3-2-CR27000-27284500 Approved Plans.pdf
PDF 3 MB Posted
- Solicitation number
- CR27000
- Issued by
- Utah
About this file
This is an approved design and construction plan document prepared by the State of Utah's Division of Facilities Construction and Management (DFCM) for the DNR Trust Lands Office Remodel project (#27284500) located at 2031 Industrial Park Road, Richfield, Utah. The project involves the remodeling of existing office space to convert two offices into three offices within an 8,200 square foot building with an 18-foot ceiling height. The work includes demolition of existing walls, creation of new office spaces (Offices 122, 125, and 146), installation of new windows and doors to match existing specifications, interior wall finishes with paint and rubber base, carpet tile flooring, ceiling work including new sheetrock and grille relocation, and electrical upgrades. The approved plans were reviewed for code compliance on June 24, 2026, by Jason Van Ausdal and include detailed architectural schedules, floor plans, demolition plans, electrical plans, and specifications for wall types, door hardware, window glazing, and MEP (mechanical, electrical, plumbing) connections.
The construction cost estimate for this invitational project is $94,000.00, with an occupancy classification of Group B and construction type 5B in accordance with 2021 International Building Code and related standards. The project is an invitational bid opportunity restricted to three pre-selected contractors: PRT Builders, Rod Lewis Construction, and Tushar Contracting. The design incorporates specific material requirements including new 1-3/4-inch thick rotary-cut flush oak veneer doors with field-applied stain and varnish finishes, wrap-around hollow metal frames, Schlage brand locksets matching existing hardware, windows with Solarband 70 glazing, and matching existing knockdown ceiling and wall textures. The plans include specifications for wall bracing at four-foot on-center spacing, floor leveling for carpet installation, RFID card reader relocation as necessary, and sound and thermal insulation requirements. Prior to occupancy certification, the contractor must provide code inspection reports, special inspection certifications from structural and mechanical engineers, fire clearance from the State Fire Marshal, elevator and boiler inspector approvals, potable water system disinfection reports, and related final approval documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-1-CR27000-27284500 Solicitation.pdf | ||
| 2-3-CR2700-27284500 Hazmat Survey.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IND
USTRY
TH
E
G R E A T
SE
AL
OF THE
STATE
O F
U
TA
H
State of Utah-Department of Administrative Services
DIVISION OF FACILITIES CONSTRUCTION
AND MANAGEMENT
4315 South 2700 West, Floor 3/Taylorsville, Utah 84129-2128
1535 SOUTH 100 WEST
RICHFIELD, UT 84701
(435).896.8266
46 NORTH 200 EAST
ST GEORGE, UT 84770
(435).628.5969
SHEET NO. |PROJECT NO. |
ARCHITECT & CONSULTANTS
SHEET INDEXCODE REVIEW & DESIGN CRITERIA
PLUMBING FIXTURE COUNT
DEFERRED SUBMITTALS
CODE REQUIREMENT ACTUAL BUILDING DESIGNCODE ITEM -
REFERENCE
Is su e D at e:
SYMBOLS
ROOM NUMBER
DOOR NUMBER
EXTERIOR ELEVATION
WALL SECTION
BUILDING SECTION
WALL TAG
DETAIL NUMBER
TYPE
INSULATION
HEIGHT OFtda
FIRE RATING
WALLWALL1si
SHEET NUMBER
DETAIL
SHEET NUMBER
SHEET NUMBER
DETAIL NUMBER
SECTION NUMBER
000 WINDOW NUMBER
KEYNOTE0000 VIEW NUMBER
SHEET NUMBER
0' - 0" C-0
CEILING TYPE
