This is a Request for Information (RFI) regarding the potential use of Project Labor Agreements (PLAs) for two Naval Facilities Engineering System Command (NAVFAC) Mid-Atlantic construction projects at Naval Weapons Station Yorktown, Virginia.

The two projects under consideration are: (1) P-1417: Containerized Long Weapons Storage Magazine, which will construct a two-bay earth-covered magazine facility with mechanical buildings, emergency generator, bridge cranes (25-ton), HVAC units, cybersecurity systems, and antiterrorism features; and (2) P-1418: Conventional Prompt Strike (CPS) Weapons Maintenance and Storage Facility, a high-bay storage facility with structural steel framing, a 50-ton bridge crane, forklift charging system, and compressed air system. Both projects include post-construction award services, geospatial surveys, cybersecurity commissioning, operations and maintenance support information, low-impact development features, site preparation, specialized foundations, paving and site improvements, electrical utilities (including photovoltaic systems for P-1418), mechanical utilities, and physical security elements. The projects are estimated at $100M–$250M in total construction cost and will be prepared as one package under one design-bid-build contract with NAICS Code 237990.

Executive Order 14063 requires Federal agencies to use PLAs on large-scale construction projects with estimated costs at or above $35M. This RFI seeks public comments on PLA implementation through an attached seven-question questionnaire addressing contractor availability, labor market conditions, specialized construction needs, costs impacts, and prior PLA experience in the region. Responses must be submitted via email to catharine.a.keeling.civ@us.navy.mil by 2:00 P.M. local time on November 6, 2026. This is a planning survey only and does not constitute a solicitation or obligation on the Government's part.

View the file

Other files

File Type Posted
Project Information Form.docx DOCX document
27R0019 P1417 - 1418 - PLA Questionnaire .docx DOCX document
Contractor Information Form.docx DOCX document
27R0019 P1417-P1418 Weapons Mag Yktwn VA SSN.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Labor Agreement (PLA) Request for Information (RFI) for

DBB P-1417: Containerized Long Weapons Storage Magazine, Naval Weapons Station Yorktown, Yorktown, Virginia & P-1418: Conventional Prompt Strike (CPS) Weapons Maintenance and Storage

Facility, Naval Weapons Station Yorktown, Yorktown, Virginia

This is a request for information/market survey. This is not a request for proposal, request for quote, or an invitation for bid. There will be no solicitation, specification, or drawings available at this time.

Naval Facilities Engineering System Command (NAVFAC) Mid-Atlantic is soliciting comments from the public addressing the potential use of Project Labor Agreements (PLA) for the following construction project.

P-1417: Containerized Long Weapons Storage Magazine, Naval Weapons Station Yorktown, Yorktown, Virginia

This project constructs one Containerized Large Weapons Storage (CLWS) two-bay earth-covered magazine, with two mechanical buildings to support electrical and heating/ventilation/air-conditioning equipment, and one emergency generator facility. Magazine and supporting buildings construction will consist of reinforced concrete mat foundations, walls, floors, roof, and entrance and loading aprons. It will include ordnance bonding, grounding and lightning protection systems, and earth covering.

Facility-related control systems include cybersecurity features in accordance with current Department of

Defense (DoD) criteria.

This project will provide Antiterrorism (AT) features and comply with applicable service and

Geographic Combatant Commander policies and directive per Unified Facilities Criteria (UFC) for DoD

Minimum Antiterrorism Standards for Buildings.

Built-in equipment includes two bridge cranes (25-ton), with one bridge crane serving each bay, and four HVAC units (2 units per bay: 1 primary and 1 back-up). The new CLWS magazine is designed to accommodate the cranes and will include a crane rail in each bay as part of its standard design. An emergency generator is also included to maintain environmental control systems and ensure continuity of operations).

Special Costs include Post Construction Award Services (PCAS), geospatial surveys and mapping, and cybersecurity commissioning. The cybersecurity commissioning cost is to cover the contractor's submittals, administrative actions and compliance with the Department of Navy's (DON) cybersecurity requirements as well as DON's in-house costs to review contractor submittals and to implement steps necessary for obtaining Authority to Operate.

Operations and Maintenance Support Information (OMSI) is included in this project. DoD and DON principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact

Development (LID) will be included in the design and construction of this project as appropriate.

Site preparation includes clearing and grubbing, grading, excavation, fill, and earth cover for the magazine.

Special foundation features include reinforced concrete mat foundation over ground improvements and a load transfer platform for each to support the magazine facilities.

Paving and site improvements includes access roads, stormwater management features, paved truck loading and unloading area, and landscaping.

Electrical utilities include underground utility distribution, secondary electrical distribution systems, lighting, and telecommunications infrastructure. Mechanical utilities include storm sewer system and gas service. Facilities will be designed to meet or exceed the useful service life specified in DoD Unified

Facility Criteria. Facilities will incorporate features that provide the lowest practical life cycle cost solutions satisfying the facility requirements with the goal of maximizing energy efficiency.

