26QE014_ATTACH2_TECH_CAP.pdf
PDF 139 KB Posted
- Attached to
- Guam Device and Wireless Services
- Solicitation number
- HE125426QE014
- Issued by
-
Department of Defense Education Activity
About this file
This is a technical capability evaluation form (Attachment 2 – Factor 1) for a Department of Defense procurement solicitation managed by the DoWEA Procurement Field Support Branch.
The offeror must demonstrate technical capability to provide smartphones and basic mobile phones meeting specific requirements outlined in Objectives 1 and 2 of an accompanying Performance Work Statement. For smartphones, required specifications include 128 GB storage, Super Retina Display, Optical Image Stabilization (OIS), advanced dual camera with 48MP vertical stack, camera control button, and Global System for Mobile Communication (GSM) Subscriber Identity Module (SIM) support. For basic phones (dumbphones), the offeror must support communication within the Territory of Guam with inbound/outbound voice calls, unrestricted emergency dialing, reliable operation across Guam including remote areas, durable field-environment construction, industry-standard lithium-ion battery, and a simple user interface for rapid emergency use. Offerors must complete a compliance table indicating yes or no for each specification and submit supporting technical specifications and product literature to substantiate their responses. The offeror must also commit to a delivery date for all phones and mobile phone service activation, with a mandatory deadline of 01 April 2026 at minimum. Source selection information is governed by FAR 2.101 and 3.104.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26QE014_SOL_0001_AMD1.pdf | ||
| 26QE014_ATTACH2_TECH_CAP.pdf | ||
| 26QE014_SOL_0001.pdf | ||
| 26QE014_ATTACH3_PRICE.xlsx | XLSX spreadsheet | |
| 26QE014_Encl3_CPARS.pdf | ||
| 26QE014_Encl2_Letter of Commitment.pdf | ||
| 26QE014_SOL_032526.pdf | ||
| 26QE014_ATTACH1_PWS.pdf | ||
| 26QE014_ATTACH3_PRICE_021826.xlsx | XLSX spreadsheet | |
| 26QE014_Encl4_52.204-26.pdf | ||
| 26QE014_ATTACH5_RepsCerts.pdf | ||
| 26QE014_Encl5_52.204-24.pdf | ||
| 26QE014_Encl6_252.239-7009.pdf | ||
| 26QE014_Encl1_52.209-7.pdf | ||
| 26QE014_ATTACH4_PPQ.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DoWEA Procurement Field Support Branch
Attachment 2 – Factor 1: Technical Capability
Please complete all required fields in the fillable sections below.
Contractor Name:
Subfactor 1 – Mobile Phone Technical Requirements (Objectives 1 and 2):
The Offeror shall provide technical specifications that clearly demonstrate that the proposed smart phones and basic phones comply with the requirements outlined in Objectives 1 and 2 of the Performance Work Statement (PWS).
The Offeror shall complete all fields in the Subfactor 1 Table below. The submission shall include technical specifications and supporting product literature that directly correspond to and substantiate the information provided in the table.
Specifications YES NO Smartphone 128 GB Storage Super Retina Display OIS (Optical Image Stabilization) Advance Dual Camera 48MP Vertical Stack Camera Control Button Global System for Mobile Communication (GSM) Subscriber Identity Module (SIM) support Dumbphone (Support the following) Communication within the Territory of Guam Inbound/Outbound voice calls Unrestricted emergency dialing Operate reliably across Guam, including remote areas Durable construction suitable for field environment Include Industry Standard Lithium-ion battery Use simple user interface for rapid emergency use
Subfactor 2 – Delivery Date: The Offeror shall state the earlier phones will be delivered below. At a minimum, the Offeror must deliver all the phones and activate mobile phone services by 01 APR 2026
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
| Subfactor 1 Mobile Phone Technical Requirements Objectives 1 and 2: |
| YESSmartphone: |
| NOSmartphone: |
| YES128 GB Storage: |
| NO128 GB Storage: |
| YESSuper Retina Display: |
| NOSuper Retina Display: |
| YESOIS Optical Image Stabilization: |
| NOOIS Optical Image Stabilization: |
| YESAdvance Dual Camera 48MP Vertical Stack: |
| NOAdvance Dual Camera 48MP Vertical Stack: |
| YESCamera Control Button: |
| NOCamera Control Button: |
| YESGlobal System for Mobile Communication GSM Subscriber Identity Module SIM support: |
| NOGlobal System for Mobile Communication GSM Subscriber Identity Module SIM support: |
| YESDumbphone Support the following: |
| NODumbphone Support the following: |
| YESCommunication within the Territory of Guam: |
| NOCommunication within the Territory of Guam: |
| YESInboundOutbound voice calls: |
| NOInboundOutbound voice calls: |
| YESUnrestricted emergency dialing: |
| NOUnrestricted emergency dialing: |
| YESOperate reliably across Guam including remote areas: |
| NOOperate reliably across Guam including remote areas: |
| fill_25: |
| fill_26: |
| YESInclude Industry Standard Lithiumion battery: |
| NOInclude Industry Standard Lithiumion battery: |
| YESUse simple user interface for rapid emergency use: |
| NOUse simple user interface for rapid emergency use: |
| undefined: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box28: Off |
| Text29: |
| Text30: |
| Text31: |
| Text32: |
| Text33: |
| Text40: |
File details come from the government source that posted it. Updated .