This document outlines the delivery schedule for a contract to produce the Secretary of Health and Human Services Report to Congress on Preventing Underage Drinking as required by the Sober Truth on Preventing Underage Drinking Act. The contractor will be required to deliver various plans, reports, questionnaires, meeting materials and other items on a recurring schedule over the five-year period of performance. Key deliverables include an IT plan, website migration plans, security documentation such as a privacy impact assessment and security plans, training records for staff, vulnerability scan reports, records transfer plans and various meeting materials and reports to support development of the annual report to Congress. The contractor must also develop and maintain a web-based questionnaire to collect state data, conduct data analysis, and facilitate workshops on related policy topics. Delivery due dates range from 30 to 90 days after contract award for initial documentation, to annual, semi-annual or as-needed recurring deliverables over the life of the contract.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reference No. 277-20-0550
Attachment 1c. Delivery Schedule
Schedule of Deliverables and/or Reporting Requirements
General Deliverables - List of Deliverables Based on Division of Technology Management
(DTM) and Office of Communication (OC) Requirements:
Item Timeline To Section
1 Final Information
Technology (IT) Plan
60 calendar days after award. Review annually
DTM thru Contracting Officer's
Representative (COR)
II
2 Meeting on systems or websites migration from third-party hosted service to SAMHSA
At least 60 calendars days or earlier before the planned migration date
DTM Infrastructure Team thru
COR
III
3 IT and Web Cost
Reports
Twice a year (July and November)
DTM Federal Information
Technology Acquisition Reform
Act (FITARA) Team thru COR
IV
4 IT Investment Factsheet 90 calendar days after award and update annually
DTM FITARA Team thru COR IV
5 Website Domain
Registration
When registered and when requested
DTM FITARA Team thru COR IV
6 Privacy Threshold
Analysis (PTA)
30 calendar days after award
Privacy and Chief Information
Security Officer (CISO) and
Info.Privacy@samhsa.hhs.gov thru COR
V. A. 1. 5). b
7 Entity, data type and relationship diagrams
No later than 30 calendar days after award
CISO and
Info.Privacy@samhsa.hhs.gov thru COR
V. A. 1. 5). c
8 Draft system’s Privacy
Impact Assessments
(PIAs) if full PIAs is needed
No later than 45 calendar days after contract effective date
(CED)
Privacy Officer and
Info.Privacy@samhsa.hhs.gov thru COR
V .A. 1. 5) .f
9 Encryption Key if applicable
When requested or at the end of the contract
Info.Privacy@samhsa.hhs.gov and COR
V. A. 1.
10) .h
10 Information Security
Awareness and Privacy training
Within 30 calendar days after CED and annually
COR V. A. 3. 1)
11 Security and Privacy
Role-based Training
Within 30 calendar days after CED and annually
COR V. A. 3. 2)
12 Security and Privacy
Training Records
Within 35 calendar days after CED and annually
COR V. A. 3. 3)
13 Read and sign Rules of
Behavior
Within 35 calendar days after CED and annually
COR V. A. 4
14 Staff Roster Within 30 calendar days after CED and
COR V. A. 5. 2)
mailto:Info.Privacy@samhsa.hhs.gov mailto:Info.Privacy@samhsa.hhs.gov mailto:Info.Privacy@samhsa.hhs.gov mailto:Info.Privacy@samhsa.hhs.gov
10 days when staffing changes
15 Project
Closeout/System
Decommission meeting
At least 30 calendar days before project closeout/system decommission
DTM thru COR V. A. 6
16 Initiate security assessment and authorization (SA&A) process
No later than 30 calendar days after
CED
CISO thru COR V. B. 2. 3)
17 System Authorization to
Operate (ATO)
Before system goes live
CIO and CISO V. B. 2. 4)
18 Information System
Security Plan (ISSP)
(with supporting artifacts and documents listed on the ATO package and the
Security Checklist.)
Part of ATO package, before system goes live
CISO and security email box infosecurity@samhsa.hhs.gov
V. B. 2. 6) b
V. B. 2. 6)
19 E-Authentication
Questionnaire (Risk
Assessment)
Within 30 calendar days after CED
CISO and infosecurity@samhsa.hhs.gov.
Template can be requested by emailing CISO and ISSO.