CEILING HEIGHT
CEILING TAG
0 GRIDLINE
LEVEL ELEVATION
SPOT ELEVATION
VICINITY MAP
SPECIAL INSPECTIONS AND DEFERRED SUBMITTALS
DEFERRED SUBMITTALS
SPECIAL INSPECTIONS
THE FOLLOWING DOCUMENTS ARE REQUIRED BEFORE A
CERTIFICATE OF OCCUPANCY IS ISSUED
CODE INSPECTION REPORT FOR CERTIFICATE OF OCCUPANCY
FINAL REPORT ON ALL SPECIAL INSPECTIONS
CERTIFICATE OF FIRE CLEARANCE FOR THE STATE FIRE MARSHALL
FINAL APPROVAL FORM THE STATE ELEVATOR INSPECTOR
FINAL APPROVAL FORM THE STATE BOILER INSPECTOR
REPORT OF THE DISINFECTION OF POTABLE WATER SYSTEMS
CERTIFICATE FOR THE APPROVED FABRICATOR
STAMPED SIGNED OBSERVATION REPORT FOR THE STRUCTURAL ENGINEER
FINAL REPORT FOR THE SPECIAL INSPECTOR, MECHANICAL ENGINEER WHEN
SMOKE
CONTROL IS REQUIRED
APPLICABLE CODES
CODE ANALYSIS
ADA Accessibility Guidelines
Uniform Code for Building Conservation
National Electrical Code
International Energy Conservation Code
International Fire Code
International Plumbing Code
International Mechanical Code
International Building Code
Year
Special Use and Occupancy (e.g. High Rise, Covered Mall): __________________
Design Wind Speed: ______ mphB. Seismic Design Category: ______
Change in Use: Yes ______ No ______ Mixed Occupancy: Yes ______ No ______
A. Occupancy and Group: ________ ________ ________ ________ ________
North: ______ South: ______ East: ______ West: ______
BAHTBABABA
Tabular Area: ____________________________________________I.
Actual Area per Floor (square feet): __________________________H.
Number of Stories: ______ Building Height: ______G.
Required: ______ Provided: ______ Type of Sprinkler System: ____________ Sprinklers:F.
Mixed Occupancies: ______ Nonseparated Uses: ______E.
Fire Resistance Rating Requirements for the Exterior Walls based on the fire separation distance (in hours):
D.
C. Type of Construction (circle one):
INTERIOR ELEVATION
VIEW NUMBER
SHEET NUMBER
6/ 2/
1:
:0
AM
2602-109 G-001
DFCM
DNR TRUST LANDS OFFICE REMODEL
N/A
Occupancy - Chapter 3 B
Construction Type - Section 602 5B
DFCM Project No.27284500
2031 INDUSTRIAL PARK RD, RICHFIELD, UT 84701
SHEET # DESCRIPTION
1-GENERAL
G-001 TITLE SHEET
4-ARCHITECTURAL
A-100 DEMOLITION PLAN
A-101 FLOOR PLAN & ELECTRICAL PLAN
A-601 ARCHITECTURAL SCHEDULES
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A
B
X X
N/A
N/AN/A
N/A N/A N/A N/A
NO NO
NO NO N/A
N/A
8,200 S.F. ±
18'±
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
06/24/2026
REVIEWED FOR CODE
COMPLIANCE
E E
D D
C C
F F
10 10
9 9
EXISTING
OFFICE 122
EXISTING
OFFICE 125
EXISTING
DEMOLISHED
NEW CONSTRUCTION
FUTURE
PHASES
1 2 3 4 5
A
B
C
D
1 2 3 4 5
A
SHEET NUMBER
SHEET TITLE
COPYRIGHT:
C
DFCM STAMP:
D CREATED BY:
DESCRIPTIONMARK DATE
B
PROJECT TITLE:
CHK'D BY:
ISSUE TYPE:
ISSUE DATE:
CAD DWG FILE:
DRAWN BY:
DFCM PROJECT NO:
CAD PROJECT NO:
Phone: (801) 538 - 3018 Salt Lake City, Utah 84114 4110 State Office Building
DFCM
dfcm.utah.gov
2024 JONES &DEMILLE
ENGINEERING
27284500
H
-1
\D e s ig n \D e s ig n P r o c e s s D o c u m e n t a t io n (D
P D
A r c h it e c t u r e \0
_R
E V
IT
\0
_R e v it
\2
-1
D N
R T r u s t L a n d s O f f ic e R e m o d e l .r v t
DNR TRUST
LANDS OFFICE
REMODEL
2602-109
Author
A-100
DEMOLITION
PLAN
Checker
1/4" = 1'-0"1 DEMOLITON PLAN - TRUST LANDS OFFICE
DEMOLITION SCHEDULE
MARK DESCRIPTION OF WORK
1 DEMO WALL, PATCH WALL FINISHES TO MATCH EXISTING.
3 DEMO DOOR. IN-FILL WALL AND MATCH FINISHES TO EXISTING.
4 CREATE OPENING FOR WINDOW. WINDOW TO MATCH EXISTING.
PATCH WALL FINISHES TO MATCH EXISTING.
