This is a First Article Testing (FAT) requirement document that outlines testing requirements for radiators under drawing 12637820. The document specifies that 4 samples are required for testing, with 4 being consumed during testing and 1 serving as a standard. The contractor must compile a First Article Test Report (FATR) documenting all inspection and test results, including supplier certifications, measurements, and technical data with sufficient narrative content and evidence for government review.
This document relates to a sole-source solicitation (W56HZV-24-R-0016) issued by Army Contracting Command-Detroit Arsenal for Radiator Engine Coolers. The solicitation covers two NSNs: 2930-01-681-6394 (P/N 6117948, quantity 750) and 2930-01-681-6412 (P/N 6118072, quantity 3,278) under NAICS 336390. Proposals are due March 13, 2025, at 5:00 PM EST and must be submitted via email to the Contract Specialist and Contracting Officer. The contract will be a 3-year Firm-Fixed Price agreement with no Technical Data Package available.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NIIN 016816412 SPI.pdf | ||
| 2L0077 FIRST ARTICLE TEST.docx | DOCX document | |
| First-Article-Waiver-Worksheet.pdf | ||
| NIIN 016816394 - SPI.pdf | ||
| W56HZV24R0016.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2L0074 08/31/2023
FIRST ARTICLE TESTING
1. FIRST ARTICLE APPROVAL-CONTRACTOR TESTING: First Article Approval- Contractor testing shall be performed in accordance with drawing 12637820.
Sample quantities as follows:
| Samples Manufacturing | ||
| PN | Nomenclature FAT Samples Consumed Standard |
12637820 Radiator 4 4 1
2. For the purpose of clarification of this document, the terminology "First Article" shall replace “INITIAL PRODUCTION APPROVAL” in all applicable drawings, specifications, and QAPs.
3. The First Article Test Report (FATR) shall be compiled by the contractor in the contractor's own format. The FATR shall document the results of all inspections and tests (including supplier and vendor inspection records and certifications, when applicable). The FATR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (as applicable) keyed to each drawing, specification, SQAP, QAR, QAP requirement and identified as such. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the contractor to allow the designated Government representative to determine that the First Article Test was successfully completed.
File details come from the government source that posted it. Updated .