This document contains a Clarifying Questions file for a federal contract opportunity involving network infrastructure and Wi-Fi services. The solicitation is live, brand-new, and will be competed as other than full and open competition. Key details include a planned performance start date of January 15, 2026, with proposals due by 12:00 NOON Central Time on January 2, 2026. The contract will involve network switches, enterprise Wi-Fi access points (both indoor and outdoor), and edge networking services with a 5Gbps bandwidth requirement.
The technical requirements specify Wi-Fi coverage for a warehouse, administrative offices, and loading zones, with a concrete tilt wall building construction. The base infrastructure will use a mixture of single-mode and multi-mode fiber. Specific equipment includes 14 outdoor Wi-Fi access points and indoor access points, with a firewall requirement. The contract will be a 12-month fixed firm price contract, with vendors expected to determine their pricing approach. Critical operational details such as exact equipment placement, maintenance windows, and performance reporting will be coordinated with the requiring activity upon award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clarifying Questions
1. Is the solicitation cancelled or live?
a. Live.
2. What is the total value of this contract?
a. Not Applicable. This has not been rewarded.
3. Does an incumbent exist?
a. No.
4. Is this a brand-new contract?
a. Yes.
5. Who is the current service provider?
a. Pursuant to FAR 13.106-1(b), this requirement will be competed as other than full and open competition.
6. Are there floor plans/CAD drawings available for all locations showing Bldg. number, room number, room dimensions, and existing equipment installation layout?
a. Please see attachment.
7. What is the Bldg. number and room number of the Ft. Cavasos DEMARC for the current base telecom vendors providing exist telco services? Please include street address or Lat/Long.
a. Physical address will be provided within the contract award. Please see PWS for further information.
8. What is the Bldg. number and room number for each Bldg./location requiring service? Please include street address or Lat/Long.
a. Physical address will be provided within the contract award. Please see PWS for further information.
9. Are there sufficient air conditioning and backup power at each location to sustain network equipment in the event of an outage?
10. Is there existing equipment the new vendor will replace? If so, is there a comprehensive list of equipment already in place that you can provide?
11. Is the base infrastructure SM or MM fiber?
a. A mixture of both.
12. Is there inside wiring for each Bldg. available for use by the vendor?
13. There is a part in the scope listing performance of “good” and bad signal strength, but I did not see a SNR level included. Can you clarify if SNR is required?
a. Good and Bad as in is the internet working as required in the contract.
14. TECHNICAL EXHIBIT 2 - Industrial Crane Boom Truck - Performance Characteristics.
How is the” Industrial Crane Boom Truck” relevant to “Performance Characteristics”?
a. Exbibit 2 does not list any cranes.
15. Can you provide a coverage area map for each location? This will be required to calculate the signal coverage per the technical specifications.
a. Please see attachment.
16. What is the Bldg. construction (concrete walls/floors, drops ceiling, interior walls, etc.) for each location where Wi-Fi coverage is required?
a. Building is a concrete tilt wall with inner dry walled office spaces.
17. Part 5 item 5.1.1 (on page 37 in the pdf) lists that a comprehensive site survey, existing infrastructure analysis, design, and proposal for installation shall occur before installation which does not align with the CLIN table on page 2 & 3. What is the expectation and how can it be completed prior to the Closing date? This seems to be unreasonable for a comprehensive reply.
a. This is a task that is completed once an awardee is picked, or in this case after award. Pursuant to FAR 13.106-1(b), this requirement will be competed as other than full and open competition.
18. How many devices and types will be using the Wi-Fi at each location?
a. Too vague of a question. Please Specify.
19. What is the minimum bandwidth per device for each location.
a. 5gbps
20. What is the Firewall/Security requirements for the network? If so, what is required.
a. A firewall is required.
21. The due date for questions is stated as “3:00 PM Central Time (UTC-5) on December 31, 2025”. When will the vendors receive the reply answering all vendor questions?
a. Before COB DEC 31 or Before 0900 JAN 2
22. “Period of Performance” is stated as 15 January 2026 for the start date with the response due date as “12:00 NOON Central Time (UTC-5) on January 2, 2026”. When is the date of the award and fully executed agreement to be in place for award vendor to proceed with the project? This timeline does not seem reasonable for an open Solicitation. Questions are due December 31, 2025. Proposals are due January 2, 2026. Please consider extending the deadline by one week from date of provided answers to questions to allow respondents time to evaluate RFI responses.
a. As stated in the description and in the Synopsis attachment: Period of Performance is subject to change. Contract will begin once awardee and KO have signed Approx 15 JAN. Pursuant to FAR 13.106-1(b), this requirement will be competed as other than full and open competition. An extension is not needed.
23. Is there any consideration for extending the response date by 30 days due to the short timeline for vendors to respond?
24. Are there any considerations to use an AAFES MOA as a contract vehicle for the project?
25. Please provide Division 27 project specifications
a. Please provide more conten t to clarify what this question is asking.