5 CONTRACTOR TO REMOVE AND SALVAGE EXISTING FLOOR CARPET
TILE THAT IS IN CONFLICT WITH THE NEW CONSTRUCTION. PROVIDE
COVERINGS ON EXISTING FLOOR FOR PROTECTION DURING
CONSTRUCTION.
6 REMOVE SHEETROCK 1'-6"+/- ON BOTH SIDES OF EXISTING WALL
FOR A COMPLETE DEMO OF WALL THAT ATTACHES TO EXISTING
ROOF STRUCTURE.
7 EXISTING RFID CARD READER TO BE RELOCATED FROM NEW
WINDOW LOCATION IF NECESSARY.
8 REPLACE EXISTING DOOR WITH A NEW DOOR, SEE SCHEDULE.
9 REMOVE SHEETROCK 1'-6"+/- ON BOTH SIDES OF NEW WALL TO
ALLOW ATTACHEMENT OF NEW WALL TO EXISTING ROOF
STRUCTURE.
10 RELOCATE EXISTING HARDWARE AND DOOR 122 TO THIS LOCATION,
SEE DOOR SCHEDULE.
06/04/26
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
06/24/2026
1.
2.
3.
4.
5.
6.
7.
FURNITURE IS TO BE O.F.O.I.
NEW OFFICE INTERIOR WALL FINISH TO MATCH EXISTING. PAINT ALL
WALLS & CEILINGS OF 3 NEW OFFICES & EAST WALL OF HALL 124.
PROVIDE 4" RUBBER BASE IN ALL 3 NEW OFFICES & EAST WALL OF
HALL 124.
OWNER WILL PROVIDE SOME EXISTING MATCHING CARPET TILE
THAT CAN BE USED ALONG WITH THE SALVAGED CARPET TILE TO
COMPLETE FLOORING IN THE 3 NEW OFFICES.
BRACE TOP OF NEW WALLS TO EXISTING ROOF STRUCTURE ABOVE
@ 4' O.C. EACH WAY.
PROVIDE ANY FLOOR LEVELING NEEDED FOR CARPET.
MATCH EXISTING KNOCKDOWN CEILING & WALL FINISHES AND
TEXTURES. REMOVE ADJACENT TEXTURES SO THAT NEW TEXTURE
GOES FROM FLOOR-TO-CEILING AND WALL-TO-WALL.
GENERAL NOTES:
E E
D D
C C
F F
3' - 10 3/4" 20' - 10 11/16" 4' - 9 1/8" 7' - 0 5/16"
7'
9"
/2
/1
6"
11' - 8 3/16" ± 9' - 1 23/32" ± 10' - 6 9/32" ±
OFFICE
OFFICE
OFFICE
HALL
tc5 -si tc5 -si tc5 -si ttb10 if ti
REQ'D
1' - 6"
NEW WINDOW, MATCH EXISTING,
SEE DETAILS 3/A-601 & 4/A-601
146A122A 125A
DOOR MARK
WINDOW/STOREFRONT MARK
ROOM NUMBER MARK
101A
SIGN MARK
1.
