud Soil Management Guide.pdf
PDF 437 KB Posted
- Solicitation number
- 260288
- Issued by
- Sedgwick County, Kansas
About this file
Redbud Multi-Use Path Phase 2 Soil Management Guide
This document is a soil management guide prepared for the City of Wichita, Kansas, in support of the Redbud Multi-Use Path Phase 2 construction project extending from Woodlawn to K-96. The guide establishes protocols and procedures for the proper handling, testing, and management of soil materials encountered during the construction of the multi-use path. The document provides technical specifications and best practices for soil excavation, stockpiling, compaction, and disposal to ensure environmental compliance and project quality standards. The guide serves as an attachment to the bid documents and construction contract, establishing mandatory requirements that contractors must follow throughout the soil management aspects of the project.
The soil management guide includes detailed testing requirements, acceptable soil quality standards, remediation procedures for contaminated or unsuitable materials, and documentation procedures. Contractors are required to comply with all specifications outlined in this attachment as part of their construction obligations. The guide ensures that soil handling activities meet state and local environmental regulations, support proper drainage and stability of the multi-use path structure, and maintain compliance with the City of Wichita's Public Works & Utilities Department standards. This attachment is essential for contractors submitting bids to understand the technical and regulatory requirements governing soil-related work on the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .