About this file
This is an Invitation to Bid (ITB) Specifications and Bidding Information document issued by the City of Alpharetta, Georgia for FY27 Sidewalk Repair and Maintenance (ITB #27-003). The project consists of furnishing all materials, labor, and equipment for the complete construction of sidewalk repair and replacement, including demolition and disposal of existing concrete sidewalk, construction of new concrete sidewalk and handicap ramps, and related work. The work locations are along Westside Parkway, Kimball Bridge Road, and Clubhouse Drive. The bidding deadline is September 17, 2026 at 10:00 AM, with bid submissions required exclusively through the Bonfire online platform. A public bid opening will be held via Microsoft Teams Meeting shortly after the submission deadline. The contractor must commence work within ten calendar days of receiving the Notice to Proceed and achieve final completion within 120 calendar days. All bids must include a cover letter with business profile, resumes of key personnel, at least three references for similar work completed within the last three years, available resources, and examples of up to six previous projects.
Bid pricing must be submitted using the provided Schedule of Items in Excel format, with the award based on the bid grand total. A bid bond equal to 5 percent of the grand total bid price is required. The contractor must perform at least 50 percent of the work with their own organization and cannot subcontract without written City consent. Performance and Payment Bonds in the amount of 100 percent of the contract price are required prior to commencing work. Retainage of 5 percent will be applied to each progress payment, and liquidated damages will apply. Work hours are limited to 7:00 AM to 7:00 PM Monday through Friday, with no weekend work permitted. The contractor is responsible for all traffic control measures, utility locating, and required testing services through an independent source. All required forms including IRS Form W-9, Bidder's Disclosures and Certifications, and an E-Verify affidavit must be completed and submitted with the bid. Beth Rucker, Procurement Agent, is the sole point of contact for all questions and communication regarding this ITB.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 2025
CITY OF ALPHARETTA INVITATION TO BID (ITB)
ITB Number: 27-003 ITB Title: FY27 SIDEWALK REPAIR & MAINTENANCE
ITB SPECIFICATIONS & BIDDING INFORMATION
1. ITB Period of No Communication The “No Communication” period starts on the issue date of this Invitation to Bid (ITB) August 20, 2026, and lasts until the City Council meeting for contract award recommendation (or until contract award if this isn’t required to go before council for approval).
No person or company, their employees, representatives, agents, attorneys, etc. will contact the City’s elected officials or any City staff concerning this ITB.
Contacting anyone other than the Procurement Agent named below for this ITB during this time will be reason to remove a bid from consideration or review.
2. Procurement Agent, Single Point of Contact Beth Rucker is the designated Procurement Agent and the sole point of contact for this ITB on behalf of the City. Bidders must direct all questions and comments exclusively through the Opportunity Q&A tab prior to the posted Question Due Date on the Bonfire project webpage.
Link to Bonfire: https://cityofalpharetta.bonfirehub.com/ All official communication will be provided through the Bonfire project webpage, and Bidders are responsible for monitoring the Bonfire webpage for any status updates, addenda, or the final award notice. Direct communication with any other City staff regarding this ITB is not permitted and may result in disqualification.
Beth can be reached at 678-297-6052 or purchasing@alpharetta.ga.us.
City of Alpharetta 2 Park Plaza Alpharetta, GA 30009 Attn: Beth Rucker, Procurement Agent
3. Please Note: To all current and previous City of Alpharetta vendors, contractors, and consultants.
Regardless of any previous relationship with our City, you must build out your bid response as requested in this ITB.
Do not neglect to provide requested information or details requested simply because you expect that we already know your work.
Your response to this procurement will be reviewed solely in the information provided in your response.
https://cityofalpharetta.bonfirehub.com/ mailto:purchasing@alpharetta.ga.us
City of Alpharetta ITB #27-003, FY27 SIDEWALK REPAIR & MAINTENANCE Specifications & Bidding Info
4. ITB Schedule of Events A. Bidding Close Date, Deadline for Submissions: September 17, 2026, at 10:00am. We may change this date during the ITB process. We will post any change in an addendum.
Review web page for addenda.
B. Link to Bonfire Project Web Page: https://cityofalpharetta.bonfirehub.com/
C. This project web page has important dates and all project documents for this ITB.
D. Enter all questions, comments, requests for information before the Questions Due Date using Message – Opportunity Q&A at the Bonfire project web page.
E. In each question, clearly note the ITB document and section that is in question.
F. We will share any changes or added information from the City with a written addendum publicly posted online with the project procurement documents. Anything assumed as a change that was only communicated in email or verbally does not qualify as a change to the project or procurement information.
G. It is your responsibility to check the project web page for any addenda, other information, or other messages before finally uploading a bid. You must respond using any updated information.
