About this file
This is a bid plan document for the City of Olathe's 2026 Sidewalk Construction project (Project No. 3-C-072-26), prepared by JEO Consulting Group, Inc. The project encompasses sidewalk, driveway, and curb construction across multiple locations in Olathe, Kansas, including E Cherokee Lane, E Cherokee Place, W Ferrel Drive, W Elm Street, E Harold Street, N Stevenson Street, W Wabash Street, and W Chambery Drive. The bid documents include comprehensive survey data with benchmarks, typical sections, and detailed sidewalk plans across 35 sheets. Key bid items include 627 square yards of 4-inch concrete sidewalk installation, 156 square yards of sidewalk with integral curb, 389-300 square yards of concrete drives at varying depths, removal of existing asphalt and concrete surfaces totaling 238-592 square yards, curb and gutter replacement of 902 linear feet, six sidewalk ramps of varying types, tree removal, landscape rock relocation, mailbox adjustments, pavement marking installation and removal, and storm drainage work including curb inlet installation. The project requires 95 percent compaction for all backfill within the right-of-way, KCMMB4K concrete throughout, and compliance with the City of Olathe Technical Specifications and the latest ADAAG standards for accessibility.
The bid documents indicate that contractors must have one signed copy of the plans and applicable specifications at the job site at all times and must notify the City Engineer prior to commencing work. Work on Saturdays requires approval by 3:00 p.m. on the preceding Thursday, while legal holiday work requires five working days' notice; Sunday work is prohibited. All contractors are responsible for utility location verification through the One-Call notification system, as utility information shown on plans is not guaranteed accurate. The project includes 1,012 square yards of sodding with topsoil requirements and 6 square yards of black landscape rock with weed barrier. Contractors must provide temporary erosion and water pollution control measures, maintain traffic control in accordance with the Manual on Uniform Traffic Control Devices (MUTCD), protect existing utilities and structures, and coordinate all construction activities to maintain property access. The project requires 48 hours' notice to affected property owners before street closures and coordination with police, fire, medical services, and school bus companies. All workmanship and materials are subject to City inspection and approval, and contractors are responsible for damage to existing pavement, structures, and landscaping adjacent to the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2026 Microsoft Corporation © 2026 TomTom © 2026 Zenrin
POINT
NAME
NORTHING
US SURVEY FEET
EASTING
US SURVEY FEET ELEVATION LONG DESCRIPTION
BM-10 513381 11633258 1050.29 SOUTHEAST SIDE OF INTERSECTION OF E CHEROKEE LANE
WITH E CHEROKEE LANE
BM-11 513216 11632620 1057.68 TOP NUT OF FIRE HYDRANT, 20' NORTH OF CENTERLINE OF E
CHEROKEE LANE AND 100' EAST OF E OSAGE CIRCLE
CENTERLINE
BM-12 517677 11614349 1047.89 SQUARE CUT IN SOUTHEAST CORNER OF CURB INLET, 19'
SOUTH OF W FERREL DRIVE CENTERLINE AND 36' WEST OF
CENTERLINE OF DRIVEWAY FOR 1821 W FERREL DRIVE
BM-13 518672 11613944 1045.68 RAILROAD SPIKE IN SOUTH FACE OF POWER POLE AT THE
NORTHEAST QUADRANT OF THE INTERSECTION OF W
CHAMBERY DRIVE AND W WABASH STREET
BM-14 519333 11618199 1019.44 SQUARE CUT IN WEST CORNER OF CURB INLET ON NORTH
SIDE OF W ELM STREET, 110' WEST OF S PARKER STREET
CENTERLINE
BM-15 526746 11624005 1026.43 RAILROAD SPIKE IN NORTHWEST FACE OF POWER POLE, 28.9'
SOUTH OF E HAROLD STREET CENTERLINE AND 80' EAST OF
CENTERLINE OF DRIVEWAY TO 511 E HAROLD STREET
BM-16 522960 11623891 1019.66 SQUARE CUT IN SOUTHEAST CORNER OF CURB INLET ON
EAST SIDE OF N STEVENSON STREET, 18' SOUTH OF
CENTERLINE OF DRIVEWAY TO 504 N STEVENSON STREET
CITY OF OLATHE
2026 SIDEWALK CONSTRUCTION
SCALE: N.T.S.
R
NOTE: NEITHER THE OWNER (CLIENT) NOR JEO CONSULTING GROUP, INC. ASSUMES ANY RESPONSIBILITY FOR UTILITY LOCATIONS BEING ACCURATELY SHOWN OR NOT SHOWN ON THE PLANS. A REQUEST FOR UTILITY LOCATES WAS MADE FOR
THIS LOCATION AS PER THE ONE-CALL NOTIFICATION SYSTEM ACT.
(DATE: OC DATE TICKET NO.: TICKET NO ).
(DATE: OC DATE TICKET NO.: TICKET NO ).
UTILITIES SHOWN ARE FROM FIELD MARKINGS PROVIDED IN THE FIELD BY THE UTILITY PROVIDERS.
THE EXACT LOCATION AND/OR SIZE OF UNDERGROUND FEATURES MAY NOT BE ACCURATELY, COMPLETELY AND RELIABLY DEPICTED. FIELD VERIFICATION OF UTILITIES MAY BE REQUIRED. CONTRACTOR(S) SHALL NOTIFY THE RESPECTIVE UTILITY
COMPANIES BEFORE COMMENCING ANY WORK.
LOCATION MAP
Dr aw ing N am e:
C0
-T
IT
LE
.dw g Fil e P ath
: J :\P ro jec ts\
.01 -o lat he si de wa lk co ns tru cti on \7
De sig n\2 dr aw ing s\0 2-sh ee ts Pl ott ed
B y:
MA
DD
IE
B
RE
NN
FO
ER
DE
R
Sh ee t S ize
: A
NS
I E
XP
AN
D
D (3
4.0 0 X
.00
IN
CH
ES
Pl ot
Sc ale
: 1 :1
N
CITY PROJECT NO. 3-C-072-26
PROJECT LOCATIONS
APPROVED BY:
CITY ENGINEER DATE
APPROVED FOR ONE YEAR FROM THIS DATE
PREPARED AND SUBMITTED BY:
CIVIL ENGINEER DATE
Non-Telecommunications City of Olathe 1385 S. Robinson St.
Olathe, KS 66061
Utility Coordinators Brent Berry Office: (913) 971-8532 E-mail: bberry@olatheks,org
Alex Cashman Office: (913) 971-9006 E-mail: cashman@olatheks.org
Sanitary & Water Aaron Wasko Office: (913) 971-9108 E-mail: amwasko@olatheks.org
Street Lights Scott Burton Office: (913) 971-6015 E-mail: sjburton@olatheks.org
Traffic Zach Baker Office: (913) 971-9009 E-mail: zdbaker@olatheks.org
Atmos Energy 25090 W. 110th Terrace Olathe, KS 66061
Project Contact Kane Manis Office: (913) 494-8876 E-mail: kane.manis@atmosenergy.com
Damage Prevention Manager Chris Fry Office: (913) 653-3223 E-mail: chris.fry@atmosenergy.com
Evergy Emergency: (816) 471-5275
Jorge Fernandez Office: (785) 508-2409 E-mail: jorge.fernandez@evergy.com
Jacob Ledger Cell: (816) 652-1655 E-mail: jacob.ledger@evergy.com
Telecommunications AT&T (Distribution) Troy Mitchell 9444 Nall Ave.
Overland Park, KS 66207 Office: (913) 383-4934 Cell: (913) 293-8453 Emergency: (800) 288-2020 E-mail: sm9517@att.com
Charter (offering Spectrum) 8221 W. 119th Street Overland Park, KS 66213 Emergency: (866) 967-7611
Daron Dietz (Construction Supervisor) Office (913) 643-1972 E-mail: daron.dietz@spectrum.com
Anthony Freeman (Construction Coordinator III) Office: (913) 643-1918 E-mail: anthony.s.freeman@spectrum.com
Richard "Pup" Sieger (Construction Coordinator II) Office: (913) 643-1925 E-mail: richard.sieger@spectrum.com
Comcast Cable Dallas Swofford 4700 Little Blue Pkwy.
Independence, MO 64057 Cell: (816) 394-4600 E-mail: dallas_swofford@comcast.com
Everfast Fiber Damion Hays 9701 Lackman Rd.
Lenexa, KS 66215 Office: (913) 322-9750 Cell: (785) 371-6231 E-mail: damion.hays@everfastfiber.com
Google Fiber Jayson DeMar 908 Broadway Blvd.
Kansas City, MO 64105 Cell: (816) 548-1839 E-mail: kc-google-uc@google.com
Segra (formerly UPN) Brian Short Cell: (816) 400-9084 E-mail: brian.short@segrafiber.com
Verizon Business (formerly MCI) Bryan Burger 10740 Nall Ave., Suite 400 Overland Park, KS 66211 Office: (913) 344-2007 Cell: (816) 204-4494 E-mail: bryan.burger@verizon.com
WANRack Jon Markarian 4550 W. 109th Street, Suite 115 Overland Park, KS 66211 Office: (816) 527-7237 E-mail: jon.markarian@wanrack.com
Sheet No. Description
1 TITLE SHEET
2 GENERAL NOTES AND LEGEND
3 QUANTITIES
4-10 SURVEY DATA
11-12 GENERAL LAYOUT
13-15 TYPICAL SECTIONS
16-27 SIDEWALK PLAN
28-31 ROADWAY DETAILS
32-33 STORM SEWER DETAILS
34-35 PAVEMENT MARKING AND SIGN DETAILS
UTILITIES INDEX OF SHEETS
BENCHMARKS
(NAVD88)
ISSUE
BD
MARK DATE DESCRIPTION
04/17/2026 BID DOCUMENTS
Olathe 2026 Sidewalk Construction
250731.01
JEO
4400 COLLEGE BLVD, SUITE 200
OVERLAND PARK, KS 66211
800.723.8567 | jeo.com
ORGANIZATION CERTIFICATE OF
AUTHORIZATION NUMBER: CA-0069
JEO PROJECT NO.:
DRAWN BY:
QAQC:
SCALES SHOWN FOR 22"x34" SHEET
VERIFY SCALE FOR REDUCED OR PRINTED COPIES
Additional Project Info:
TITLE SHEET
DAVID SMALLING 06/05/2026
6/5/2026Nate Baldwin, P.E. Digitally signed by Nate Baldwin, P.E.
Date: 2026.06.05 11:36:43-05'00' http://www.jeo.com
Dr aw ing N am e:
C0
-T
IT
LE
.dw g Fil e P ath
: J :\P ro jec ts\
.01 -o lat he si de wa lk co ns tru cti on \7
De sig n\2 dr aw ing s\0 2-sh ee ts Pl ott ed
B y:
MA
DD
IE
B
RE
NN
FO
ER
DE
R
Sh ee t S ize
: A
NS
I E
XP
AN
D
D (3
4.0 0 X
.00
IN
CH
ES
Pl ot
Sc ale
: 1 :1
GENERAL NOTES
1. THE CONTRACTOR SHALL HAVE ONE (1) SIGNED COPY OF THE PLANS (APPROVED BY THE CITY
OF OLATHE) AND ONE (1) COPY OF THE APPROPRIATE DESIGN AND CONSTRUCTION
STANDARDS AND SPECIFICATIONS AT THE JOB SITE AT ALL TIMES.
