This document is the mandatory pre-proposal meeting minutes for the Santaquin Storm Drain Master Plan Update contract opportunity held by Santaquin City, Utah on September 16, 2026. The City seeks consulting engineering services to develop a comprehensive city-wide Storm Drain Master Plan with an associated Capital Improvements Plan, Impact Fee Facilities Plan compliant with Utah Impact Fee laws, Impact Fee Analysis, and a Storm Drain User Rate Study. The project requires development of a functional computer model of the city's storm drain system, identification of existing deficiencies, evaluation of future flow projections and development impacts, recommendations on storm water ordinances and operational practices, present worth cost estimates for capital improvements, identification of MS4 compliance issues, and updated user rate recommendations. The proposal submission must not exceed 10 pages with a maximum of four 11"x17" sheets, with a cover page excluded from the page count. The mandatory pre-proposal meeting occurred on Wednesday, September 16, 2026, with the final proposal due date of Friday, October 9, 2026. The City Council contract award presentation is scheduled for Tuesday, October 20, 2026. Seven key City contacts are identified including the City Manager, City Engineer, and Public Works Director.
The City will provide existing storm drain GIS shapefiles and associated data to support the consultant's work, with no significant additional data collection anticipated; however, occasional field visits may be necessary. The City currently uses Esri and Autodesk Civil3D software, and while compatibility with these platforms is preferred, it is not required. No specific modeling software is mandated. A 2021 supplemental watershed plan and existing Storm Drain Master Plan are available online as reference materials. The project scope excludes comprehensive hydrology studies for all 22 identified drainages along the east bench, focusing instead on areas with historical issues. The City anticipates becoming an MS4 regulated entity within the next few years and desires annual updates to the IFFP and IFA to account for rising construction and property acquisition costs.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Santaquin Storm Drain Master Plan, IFFP, and IFA
Pre-Proposal Meeting Minutes
9-16-2026
1. Introductions and Contact Information
a. City
i. Norm Beagley –City Manager nbeagley@santaquin.gov
ii. Jon Lundell – City Engineer 801-754-1927 office
801-592-3868 cell jlundell@santaquin.gov
iii. Megan Wilson – Engineer 801-754-1928 office 509-989-2774 cell mwilson@santaquin.gov
iv. Morgan Brim – Com. Dev. Director 801-754-1928 mbrim@santaquin.gov
v. Josh Carr – GIS specialist jcarr@santaquin.gov
vi. Jason Callaway – Public Works Director jcallaway@santaquin.gov
vii. Shad Eva – PW Storm Water lead seva@santaquin.gov
2. Background
a. The city is desires to update the city-wide storm drain master plan to guide future development; address existing drainage concerns, deficiencies, and issues; and create the associated IFFP, and IFA.
b. The city owns and operates limited and localized storm drain facilities. City policy has been, and is anticipated to continue, that development will be responsible for the installation of facilities to control storm water generated due to any development in accordance with current city code.
c. The city does not own or maintain any regional storm water retention basins.
d. Currently some portions of the city do not have any storm drain infrastructure and drain into irrigation ditches along the roadway. Many of these ditches have been removed during development and are no longer viable storm drain facilities.
e. Multiple drainages (appr. 22) located along the east bench of Santaquin city that have been identified and delineated. Additionally, Summit Creek which flows out of Santaquin Canyon, contributes annual flows that impact the city.
The City and Utah County have two separate NRCS funded projects to design and construct basins, earthen channels, and other facilities to address any potential debris flows. The City has receive final design approval and is proceeding to the construction phase of the projects. Utah county is currently in the design phase of the project. The study will need to incorporate the anticipated controlled outflows from these debris basins.
3. Objectives
a. Develop a functional computer model of the city storm drain system
b. Identify existing deficiencies
c. Evaluate future flow projections and impact of development on flow projections.
d. Evaluate and provide recommendations on the City’s current storm water ordinances, standards, philosophies and operational practices
e. Update Master Plan, Capital Improvements plan, IFFP, and IFA.
f. Provide present worth cost estimates for CIP.
g. Identify operational issues for compliance with MS4 regulations. The City currently is not an MS4, but anticipates that changing within the next few years.
h. The city desires to update the IFFP and IFA on an annual basis to account for rising costs of construction, property acquisition, etc.
i. Provide recommendation on an updated storm drain user rate.
4. Proposal Format
a. 10 Page Maximum
b. Maximum of 4 11”x17” sheets
c. Cover page is not included in page count
d. Refer to Appendix A in the RFP for submittal guidelines
e. Submit to jlundell@santaquin.gov
5. Selection Process Milestones
Date Action
Friday, September 4, 2026 Request for Proposals published
Wednesday, September 16, 2026 Mandatory Pre-Proposal Meeting
Monday, October 5, 2026 Final Date to Submit Questions
Friday, October 9, 2026 Proposal Due Date
Thursday, October 15, 2026 Proposals Review by Selection Committee
Tuesday, October 20, 2026 Contract award presented for City Council Consideration
Questions:
1. A 2021 report on drainages is available on the city website o https://www.santaquin.gov/1516/Supplemental-Watershed-Plan-1-Environmen
2. The scope of this project does not include the hydrology study for all 22 projects. The above mentioned report covers areas where issues have occurred historically
3. Known deficiencies are included in the existing master plan. Some may be resolved since the last master plan update o Existing deficiencies are identified in the current SD MP available at https://ut-santaquin.civicplus.com/DocumentCenter/View/2337/Storm-
Drain-Master-Plan
4. No specific modeling software is preferred. The city currently uses Esri and Autodesk
Civil3d software. It is preferred that the modeling software is compatible with either of these software packages, but it is not required.
5. No significant data collection is anticipated for this project. The city will provide existing storm drain GIS shapefiles and associated data. The city can also gather missing data as it is identified. The consultant may do occasional field visits if needed.
6. Clarification on number/sizes of pages o Page Format to be 8 ½“ x 11” with 2 exceptions
One 11” x 17” may be utilized to list projects under relevant experience One 11” x 17” may be utilized to show the proposed schedule o See provided addendum #1
7. GIS data is not available online but is relatively accurate/complete