V. B. 2. 9)
20 Privacy and security kickoff meeting
Within four (4) weeks of CED
COR and CISO Work plan
21 Annual Penetration
Testing Summary
Report
Annually, anytime during a contract year
COR and DTM Security Team V. B. 2. 15)
22 Vulnerability scan reports for database, application, and operation system
Every 30 days after
ATO is granted
Upload to SAMHSA Sharepoint
Site directed by the SAMHSA
Security team and COR
V. B. 3. 4)
23 Vulnerability “Change
Report” and Cloud
Security Continuous
Monitoring Reporting
Every 30 days after
ATO is granted
Upload to SAMHSA Sharepoint
Site directed by the SAMHSA
Security team and COR
V. B. 3. 4)
V. C. 4 2)
24 Permanent electronic records
60 days prior to period of performance expiration
DTM Records Management
Officer
VI. B.5
25 Records management training and provide
Contractor Records
Management Training
Completion
Memorandum
Within 30 days of contract award or new contract staff start date and then annually for the life of the contract.
COR
VI. B. 11
26 Electronic Systems
Questionnaire
Responses within 4 weeks after the CED and 30 days prior to modifications to system
DTM thru COR during the kickoff meeting
VI. B. 12
mailto:infosecurity@samhsa.hhs.gov mailto:infosecurity@samhsa.hhs.gov
Specific Deliverables - The contractor shall deliver the following items in accordance with the stated delivery schedule:
Task
Description/Items
Quantity
Due Date
General
Requirements
IT Security Plan 2 of each, 1 draft
1 final
Final due not later than 90 calendar days after CED
Prepare an IT Plan that will include the design, development, implementation, and maintenance for all IT applications and major IT milestones and implementation dates of the project.
2 of each, 1 draft
1 final
Final due not later than 90 calendar days after CED
Content Development and Management
Plan
2 of each, 1 draft
1 final
Final due within 60 days after the CED, the
Contractor shall submit
“Electronic Versions” and
“Hard Copies”.
Task 1
Contract
Management
27 HHS Accessibility
Checklist
Each content deliverables
COR OC
requirements
I. G
28 Content Development and Management Plan
Within 60 days after
CED
OC and DTM (including Records
Officer) thru COR
OC
requirements
IV. A
29 Web Content Approval No later than 3 weeks prior to the planned initial posting of document
COR OC
requirements
IV. C
30 Web Content Migration
Plan including a demo
Within 60 days after
CED; demo within 30 days after CED
COR and DTM (including
Records Officer) thru COR
OC
requirements
IV. D
31 Meeting on IT transition activities related to data, software, web content, and electronic records
Within 30 days after
CED
COR, DTM, and OC OC requirements
IV. E
32 Reports of actual Web-related IT costs
Twice a year (July and November)
OC and DTM thru COR
(could be combined with IT and
Web Cost reports, see #3)
OC
requirements
IV. F
33 Transition Task Schedule meeting with COR and DTM to discuss transition activities
COR and DTM Transition
The Contractor shall conduct a kick-off meeting.
Within 2 weeks of Contract
Effective Date (CED).
Subtask 1.1
Subtask 1.2
Meetings shall be held weekly between the Contractor, the COR, and other relevant parties. The Contractor shall provide agendas and summary of discussions, and documentation of decisions made prior to and following each meeting.
52 Agendas --at least two (2) business days in advance of each meeting. Meeting
Summaries shall be provided within three (3) business days following each meeting
Subtask 1.3 The Contract Project Director shall prepare and submit an annual operational budget by task, listing all expenses associated in accomplishing each task.
1 Annual, 3 Updates
Annual operational budget should be submitted via
Excel Spreadsheet at the start of each contract year, and quarterly thereafter.
One (1), copy of the annual operational budget updated quarterly should be submitted to the COR and one (1) copy to the CO.
Task 2
Reporting
Requirements
Monthly report
2 of each, 1 final
Drafts due at the end of each month, final due on or before the 10th day of the following month
Subtask 2.1
Subtask 2.2 Annual Report 2 of each, 1 draft
1 final
Drafts are due 45 days prior to end of award period with final due within 30 calendar days before the end of the award period of performance
Subtask 2.3 Final Report 2 of each, 1 draft
1 final
Drafts are due 45 days prior to termination of the contract with final due within 30 calendar days before the termination of the contract
Task 3
OMB Clearance
Package
Draft and submit OMB evaluation plan for review of SAMHSA OMB Clearance
Officer.