H. A public bid opening will be held shortly after the ITB due date / time has passed. ITB Public Opening will be held via Microsoft Teams Meeting. Click to link to the meeting.
I. Review the Bonfire project site after the public bid opening for the Preliminary Bid Tabulation to be posted with other project files. It will be posted after the City’s administrative review has been completed.
WHAT THE CITY WANTS TO DO
1. Project Background and General Description The work to be done consists of the furnishing of all materials, labor, and equipment for the complete construction of FY27 SIDEWALK REPAIR AND REPLACEMENT including but not limited to the demolition and disposal of existing concrete sidewalk, the construction of new concrete sidewalk and handicap ramps, and related work to sidewalk repair and reconstruction. The location of the work is along Westside Parkway, Kimball Bridge Road, and Clubhouse Drive.
2. Plans and Specifications The Contractor must comply with all specifications set forth in appendices A through D which are posted as separate documents titled Appendix A-General Conditions, Appendix B-Supplemental Conditions, Appendix C-Technical Specifications, and Appendix D-Design Standards under files on the Bonfire project page.
https://teams.microsoft.com/meet/225880483799907?p=J8tPye0cRgBf8GQnKr
3. Project Specific Requirements A. Work Commencement. Contractor shall commence the Work with adequate force and equipment within ten (10) calendar days from receipt of Notice to Proceed and shall continuously pursue the work without interruption to completion and to achieve Final Completion of the Work by one hundred and twenty (120) calendar days from Notice to Proceed.
B. Work Performance. Contractor shall be responsible for performing with their own organization at least fifty percent (50%) of the work in this contract. The Contractor shall not subcontract, transfer, assign, or otherwise dispose of the contract or any portion thereof, without the written consent of the City.
C. Retainage, Liquidated Damages, & Bonds. Retainage in the amount of 5% of each progress payment will be applied. Liquidated damages will apply. Prior to commencing the Work, the Contractor, as principal, and a surety company listed in the Federal Register and licensed to write surety insurance in the State of Georgia, as surety, must give a Performance Bond in the amount of one hundred percent (100%) of the price of the Contract and a Payment (Labor and Material) Bond, in the amount of one hundred percent (100%) of the price of the Contract.
D. Work Hours. Permitted work hours shall be from 7:00 AM to 7:00 PM Monday through Friday. Work on Saturday or Sunday is not allowed.
E. The cost of any work performed, materials furnished, services provided, or expenses incurred, which are not specifically delineated in the contract documents, but which are incidental to the scope, intent, and completion of the contract, shall be included in the prices for the various items scheduled.
F. Traffic Control Measures. Contractor shall be responsible for implementing and maintaining all necessary traffic control measures when working within public right of way. Contractor shall submit a traffic control plan to the City for approval prior to commencing any operations at a given location. Traffic can only be impeded between the hours of 9:00 AM and 4:00 PM. Traffic control is entirely the responsibility of the Bidder and must comply with Manual on Uniform Traffic Control Devices (MUTCD) standards.
G. Should the Contractor desire to utilize police officers as part of their traffic control, only City of Alpharetta Police may be so utilized. Contact Sergeant Jabbar Braithwaite (678- 297-6182) with the City of Alpharetta Department of Police.
H. The Contractor’s sole point of contact on this project shall be the City’s Construction Manager or their designee. The Contractor shall not contact the Engineer directly without the prior approval of the City’s Construction Manager. Any requirements for submittals, notifications, etc. to the Engineer called for on the plans or in the project specifications shall instead be made to the City’s Construction Manager.
I. Contractor must reconstruct sidewalks within 48 hours of demolition. If rain is forecast to occur prior to reconstruction, Contractor shall be responsible for providing adequate erosion and sedimentation control measures. This includes, but is not necessarily limited to, temporary stabilization with hay/straw (Ds1), silt fence (Sd1), and inlet protection (Sd2) as appropriate.
J. Contractor shall have all construction debris removed from area within 48 hours of the sidewalk being reconstructed. This includes wash out bags, plastic, trash bags, excess concrete, etc.
K. Contractor must restore the area completely within 2 weeks of sidewalk being reconstructed. This includes backfilling with soil, installing sod, final cleanup, etc.
L. Root barrier will be required where trees and shrubs are impacting the sidewalk. This will be determined by a City official.
M. All sidewalks, ADA ramps, and curb and gutter must be constructed according to the standard plan details that are provided. All truncated dome pads shall be brick red in color and are required to cover the entire width of the ramp opening.
N. Unit prices for all ADA ramps shall include the demolition and installation of the adjoining curb and gutter. Removing the curb and leaving the gutter will not be allowed under any circumstance.