2. THE CITY OF OLATHE TECHNICAL SPECIFICATIONS, LATEST EDITION, SHALL GOVERN
CONSTRUCTION OF THIS PROJECT.
3. CONSTRUCTION OF THE IMPROVEMENTS SHOWN OR IMPLIED BY THIS SET OF DRAWINGS
SHALL NOT BE INITIATED OR ANY PART THEREOF UNDERTAKEN UNTIL THE CITY ENGINEER IS
NOTIFIED OF SUCH INTENT AND ALL REQUIRED AND PROPERLY EXECUTED BONDS AND
CONTRACT AGREEMENTS ARE RECEIVED AND APPROVED BY THE CITY ENGINEER.
4. WORK ON SATURDAYS OR LEGAL HOLIDAYS SHALL BE AS APPROVED BY THE CITY ENGINEER.
REQUESTS FOR PERMISSION TO WORK ON SATURDAYS MUST BE RECEIVED NO LATER THAN
3:00 P.M. ON THE PRECEDING THURSDAY. REQUESTS TO WORK ON LEGAL HOLIDAYS MUST BE
RECEIVED AT LEAST (5) WORKING DAYS PRIOR TO THE ANTICIPATED DATE OF THE WORK TO
BE PERFORMED. SUNDAY WORK WILL NOT BE ALLOWED UNDER ANY CIRCUMSTANCE. LEGAL
HOLIDAYS OBSERVED BY THE CITY OF OLATHE ARE NEW YEAR'S DAY, MARTIN LUTHER KING'S
BIRTHDAY, FEDERAL MONDAY, MEMORIAL DAY, JUNETEENTH, INDEPENDENCE DAY, LABOR
DAY, VETERAN'S DAY, THANKSGIVING DAY (INCLUDING THE FOLLOWING FRIDAY) A HALF DAY
FOR CHRISTMAS EVE, AND A FULL DAY FOR CHRISTMAS. THE ACTUAL DAYS OFF FOR THESE
HOLIDAYS MAY VARY AND IN CERTAIN SITUATIONS. ADDITIONAL DAYS MAY BE PART OF THE
AMOUNT OF TIME GRANTED AS AN OFFICIAL HOLIDAY BY THE CITY OF OLATHE. IT SHALL BE
THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN THESE DAYS PRIOR TO THE ACTUAL
REQUEST FOR FOR INSPECTION SERVICES.
5. THE CONTRACTOR SHALL AT NO TIME LEAVE EQUIPMENT, MATERIALS, OR DEBRIS IN
LOCATIONS THAT COULD OBSTRUCT INTERSECTION SIGHT DISTANCE, OBSTRUCT ANY
EXISTING CAPACITY OF THE STORM SEWER SYSTEM, OR CAUSE FLOODING OR SEDIMENT
RUNOFF TO RESIDENCES.
6. THE CONTRACTOR SHALL PROVIDE TEMPORARY WALKS, FENCING, BARRICADES OR OTHER
PROTECTIVE MEASURES AS NECESSARY TO ENSURE THE SAFETY OF THE PUBLIC
TRAVERSING THE PROJECT SITE. EQUIPMENT STORAGE AREAS AND MATERIAL STOCKPILES
SHALL BE LOCATED ON SITES PROVIDED BY THE CONTRACTOR WITH DUE REGARD TO
LOCATION, APPEARANCE, AND HAZARD POTENTIAL TO THE TRAVELING PUBLIC.
7. ALL BACKFILL SHALL BE TAMPED. WITHIN THE RIGHT-OF-WAY, NINETY-FIVE PERCENT (95%)
COMPACTION AT OPTIMUM MOISTURE IS REQUIRED.
8. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS. ANY DISCREPANCY
BETWEEN THE DIMENSIONS AND ELEVATIONS SHOWN ON THE PLANS AND THOSE FOUND BY
THE CONTRACTOR SHALL BE SUPPLIED TO THE ENGINEER FOR APPROVAL PRIOR TO
CONSTRUCTION.
9. ALL DISTURBED AREAS SHALL BE SODDED UNLESS OTHERWISE NOTED ON THE PLANS. ANY
ADDITIONAL SODDING NEEDED BEYOND THE QUANTITIES SHOWN SHALL BE SUBSIDIARY TO
OTHER BID ITEMS NOTED.
10. THE TOP TWELVE INCHES (12") OF BACKFILL IN AREAS TO BE SODDED SHALL BE BACKFILLED
WITH TOPSOIL OF QUALITY EQUAL TO OR BETTER THAN THAT OF THE SOIL UNDERLAYING
ADJOINING SODDED AREAS. MATERIAL TO BE USED AS TOPSOIL SHALL BE APPROVED BY THE
ENGINEER PRIOR TO PLACEMENT. THE CONTRACTOR MAY, AT HIS OPTION, EXCAVATE AND
STOCKPILE THE EXISTING TOPSOIL IN A SUITABLE LOCATION AND REUSE THIS MATERIAL FOR
THE FINAL BACKFILL. ALL MATERIAL USED AS FINAL BACKFILL INCLUDING JOB EXCAVATED
MATERIAL, SHALL BE FREE FROM ROCK, GRAVEL OR OTHER UNSUITABLE MATERIAL.
IMMEDIATELY PRIOR TO THE PLACEMENT OF THE TOPSOIL, THE EXISTING GRADE SHALL BE
LOOSENED BY DISKING, SCARIFYING OR TILLING TO A DEPTH OF AT LEAST TWO INCHES (2")
TO PERMIT BONDING OF THE TOPSOIL TO THE UNDERLYING AREA.
11. THE CONTRACTOR MAY PURCHASE WATER REQUIRED FOR THE CONSTRUCTION OF THIS
PROJECT FROM THE CITY UTILITIES DEPARTMENT THROUGH THE USE OF A FIRE HYDRANT
WATER METER. METERS CAN BE OBTAINED FROM THE UTILITIES CENTER FOR A NOMINAL
DEPOSIT, REFUNDABLE UPON THE RETURN OF THE METER.
12. ALL EXISTING CONCRETE PAVEMENT, CURB AND GUTTER, DRIVEWAYS, SIDEWALKS OR
BITUMINOUS SURFACING TO BE REMOVED SHALL BE SAW CUT TO NEAT LINES AS SHOWN
ON THE PLANS OR TO THE NEAREST JOINT AS DIRECTED BY THE ENGINEER. ADDITIONAL
REMOVAL MAY BE ORDERED BY THE ENGINEER. ALL WASTE MATERIAL SHALL BE DISPOSED
OF ON SITES PROVIDED BY THE CONTRACTOR AND APPROVED BY THE ENGINEER. ALL
MATERIALS SHALL BE DISPOSED OF BY THE CONTRACTOR AT HIS EXPENSE.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO EXISTING PAVEMENT, CURBS,
SIDEWALKS, DRIVEWAYS, ANY OTHER SURFACE, STRUCTURE, TREE OR SHRUB, ETC.
ADJACENT TO THE PROJECT. ALL REPAIRS SHALL BE MADE BY THE CONTRACTOR AT HIS
EXPENSE.
14. AT ALL LOCATIONS WHERE THE NEW CURB CONNECTS TO AN EXISTING CURB OF DIFFERENT
SHAPE, A TRANSITION SHALL BE MADE IN THE NEW CURB TO MATCH THE EXISTING CURB.
THE TRANSITION LENGTH SHALL BE FIVE FEET (5') IN LENGTH UNLESS OTHERWISE INDICATED
IN THE PLANS.
15. THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES SO THAT ACCESS TO
ADJOINING PROPERTY IS MAINTAINED TO THE GREATEST EXTENT POSSIBLE.
16. POLICE, FIRE DEPARTMENTS, MED-ACT AND SCHOOL BUS COMPANIES SHALL BE NOTIFIED
PRIOR TO CLOSING ANY STREET. IN ADDITION, THE CONTRACTOR SHALL PROVIDE WRITTEN
NOTIFICATION TO ALL AFFECTED PROPERTY OWNERS AT LEAST FORTY-EIGHT (48) HOURS IN
ADVANCE OF THE STREET BEING CLOSED. STREET CLOSURES REQUIRE THE APPROVAL OF
THE CITY ENGINEER.
17. CONTRACTOR IS RESPONSIBLE FOR KEEPING THE CONSTRUCTION AREA FREE OF ALL
CONSTRUCTION DEBRIS, PLANT MATERIALS, TRASH, AND OTHER REFUSE THAT MAY APPEAR
AS A RESULT OF CONTRACTOR ACTIVITIES, CITY ACTIVITIES, UTILITY WORK OR OTHER
ACTIVITIES THAT MAY OCCUR WITHIN CONSTRUCTION LIMITS.
18. CONTRACTOR SHALL BE RESPONSIBLE FOR AND PROVIDE ALL TEMPORARY EROSION AND
WATER POLLUTION CONTROL MEASURES. CONTRACTOR SHALL BE RESPONSIBLE FOR AND
PROVIDE ALL TEMPORARY EROSION AND WATER POLLUTION CONTROL MEASURES DURING
THE LIFE OF THE CONTRACT. THIS WORK SHALL BE CONSIDERED SUBSIDIARY TO OTHER BID
ITEMS.
19. TEMPORARY PAVEMENT MARKINGS SHALL CONFORM TO THE LATEST VERSION OF THE
MUTCD AND WILL BE CONSIDERED SUBSIDIARY TO PERMANENT PAVEMENT MARKING BID
ITEMS.
20. CONTRACTOR IS RESPONSIBLE FOR PROTECTING AND ADJUSTING OR REBUILDING ALL
EXISTING MANHOLES AND CATCH BASINS. UTILITY CONTRACTOR IS RESPONSIBLE FOR
PROTECTING AND ADJUSTING OR REBUILDING ALL EXISTING MANHOLES, CATCH BASINS,
UTILITY VALVES, FIRE HYDRANTS AND METER PITS WITHIN CONSTRUCTION LIMITS TO THE
FINAL GRADE AS REQUIRED. THIS WORK SHALL BE SUBSIDIARY TO OTHER BID ITEMS UNLESS
NOTED OTHERWISE.
21. FOR ANY WORK AT THE INTERSECTION WITH AN ARTERIAL STREET REQUIRING THE CLOSURE
OF THE ARTERIAL CROSS STREET, THE CONTRACTOR SHALL PROVIDE A REQUEST FOR THE
CLOSURE AND A DETAILED DETOUR PLAN TO THE CITY FOR APPROVAL 10 DAYS PRIOR TO
REQUESTED CLOSURE DATE.
22. ALL WORKMANSHIP AND MATERIALS SHALL BE SUBJECT TO INSPECTION AND APPROVAL BY
THE CITY.
23. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL PROPERTY PINS
AND ANY SURVEY MONUMENTS, WHETHER SHOWN ON THE PLANS OR NOT. ANY PROPERTY
PINS AND OR MONUMENTS THAT MAY BE DISTURBED BY CONSTRUCTION ACTIVITY SHALL
BE RECORDED PRIOR TO ANY DISTURBANCE AND VERIFIED AFTER CONSTRUCTION IS
COMPLETE. ANY PINS OR MONUMENTS FOUND TO BE DISTURBED SHALL BE RESET BY A
KANSAS LICENSED LAND SURVEYOR TO THE LOCATION AND CONDITION PRIOR TO
CONSTRUCTION. THIS WORK SHALL NOT REQUIRE NOR CONSTITUTE A PROPERTY OR
BOUNDARY SURVEY. PAYMENT FOR THIS WORK SHALL BE SUBSIDIARY TO CONSTRUCTION
STAKING.
