3-2-SB27012 - Elevator Maintenance - Cost Proposal Form (3 year).xlsx

XLSX spreadsheet 73 KB Posted

Attached to
DFCM Maintenance - Elevator Maintenance - Invitation to Bid - Sandy Division of Child Family Services
Solicitation number
SB27012
Issued by
Salt Lake County, Salt Lake City, Utah

About this file

This is a cost proposal form for elevator maintenance services issued by the State of Utah's Division of Facilities Construction and Management (DFCM) for the Sandy Division of Child Family Services. The form requires contractors to submit pricing for a three-year maintenance contract covering multiple elevator types, including traction elevators, hydraulic elevators, lifts, and other equipment. Contractors must provide unit costs for monthly maintenance, quarterly maintenance, and annual testing for each piece of equipment, along with hourly rates for repairs during regular and overtime periods, as well as team-based repair rates. The proposal form is structured to calculate total annual contract costs by year, with all yellow cells designated as required fields and orange cells required when applicable.

The cost proposal explicitly excludes five-year testing expenses from the total contract cost calculation, as this testing is billed independently to DFCM and is not included in the budgeted amount for scheduled maintenance. Contractors must specify the number of units for each equipment type at the referenced building and provide detailed pricing breakdowns for all three contract years. The form includes fields for contractor name, building identification, unit quantities, and three-year hourly rate averages. Any repair work, five-year testing costs, and work outside scheduled maintenance must be invoiced separately from the standard maintenance contract billing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VBS Elevator Cost Proposal

DFCM ELEVATOR MAINTENANCE 3 YEAR COST PROPOSAL FORM

All YELLOW cells are required fields / ORANGE cells are required when applicable
Contractor Name:
U3P Reference #:
Building Name:
# of Traction Elevators:
# of Hydraulic Elevators:
# of Lifts:
# of Other:Description of 'Other':
Enter cost as a 'per unit' amount.Five Year Testing*Repair rates are not calculated into the Contract cost.
Contract YearSystem Type# of UnitsMonthly Maint / UnitAnnual TotalQuarterly Maint / UnitAnnual TotalAnnual Testing / UnitAnnual TotalAnnual Contract Cost by Year5 Year Test / UnitTotal 5 Year Test for Unit TypeHourly Rate for RepairsOvertime Rate for RepairsTeam Hourly Rate for RepairsTeam Overtime Rate for Repairs
1Traction Elevators0$ - 0$ - 0$ - 0$ - 0$ - 0
Hydraulic Elevators0$ - 0$ - 0$ - 0$ - 0
Lifts0$ - 0$ - 0$ - 0$ - 0
Other0$ - 0$ - 0$ - 0$ - 0
2Traction Elevators0$ - 0$ - 0$ - 0$ - 0$ - 0
Hydraulic Elevators0$ - 0$ - 0$ - 0$ - 0
Lifts0$ - 0$ - 0$ - 0$ - 0
Other0$ - 0$ - 0$ - 0$ - 0
3Traction Elevators0$ - 0$ - 0$ - 0$ - 0$ - 0
Hydraulic Elevators0$ - 0$ - 0$ - 0$ - 0
Lifts0$ - 0$ - 0$ - 0$ - 0
Other0$ - 0$ - 0$ - 0$ - 0
Five Year Testing Total for All Units*Three Year Hourly Rate Averages
Total Contract Cost:$ - 0$ - 0ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

*The cost of the five year testing is not included in the Total Contract Cost. The five year testing cost proposed shall be provided only if the testing requirement s scheduled to fall within the term of the Contract. The budget provided in the solicitation does not include the cost of the five year testing. The budget is inclusive of only the cost of scheduled maintenance. Five year testing, repairs, and work other than the scheduled maintenance must be billed to DFCM independently of the Contract billing for scheduled maintenance.

7.20.2026

Sheet1 isfCONTRACTs image1.png

File details come from the government source that posted it. Updated .