26M092CN Multiple Location BEQ Parking Lot Repairs PD.pdf
PDF 492 KB Posted
- Attached to
- FY26 Multiple Location BEQ Parking Lot Repairs
- Solicitation number
- N4008526R9066
About this file
This is a Project Description document for a federal construction contract at Marine Corps Base Camp Lejeune, North Carolina.
The Contractor shall provide comprehensive pavement rehabilitation services for designated BEQ (Bachelor Enlisted Quarters) parking facilities. Work includes professional-grade hot-mix asphalt (HMA) pavement overlay and complete systematic reinstatement of all surface pavement markings. The Contractor must supply all labor, management, supervision, tools, materials, equipment, transportation, and quality control necessary to complete the project. The facility will remain operational throughout the entire construction period, requiring the Contractor to minimize interference with normal facility operations and move furniture and other objects as needed. Supervision requirements allow a single qualified individual to serve concurrently as Superintendent, Quality Control Manager, and Safety & Health Officer, provided that person meets all qualifications as defined in the project specification.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT DESCRIPTION
The Contractor shall provide all labor, management, supervision, tools, materials, equipment, transportation, and quality control necessary to execute a professional-grade hot-mix asphalt (HMA) pavement overlay and the complete systematic reinstatement of all surface pavement markings across designated BEQ parking facilities at Marine Corps Base (MCB) Camp Lejeune, North Carolina.
SPECIAL SCHEDULING
The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations of the facility/ activity. The furniture and other objects in the room are to be moved by the contractor.
SUPERVISION
One person may fill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer, if duly qualified for all three positions as defined in the project specification.
File details come from the government source that posted it. Updated .