This is a General Conditions Pricing Breakdown form (Attachment J) for Solicitation No. 696-FD-26-Q040, a Construction Manager at Risk project for the Clements Unit managed by the Texas Department of Criminal Justice (TDCJ). The form establishes the cost breakdown structure for general conditions across multiple construction document phases, including 65% Construction Documents (CD), 95% CD, and 100% CD milestones, with a separate Pre-Construction Fee line item. The pricing breakdown is organized to capture project management staffing, bonding and insurance requirements, utility costs, site facilities, testing services, and miscellaneous job-site expenses necessary for project execution but not incorporated into the final work product.

The General Conditions Cost Estimate Form requires contractors to itemize costs across multiple categories including Project Management Staff Personnel (On-Site), Bonds & Insurance (Builder's Risk, General Liability, Payment and Performance), utilities (Electricity, Water for job and drinking water), site facilities (Storage Containers/Trailers, Office Trailer monthly rental, Dumpsters, Crane), and support services (Testing and Balancing, As-Built Drawings, Fire Protection, Construction Materials Testing, Information Technology, Office Supply, Safety Equipment, and Fuel). The form explicitly notes that the provided line items are not exhaustive and contractors should include all applicable general conditions costs. The document indicates a total cost of $0.00, suggesting this is a template form awaiting completion with actual bid pricing based on the project schedule measured in calendar days.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL CONDITIONS PRICING BREAKDOWN

Attachment J

SOLICITATION NO.

Cost

$0.00

CD Milestones Breakdown Criteria

CONSTRUCTION DOCUMENTS (CD) COST BREAKDOWN

65% CD

100% CD

Pre-Construction Fee Total

GENERAL CONDITIONS COST BREAKDOWN

COST ESTIMATE FORM

TDCJ UNIT:

CITY: COUNTY:

PROJECT NAME/DESC.: SCHEDULE (Calendar Days):

Project Management Staff Personnel (On-Site)

Bonds & Insurance

General Conditions

Builder's Risk Insurance General Liability Insurance (Auto, Umbrella, Products & Public Liability Insurance)

Payment and Performance Bonds

Electricity Water (Job)

95% CD

696-FD-26-Q040 Page 1 of 2

GENERAL CONDITIONS PRICING BREAKDOWN

Attachment J

$0.00

$0.00

***Please notice this this is not an exhaustive list. General conditions should include any item that is not incorporated in the completed work product and is not trade specific.

Information Technology

Third-Party Commissioning Services

AVERAGE MONTHLY JOB BREAKDOWN TOTAL COST

General Conditions Total

a. Testing and Balancing

As-Built Drawings Fire Protection

Water (Drinking) & Associated Accessories Storage Containers/Trailers Office Trailer (Monthly Rental Cost) Dumpsters Crane

b. Construction Materials Testing

Information Technology Office Supply - Monthly Safety Material Safety Equipment Fuel

Fire Protection