24. ALL TREES, SHRUBS, BUSHES, AND BRUSH WITHIN THE GRADING LIMITS SHALL BE
PROTECTED FROM DAMAGE BY THE CONTRACTOR UNLESS SPECIFICALLY INDICATED TO BE
REMOVED ON THE PLANS. THE CONTRACTOR SHALL MAKE ALL REASONABLE EFFORTS TO
SPARE TREES AND LANDSCAPING TREES BY ADJUSTING BACK SLOPES DURING
CONSTRUCTION, AS APPROVED BY THE ENGINEER. ALL TREES WITHIN THE CONSTRUCTION
LIMITS TO BE SPARED SHALL BE PHYSICALLY PROTECTED PRIOR TO CONSTRUCTION BY
METHODS APPROVED BY THE ENGINEER.
25. ALL WORK SHALL BE CONFINED WITHIN THE EASEMENTS AND/OR GRADING LIMITS AS
DIRECTED BY THE ENGINEER. GRADING LIMITS SHOWN ARE APPROXIMATE AND SHALL BE
ADJUSTED AS NEEDED TO PROPERLY MATCH THE EXISTING CONDITIONS AND MINIMIZE
IMPACTS TO ADJACENT PROPERTIES DURING CONSTRUCTION.
26. THE INFORMATION SHOWN ON THESE PLANS CONCERNING TYPE AND LOCATION OF
UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR COMPLETE. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL UTILITY COMPANIES FOR FIELD
LOCATION OF ALL UNDERGROUND UTILITY LINES PRIOR TO ANY EXCAVATION AND FOR
MAKING HIS OWN VERIFICATION AS TO THE TYPE AND LOCATION OF UNDERGROUND
UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE THERETO. UTILITIES DAMAGED
THROUGH THE NEGLIGENCE OF THE CONTRACTOR TO OBTAIN THE EXACT LOCATION SHALL
BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS EXPENSE.
27. ANY POLES TO BE BRACED FOR CONSTRUCTION SHALL BE COORDINATED WITH EVERGY OR
THE OWNER OF THAT POLE. CONTRACTOR SHALL NOTIFY EVERGY 72 HOURS PRIOR TO
EXCAVATION ADJACENT TO THEIR POLES. ANY AND ALL COSTS ASSOCIATED WITH BRACES
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
28. EXISTING PERMANENT STRUCTURES SHOWN WITHIN THE CONSTRUCTION EASEMENTS
SHALL BE PRESERVED AND PROTECTED BY THE CONTRACTOR THROUGHOUT THE
CONSTRUCTION PERIOD UNLESS SHOWN TO BE REMOVED ON THE PLANS.
29. THE CITY OF OLATHE HAS THE RIGHT OF FIRST REFUSAL OF ANY OF THE DEMOLITION OR
REMOVAL ITEMS WITHIN THE STREET RIGHT-OF-WAY. THE INDIVIDUAL PROPERTY OWNERS
SHALL HAVE THE RIGHT OF FIRST REFUSAL ON ANY DEMOLITION OR REMOVAL ITEMS
WITHIN TEMPORARY CONSTRUCTION EASEMENTS (T.C.E.).
30. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING, AND IF DAMAGED,
RESTORING MAILBOXES, DRIVEWAY MARKERS, YARD LIGHTS, BASEMENT DRAINS, ROOF
DRAINS, SPRINKLER SYSTEMS AND UTILITY SERVICE LINE CONNECTIONS TO A CONDITION
EQUAL TO THAT BEFORE DAMAGE OCCURRED. MAILBOX ADJUSTMENTS, REINSTALLATIONS,
AND REPLACEMENTS SHALL BE SUBSIDIARY TO ALL OTHER BID ITEMS. TEMPORARY
MAILBOXES WILL BE PROVIDED TO AFFECTED RESIDENTS DURING CONSTRUCTION IN A
LOCATION ACCESSIBLE TO THE U.S. POST OFFICE DEPARTMENT.
31. THE TRAFFIC CONTROL REQUIREMENTS SHOWN IN THESE PLANS ARE MINIMUM
REQUIREMENTS ONLY AND DO NOT ATTEMPT TO ADDRESS IN DEPTH THE VARIETY OF
SITUATIONS THAT MAY OCCUR ONCE CONSTRUCTION BEGINS. IN NO WAY DO THE
REQUIREMENTS SHOWN HEREIN RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY FOR
SELECTING THE PROPER TRAFFIC CONTROL DEVICES AND IMPLEMENTATION PROCEDURES
THAT WILL INSURE THE SAFETY OF MOTORISTS, PEDESTRIANS, AND WORKERS AT ALL TIMES.
ALL TRAFFIC CONTROL DEVICES SHALL BE IN CONFORMANCE WITH THE CURRENT EDITION
OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
32. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ALL ITEMS AS REQUIRED BY THE CITY OF
OLATHE TECHNICAL SPECIFICATIONS, DESIGN CRITERIA AND PLAN SET FOR PUBLIC
IMPROVEMENT PROJECTS, FOR APPROVAL BY THE ENGINEER PRIOR TO CONSTRUCTION.
33. ALL EXCAVATION SHALL BE UNCLASSIFIED. NO SEPARATE OR ADDITIONAL PAYMENT WILL BE
MADE FOR ANY ROCK EXCAVATION REQUIRED FOR THESE IMPROVEMENTS. TRENCH
EXCAVATION SHALL BE SUBSIDIARY TO OTHER ITEMS OF WORK AND IS NOT INCLUDED IN
ANY EARTHWORK CALCULATIONS.
34. CONTRACTOR MAY NOT USE PRIVATE PARKING LOTS WITHOUT WRITTEN APPROVAL OF
OWNER. APPROVAL SHALL INCLUDE TERMS OF USE AND RESTITUTION. SHOULD THE
PARKING LOT BE DAMAGED THE CONTRACTOR SHALL BE REQUIRED TO REPAIR AND OR
REPLACE TO THE SATISFACTION OF THE OWNER. THE CITY WILL RETAIN THE ESTIMATED
COST OF REPAIRS UNTIL WORK IS COMPLETED.
35. THE CONTRACTOR SHALL PROVIDE A BULLETIN TO THE RESIDENTS AT LEAST 48 HOURS
PRIOR TO EACH PHASE OF CONSTRUCTION TO EXPLAIN TO RESIDENTS THE UPCOMING
ITEMS OF WORK, IMPACTS TO TRAFFIC, AND IMPACTS TO ACCESS TO THEIR HOUSE. THE
CONTRACTOR SHALL ALSO PROVIDE INFORMATION ON WHERE RESIDENTS ARE ALLOWED
TO PARK WHEN THEY CANNOT USE THEIR DRIVEWAY. THE BULLETIN SHALL BE SENT TO THE
ENGINEER FOR REVIEW THREE DAYS PRIOR TO DISTRIBUTION AND IS REQUIRED IN ADDITION
TO NOTIFICATIONS AS REQUIRED IN THE PROJECT SPECIAL PROVISIONS.
36. ALL SIDEWALK CONSTRUCTION SHALL COMPLY WITH THE LATEST VERSION OF ADAAG.
37. AREAS WITH EXCESS EXCAVATION SHALL BE SODDED AT THE CONTRACTOR'S EXPENSE.
CABLE TELEVISION
ELECTRIC (OVHD)
FIBER OPTIC LINE
OHE OHE
FO FO
GAS LINE
RIGHT-OF-WAY LINE ROW ROW
UTV UTV
LIMITS OF CONSTRUCTION LOC LOC
G G
CABLE TV (NS) <UTV> <UTV>
ELECTRIC (UGND) UGE UGE
FIRE HYDRANT (EXISTING)
POWER POLE (EXISTING)
WATER VALVE
GUY WIRE ANCHOR
LIGHT POLE
WATER METER
FIBER OPTICS PULL BOX
GAS METER
GAS VALVE
LEGEND
FENCE (CHAINLINK)
EXISTING EX
EXISTING, NOT-SURVEYED NS
PROPOSED PR
OVERHEAD OVHD
UNDERGROUND UGND
TOP OF PAVEMENT TP
TOP OF CURB TC
GROUND GR
TOP OF WALL TW
BOTTOM OF WALL BW
FLOWLINE FL
ISSUE
BD
MARK DATE DESCRIPTION
04/17/2026 BID DOCUMENTS
Olathe 2026 Sidewalk Construction
250731.01
JEO
4400 COLLEGE BLVD, SUITE 200
OVERLAND PARK, KS 66211
800.723.8567 | jeo.com
ORGANIZATION CERTIFICATE OF
AUTHORIZATION NUMBER: CA-0069
JEO PROJECT NO.:
DRAWN BY:
QAQC:
SCALES SHOWN FOR 22"x34" SHEET
VERIFY SCALE FOR REDUCED OR PRINTED COPIES
ADDITIONAL INFO:
GENERAL NOTES AND
LEGEND
PAVEMENT REPAIR
DETECTABLE
WARNING
PANEL
RAMP
CURB & GUTTER
REPLACEMENT
SOD
TEMPORARY
CONSTRUCTION EASEMENT
TCE
CONCRETE
SIDEWALK
COLORED STAMPED CONCRETE
INTEGRAL CURB
ASPHALT DRIVEWAY
CONCRETE DRIVEWAY
BLACK LANDSCAPE ROCK
Dr aw ing N am e:
C0
QU
AN
TI
TI
ES
.dw g
Fil e P ath : J
:\P ro jec ts\
.01
-o lat he si de wa lk co ns tru cti on
\7 De sig n\2 dr aw ing s\0
2-sh ee ts
Pl ott ed B y:
MA
DD
IE
B
RE
NN
FO
ER
DE
R Sh ee t S ize : A
NS
I E
XP
AN
D D
(3 4.0
0 X
.00
IN
CH
ES
Pl ot Sc ale : 1
:1
ISSUE
BD
MARK DATE DESCRIPTION
04/17/2026 BID DOCUMENTS
Olathe 2026 Sidewalk Construction
250731.01
JEO
4400 COLLEGE BLVD, SUITE 200
OVERLAND PARK, KS 66211
800.723.8567 | jeo.com