NOTE:
SEE ARCHITECTURAL SCHEDULES SHEET(S) FOR
WALL TYPES, DOOR TYPES, WINDOWS TYPES, AND
GLAZING TYPES.
tda 1si
FLOOR PLAN LEGEND
WALL HEIGHT
td = TO DECK tc = TO CEILING tt = TO TRUSS BOTTOM if = IN-FILL
FIRE RATING
- = NOT RATED
# = NO. HOURS RATED
INSULATION
si = SOUND INSULATION ti = THERMAL INSULATION
WALL TYPE
WALL TAG LEGEND
ROOM NAME
WALL TYPE
AIR BARRIER
1/2" OSB SHEATHING
2X6 STUD @ 16" OC
5/8" TYPE "X" GYP. BD
BATT INSULATION, SEE SPECS
WALL TYPE
5/8" TYPE "X" GYP. BD
2X4 STUD @ 16" OC
5/8" TYPE "X" GYP. BD
1/2" RESILIENT CLIP
2" RIGID INSULATION
WALL TYPE LEGEND
1/2" OSB SHEATHING
MFG STONE WAINSCOT
3" E.I.F.S. ABOVE WAINSCOT
E E
D D
C C
F F
OFFICE
OFFICE
OFFICE
MATCH
9' - 11 3/8"
MATCH
9' - 11 3/8"
MATCH
9' - 11 3/8"
SS S
NEW SHEETROCK CEILING,
SEE DEMO PLAN
EXISTING GRILLE TO REMAIN IN PLACE EXISTING GRILLE TO REMAIN IN PLACE
EXISTING GRILLE TO REMAIN IN PLACE
NEW GRILLE TO MATCH EXISTING
NEW GRILLE TO MATCH EXISTING EXISTING GRILLE TO BE RELOCATED
LIGHT FIXTURE - SEE LIGHTING PLAN
RECESSED LIGHT FIXTURE - SEE LIGHT PLAN
CEILING MOUNTED DUAL TECHNOLOGY
OCC. SENSOR
CEILING MOUNTED POWER PACK
CEILING MOUNTED EXHAUST FAN
PP
CEILING MOUNTED SUPPLY AIR DIFFUSER
CEILING MOUNTED RETURN AIR GRILLE
EXIT LIGHT
CEILING TYPE
CEILING HEIGHT
CEILING IDENTIFICATION
REFLECTED CEILING PLAN
LEGEND
X-X 0'-0"
DATA/PHONE OUTLET
S SWITCH
DUPLEX OUTLET
1.
2.
CONNECT RELOCATED CEILING GRILLES AS WELL AS NEW CEILING
GRILLES TO EXISTING DUCTWORK. PATCH DUCTWORK WHERE
RELOCATED GRILLES WERE REMOVED.
INSTALL NEW OUTLET, DATA/PHONE, AND SWITCH BOXES AND
DEVICES TO MATCH EXISTING COLOR AND QUALITY.
GENERAL MEP NOTES:
EXISTING
DEMOLISHED
NEW CONSTRUCTION
FUTURE
PHASES
1 2 3 4 5
A
B
C
D
1 2 3 4 5
A
SHEET NUMBER
SHEET TITLE
COPYRIGHT:
C
DFCM STAMP:
D CREATED BY:
DESCRIPTIONMARK DATE
B
PROJECT TITLE:
CHK'D BY:
ISSUE TYPE:
ISSUE DATE:
CAD DWG FILE:
DRAWN BY:
DFCM PROJECT NO:
CAD PROJECT NO:
Phone: (801) 538 - 3018 Salt Lake City, Utah 84114 4110 State Office Building
DFCM
dfcm.utah.gov
2024 JONES &DEMILLE
ENGINEERING
27284500
H
-1
\D e s ig n \D e s ig n P r o c e s s D o c u m e n t a t io n (D
P D
A r c h it e c t u r e \0
_R
E V
IT
\0
_R e v it
\2
-1
D N
R T r u s t L a n d s O f f ic e R e m o d e l .r v t
DNR TRUST
LANDS OFFICE
REMODEL
2602-109
MM
A-101
FLOOR PLAN &
ELECTRICAL
PLAN
KC
1/4" = 1'-0"1 MAIN FLOOR PLAN - TRUST LANDS OFFICE
1/4" = 1'-0"2 ELECTRICAL PLAN - TRUST LANDS OFFICE
06/04/26
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
06/24/2026
