26R6111 Shipyard Data Template.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
TUGCON; OPEN-OCEAN TOW
Solicitation number
N3220526R6111
Issued by

About this file

This is a shipyard data template required for submission as part of RFP N3220526R6111, a solicitation from the Department of the Navy Military Sealift Command for tugboat and open-ocean tow services (TUGCON).

The template requires offerors to provide comprehensive documentation of all vessels in their fleet, including both owned and operated assets. Specifically, vendors must list each vessel and detail all maintenance and overhaul shipyard work performed over the four-year period preceding offer submittal. For each vessel and work scope, offerors must identify whether the work was completed at a qualifying U.S. shipyard or qualifying foreign shipyard, provide the associated cost of work performed, include the shipyard name and address, and specify the inclusive dates of work completion. The template includes example entries for a tug and barge with cost fields designated in currency format, establishing the format and level of detail expected in responses. This submission requirement appears designed to substantiate vessel maintenance history and demonstrate compliance with domestic shipyard work preferences or scoring criteria applicable to this Navy tugboat services contract.

View the file

Other files

File Type Posted
26R6111 QA_0002.pdf PDF
26R6111 A0001_RFP.pdf PDF
26R6111 QA_0001.pdf PDF
2015-0213 Rev. 40.pdf PDF
26R6111 RFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Include all vessels in your fleet; Must list all covered vessels owned and/or operated by offeror and their maintenance/ overhaul shipyard work to include the 4 preceding years up to time of offer submittal
VESSELDESCRIPTION OF QUALIFYING U.S. SHIPYARD WORK PERFORMEDCOST OF WORK PERFORMEDDESCRIPTION OF QUALIFYING FOREIGN SHIPYARD WORK PERFORMEDCOST OF WORK PERFORMEDSHIPYARD NAME AND ADDRESSINCLUSIVE DATES OF WORK PERFORMED
Tug ABC
Barge ABC

Approximate Total $0.00 Approximate Total $0.00

Sheet2

Sheet3

File details come from the government source that posted it. Updated .