ORGANIZATION CERTIFICATE OF
AUTHORIZATION NUMBER: CA-0069
JEO PROJECT NO.:
DRAWN BY:
QAQC:
SCALES SHOWN FOR 22"x34" SHEET
VERIFY SCALE FOR REDUCED OR PRINTED COPIES
ADDITIONAL INFO:
QUANTITIES
SUMMARY OF QUANTITIES
ITEM NO. BID ITEM UNIT QUANTITY
COMMON ITEMS
1 MOBILIZATION LUMP SUM 1
2 TRAFFIC CONTROL LUMP SUM 1
3 CONSTRUCTION STAKING LUMP SUM 1
SITE WORK
4 CLEARING & GRUBBING LUMP SUM 1
5 REMOVE EXISTING ASPHALT DRIVE SQ YD 238
6 REMOVE EXISTING CONCRETE DRIVE SQ YD 592
7 REMOVE EXISTING CONCRETE SIDEWALK SQ YD 221
8 REMOVE TREE EACH 2
9 REMOVE AND RELOCATE LANDSCAPE ROCK EACH 5
10 REMOVE AND RESET MAILBOX EACH 2
11 REMOVE PARKING BLOCK EACH 1
UTILITY RELOCATIONS
12 ADJUST EXISTING STORM SEWER MANHOLE EACH 1
ASPHALT WORK
13 FULL DEPTH STREET PATCH SQ YD 78
14 INSTALL 4" BM-2B ASPHALT DRIVE BASE SQ YD 142
CONCRETE WORK
15 INSTALL 4” CONCRETE SIDEWALK SQ YD 627
16 INSTALL 4” CONCRETE SIDEWALK WITH INTEGRAL CURB SQ YD 156
17 INSTALL 4" COLORED STAMPED CONCRETE SQ YD 35
18 INSTALL TYPE I SIDEWALK RAMP EACH 6
19 INSTALL TYPE II SIDEWALK RAMP EACH 2
20 INSTALL TYPE III SIDEWALK RAMP EACH 2
21 INSTALL TYPE IV SIDEWALK RAMP EACH 1
22 INSTALL 6” CONCRETE DRIVE SQ YD 389
23 INSTALL 7” CONCRETE DRIVE SQ YD 300
24 INSTALL TYPE "C" CONCRETE CURB & GUTTER LIN FT 18
25 REMOVE & REPLACE CONCRETE CURB & GUTTER LIN FT 902
STORM DRAINAGE WORK
26 INSTALL 4' X 3' MODIFIED TYPE 10 CURB INLET EACH 1
27 INSTALL 2.5' X 7' NON-SETBACK CURB INLET TOP EACH 1
TRAFFIC WORK AND PAVEMENT MARKING
28 REMOVE TRAFFIC SIGNAL LOOP JUNCTION BOX EACH 1
29 4” YELLOW THERMOPLASTIC LIN FT 99
30 24” WHITE PREFORMED THERMOPLASTIC LIN FT 30
31 REMOVE PAVEMENT MARKING LIN FT 203
32 REMOVE AND RELOCATE EXISTING SIGN EA 2
33 PERMANENT STREET SIGNING EA 4
FINAL CLEAN UP
34 EXTEND SUMP PUMP DRAIN AND RELOCATE POP-UP
DRAIN EMITTER LUMP SUM 1
35 BLACK LANDSCAPE ROCK (1”-2”) WITH WEED
BARRIER LANDSCAPE FABRIC SQ YD 6
36 SODDING SQ YD 1012
RESIDENCE
SHED
RO
W
RO
W
RO
W
ROW ROW ROW ROW ROW ROW
ROW
ROW
ROW
S
PA
W
NE
E
DR
IV
E
E
OS
AG
E
CI
RC
LE
E CHEROKEE LANE
E CHEROKEE LANE
TACTILE INSERT
SPLIT TRUNK
PIN OAK
MAPLE
ATMOS
CLEAR FLAG
2001 E CHEROKEE LN
1401 S PARKER DR
1400 S PARKER DR
15" x 12" STUMP
TACTILE INSERT
6.5" WIDE
BRICK WALL
PIN OAK
6' TALL WOOD PANEL
PRIVACY FENCE
4" WIDE FENCE POSTS
USED FOR RETAINING WALL
3.5" RETAINING WALL
(BRICK)
BM-11
CP-102
BM-11
CP-102
BENCHMARKS - NAVD88
POINT NORTHING EASTING ELEVATION LONG
NAME US SURVEY FEET US SURVEY FEET DESCRIPTION
BM-11 513216 11632620 1057.68
TOP NUT OF FIRE HYDRANT, 20' NORTH OF CENTERLINE OF
E CHEROKEE LANE AND 100' EAST OF E OSAGE CIRCLE
CENTERLINE
HORIZONTAL SURVEY CONTROL - KRCS ZONE 11 (KANSAS CITY)
POINT NORTHING EASTING LONG
NAME US SURVEY FEET US SURVEY FEET DESCRIPTION
CP-102 513208.53 11632709.73 5/8" REBAR WITH CAP STAMPED "CONTROL POINT"
ISSUE
BD
MARK DATE DESCRIPTION
04/17/2026 BID DOCUMENTS
Olathe 2026 Sidewalk Construction
250731.01
JEO
4400 COLLEGE BLVD, SUITE 200
OVERLAND PARK, KS 66211
800.723.8567 | jeo.com
ORGANIZATION CERTIFICATE OF
AUTHORIZATION NUMBER: CA-0069
JEO PROJECT NO.:
DRAWN BY:
QAQC:
SCALES SHOWN FOR 22"x34" SHEET
VERIFY SCALE FOR REDUCED OR PRINTED COPIES
SURVEY DATA
CHEROKEE LANE
04D ra w in g N am e:
C
- C
O N
TR
O
L.
dw g Fi le P at h:
J :\P ro je ct s\
.0
1-ol at he si de w al k co ns tru ct io n\
D es ig n\ dr aw in gs
\0 2-sh ee ts Pl ot te d By
: M
AD
D
IE
B R
EN
N
FO
ER
D
ER
Sh ee t S iz e:
A
N
SI
E
XP
AN
D
D (3
4.
X
2.
IN
C
H
ES
Pl ot S ca le
: 1 :1 N
0 20 40
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROWROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
GOOGLE FIBER
MARKING STOPS HERE WITH ARROW TO WEST AND SW
GOOGLE FIBER
MARKING STOPS HERE WITH ARROW TO EAST
GOOGLE FIBER
MARKING STOPS HERE WITH ARROW TO WNW
GOOGLE FIBER
MARKING STOPS HERE WITH ARROW TO SOUTHWEST
EVERGY
MARKING STOPS HERE WITH ARROW TO NORTHWEST
MARKING STOPS HERE WITH ARROW TO NORTHWEST
SAMH
RIM ELEV = 1048.86
8" CLAY FLOWLINE ELEV SE = 1042.57'
8" CLAY FLOWLINE ELEV ENE = 1042.47'
SAN SAN SAN SAN SAN SAN SAN SAN
SAN
SAN
SAN
SAN
SAMH
RIM ELEV = 1050.50
8" CLAY FLOWLINE ELEV NW = 1043.68'
8" CLAY FLOWLINE ELEV ENE = 1043.98'
6" CLAY FLOWLINE ELEV SE = 1043.92' (DID NOT FIND CONNECTION)
SSMH
3' x 6' CONCRETE BOX
RIM ELEV = 1049.42
21" TALL x 32" WIDE ELIPTICAL CMP FLOWLINE ELEV SSE = 1045.93' 21" TALL x 32" WIDE ELIPTICAL CMP FLOWLINE ELEV WNW = 1045.60'
SSMH
3' x 6' CONCRETE BOX
RIM ELEV = 1050.23
21" TALL x 32" WIDE ELIPTICAL CMP
FLOWLINE ELEV NNW = 1046.69'
E CHEROKEE PLACE
E CHEROKEE PLACE
E CHEROKEE LANE
E CHEROKEE LA
NE
GOOGLE FIBER
GOOGLE FIBER
MAPLE
ELM
ELM
COTTONWOOD
2028 E CHEROKEE PL
2024 E CHEROKEE PL
2024 E CHEROKEE LN
2020 E CHEROKEE LN
6" WIDE
BRICK WALL
RETAINING WALL IS DEGRATED
AND FALLING APART
6" BRICK
RETAINING WALL
3' x 3' DECORATIVE ROCK
3' x 3' DECORATIVE ROCK
3' x 3' DECORATIVE ROCK
2' x 4' DECORATIVE ROCK
3' x 3' DECORATIVE ROCK
SAMH
RIM ELEV = 1051.73
4" PVC FLOWLINE ELEV NORTH = 1046.22'
8" PVC FLOWLINE ELEV EAST = 1046.45'
4" PVC FLOWLINE ELEV SE = 1046.35'
4" PVC FLOWLINE ELEV SSE = 1046.28'
8" CLAY FLOWLINE ELEV WSW = 1045.81'
STREET NAME &
STOP SIGN
BM-10
CP-101
SAN
SAN
SAN
SAN
SAN
SAN
FO
FO
FO
FO
FO
FO
FO FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
UGE
UGE
CP-101
BM-10
BENCHMARKS - NAVD88
POINT NORTHING EASTING ELEVATION LONG
NAME US SURVEY FEET US SURVEY FEET DESCRIPTION
BM-10 513381 11633258 1050.29
SQUARE CUT IN SOUTHWEST CORNER OF AREA INLET ON
SOUTHEAST SIDE OF INTERSECTION OF E CHEROKEE LANE
WITH E CHEROKEE LANE
HORIZONTAL SURVEY CONTROL - KRCS ZONE 11 (KANSAS CITY)
POINT NORTHING EASTING LONG
NAME US SURVEY FEET US SURVEY FEET DESCRIPTION
CP-101 513466.31 11633367.18 5/8" REBAR WITH CAP STAMPED "CONTROL POINT"
ISSUE
BD
MARK DATE DESCRIPTION
04/17/2026 BID DOCUMENTS
Olathe 2026 Sidewalk Construction
250731.01
JEO
4400 COLLEGE BLVD, SUITE 200
OVERLAND PARK, KS 66211
800.723.8567 | jeo.com
ORGANIZATION CERTIFICATE OF
AUTHORIZATION NUMBER: CA-0069
JEO PROJECT NO.:
DRAWN BY:
QAQC:
SCALES SHOWN FOR 22"x34" SHEET
VERIFY SCALE FOR REDUCED OR PRINTED COPIES
SURVEY DATA
CHEROKEE PLACE
05D ra w in g N am e:
C
- C
O N
TR
O
L.
dw g Fi le P at h:
J :\P ro je ct s\
.0
1-ol at he si de w al k co ns tru ct io n\
D es ig n\ dr aw in gs
\0 2-sh ee ts Pl ot te d By
: M
AD
D
IE
B R
EN
N
FO
ER
D
ER
Sh ee t S iz e:
A
N
SI
E
XP
AN
D
D (3
4.
X
2.
