3-2026 SSSD RFP CM GC Questions Doc.docx
DOCX document 315 KB Posted
- Solicitation number
- GJ27-17
- Issued by
- Summit County, Utah
About this file
This is a Questions and Answers document from the South Sanpete School District (SSSD) related to a Construction Manager/General Contractor (CM/GC) Request for Proposal for two APEX Centers at Manti High School and Gunnison Valley High School in Utah. The project involves two completely separate building constructions that will be located in close proximity to their respective existing schools. The designer for both projects is KMA Architects, with the design currently at approximately 25% schematic design status. The District intends to begin construction in January or February 2026. Questions from potential bidders were due by August 27, 2026 at 2:00 PM Mountain Time, and proposal submissions are due by September 2, 2026 at 2:00 PM Mountain Time to Jake Hill at jake.hill@ssanpete.org. Detailed construction plan documents and drawings will be made available to bidders in December 2025.
No addenda have been released as of August 20, 2026. The District has not imposed union requirements on this project. The Facilities and Lease Code (FLCC) number is referenced in the RFP document. Plan documents are available in a digital format with a 1GB file size limit per upload. Interested bidders should direct all questions and submissions to the designated contact at the South Sanpete School District, as the posting serves as a courtesy advertisement and contract awards will not be posted on the state website.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-1 APEX Bldgs RFP for CM Gen Contractor Svcs.docx | DOCX document | |
| 2-2026 SSSD RFP CM GC Questions 082026.docx | DOCX document | |
| 4-000 U3P Courtesy Posting Closed.pdf | ||
| 5-APEX Award Justification Statement - Single award (1).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
39 S Main Manti, UT 84642 | Phone 435-835-2261 GJ27-17 SSSD Manti & Gunnison APEX Centers
SSSD RFP CM/GC Questions:
Question 1:
Can you tell me which AE firm the designer is with on these two projects?
Are they completely separate buildings, or will they be connected to each school?
Also, what is the design status of each project?
How early could we start construction?
Answer 1:
KMA Architects is the firm the District is working with on these projects.
Yes, they are completely separate buildings, although they will be located very close to the existing schools.
The design status of each project is approximately 25% + schematic design.
We want to start construction in January/February.
Question 2:
Can I get a copy of any addenda that have been released to date?
What is the estimated construction budget?
Do you have Union Requirements?
Answer 2:
No addenda have been released to date 8-20-26.
The FLCC number is in the RFP document.
No.
Question 3:
I hope this message finds you well.
I am writing to request soft copies of the Plan documents related to [ RFP - Manti High School APEX Center And Gunnison Valley High School APEX Center ].
Answer 3:
The plans will be available in December.
Question 4:
Are there any plans or drawings for the Manti High School Apex Center & Gunnison Valley High School APEX Center?
Answer 4:
The plans will be available in December.
image1.png
File details come from the government source that posted it. Updated .