2 of each
1 final
Drafts due 45 calendar days of CED , Final due no later than 90 calendar days after CED
Subtask 3.1 Review evaluation plan with SAMHSA
OMB Officer.
1 Drafts are due 45 calendar days of CED, Final due no later than 90 calendar days after CED
Subtask 3.2 Draft OMB Clearance Package and prepare any additional documents necessary for OMB data collection clearance, including revising proposed
State questionnaires.
2 of each
1 Final
Draft OMB clearance package within 21 days of approval of the Evaluation
Plan, final OMB Clearance
Package within seven (7) calendar days following initial draft submission.
Subtask 3.3 Draft 60 day Federal Register Notice
(FRN)
2 of each
1 draft
1 Final
Draft 60 day Federal
Register Notice (FRN) shall be submitted within
28 days of approval of the
Evaluation Plan, and the final 60-day FRN within seven (7) calendar days following initial draft submission.
Subtask 3.4 Draft 30 day Federal Register Notice 2 of each
1 draft
1 Final
Draft submitted within 45 days of the 60-day FRN, with final 30 day FRN submitted within seven (7) calendar days following initial draft submission.
Subtask 3.5 Final OMB Clearance Package 2 of each
1 Final
Within 30 days after the end of the 60 day FRN comment period
Task 4
Annual Report to
Congress
Develop the annual report to congress on national efforts to reduce underage drinking and state reports on the prevention and enforcement of underage drinking activities.
1 Final
+ Drafts
Draft Annual RTC and SR due 90 days prior to estimated publish date
Subtask 4.1 Review the RTC prepared in the prior year and recommend changes for
1 format per year and 1
Upon COR approval upcoming Annual RTC and SR for revision.
final report per year
Subtask 4.2 Draft a severable executive summary for the RTC.
+ drafts
Subtask 4.3 Develop the upcoming year RTC and
Executive Summary, revise reports as needed and make them 508 compliant.
Submit drafts for approval.
+ drafts
Subtask 4.4 Provide information needed for SR and assemble for each state.
51+ drafts
As state information becomes available
Subtask 4.5 When information is not available in
APIS, collect and assemble additional information.
As needed As needed
Subtask 4.6 Modify the State Questionnaire based on comments solicited as a result of the
Federal Register Notice and OMB’s feedback.
1 Within 1 month of receiving comments
Subtask 4.7 Survey states with approved questionnaire and provide technical support to States to ensure that the information that has been provided is consistent with the intent of the questionnaire.
Minimum of
51 contacts with states
Beginning one (1) month after questionnaire revision and OMB approval
Subtask 4.8 Develop State Reports organized by HHS region
51 + Within two (2) months of receipt of all State questionnaires to COR
Subtask 4.9 Continue preparation for upcoming years
RTC/SR, develop, and implement quality controls and record keeping.
As needed As needed
Subtask 4.10 Revise and submit drafts of the RTC &
SRs as well as provide professional copy editing and ensuring that it is 508 compliant and submit final document.
1 Final
Report (RTC w/SR)
Within two (2) months of receiving revisions to draft, submit to COR
Subtask 4.11 Conduct at least one (1) meeting of interested parties to consider potential changes, prepare additional documents, and submit to COR for review and modify state questionnaire accordingly.
1 Two (2) months after submission of current year final State Report
Subtask 4.12 Implement process for selecting new topics for SR with input from interested parties.
As Needed Within 2 months of new topic selection
Subtask 4.13 Document all operational procedures employed in developing the RTC and canvassing the states for the SRs.
As needed As needed
Task 5
Web-based questionnaire &
TTA
Develop, maintain, and update web-based questionnaire and provide technical support to states and the District of
Columbia
1 plan As needed upon COR review and approval
Subtask 5.1 Provide maintenance, testing, and, as necessary, website design, revision, and repair for questionnaire website. Ensure that existing functionality incorporated in the design of the questionnaire website operates as intended, and that links (both internal and external) are operational and connect to the intended web pages.
12 Provide COR with updates in monthly report
Subtask 5.2 Provide and perform quality assurance procedures and develop a report related to development of questionnaire.
1 outline
1 report
An initial outline two (2) months after start of award;
a full report at the end of each contract year. First report is due after one (1) full year of award is completed
Subtask 5.3 Document all operational procedures employed in operating questionnaire website.