IN
C
H
ES
Pl ot S ca le
: 1 :1 N
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW
ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW
RO
W
RO
W
ST
ST
ST
ST
ST
ST ST ST
ST
ST
ST
ST
ST
ST
S
PA
RK
ER
S
TR
EE
T
W ELM STREET
SSMH
MANHOLE LID ELEVATION = 1018.60'
36" CMP FLOWLINE ELEV EAST = 1013.93'
36" CMP FLOWLINE ELEV WEST = 1013.65' (DID NOT FIND CONNECTOR)
19" TALL x 32" WEST ELLIPTICAL RCP FLOWLINE ELEV NNE = 1014.35'
SSMH
MANHOLE LID ELEVATION = 1018.62'
36" CMP FLOWLINE ELEV WEST = 1014.88'
32" CMP FLOWLINE ELEV SE = 1014.87'
SAMH
RIM ELEV = 1020.52
8" CLAY FLOWLINE ELEV EAST = 1011.77'
SAMH
RIM ELEV = 1019.40
8" CLAY FLOWLINE ELEV WEST = 1015.26'
6" CLAY FLOWLINE ELEV EAST = 1015.48' (COULD NOT FIND CONNECTION)
6" CLAY FLOWLINE ELEV SE = 1015.57' (TO BACK OF BUILDINGS)
CBS
6' x 4' CONCRETE BOX
MANHOLE RIM ELEV = 1018.54
24" CMP FLOWLINE ELEV NORTH = 1016.70' (SILTED)
CBS
4' x 6' CONCRETE BOX
MANHOLE RIM ELEV = 1018.48'
19" x 32" ELLIPTICAL RCP FLOWLINE ELEV WEST = 1015.48'
CBS
4 x 6' CONCRETE BOX
MANHOLE RIM ELEV = 1018.47'
24" RCP FLOWLINE ELEV ENE = 1015.17'
24" CMP FLOWLINE ELEV SW = 1015.09'
CBS
4 x 6' CONCRETE BOX
MANHOLE RIM ELEV = 1018.70
24" RCP FLOWLINE ELEV WSW = 1015.65'
CBS
3.3' x 4' CONCRETE BOX
MANHIOLE RIM ELEV = 1019.42
12" CMP FLOWLINE ELEV WSW = 1016.73'
CBS
2.5' x 7' CONCRETE BOX
32" CMP FLOWLINE ELEV NW = 1015.13'
19" x 32" ELLIPTICAL CONCRETE PIPE FLOWLINE ELEV EAST = 1015.21'
24" CMP FLOWLINE ELEV SOUTH = 1015.92'
TOP OF CURB
IS BROKEN
TACTILE
INSERT
ROLLING RIDGE APARTMENTS
SIGN GOOGLE FIBER
GOOGLE FIBER
ENDS AT RISER
EVERGY
TRAFFIC SIGNAL
MANHOLE
EVERGY
MARKING ENDS WITH ARROW TO EAST
EVERGY
MARKING ENDS WITH ARROW TO EAST
EVERGY
MARKING ENDS WITH ARROW TO EAST
EVERGY
MARKING ENDS WITH ARROW TO NORTH
EVERGY
MARKING ENDS WITH ARROW TO EAST
MARKING ENDS
WITH ARROW TO WEST
CONTINUES SOUTH
CONTINUES NORTH
GOOGLE FIBER
ENDS AT RISER
AT&T/D
ENDS AT RISER
AT&T/D
STARTS AT RISER
AT&T/D
MARKING ENDS
WITH ARROW TO WEST
EVERGY
TRAFFIC SIGNAL
MANHOLE
AT&T/D
GOOGLE FIBER
AT&T/D
<ST>
<ST>
<ST>
<ST>
<ST>
<ST>
<ST>
CBS
2.5' x 7' CONCRETE BOX
12" CMP FLOWLINE ELEV NE = 1016.54'
24" CMP FLOWLINE ELEV WEST = 1014.92' (COULD NOT FIND CONNECTOR)
GRT
21" x 28" GRATE
GRATE ELEV = 1018.32'
DROP PIPE DOWN TO 36" CMP
36" CMP FLOWLINE ELEV NORTH = 1016.58'
REDBUD 12" WIDE CONCRETE WALL
BOXELDER
BOXELDER
6' TALL PRIVACY
FENCE AROUND DUMPSTER
GARDEN BOX
4.5" WIDE
WOODEN GARDEN TIES
4" WIDE
PARKING STOP
TACTILE
INSERT
ASPHALT PATCH
8" WIDE
BRICK WALL
AT&T/D MARKING ENDS WITH ARROW TO NORTH
BM-14
CP-106
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UT
V
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
UGE
UGE UGE UGE
UGE
UTV UTV UTV UTV UTV UTV
UTV
UTV
UTV
UTV
UTV
UTV UTV UTV UTV UTV UTV
UTV
UTV
FO
FO
FOFOFOFO
FO
FO
FO
OH
E
OH
E
UTV UTV UTV
OHE
OHE
OHE
OHE
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
PL
PL
PL
PL
PL
PL
PL
BM-14
CP-106
HORIZONTAL SURVEY CONTROL - KRCS ZONE 11 (KANSAS CITY)
POINT NORTHING EASTING LONG
NAME US SURVEY FEET US SURVEY FEET DESCRIPTION
CP-106 519271.64 11617795.42 5/8" REBAR WITH CAP STAMPED "CONTROL POINT"
BENCHMARKS - NAVD88
POINT NORTHING EASTING ELEVATION LONG
NAME US SURVEY FEET US SURVEY FEET DESCRIPTION
BM-14 519333 11618199 1019.44
SQUARE CUT IN WEST CORNER OF CURB INLET ON NORTH
SIDE OF W ELM STREET, 110' WEST OF S PARKER STREET
CENTERLINE
ISSUE
BD
MARK DATE DESCRIPTION
04/17/2026 BID DOCUMENTS
Olathe 2026 Sidewalk Construction
250731.01
JEO
4400 COLLEGE BLVD, SUITE 200
OVERLAND PARK, KS 66211
800.723.8567 | jeo.com
ORGANIZATION CERTIFICATE OF
AUTHORIZATION NUMBER: CA-0069
JEO PROJECT NO.:
DRAWN BY:
QAQC:
SCALES SHOWN FOR 22"x34" SHEET
VERIFY SCALE FOR REDUCED OR PRINTED COPIES
SURVEY DATA
ELM STREET
06D ra w in g N am e:
C
- C
O N
TR
O
L.
dw g Fi le P at h:
J :\P ro je ct s\
.0
1-ol at he si de w al k co ns tru ct io n\
D es ig n\ dr aw in gs
\0 2-sh ee ts Pl ot te d By
: M
AD
D
IE
B R
EN
N
FO
ER
D
ER
Sh ee t S iz e:
A
N
SI
E
XP
AN
D
D (3
4.
X
2.
IN
C
H
ES
Pl ot S ca le
: 1 :1 N
ROW ROW ROW ROW
ROW ROW ROW ROWROWROWROWROW
ROW
ROW
ROW
ROW
ROW
ROWROWROW
ROW
ROW
ROW
ROW
1048 1048
SAMH
RIM ELEVATION = 1042.97'
8" CLAY FLOWLINE ELEV WEST = 1036.70'
SAMH
8" CLAY FLOWLINE ELEV SE = 1043.76'
SAMH
RIM ELEV = 1046.89
8" CLAY FLOWLINE ELEV NW = 1041.24'
8" CLAY FLOWLINE ELEV EAST = 1040.93'
6" CLAY FLOWLINE ELEV SW = 1041.23' (DID NOT FIND CONNECTION)
W FERREL DRIVE
W FERREL DRIVE
UNKNOWN
UTILITY OPERATOR
SOUTHEAST CORNER
OF DRIVEWAY IS BROKEN OUT
SIVER MAPLE
PIN OAK
MARKING STOPS HERE
WITH ARROW TO NORTH
CONTINUES SSW
AT&T/D
CLEAR FLAG
MARKING STOP HERE
WITH ARROW TO SOUTH
1821 W FERREL DR
1818 W FERREL DR
1817 W FERREL DR
1813 W FERREL DR
1808 W FERREL DR
8" WIDE
BRICK WALL
8" WIDE
BRICK WALL
SIVER MAPLE
REDBUD
4" x 4" SQUARE STEEL BOLLARD
3.5' TALL
3" DIAMETER x 3' TALL
ROUND STEEL BOLLARD
3' WIDE x 2.5; TALL
BUSH LINE
BM-12
CP-104
G G
G
G
G G
G
OH
E
OH
E
OH
E
OHE
OHE
OH
E
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN SAN SAN SAN SAN SAN SAN
BM-12
CP-104
HORIZONTAL SURVEY CONTROL - KRCS ZONE 11 (KANSAS CITY)
POINT NORTHING EASTING LONG
NAME US SURVEY FEET US SURVEY FEET DESCRIPTION
CP-104 517642.61 11614601.04 5/8" REBAR WITH CAP STAMPED "CONTROL POINT"
BENCHMARKS - NAVD88
POINT NORTHING EASTING ELEVATION LONG
NAME US SURVEY FEET US SURVEY FEET DESCRIPTION
BM-12 517677 11614349 1047.89
SQUARE CUT IN SOUTHEAST CORNER OF CURB INLET, 19'
SOUTH OF W FERREL DRIVE CENTERLINE AND 36' WEST OF
CENTERLINE OF DRIVEWAY FOR 1821 W FERREL DRIVE
ISSUE
BD
MARK DATE DESCRIPTION
04/17/2026 BID DOCUMENTS
Olathe 2026 Sidewalk Construction
250731.01
JEO
4400 COLLEGE BLVD, SUITE 200
OVERLAND PARK, KS 66211
800.723.8567 | jeo.com
ORGANIZATION CERTIFICATE OF
AUTHORIZATION NUMBER: CA-0069
JEO PROJECT NO.:
DRAWN BY:
QAQC:
SCALES SHOWN FOR 22"x34" SHEET
VERIFY SCALE FOR REDUCED OR PRINTED COPIES
SURVEY DATA
FERREL DRIVE
07D ra w in g N am e:
C
- C
O N
TR
O
L.
dw g Fi le P at h:
J :\P ro je ct s\
.0
1-ol at he si de w al k co ns tru ct io n\
D es ig n\ dr aw in gs
\0 2-sh ee ts Pl ot te d By
: M
AD
D
IE
B R
EN
N
FO
ER
D
ER
Sh ee t S iz e:
A
N
SI
E
XP
AN
D
D (3
4.
X
2.
