About this file
This document contains a solicitation for construction services at a Federal Communications Commission facility in Vero Beach, Florida. The solicitation seeks quotes to perform demolition and renovation work with an estimated price range between $200,000 to $300,000. Quotes are due by February 9, 2024 and must be submitted electronically to Luis.Salas@fcc.gov. A mandatory site visit is scheduled for January 25, 2024 at 10:00 AM EST at the project location. Scope of work includes pruning and removing trees, clearing debris, converting lights to LED, removing downed towers, and replacing carpeting. Vendors must inspect the site as the included clauses address differing site conditions and conditions affecting the work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| As-Built Drawings - Reduced Size - Set 2.pdf | ||
| As-Built Drawings - Reduced Size - Set 1.pdf | ||
| Amendment- P00002.pdf | ||
| Vero Beach FL - SOW - Rev1.pdf | ||
| Vero Beach RFI - FCC Responses - 20240222.pdf | ||
| FCC VB Site Sign-In Sheet (1-25-2024).pdf | ||
| Amendment- P00001.pdf | ||
| Davis-Bacon Act WD - FL20240209.pdf | ||
| RFQ-Pricing Sheet CLIN Structure- Vero Beach.xlsx | XLSX spreadsheet | |
| 1-Vero Beach - SOW.pdf | ||
| RFQ-273FCC24R0006- Vero Beach Field Office Demo-Renovation.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vero Beach – Appendix 1 Vero Beach Trees
SOW – Appendix 1 – Page 1 of 18
Prune/trim tree branches that cover/hover over driveway back 6 feet from edge of driveway.
Tree branches shall be no lower than 16 feet from the ground to allow box truck and/or semi-truck through. Debris shall be pushed back to main tree line minimum 25 feet from driveway.
Tree branches to go to designated vegeta on and tree debris area.
SOW – Appendix 1 – Page 2 of 18
SOW – Appendix 1 – Page 3 of 18
Prune/trim tree branches that cover/hover over driveway and hang less than 16 feet from ground on the pond side. Tree branches shall be no lower than 16 feet from the ground. Tree branches and any ground brush to go to designated vegeta on and tree debris area. Foliage and debris on pond side shall be cleared all the way to the pond.
SOW – Appendix 1 – Page 4 of 18
SOW – Appendix 1 – Page 5 of 18
SOW – Appendix 1 – Page 6 of 18
Trees and palm trees that have been marked and numbered (1-15) with an orange “X” shall be cut, removed, and stump grinded (x15).
SOW – Appendix 1 – Page 7 of 18
SOW – Appendix 1 – Page 8 of 18
SOW – Appendix 1 – Page 9 of 18
SOW – Appendix 1 – Page 10 of 18
Push back tree and debris to main tree line that surrounds light pole next to main building and flagpole. Convert the light pole to dusk to dawn LED light. Move debris to designated vegetation and tree debris area. Use this term in the rest of the document.
SOW – Appendix 1 – Page 11 of 18
SOW – Appendix 1 – Page 12 of 18
Cut debris that surrounds the Lightening Arrestor pole and move to designated vegetation and tree debris area. Lightening Arrestor pole to remain as-is.
SOW – Appendix 1 – Page 13 of 18
Cut foliage/debris that surround downed towers behind main building to provide access. Move foliage/debris to designated vegetation and tree debris area. Downed towers and bases remove off property.
SOW – Appendix 1 – Page 14 of 18
Trim branches that is next to slanted light pole ver cally and horizontally, minimum 6 to 8 feet and 16 feet ver cally from the driveway. Straighten slanted light pole and convert light to dusk to dawn LED.
SOW – Appendix 1 – Page 15 of 18
All trees that are hanging over circular driveway shall be cut back 6 to 8 feet from driveway and 16 vertical feet from driveway.
SOW – Appendix 1 – Page 16 of 18
Remove debris that surrounds irriga on well and take to designated vegeta on and tree debris area.
SOW – Appendix 1 – Page 17 of 18
Replace front of main building outdoor non-LED light (next to flagpole) with dusk to dawn double/triple LED lights (x1). Match with the three (3) LED lights on right side of building.
Replace garage side main building outdoor solar non-LED light with dusk to dawn double/triple LED lights (x2). Match with the three (3) LED lights on opposite side of garage.
SOW – Appendix 1 – Page 18 of 18
Main building carpet color for reference when matching with new carpet les.