O. Modification to existing concrete islands for an ADA cut through shall be saw cut and demoed six feet wide. A six-inch header curb shall be poured on either side of the cut through, allowing for a five-foot-wide walking path. The concrete within the walking path shall be no less than 4 inches thick. A brick red truncated dome pad shall be installed anywhere that the cut through meets a roadway.
P. Contractor is responsible for obtaining any utility locates. If any utilities are damaged during construction, the contractor shall notify the City immediately.
Q. Contractor is responsible for all required testing as set forth in the Technical Specifications (Appendix C-posted as a separate document). Testing services must be provided by an independent source. All testing costs shall be incorporated into the unit price for the associated line items.
R. Line item 23 on the SOI reflects loops that could possibly be impacted during the project.
If the contractor can avoid damage to the loop wires, repairs will not be required. If a loop is damaged, it is the contractor’s responsibility to coordinate the repair.
S. The City intends to award this contract to a single Contractor. Should the bid results exceed the City’s budget for this project, the City reserves the right to eliminate sections of sidewalk repair from the final scope of work.
4. Public Works Construction According to Georgia Public Works Law (O.C.G.A. § 36-91-1 et seq), public works construction means the building, altering, repairing, improving, or demolishing of any public structure or building or other public improvements of any kind to any public real property other than road construction or the routine operation, repair, or maintenance of existing structures, buildings, or real property.
A. The work is solely within City-owned right of way or property. No right of way or easement acquisitions are needed.
B. The Schedule of Items form will be used as the primary representation of each Bidder’s cost/price. The award of this project will be based on bid grand total.
FOLLOW THIS OUTLINE
How We Want You to Construct Your Bid
1. Using Bonfire to Submit Bid
1.1. This is the link to Bonfire Project Web Page to get our documents and to upload your bid: https://cityofalpharetta.bonfirehub.com/
1.2. We are accepting all bids by online response only. You must upload completed bids and ‘Submit’ online before the closing date and time found in this document and in the Project Details of the project web page for this ITB. Any change to the deadline will only be by publicly posted addendum.
1.3. Don’t send bids by mail, fax, or email. We will not accept paper copy bids. We will not accept any bids after the closing time deadline has passed.
1.4. You have not completed your response simply by uploading bid documents and information. You must successfully upload all the required documents, including filling out any questionnaires, price sheets, or data requests, and then you must click the Submit button before the closing time.
1.5. You will receive an email confirmation receipt with a unique confirmation number shortly after you complete your bid upload. This confirms that you have successfully turned in your bid with all required information.
1.6. You can update your bid at any time until the closing time even after Submitting.
1.7. All uploaded items and responses are Sealed in the project web page and will only be visible by the City after the closing time has passed.
1.8. If the file is ‘mandatory’ or ‘required’, you won’t be able to complete your bid until you have met all requirements.
1.9. Uploading large documents may take more time, depending on the size of the file(s) and your Internet connection speed.
1.10. Pay attention to the type and number of files we have asked you to upload.
1.11. The largest upload file size is 1000 MB (1 GB) per file.
1.12. Don’t embed any documents within your uploaded files. They won’t be accessible or evaluated.
1.13. Minimum system requirements:
a) Use a Supported Browser: Microsoft Edge (Windows), Google Chrome (Windows & Mac), and Mozilla Firefox (Windows & Mac).
b) Java Script must be enabled.
c) Browser cookies.
d) Use a desktop or non-mobile device: We make the best effort to have certain views available on mobile devices, however, this is not something we officially commit to at this time since so much of the workflow requires full desktop experience.
1.14. For successful Questionnaire and/or Bid Table uploads, please ensure you are using Microsoft Office/Excel/Word 2007 or newer.
2. Required Bid Document Formats Each bid must follow these document formats.
• Format your documents using this outline:
no more than 10 (10) pages per bid, formatted to single or double space lines, 10 to 12-point font size, black font color (excludes photos, charts, section separators or headings), and upload Bid documents (except Excel cost sheet or if otherwise directed) in PDF format.
TECHNICAL BID INFORMATION
A. Cover Letter with Brief Business Profile, length of time in business, and a summary describing company strong points and why your experience with similar projects will benefit the City.
B. Business information, including name and home office address. If another office address oversees work for this project, add that address information too.
C. Contact, one person to be the single point of contact for this bid. All communication with the City will be with this person. Supply the following contact information in the bid:
• Name, including business title and preferred personal/honorific title (Mr. Ms.
Dr. etc.)
• mailing address,
• telephone number, cell phone number, and
• e-mail address.
D. Resumes or Statements of Qualifications. Include short resumes or qualifications for key people that you plan to assign to this project. The information included should be for work history related to this project. At a minimum, include:
• Employee’s name, title, and intended role for this project.
• Employee’s work experience and years performing work like this project.
