2L0077 FIRST ARTICLE TEST.docx

DOCX document 16 KB Posted

Attached to
W56HZV-24-R-0016 Radiator, Engine Cooler Solicitation
Solicitation number
W56HZV_24_Q_0016
Issued by

About this file

This file is a First Article Testing (FAT) requirement document that specifies testing procedures for radiator components. The contractor must perform testing in accordance with drawing 12637821, requiring 4 sample radiators, with all 4 being consumed during testing. The contractor must compile a First Article Test Report (FATR) documenting all inspection and test results, including supplier certifications, measurements, and technical data with sufficient detail for government review.

This requirement is part of a larger Army sole-source solicitation (W56HZV-24-R-0016) for Radiator Engine Coolers issued by Army Contracting Command-Detroit Arsenal. The 3-year firm-fixed-price contract covers two NSNs: 2930-01-681-6394 (P/N 6117948, quantity 750) and 2930-01-681-6412 (P/N 6118072, quantity 3,278). Quotes are due by March 13, 2025, at 5:00 PM EST, and must be submitted via email to the Contract Specialist and Contracting Officer. The solicitation falls under NAICS code 336390 and has no associated Technical Data Package.

View the file

Other files

File Type Posted
NIIN 016816412 SPI.pdf PDF
2L0074 FIRST ARTICLE TEST.docx DOCX document
First-Article-Waiver-Worksheet.pdf PDF
NIIN 016816394 - SPI.pdf PDF
W56HZV24R0016.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2L0077 08/31/2023

FIRST ARTICLE TESTING

1. FIRST ARTICLE APPROVAL-CONTRACTOR TESTING: First Article Approval- Contractor testing shall be performed in accordance with drawing 12637821.

Sample quantities as follows:

Samples Manufacturing
PNNomenclature FAT Samples Consumed Standard

12637821 Radiator 4 4 1

2. For the purpose of clarification of this document, the terminology "First Article" shall replace “INITIAL PRODUCTION APPROVAL” in all applicable drawings, specifications, and QAPs.

3. The First Article Test Report (FATR) shall be compiled by the contractor in the contractor's own format. The FATR shall document the results of all inspections and tests (including supplier and vendor inspection records and certifications, when applicable). The FATR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (as applicable) keyed to each drawing, specification, SQAP, QAR, QAP requirement and identified as such. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the contractor to allow the designated Government representative to determine that the First Article Test was successfully completed.