IN
C
H
ES
Pl ot S ca le
: 1 :1 N
<SAN> <SAN> <SAN> <SAN> <SAN> <SAN> <SAN> <SAN> <SAN> <SAN> <SAN> <SAN> <SAN> <SAN> <SAN> <SAN> <SAN> <SAN> <SAN><SAN>
<S
AN
<S
AN
<S
AN
<S
AN
<S
AN
RO
W
RO
W
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
RO
W
RO
W
RO
W
RO
W
ROW
E HAROLD STREET
N W
OO
DL
AN
D
ST
RE
ET
E HAROLD STREET
ST
ST
SAMH
RIM ELEV = 1005.24
COULD NOT OPEN
SAMH
RIM ELEV = 1006.14
COULD NOT OPEN
CBS
CIRCULAR BASIN - NO INLET
COULD NOT GET BASIN SIZE
24" CMP FLOWLINE ELEV WNW = 1001.64'
21" SMOOTH METAL PIPE FLOWLINE ELEV SOUTH = 1002.71'
SSMH
4' x 6.5' BRICK BOX
RIM ELEV = 1005.22'
24" CMP FLOWLINE ELEV ESE = 1000.04'
SSMH
4' x 6' CONCRETE BOX
RIM ELEV = 1006.09
21" SMOOTH METAL PIPE FLOWLINE ELEV NORTH = 1002.86'
SAMH
4' DIAMETER WELL
RIM ELEV = 1021.39
8" CLAY FLOWLINE ELEV EAST = 1004.17'
8" CLAY FLOWLINE ELEV WEST = 1013.84'
SAMH
4' DIAMETER WELL
RIM ELEV = 1009.12
8" CLAY FLOWLINE ELEV EAST = 1004.41'
8" PVC FLOWLINE ELEV NORTH = 1004.96' (COULD NOT FIND CONNECTION)
8" CLAY FLOWLINE ELEV SOUTH = 1003.32' (CONNECTOR SEIZED SHUT)
UNKNOWN UTILITY OPERATOR
MARKING STOPS
WITH ARROW TO NORTH
TACTILE INSERT
TACTILE INSERT
TACTILE INSERT
RED OAK
REDBUDREDBUD
OLD MAILBOX
MAPLE
GOOGLE FIBER
MARKING STOPS
WITH ARROW TO NORTH
GOOGLE FIBER
MARKING STOPS
WITH ARROW TO NORTH
GOOGLE FIBER
GOOGLE FIBER
GOOGLE FIBER
GOOGLE FIBER
GOOGLE FIBER
END MARKINGS NO ARROW
CONTINUES NORTH
CONTINUES EAST
ATT/D
MARKING STOP
ALL 4 LINES CONTINUE NORTH
ATT/D
MARKING STOP
ALL 4 LINES CONTINUE WEST
CONTINUES WEST
MARKING ENDS
WITH ARROW TO WEST
ATMOS
MARKING ENDS
WITH ARROW TO WEST ATMOS
ATMOS
MARKING ENDS
WITH ARROW TO NORTH
REDBUD
512 E HAROLD ST
520 E HAROLD ST511 E HAROLD ST
516 E HAROLD ST
509 E HAROLD STOLD MAILBOX
508 E HAROLD ST
504 E HAROLD ST500 E HAROLD ST
10' TALL
PRIVACY FENCE
9" WIDE
CONCRETE WALL
6" WIDE
CONCRETE WALL
STOP
SIGN
STOP
SIGN
STOP
SIGN
CP-108
OH
E
UTV
UTV
UTV
UTV
OHE
OHE
OHE
OHEOHE
UTV UTV UTV UTV
UTV UTV UTV
UTV UTV UTV UTV UTV UTV UTV UTV UTV UTV UTV UTV UTV UTV UTV UTV
UTV
UTV
UTV
UTV UTV UTV UTV UTV UTV UTV UTV UTV UTV UTV UTV UTV UTV UTV UTV UTV UTV
FO
FO
FO
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
FO
FO
FO
FO
FO
FO
FO
FOOHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE
G
G
FO FO
FO
FO
FO
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
FO FO
FO
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
UT
V
UT
V
UT
V
UT
V
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
CP-108
HORIZONTAL SURVEY CONTROL - KRCS ZONE 11 (KANSAS CITY)
POINT NORTHING EASTING LONG
NAME US SURVEY FEET US SURVEY FEET DESCRIPTION
CP-108 526952.51 11623483.09 5/8" REBAR WITH CAP STAMPED "CONTROL POINT"
BENCHMARKS - NAVD88
POINT NORTHING EASTING ELEVATION LONG
NAME US SURVEY FEET US SURVEY FEET DESCRIPTION
BM-15 526746 11624005 1026.43
RAILROAD SPIKE IN NORTHWEST FACE OF POWER POLE,
28.9' SOUTH OF E HAROLD STREET CENTERLINE AND 80'
EAST OF CENTERLINE OF DRIVEWAY TO 511 E HAROLD
STREET
<SAN> <SAN> <SAN> <SAN> <SAN> <SAN> <SAN> <SAN> <SAN>
RO
W
ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW
RO
W
RO
W
ROW ROW ROW ROW ROW ROW ROW ROW ROW
RO
W
RO
W
N W
AL
KE
R
LA
NE
E HAROLD STREET
SAMH
4' DIAMETER WELL
RIM ELEV = 1024.55
8" CLAY FLOWLINE ELEV NE = 1017.27'
8" CLAY FLOWLINE ELEV WEST = 1016.86'
TACTILE INSERT
TACTILE INSERT
REDBUD
GOOGLE FIBER
MAERKING STOPS
WITH ARROW TO SOUTH AND EAST
GOOGLE FIBER
MARKING STOPS
WITH ARROW TO EAST
GOOGLE FIBER
GOOGLE FIBER
ATT/D HIGH PROFILE
MARKING STOPS
WITH ARROW TO EAST
ATT/D
MARKING STOPS
WITH ARROW TO EAST
ATT/D
MARKING STOPS
WITH ARROW TO EAST
ATMOS
MARKING ENDS
WITH ARROW TO NORTH
CONTINUES SOUTH
ATMOS
MARKING ENDS
WITH ARROW TO SOUTH
528 E HAROLD ST524 E HAROLD ST
STOP
SIGN
STOP
SIGN
STOP
SIGN
BM-15
G G
G G
OHE
OHE
FO FO FO
UTV UTV UTV UTV UTV UTV UTV UTV
UTV UTV UTV
UTV UTV UTV UTV UTV UTV UTV UTV UTV UTV UTVFO FO FO FO FO FO FO FO FO FO FO FO
OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE
FO FO FO FO FO FO FO FO FO FO FO FO
FO FO FO FO FO FO FO FO FO FO FO
SAN SAN SAN SAN
BM-15
ISSUE
BD
MARK DATE DESCRIPTION
04/17/2026 BID DOCUMENTS
Olathe 2026 Sidewalk Construction
250731.01
JEO
4400 COLLEGE BLVD, SUITE 200
OVERLAND PARK, KS 66211
800.723.8567 | jeo.com
ORGANIZATION CERTIFICATE OF
AUTHORIZATION NUMBER: CA-0069
JEO PROJECT NO.:
DRAWN BY:
QAQC:
SCALES SHOWN FOR 22"x34" SHEET
VERIFY SCALE FOR REDUCED OR PRINTED COPIES
SURVEY DATA
HAROLD STREET
08D ra w in g N am e:
C
- C
O N
TR
O
L.
dw g Fi le P at h:
J :\P ro je ct s\
.0
1-ol at he si de w al k co ns tru ct io n\
D es ig n\ dr aw in gs
\0 2-sh ee ts Pl ot te d By
: M
AD
D
IE
B R
EN
N
FO
ER
D
ER
Sh ee t S iz e:
A
N
SI
E
XP
AN
D
D (3
4.
X
2.
IN
C
H
ES
Pl ot S ca le
: 1 :1 N
0 20 40
MA
TC
HL
IN
E
MA
TC
HL
IN
E
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
RO
W
RO
W
RO
W
RO
W
RO
W
RO
W
RO
W
RO
W
RO
W
RO
W
RO
W
RO
W
GATE
GATE
6" WIDE
CONCRETE WALL
N
ST
EV
EN
SO
N
ST
RE
ET
E PRAIRIE STREET
ST
ST ST ST ST ST ST ST ST ST ST ST ST ST ST
SSMH
RIM ELEV = 1026.94'
24" CMP FLOWLINE ELEV WEST = 1024.20'
STEP LANDING
ELEV = 1026.49'
STEP LANDING
ELEV = 1025.89'
STEP LANDING
ELEV = 1025.19'
SSMH
RIM ELEV = 1019.23
LOCKED SHUT (UNABLE TO OPEN)
GOOGLE FIBER
MARKING STOPS HERE
WITH ARROW TO WEST
GOOGLE FIBER
GOOGLE FIBER
GOOGLE FIBER
MARKING STOPS HERE
WITH ARROW TO EAST
ATT/D
MARKING STOPS HERE
WITH ARROW TO WEST
ATT/D
MARKING STOPS HERE
WITH ARROW TO WEST
ATT/D
MARKING STOPS HERE
WITH ARROW TO WEST
ATT/D
MARKING STOPS HERE
WITH ARROW TO EAST
ATT/D
GOOGLE FIBER
ATT/D
MARKING STOPS HERE
WITH ARROW TO EAST
ATMOS
MARKING STOPS HERE
WITH ARROW TO WEST AND NORTH
ATMOS
MARKING STOPS HERE
WITH ARROW TO WEST
ATMOS
MARKING STOPS HERE
WITH ARROW TO EAST AND NORTH
GOOGLE FIBER
MARKING ENDS
WITH ARROW TO SOUTHATMOS
CONTINUES TO METER
ATMOS
CONTINUES TO METER 12" WIDE
BRICK WALL
8" WIDE
CONCRETE WALL
8" WIDE
CONCRETE WALL
6" WIDE
CONCRETE WALL
6" WIDE
BRICK WALL
ATT/D
MARKING STOPS HERE
WITH ARROW TO EAST
ATMOS
MARKING STOPS HERE
WITH ARROW TO EAST
CBS
3' x 5' CONCRETE BOX
MANHOLE RIM ELEV = 1019.62
24" CMP FLOWLINE ELEV EAST = 1016.14'
21" TALL x 31" WIDE CMP FLOWLINE ELEV NORTH = 1016.02'
CBS
3.5' x 5' CONCRETE BOX
MANHOLE RIM ELEV = 1017.95
24" TALL x 36" WIDE CMP FLOWLINE ELEV EAST = 1013.83'
CBS
3.5' x 5' CONCRETE BOX
MANHOLE RIM ELEV = 1017.86
24" TALL x 36" WIDE CMP FLOWLINE ELEV WEST = 1013.80' 21" TALL x 31" WIDE CMP FLOWLINE ELEV SOUTH = 1013.96'
3' TALL FENCE
BM-16
CP-109
G
G G G G G
UTV UTV UTV UTV UTV
FO FO FO FO FO
FO FO
FO FO
FO
FO
FOFOFO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
UTV
UTV
UTV
G G
G G
BM-16
CP-109
HORIZONTAL SURVEY CONTROL - KRCS ZONE 11 (KANSAS CITY)
POINT NORTHING EASTING LONG
NAME US SURVEY FEET US SURVEY FEET DESCRIPTION
CP-109 523015.31 11623890.67 5/8" REBAR WITH CAP STAMPED "CONTROL POINT"
BENCHMARKS - NAVD88
POINT NORTHING EASTING ELEVATION LONG
NAME US SURVEY FEET US SURVEY FEET DESCRIPTION
BM-16 522960 11623891 1019.66
SQUARE CUT IN SOUTHEAST CORNER OF CURB INLET ON
EAST SIDE OF N STEVENSON STREET, 18' SOUTH OF
CENTERLINE OF DRIVEWAY TO 504 N STEVENSON STREET
ISSUE
BD
MARK DATE DESCRIPTION
04/17/2026 BID DOCUMENTS
Olathe 2026 Sidewalk Construction
250731.01
JEO
4400 COLLEGE BLVD, SUITE 200
OVERLAND PARK, KS 66211
800.723.8567 | jeo.com
ORGANIZATION CERTIFICATE OF
AUTHORIZATION NUMBER: CA-0069
JEO PROJECT NO.:
DRAWN BY:
QAQC:
SCALES SHOWN FOR 22"x34" SHEET
VERIFY SCALE FOR REDUCED OR PRINTED COPIES
SURVEY DATA
STEVENSON DRIVE
09D ra w in g N am e:
C
- C
O N
TR
O
L.
dw g Fi le P at h:
J :\P ro je ct s\
.0
1-ol at he si de w al k co ns tru ct io n\
D es ig n\ dr aw in gs
\0 2-sh ee ts Pl ot te d By
: M
AD
D
IE
B R
EN
N
FO
ER
D
ER
Sh ee t S iz e:
A
N
SI
E
XP
AN
D
D (3
4.
X
2.