P-1418: CPS Weapons Maintenance and Storage Facility, Naval Weapons Station Yorktown, Yorktown, Virginia

Constructs a high bay storage facility supported by mat foundations. The facility will utilize structural steel framing with a standing-seem roof. Exteriors are expected to be a combination of concrete and insulated metal panels. This project provides maintenance, operational, and storage space to support the

Conventional Prompt Strike (CPS) program.

Facility-related control systems include cybersecurity features in accordance with current Department of

Defense (DoD) criteria.

This project will provide Antiterrorism (AT) features and comply with applicable service and

Geographic Combatant Commander policies and directive per Unified Facilities Criteria (UFC) 4-010-

01 DoD Minimum Antiterrorism Standards for Buildings. User generated unit costs were used for this project and include the cost of features to meet minimum DoD AT standards.

Built-in equipment includes a bridge crane (50-ton), forklift charging system, and compressed air system.

Special costs include Post Construction Contract Award Services (PCAS), third-party commissioning, mechanical acceptance, and cybersecurity commissioning. The cybersecurity commissioning cost is to cover the Navy's (DON) cybersecurity requirements as well as DON's in-house costs to review contractor submittals and to implement steps necessary for obtaining Authority to Operate.

Operations and Maintenance Support Information (OMSI) is included in this project. DoD and DON principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact

Development will be included in the design and construction of this project as appropriate.

Site preparations include clearing, underground demolition, excavation, fill, site grading, and compaction.

Special foundation features include rigid inclusion ground improvements and load transfer platform.

Paving and site improvements include asphalt paving, concrete paving, curb, gutter, sidewalks, and landscaping.

Electrical utilities include a pad-mounted transformer (500 kVA), electrical distribution, site lighting, communication distribution, and photovoltaic system. Mechanical utilities include potable water, fire water, fire hydrants, sanitary sewer, sanitary sewer structures, storm sewer, storm sewer structures, storm management pond, underdrains, and pond structures. Included also- installation of Photovoltaic panels and required support structure and systems.

Physical security includes 232 meters (m) of security fencing (2.4 m high), gates, and drop arm barriers.

Facilities will be designed to meet or exceed the useful service life specified in DoD UFCs. Facilities will incorporate features that provide the lowest practical life cycle cost solutions satisfying the facility requirements with the goal of maximizing energy efficiency.

The project will be prepared one package, under one contract. The project will be design-bid-build. NAICS Code: 237990. The magnitude of construction is anticipated to be $100M – $250M.

A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement as described in 29 U.S.C. 158 (f). Federal Acquisition Regulation (FAR) policy states:

Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use PLAs in large-scale construction projects (defined as a construction projects with a total estimated cost at or above $35M) to promote economy and efficiency in the administration and completion of Federal construction projects. When awarding a contract in connection with a large-scale construction project, agencies shall require use of a PLA for contractors and subcontractors engaged in construction on the project, unless an exception(s) at FAR 22.504(d) (DPCAP CD 2026-

O0040) applies. Reference is made to: FAR Subpart 22.5 (DPCAP CD 2026-O0040) Use of Project

Labor Agreements for Federal Construction Projects; provision, FAR 52.222-33 (DPCAP CD 2026-

O0038) Notice of Requirement for Project Labor Agreement; and to clause, FAR 52.222-34 (DPCAP

CD 2026-O0038) Project Labor Agreement.

In consideration of the above factors, and any others which may be deemed appropriate, the public is invited to provide responses on the use of a PLA for this construction project utilizing the attached questionnaire.

This is not an announcement of the availability of a solicitation nor is it a means of generating a plan holder’s list. This survey is for planning purposes only and shall not be construed as a Request for

Proposal or as an obligation on the part of the Government. The Government does not intend to award a contract on the basis of this market survey or otherwise pay for the requested information. The

Government will not provide a debriefing on the results of this survey. All information will be held in a confidential manner and will only be used for the purposes intended.

Responses shall be submitted on the attached questionnaire via email to catharine.a.keeling.civ@us.navy.mil no later than 2:00 P.M. local time on 06 November 2026.

Project Labor Agreement (PLA) Questionnaire

Questions Responses

1) Are you responding as a representative of a government entity, union, contractor (union or non-union) and/or qualified small business?

2) Would the work involve specialized construction that is available from only a limited number of contractors or subcontractors? Explain in detail.

3) What is your understanding of the availability of union labor and non-union labor in this area for this type of project? Are you otherwise aware of national, regional, or local interest in participating in this project by union or non-union contractors.

Explain in detail.

4) As a qualified contractor for a project of this type, would you be interested in participating in this project?

Would the requirement of a PLA under this project impact your interest in any way? Explain in detail.

5) Are you aware of PLAs having been used on other similar construction projects in the area and/or other nearby areas?

Explain in detail.

6) How do union wage rates compare to prevailing wage rates for this type of project and in this area, i.e., prevailing wage rates under the Construction Wage Rates Requirements statute (formerly known as the Davis-Bacon Act). Explain in detail.

7) Are there any ways in which the requirement of a PLA might increase costs on a project of this type in this area? Explain in detail.