NEW WINDOW
NEW PRE-FINISHED METAL
FLASHING
EXISTING CULTURED STONE
EXISTING SHEATHING
EXISTING WALL
EXISTING GYP BD
NEW 2x
NEW GYP BD
NEW SILL, MATCH EXISTING
NEW CAULK
EXISTING GYP BD
NEW GYP BD
NEW 2x
NEW (2) 2x8 HEADER
NEW POLYISO INSULATION
NEW WINDOW
EXISTING WALL
EXISTING SHEATHING
EXISTING EIFS
NEW PRE-FINISHED METAL
FLASHING
NEW CAULK
EXISTING
DEMOLISHED
NEW CONSTRUCTION
FUTURE
PHASES
SE
E
SC
H
ED
U
LE
SEE SCHEDULE
WOOD DOOR, SEE DOOR NOTES WRAP-AROUND HOLLOW MTL
FRAME, SEE DOOR NOTES
2'
6" 5'
5"
3' - 0"
NEW INSULATED GLAZING TO MATCH
EXISTING GLAZING, MIN CRITERIA IS
SOLARBAND 70
451T STOREFRONT COLORED TO
MATCH EXISTING FRAMES
1 2 3 4 5
A
B
C
D
1 2 3 4 5
A
SHEET NUMBER
SHEET TITLE
COPYRIGHT:
C
DFCM STAMP:
D CREATED BY:
DESCRIPTIONMARK DATE
B
PROJECT TITLE:
CHK'D BY:
ISSUE TYPE:
ISSUE DATE:
CAD DWG FILE:
DRAWN BY:
DFCM PROJECT NO:
CAD PROJECT NO:
Phone: (801) 538 - 3018 Salt Lake City, Utah 84114 4110 State Office Building
DFCM
dfcm.utah.gov
2024 JONES &DEMILLE
ENGINEERING
27284500
H
-1
\D e s ig n \D e s ig n P r o c e s s D o c u m e n t a t io n (D
P D
A r c h it e c t u r e \0
_R
E V
IT
\0
_R e v it
\2
-1
D N
R T r u s t L a n d s O f f ic e R e m o d e l .r v t
DNR TRUST
LANDS OFFICE
REMODEL
2602-109
Author
A-601
ARCHITECTURAL
SCHEDULES
Checker
DOOR SCHEDULE
MARK ROOM
NUMBER DOOR TYPE FRAME TYPE DOOR HARDWARE GROUP REMARKSWIDTH HEIGHT
122A 122 SEE NOTES SEE NOTES 3' - 0" 7' - 0" LOCKSET TO MATCH EXISITNG SALVAGE EXISTING DOOR 122 AND REUSE HERE 125A 125 SEE NOTES SEE NOTES 3' - 0" 7' - 0" LOCKSET TO MATCH EXISITNG LOCATION OF EXISTING DOOR 122, SWITCH DOOR SWING
146A 146 SEE NOTES SEE NOTES 3' - 0" 7' - 0" LOCKSET TO MATCH EXISITNG
1.
2.
3.
PROVIDE WRAP-AROUND HOLLOW MTL FRAMES TO NEW OPENINGS.
NEW DOORS SHALL BE 1-3/4" THICK ROTARY-CUT FLUSH OAK VENEER
DOORS. NEW DOORS SHALL BE FIELD FINISHED W/ STAIN AND VARNISH
TO MATCH EXISTING DOORS.
NEW HARDWARE SHALL MATCH EXISTING. US26D FINISH, LEVER-STYLE
HANDLES, BUTTS, & SILENCERS. LOCKSETS FOR EACH DOOR SHALL
MATCH THE SCHLAGE BRAND AND DUTY THAT EXISTS.
DOOR & FRAME GENERAL NOTES
1 1/2" = 1'-0"3 SILL DETAIL
1 1/2" = 1'-0"4 HEAD/JAMB DETAIL
1/4" = 1'-0"1 DOOR TYPES
1/4" = 1'-0"2 FRAME TYPES
1/4" = 1'-0"5 WINDOW TYPES
06/04/26
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
06/24/2026
| G-001 - TITLE SHEET |
| A-100 - DEMOLITION PLAN |
| A-101 - FLOOR PLAN & ELECTRICAL PLAN |
| A-601 - ARCHITECTURAL SCHEDULES |
File details come from the government source that posted it. Updated .