IN
C
H
ES
Pl ot S ca le
: 1 :1 N
RO
W
RO
W
RO
W
RO
W
ROWROW ROW ROW ROW ROWROW ROW ROW
SAMH
RIM ELEV = 1043.66
8" CLAY FLOWLINE ELEV EAST = 1037.74'
6" CLAY FLOWLINE ELEV SSW = 1038.02' (DID NOT FIND CONNECTION)
6" CLAY FLOWLINE ELEV NORTH = 1037.91' (DID NOT FIND CONNECTION)
W C
HA
MB
ER
Y
DR
IV
E
W WABASH STREET W WABASH STREET
POST OAK
EVERGY
MARKING STOPS HERE
WITH ARROW TO SOUTH
MARKING STOPS HERE
WITH ARROW TO EAST
ELM
AT&T/D
MARKING STARTS HERE
WITH ARROW TO WEST
AT&T/D
AT&T
ATMOS
ASH
BASKETBALL GOAL
10" WIDE DECORATIVE
BRICK WALL
3" CEDAR SAP
GATE
3' TALL
ST
STREET NAME
AND STOP SIGN
BM-13
CP-105
G G
G
G
UGE
UT
V
UTV
UTV
SAN SAN SAN SAN SAN SAN SAN
CP-105
BM-13
HORIZONTAL SURVEY CONTROL - KRCS ZONE 11 (KANSAS CITY)
POINT NORTHING EASTING LONG
NAME US SURVEY FEET US SURVEY FEET DESCRIPTION
CP-105 518627.96 11613512.10 5/8" REBAR WITH CAP STAMPED "CONTROL POINT"
BENCHMARKS - NAVD88
POINT NORTHING EASTING ELEVATION LONG
NAME US SURVEY FEET US SURVEY FEET DESCRIPTION
BM-13 518672 11613944 1045.68
RAILROAD SPIKE IN SOUTH FACE OF POWER POLE AT THE
NORTHEAST QUADRANT OF THE INTERSECTION OF W
CHAMBERY DRIVE AND W WABASH STREET
ISSUE
BD
MARK DATE DESCRIPTION
04/17/2026 BID DOCUMENTS
Olathe 2026 Sidewalk Construction
250731.01
JEO
4400 COLLEGE BLVD, SUITE 200
OVERLAND PARK, KS 66211
800.723.8567 | jeo.com
ORGANIZATION CERTIFICATE OF
AUTHORIZATION NUMBER: CA-0069
JEO PROJECT NO.:
DRAWN BY:
QAQC:
SCALES SHOWN FOR 22"x34" SHEET
VERIFY SCALE FOR REDUCED OR PRINTED COPIES
SURVEY DATA
WABASH STREET
10D ra w in g N am e:
C
- C
O N
TR
O
L.
dw g Fi le P at h:
J :\P ro je ct s\
.0
1-ol at he si de w al k co ns tru ct io n\
D es ig n\ dr aw in gs
\0 2-sh ee ts Pl ot te d By
: M
AD
D
IE
B R
EN
N
FO
ER
D
ER
Sh ee t S iz e:
A
N
SI
E
XP
AN
D
D (3
4.
X
2.
IN
C
H
ES
Pl ot S ca le
: 1 :1 N
W ELM ST
SHEET 19 - 21
S
PA
R
KE
R S
T
TCE
TCE
LOC
LOC
SHEET 22
W FERREL DR
W
CHAMBERY DR
LOC
LOC
LOC
SHEET 16
E CHEROKEE LN
E O
SA
G
E C
IR
S
PA
W
N
EE
D R
CITY'S COMMENT TO MATCH AT
DRIVE TO JUST PAST THEIR MAILBOX,
THEN PLACE SIDEWALK ON BACK OF
CURB WITH CURB WALL IN ORDER TO
GRADE IN BEFORE THE EXISTING
FENCE.
E CHEROKEE LN
E CHEROKEE PL
SHEET 17 - 18
ISSUE
BD
MARK DATE DESCRIPTION
07/31/2025 BID DOCUMENTS
Olathe 2025 Sidewalk Construction
250731.00
CAS
4400 COLLEGE BLVD, SUITE 200
OVERLAND PARK, KS 66211
800.723.8567 | jeo.com
ORGANIZATION CERTIFICATE OF
AUTHORIZATION NUMBER: CA-0069
JEO PROJECT NO.:
DRAWN BY:
QAQC:
SCALES SHOWN FOR 22"x34" SHEET
VERIFY SCALE FOR REDUCED OR PRINTED COPIES
GENERAL LAYOUT
11D ra w in g N am e:
C
- G
EN
ER
AL
L
AY
O
U T.
dw g
Fi le
P at h:
J
:\P ro je ct s\
.0 1-ol at he si de w al k co ns tru ct io n\
D es ig n\ dr aw in gs \0
2-sh ee ts
Pl ot te d
By : M
AD
D
IE
B
R
EN
N
FO
ER
D
ER
Sh ee t S iz e:
A N
SI
E
XP
AN
D D
(3 4.
X
2.
IN
C H
ES
Pl ot
S ca le : 1
:1
N
0 100 200
N
0 100 200
N
0 100 200
0 100 200
N
SHEET 26
N STEVENSON ST
E
PR
AI
R
IE
S
T
LOC LOC
SHEET 23 - 25
E HAROLD ST
N W
O O
D
LA
N D
S T
N W
AL
KE
R L
N
SHEET 27
W WABASH ST
W
CHAMBERY DR
LOC LOC
GENERAL LAYOUT
12D ra w in g N am e:
C
- G
EN
ER
AL
L
AY
O
U T.
dw g
Fi le
P at h:
J
:\P ro je ct s\
.0 1-ol at he si de w al k co ns tru ct io n\
D es ig n\ dr aw in gs \0
2-sh ee ts
Pl ot te d
By : M
AD
D
IE
B
R
EN
N
FO
ER
D
ER
Sh ee t S iz e:
A N
SI
E
XP
AN
D D
(3 4.
X
2.
IN
C H
ES
Pl ot
S ca le : 1
:1
N
0 100 200
ISSUE
BD
MARK DATE DESCRIPTION
07/31/2025 BID DOCUMENTS
Olathe 2025 Sidewalk Construction
250731.00
CAS
4400 COLLEGE BLVD, SUITE 200
OVERLAND PARK, KS 66211
800.723.8567 | jeo.com
ORGANIZATION CERTIFICATE OF
AUTHORIZATION NUMBER: CA-0069
JEO PROJECT NO.:
DRAWN BY:
QAQC:
SCALES SHOWN FOR 22"x34" SHEET
VERIFY SCALE FOR REDUCED OR PRINTED COPIES
N
0 100 200
N
0 100 200
NOTES
1. JOINTS SHALL BE FORMED AT RIGHT ANGLES TO THE ALIGNMENT OF THE
SIDEWALK AND TO THE DEPTHS INDICATED BELOW.
2. THE SIDEWALK SHALL BE MARKED OFF INTO SQUARE STONES BY
CONTRACTION JOINTS. CONTRACTION JOINTS SHALL BE ONE-EIGHTH (1
8) INCH
WIDE BY ONE (1) INCH DEEP. IF SIDEWALK THICKNESS IS INCREASED THE
DEPTH OF THE JOINT WILL BE INCREASED PROPORTIONALLY.
3. EXPANSION JOINTS SHALL BE PLACED WHERE SIDEWALK ABUTS OTHER
STRUCTURES AND SHALL NOT BE SPACED MORE THAN 50 FEET APART ON
STRAIGHT RUNS FOR HAND LAID SIDEWALK AND NOT MORE THAN 200 FEET
APART ON STRAIGHT RUNS FOR MACHINE LAID SIDEWALKS.
4. EXPANSION JOINTS SHALL BE FORMED BY ONE-HALF (1
2) INCH THICK
PREFORMED JOINT FILLER, EXTENDING THE FULL DEPTH OF THE SLAB, AND
SECURED SO THAT THEY ARE NOT MOVED BY DEPOSITING AND COMPACTING
THE CONCRETE AT THESE JOINTS.
5. WHEN SIDEWALK IS INSTALLED ADJACENT TO A STORM STRUCTURE, THE
SIDEWALK MUST BE DOWELED INTO STRUCTURE USING #4 BARS @ 18"
INTERVALS. INCREASE SIDEWALK THICKNESS TO 6" TO MAINTAIN 2" OF COVER
FOR REBAR.
6. KCMMB4K CONCRETE SHALL BE USED THROUGHOUT AND ADHERE TO CITY OF
OLATHE TECHNICAL SPECIFICATIONS SECTION 2000 AND 2100.
7. ALL SIDEWALKS SHALL BE CONSTRUCTED AT OR NEAR THE EXISTING GROUND
LINE TO PROVIDE MINIMAL GRADING. ALL WORK SHALL BE PERFORMED
WITHIN THE EXISTING ROW UNLESS OTHERWISE NOTED ON THE PLANS.
5'1' VARIES
CHEROKEE PLACE
SLOPE: 1.5% TYP.
1% (MIN) TO 2% (MAX)
TOWARDS CURB
4" MIN. CONCRETE
SIDEWALK
EX. SLOPE
EXIST. CURB & GUTTER
4:1 TYP.
3:1 MAX. UNLESS
OTHERWISE NOTED
ON PLANS
EX
. R
OW
4:1 TYP.
3:1 MAX. UNLESS
OTHERWISE NOTED
ON PLANS
CHEROKEE PLACE
6'
SLOPE: 1.5% TYP.
1% (MIN) TO 2% (MAX)
TOWARDS CURB
4" MIN. CONCRETE
SIDEWALK
6" VARIES
EXIST. CURB & GUTTER
4:1 TYP.
3:1 MAX. UNLESS
OTHERWISE NOTED
ON PLANS
INTEGRAL CURB
12" MAX. HEIGHT
EX
. R
OWVARIES
7'
SLOPE: 1.5% TYP.
1% (MIN) TO 2% (MAX)
TOWARDS CURB
CHEROKEE LANE
6" MIN. CONCRETE
SIDEWALK
6" VARIES
EXIST. CURB & GUTTER
4:1 TYP.
3:1 MAX. UNLESS
OTHERWISE NOTED
ON PLANS
INTEGRAL CURB
12" MAX. HEIGHT
EX
. R
OW
ISSUE
BD
MARK DATE DESCRIPTION
04/17/2026 BID DOCUMENTS
Olathe 2026 Sidewalk Construction
250731.01
JEO
4400 COLLEGE BLVD, SUITE 200
OVERLAND PARK, KS 66211
800.723.8567 | jeo.com
ORGANIZATION CERTIFICATE OF
AUTHORIZATION NUMBER: CA-0069
JEO PROJECT NO.:
DRAWN BY:
QAQC:
SCALES SHOWN FOR 22"x34" SHEET
VERIFY SCALE FOR REDUCED OR PRINTED COPIES
Dr aw ing N am e:
C0
TY
PI
CA
LS
.dw g Fil e P ath
: J :\P ro jec ts\
.01 -o lat he si de wa lk co ns tru cti on \7
De sig n\2 dr aw ing s\0 2-sh ee ts Pl ott ed
B y:
MA
DD
IE
B
RE
NN
FO
ER
DE
R
Sh ee t S ize
: A
NS
I E
XP
AN
D
D (3
4.0 0 X
.00
IN
CH
ES
Pl ot
Sc ale
: 1 :1
ADDITIONAL INFO:
TYPICAL SECTIONS
2024 E CHEROKEE LANE
1400 S PAWNEE DR
2001 CHEROKEE LN
2028 E CHEROKEE LANE
2029 E CHEROKEE LANE
SIDEWALK AND TO THE DEPTHS INDICATED BELOW.
2. THE SIDEWALK SHALL BE MARKED OFF INTO SQUARE STONES BY
CONTRACTION JOINTS. CONTRACTION JOINTS SHALL BE ONE-EIGHTH (1
8) INCH
WIDE BY ONE (1) INCH DEEP. IF SIDEWALK THICKNESS IS INCREASED THE
DEPTH OF THE JOINT WILL BE INCREASED PROPORTIONALLY.
3. EXPANSION JOINTS SHALL BE PLACED WHERE SIDEWALK ABUTS OTHER
STRUCTURES AND SHALL NOT BE SPACED MORE THAN 50 FEET APART ON
STRAIGHT RUNS FOR HAND LAID SIDEWALK AND NOT MORE THAN 200 FEET
APART ON STRAIGHT RUNS FOR MACHINE LAID SIDEWALKS.