• Employee’s qualifications, education, skills, certifications that may apply.
• Employee’s length of time with your company.
• Examples of employee’s project work that is like our project.
E. References. Supply at least three references for work or services like the project in this ITB (don’t include the City of Alpharetta). These references must be for work or services provided within the last three years.
NOTE: We contact references to verify your ability to do the work. We also reserve the right to use any information or other references to decide your ability to perform the work in this ITB. Poor references from any source are grounds to disqualify a bid.
F. Available Resources. Include a list describing the personnel, equipment, materials, sub-contractors, and any other resources available to you and that may be needed and used to show your ability to do the work or services as requested in this ITB.
G. Examples of Previous Projects. If it fits the purpose of this ITB, you can use this section to highlight previous work, services, installations, etc. Keep this section to projects that are like our request in this ITB. Include no more than six (6) examples.
3. Bid Bond We require a bid bond equal to 5% of Grand Total bid price as listed in the ITB 27-003 Schedule of Items. A bid bond form has been supplied as a separate document for you to download and have completed by your surety. Return the completed bid bond to us as a separate document. All information must be readable including all seals (ex: Notary Seal).
This is a Pass / Fail. Any bids received without the required Bid Bond will not be considered and bid pricing will not be called.
4. Schedule of Items, Bid Pricing We have supplied a separate Schedule of Items (SOI) pricing sheet for you to complete. It is in Excel format for you to complete and upload with your bid.
5. Required Forms:
We have provided required forms. You must complete these forms and return them to us with every bid.
A. IRS Form W-9
B. Bidder’s Disclosures and Certifications
C. E-Verify (Affidavit Verifying Contractor Participation in Federal Work Authorization Program)
All the following must be on the E-verify affidavit.
Federal Work Authorization User Identification Number – this is only five to eight numbers.
No A, B, C’s.
It’s different from your Tax ID, Employer Identification, or Social Security
Number.
It won’t have a combination of letters and numbers.
Date of Authorization – this is when you first signed up and got the E-verify number.
Name of Contractor – your company.
Name of Project – Same as ITB title.
Date, City, and State – when and where this form was signed.
Signature of Authorized Officer or Agent – to be signed.
Printed Name and Title of Authorized Officer or Agent – the person that signed the form.
Notarized with seal.
6. Questionnaire We use a questionnaire to gather important information needed for legal requirements, your acknowledgements, our bid review, or information needed for writing a contract.
Some questions may require your answers about the work we have described in this ITB.
You will fill out the questionnaire provided. There is no other form or document to upload.
Information requests and response types are as follows:
• Authorized signer.
o For Corporations (President or Vice President) or o For LLCs (Member of the LLC) for contract execution in DocuSign: Name, corporate title (Member for LLC), email address.
o Response Type: text entry.
E-Verify note: Companies return this form to us incorrectly more often than anything else we request in our ITBs.
State of Georgia law requires that we have this completed form before we can review a bid or bid.
A form with errors doesn’t fulfill this requirement.
Top mistakes include:
Wrong number or missing information.
Not notarized.
Not signed.
Wrong form returned.
• For Corporations only, Secretary or Assistant Secretary to attest to signing for contract execution in DocuSign: Name, business title, email address, (if not a corporation, enter N/A). Response Type: text entry.
• Contact for legal notices needed for contracting: Business name and mailing address, contact name. Response Type: text entry.
• Unique Entity ID / identifier used at SAM.gov, Response Type: alphanumeric entry.
• Note the Employee-Number Category for your company (all locations). Select either 500 or more employees, 100 or more employees, or less than 100 employees.
• Acknowledge Addenda, enter the number of addenda received: 0, 1, 2, etc.
• Acknowledge Insurance Requirement, Response Type: Yes, No entry.
• Acknowledge Payment & Performance Bonds, Liquidated Damages, Response Type: Yes, No entry.
| ITB SPECIFICATIONS & BIDDING INFORMATION |
| 1. ITB Period of No Communication |
| 2. Procurement Agent, Single Point of Contact |
| 3. Please Note: To all current and previous City of Alpharetta vendors, contractors, and consultants. |
| 4. ITB Schedule of Events |
| What The City wants to Do |
| 1. Project Background and General Description |
| 2. Plans and Specifications |
| 3. Project Specific Requirements |
| 4. Public Works Construction |
| Follow this Outline |
| How We Want You to Construct Your Bid |
| 1. Using Bonfire to Submit Bid |
| 2. Required Bid Document Formats |
| TECHNICAL BID INFORMATION |
| 3. Bid Bond |
| 4. Schedule of Items, Bid Pricing |
| 5. Required Forms: |
| 6. Questionnaire |
File details come from the government source that posted it. Updated .