1 outline
1 report
An initial outline two (2) months after start of award;
a full report at the end of each contract year.
Subtask 5.4 Develop a plan for providing technical support to state agency staff filling out questionnaire.
1 plan No later than three (3) months after contract is awarded and plan is approved by COR
Subtask 5.5 Develop and maintain a technical support website to be housed on www.stopalcoholabuse.gov
1 website Completed two (2) months after TA plan is approved by COR
Subtask 5.6 The Contractor, in consultation with the
COR, shall answer any questions and post frequently asked questions (FAQs) that may be useful for others on the website.
As needed As needed
Task 6
Development of
Analytic Papers
Task 6.1 Identify, acquire, and develop papers describing underage drinking related policies that provide descriptive overviews and detailed characterizations of specific alcohol-related policies provisions.
5 per year These papers will be due one (1) – three (3) months after identification of issue, depending on complexity
Subtask 6.2 Identify experts in topic areas to provide data analysis and information relevant to the development of RTC and SR.
TBD Experts shall be confirmed one (1) month after contract award and within two (2) weeks of need being identified
Subtask 6.3 Prepare scientific journal articles approximately 10-20 pages related to current scientific trends, policy programs, practices and lessons learned.
2 Upon approval of COR
Task 7
Concept facilitation and consultation
Subtask 7.1 The Contractor shall identify national experts in topic areas to provide data analysis, staff development, and information to support the ICCPUD data committee. The Contractor shall be responsible for the qualifications for consultants recruited by them in response to the tasks of this contract.
3 consultant per year, at
25 days each, with no more than six (6) trips.
Upon approval of the COR
Subtask 7.2 The Contractor shall negotiate a daily rate with proposed consultants on a per
TBD As needed upon COR/CO review and approval http://www.stopalcoholabuse.gov/ assignment basis. This rate should not exceed $450.00 per day unless the
Contractor requests an exception and can document an approved federal rate for the consultant for similar work and the
Contracting Officer approves this rate.
Subtask 7.3 The Contractor will develop learning products and workshops on information contained within the RTC/SR to enhance the federal prevention workforce.
Two workshops and related learning products
Upon approval of the COR
Task 8
Meeting/Work shop Facilitation
Contractor to plan for 3 two-day meetings/workshops for approximately
50 interested parties/federal staff.
TBD Upon approval of the COR
Subtask 8.1 Prior to each workshop or meeting, the
Contractor and the COR shall meet to discuss meeting plans, proposed consultants in detail and development of invitation list.
TBD When possible six (6) weeks before the meeting
Subtask 8.2 Provide the COR with a Plan of
Performance for meetings/workshops that should meet the requirement outlined in the SOW.
Draft invitation letters for signature
Final invitation letters for signature
Submit final agendas for review
3 per year Six (6) weeks before event
Five (5) weeks before event
Four (4) weeks before event
Four (4) weeks before event
Subtask 8.3 Hire consultants (on as need basis). 3 per meeting/ workshop
At least six (6) weeks before meeting/workshop when possible
Subtask 8.4 Determine with COR virtual or face to face meeting, if the meeting is face to face, then Contractor to assist in identifying government facilities for meeting sites and arrange for meeting rooms, and as required microphones and public address systems as approved by the COR.
3 meetings/ workshops per year
At least five (5) weeks before workshop/meeting
Subtask 8.5 Provide 2 staff to manage logistics and prepare registration packets for each
At least 50 per meeting/
Four (4) weeks prior to the workshop/meeting, the attendee. Assist if necessary, the organizing and setting up display materials and recording of meeting minutes.
Contractor shall develop a meeting evaluation form to record comments made by participants and provide results to COR.
workshop contractor shall submit sample packet to COR for approval.
Three (3) weeks prior to the workshop/meeting
Subtask 8.6 In addition to the evaluation forms, develop a mechanism to capture the number of attendees, amount of discussion, as well as impressionistic information on level of interest, quality of the presentations.
Contractor shall prepare a summary analysis of the meeting/workshop including, but not limited to the outcome of the evaluation as well as the major recommendations and points made.
TBD Submitted to COR two (2) weeks after meeting/workshop
Task 9
Transition Plan
Task 9.1
Transition Plan
Draft and submit a plan for transfer of the project to either the government or a new contractor as applicable.
1 No later than the eight (8) months of the final performance period and initiate transition actives sixty (60) calendar days prior to contract expiration.