26. Please confirm that the new network switches will tie to an existing network located elsewhere. If so, please provide make and models of the existing equipment so that we can provide compatible hardware.
a. Pursuant to FAR 13.106-1(b), this requirement will be competed as other than full
27. CLIN 0001-0003 is for network switches and WAPs. Please provide guidance as to how to price materials in the five-year format provided. Equipment is usually a one-time purchase. Are we to include the prices for those CLINs only in the first year and leave those CLINS blank for the option years? The provided CLINs are for equipment and internet service. How do we include pricing for the installation of the ~150 drops?
b. Pursuant to FAR 13.106-1(b), this requirement will be completed as other than full and open competition. A quote is not needed. However, if you provide a quote you will have to determine how you would like to include these prices within your
CLINS.
28. whether the Government anticipates awarding to a single prime who will subcontract the low voltage install work.
a. No.
29. If there is a recommended vendor list or prime contact method for teaming on this requirement.
30. Has a V e n d o r already been selected
a. Pursuant to A 13.106 1(b), this requirement will be competed as other than full
31. Is this opportunity still available.
a. As found in the SAM Posting description: Submission of quotations are not required, the purpose of this solicitation is to provide a notice of government intention to award sole source.
32. Should estimates be justified in the proposal with heat map snapshots? Should CLIN 0005 (Edge up to 5Gbps) include firewall licensing, IDS/IPS, and 24/7 monitoring at its monthly rate?
a. You will have to determine how you would like to do pricing. If you need to adjust the CLINS to fit your quote, then that is okay. Please note, as found in the SAM Posting description: Submission of quotations is not required, the purpose of this solicitation is to provide a notice of government intention to award sole source.
33. Will the Government accept NRC lines for installation and hardware, with MRC for support in option years?
a. To ensure I answer your questions correctly. Please provide the full name for the acronym. At this moment the answer is No.
34. Will the Government provide the exact DEMARC and fiber handoff details (SM/MM; LC/SC) at award?
a. Yes.
35. Are there prohibited vendor lists beyond FAR 52.204-25/DFARS 252.204-7018 (e.g., component-level bans)?
a. No.
36. What is the warehouse operating hours and installation windows (after-hours/weekend permitted)?
a. Upon award. Awardee must coordinate with requiring activity within 24 hours to access the facility.
37. Will the COR coordinate badging and escort requirements, or should we include a security liaison in our plan?
a. Upon award. Awardee must coordinate with requiring activity within 24 hours to access the facility.
38. Any log retention or SIEM integration requirements (e.g., forwarding logs to Army enterprise tools)?
a. No.
39. Are preventive maintenance windows preferred (quarterly schedule), and must they be non-disruptive?
a. Awardee will coordinate with requiring activity, upon award.
40. What reporting format does the Government prefer for monthly performance and quarterly PM (CSV + PDF dashboards)?
a. Awardee will coordinate with requiring activity, upon award.
41. Please confirm acceptance criteria for coverage (RSSI/SNR thresholds) and latency tests—can we agree on numeric thresholds (e.g., RSSI ≥ -67 dBm, SNR ≥ 20 dB)?
a. Awardee will coordinate with requiring activity, upon award.
42. Can you confirm the anticipated award date to align mobilization (PWS indicates ~Jan 15, 2026, start)?
a. Please see question 22.
43. Please confirm if existing internet service noted in Contract Data will be replaced or augmented, and whether any cutover constraints apply.
a. Pursuant to A 13.106 1(b), this requirement will be competed as other than full and open competition.
44. What is other than full and open competition.
a. The definition can be found at the link FAR Subpart 6.3
45. The Contract Line-Item Numbers (CLINs) for the network hardware (e.g., switches, access points) list a Unit of Issue (UI) of "MONTH" for the Base Year and all Option Years. Could the Government please clarify the intended acquisition model for this equipment? Is this intended to be a lease agreement, a hardware-as-a-Service model, or a traditional fixed-price purchase where the monthly charge covers maintenance, licensing, and/or transfer of ownership?
a. This will be a 12 MONTH Fixed Firm Price Contract. You will have to determine how you would like to do pricing. If you need to adjust the CLINS to fit your quote, then that is okay. Please note, as found in the SAM Posting description:
Submission of quotations is not required, the purpose of this solicitation is to provide a notice of government intention to award sole source.
46. CLIN 0003 specifies a quantity of 14 units for the "Enterprise Network Wi-Fi 33 FAP-23X Outdoor" access points. Given that the Performance Work Statement (PWS) requires coverage for the warehouse, administrative offices, and loading zones, please confirm the intended placement of these 14 "Outdoor" units. Are they specifically for the loading zones/exterior areas, or are they to be installed inside the main warehouse structure?
a. There are two separate CLINS, one for indoors and one for Outdoors. In terms of exact placement. This will be verified by the requiring activity upon award. Please note: Pursuant to A 13.106 1(b), this requirement will be competed as other than full and open competition.