4. EXPANSION JOINTS SHALL BE FORMED BY ONE-HALF (1
2) INCH THICK
PREFORMED JOINT FILLER, EXTENDING THE FULL DEPTH OF THE SLAB, AND
SECURED SO THAT THEY ARE NOT MOVED BY DEPOSITING AND COMPACTING
THE CONCRETE AT THESE JOINTS.
5. WHEN SIDEWALK IS INSTALLED ADJACENT TO A STORM STRUCTURE, THE
SIDEWALK MUST BE DOWELED INTO STRUCTURE USING #4 BARS @ 18"
INTERVALS. INCREASE SIDEWALK THICKNESS TO 6" TO MAINTAIN 2" OF COVER
FOR REBAR.
6. KCMMB4K CONCRETE SHALL BE USED THROUGHOUT AND ADHERE TO CITY OF
OLATHE TECHNICAL SPECIFICATIONS SECTION 2000 AND 2100.
7. ALL SIDEWALKS SHALL BE CONSTRUCTED AT OR NEAR THE EXISTING GROUND
LINE TO PROVIDE MINIMAL GRADING. ALL WORK SHALL BE PERFORMED
WITHIN THE EXISTING ROW UNLESS OTHERWISE NOTED ON THE PLANS.
5'2' VARIES
FERREL DRIVE
4" MIN. CONCRETE
SIDEWALK
EX. SLOPE
EXIST. CURB & GUTTER
EX. SLOPE
4:1 TYP.
UNLESS
OTHERWISE NOTED
ON PLANS
EX
. R
OW
4:1 TYP.
3:1 MAX. UNLESS
OTHERWISE NOTED
ON PLANS
SLOPE: 1.5% TYP.
1% (MIN) TO 2% (MAX)
TOWARDS CURB
FERREL DRIVE
5' 6'VARIES
SLOPE: 1.5%
4" MIN. CONCRETE
SIDEWALK
EX. SLOPE
EXIST. CURB & GUTTER
EX. SLOPE
4:1 TYP.
UNLESS
OTHERWISE NOTED
ON PLANS
EX
. R
OW
4:1 TYP.
3:1 MAX. UNLESS
OTHERWISE NOTED
ON PLANS
5'5'
ELM STREET
EX
IS
T.
SLOPE: 1.5% TYP.
1% (MIN) TO 2% (MAX)
TOWARDS CURB
4" MIN. CONCRETE
SIDEWALK
VARIES
TYPE B CURB
VARIES EX
. R
OW
4:1 TYP.
3:1 MAX. UNLESS
OTHERWISE NOTED
ON PLANS
5' 5'
ELM STREET
EX
IS
T.
SLOPE: 1.5% TYP.
1% (MIN) TO 2% (MAX)
TOWARDS CURB
4" MIN. CONCRETE
SIDEWALK
VARIES
TYPE B CURB
VARIESEX
. R
OW
4:1 TYP.
3:1 MAX. UNLESS
OTHERWISE NOTED
ON PLANS
ISSUE
BD
MARK DATE DESCRIPTION
04/17/2026 BID DOCUMENTS
Olathe 2026 Sidewalk Construction
250731.01
JEO
4400 COLLEGE BLVD, SUITE 200
OVERLAND PARK, KS 66211
800.723.8567 | jeo.com
ORGANIZATION CERTIFICATE OF
AUTHORIZATION NUMBER: CA-0069
JEO PROJECT NO.:
DRAWN BY:
QAQC:
SCALES SHOWN FOR 22"x34" SHEET
VERIFY SCALE FOR REDUCED OR PRINTED COPIES
Dr aw ing N am e:
C0
TY
PI
CA
LS
.dw g Fil e P ath
: J :\P ro jec ts\
.01 -o lat he si de wa lk co ns tru cti on \7
De sig n\2 dr aw ing s\0 2-sh ee ts Pl ott ed
B y:
MA
DD
IE
B
RE
NN
FO
ER
DE
R
Sh ee t S ize
: A
NS
I E
XP
AN
D
D (3
4.0 0 X
.00
IN
CH
ES
Pl ot
Sc ale
: 1 :1
ADDITIONAL INFO:
TYPICAL SECTIONS
1818 W FERREL DR
1808 W FERREL DR
1817 W FERREL DR
1813 W FERREL DR
1000 W ELM ST
397 S PARKER ST
1003 W ELM ST
401 S PARKER ST
SIDEWALK AND TO THE DEPTHS INDICATED BELOW.
2. THE SIDEWALK SHALL BE MARKED OFF INTO SQUARE STONES BY
CONTRACTION JOINTS. CONTRACTION JOINTS SHALL BE ONE-EIGHTH (1
8) INCH
WIDE BY ONE (1) INCH DEEP. IF SIDEWALK THICKNESS IS INCREASED THE
DEPTH OF THE JOINT WILL BE INCREASED PROPORTIONALLY.
3. EXPANSION JOINTS SHALL BE PLACED WHERE SIDEWALK ABUTS OTHER
STRUCTURES AND SHALL NOT BE SPACED MORE THAN 50 FEET APART ON
STRAIGHT RUNS FOR HAND LAID SIDEWALK AND NOT MORE THAN 200 FEET
APART ON STRAIGHT RUNS FOR MACHINE LAID SIDEWALKS.
4. EXPANSION JOINTS SHALL BE FORMED BY ONE-HALF (1
2) INCH THICK
PREFORMED JOINT FILLER, EXTENDING THE FULL DEPTH OF THE SLAB, AND
SECURED SO THAT THEY ARE NOT MOVED BY DEPOSITING AND COMPACTING
THE CONCRETE AT THESE JOINTS.
5. WHEN SIDEWALK IS INSTALLED ADJACENT TO A STORM STRUCTURE, THE
SIDEWALK MUST BE DOWELED INTO STRUCTURE USING #4 BARS @ 18"
INTERVALS. INCREASE SIDEWALK THICKNESS TO 6" TO MAINTAIN 2" OF COVER
FOR REBAR.
6. KCMMB4K CONCRETE SHALL BE USED THROUGHOUT AND ADHERE TO CITY OF
OLATHE TECHNICAL SPECIFICATIONS SECTION 2000 AND 2100.
7. ALL SIDEWALKS SHALL BE CONSTRUCTED AT OR NEAR THE EXISTING GROUND
LINE TO PROVIDE MINIMAL GRADING. ALL WORK SHALL BE PERFORMED
WITHIN THE EXISTING ROW UNLESS OTHERWISE NOTED ON THE PLANS.
5'VARIES
STEVENSON ST
SLOPE: 1.5% TYP.
1% (MIN) TO 2% (MAX)
TOWARDS CURB
4" MIN. CONCRETE
SIDEWALK
EX. SLOPE
EXIST. CURB & GUTTER
4:1 TYP.
3:1 MAX. UNLESS
OTHERWISE NOTED
ON PLANS
VARIES EX
. R
OW
4:1 TYP.
3:1 MAX. UNLESS
OTHERWISE NOTED
ON PLANS
6'
SLOPE: 1.5% TYP.
1% (MIN) TO 2% (MAX)
TOWARDS CURB
4" MIN. CONCRETE
SIDEWALK
6" VARIES
EXIST. CURB & GUTTER
4:1 TYP.
3:1 MAX. UNLESS
OTHERWISE NOTED
ON PLANS
INTEGRAL CURB
12" MAX. HEIGHT
EX
. R
OWVARIES
STEVENSON ST
6'
SLOPE: 1.5% TYP.
1% (MIN) TO 2% (MAX)
TOWARDS CURB
4" MIN. CONCRETE
SIDEWALK
6"VARIES
EXIST. CURB & GUTTER
4:1 TYP.
3:1 MAX. UNLESS
OTHERWISE NOTED
ON PLANS
INTEGRAL CURB
9" HEIGHT
EX
. R
OW VARIES
STEVENSON ST
5'VARIES
WABASH ST
SLOPE: 1.5% TYP.
1% (MIN) TO 2% (MAX)
TOWARDS CURB
4" MIN. CONCRETE
SIDEWALK
EX. SLOPE
EXIST. CURB & GUTTER
4:1 TYP.
3:1 MAX. UNLESS
OTHERWISE NOTED
ON PLANS
1' EX
. R
OW
4:1 TYP.
3:1 MAX. UNLESS
OTHERWISE NOTED
ON PLANS
6'
SLOPE: 1.5% TYP.
1% (MIN) TO 2% (MAX)
TOWARDS CURB
HAROLD ST
4" MIN. CONCRETE
SIDEWALK
6"VARIES
EXIST. CURB & GUTTER
4:1 TYP.
3:1 MAX. UNLESS
OTHERWISE NOTED
ON PLANS
INTEGRAL CURB
12" MAX. HEIGHT
EX
. R
OW VARIES
5'VARIES VARIES
HAROLD ST
SLOPE: 1.5% TYP.
1% (MIN) TO 2% (MAX)
TOWARDS CURB
4" MIN. CONCRETE
SIDEWALK
EX
. R
OW
EXIST. CURB & GUTTER
4:1 TYP.
3:1 MAX. UNLESS
OTHERWISE NOTED
ON PLANS
5'VARIES VARIES
HAROLD ST
SLOPE: 1.5% TYP.
1% (MIN) TO 2% (MAX)
AWAY FROM CURB
4" MIN. CONCRETE
SIDEWALK
EX
. R
OW
EXIST. CURB & GUTTER4:1 TYP.
3:1 MAX. UNLESS
OTHERWISE NOTED
ON PLANS
ISSUE
BD
MARK DATE DESCRIPTION
04/17/2026 BID DOCUMENTS
Olathe 2026 Sidewalk Construction
250731.01
JEO
4400 COLLEGE BLVD, SUITE 200
OVERLAND PARK, KS 66211
800.723.8567 | jeo.com
ORGANIZATION CERTIFICATE OF
AUTHORIZATION NUMBER: CA-0069
JEO PROJECT NO.:
DRAWN BY:
QAQC:
SCALES SHOWN FOR 22"x34" SHEET
VERIFY SCALE FOR REDUCED OR PRINTED COPIES
Dr aw ing N am e:
C0
TY
PI
CA
LS
.dw g Fil e P ath
: J :\P ro jec ts\
.01 -o lat he si de wa lk co ns tru cti on \7
De sig n\2 dr aw ing s\0 2-sh ee ts Pl ott ed
B y:
MA
DD
IE
B
RE
NN
FO
ER
DE
R
Sh ee t S ize
: A
NS
I E
XP
AN
D
D (3
4.0 0 X
.00
IN
CH
ES
Pl ot
Sc ale
: 1 :1
ADDITIONAL INFO:
TYPICAL SECTIONS
424 E PRAIRIE ST
504 N STEVENSON ST
1859 W CHAMBERY DR
1813 W WABASH ST
500 E HAROLD ST
504 E HAROLD ST
508 E HAROLD ST
512 E HAROLD ST
516 E HAROLD ST
520 E HAROLD ST
524 E HAROLD ST
528 E HAROLD ST
528 E HAROLD ST
424 E PRAIRIE ST
421 E PRAIRIE ST
LOC
LOC LOC LOC
LOC
LOC
LOC
LOCLOCLOCLOCLOCLOCLOC
LOC
CP-102
BM-11
ROW
ROW
ROW
ROW
ROW
ROWROWROW
ROW
ROW
RO
W
RO
W
RO
W
ROW ROW ROW ROW ROW ROW ROW ROW
FULL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .