Document Type: Scope of Work for federal construction contract

Project Overview:

This is a scope of work for paint and flooring repairs across six Barracks and Enlisted Quarters (BEQ) buildings at Camp Lejeune: BB260, BB265, BB270, BB274, BB275, and BB355. The contract (26-0434, Project #26M089CN) requires the contractor to provide all materials, labor, equipment, and supervision for interior and exterior painting and flooring system replacement. The work includes surface preparation, paint application per specified finishes, and flooring installation in sleeping rooms and common areas.

Paint Repair Requirements:

The contractor must repair all damaged surfaces including cracks, holes, mold, and mildew; replace damaged trim boards, siding, and moldings; and apply finishes according to surface type. Paint specifications include: latex KILZ 2 or equivalent primer for repaired surfaces; two coats of latex direct-to-metal semi-gloss for metal surfaces; two coats of eggshell/satin latex for interior walls; two coats of semi-gloss latex for wood trim and doors; two coats of polyurethane for natural wood finishes; two coats of Loxon masonry coating for exterior masonry; and mildew-resistant semi-gloss paint for bathrooms. The contractor must remove and reinstall electrical covers, spray paint (not brush) electrical panels and access panels, repaint stenciled signage, and repaint exposed piping with proper markings. Approximately one-quarter of work areas will be available at any given time, requiring coordination with building points of contact. Lead paint, where present, is to be scraped and incapsulated only, not abated, with a hazardous materials plan required.

Flooring Replacement Requirements:

Sleeping rooms require removal of existing flooring and installation of new LVT flooring; shared/common spaces and lounges require removal of existing flooring and installation of epoxy resinous flooring including stair treads and stairwells. All surfaces must be cleaned of previous adhesives, and LVT surfaces must be sealed with Ardex floor sealer or equivalent before installation. All existing transition strips and rubber cove base must be removed and replaced with new materials. Products must be installed per manufacturers' specifications.

Administrative Requirements:

The contractor must submit manufacturer product specifications and technical data for all materials on two CDs/DVDs marked "Complete Submittal Package" with contract numbers. Points of contact for building access are: Casey Barnes (BB260, 910-440-0713), Chuck Callahan (BB265 and BB355, 910-451-8070), Daniel Tritt (BB270, 910-376-0784), and Shane Legg (BB274 and BB275, 910-546-6631). All attached specifications include Paints-Coatings Specifications, Resilient Flooring Specs, Material Quantity Data Sheet, Finish Legend, Combined Division 01 Specifications, Contractor Environmental Guide, and Building Floor Plans.

View the file

Other files

File Type Posted
Amend 0007.pdf PDF
Amend 0006.pdf PDF
Amend 0005.pdf PDF
Amend 0004.pdf PDF
Amend 0003.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
BEQ BB355 FLRPLN.pdf PDF
BEQ BB260 FLRPLN.pdf PDF
26M089CN BEQ BB200-BB300 Area Paint-Flooring Project QD.pdf PDF
26M089CN BEQ BB200-BB300 Area Paint-Flooring Project PS.pdf PDF
BEQ BB274-BB275 FLRPLN.pdf PDF
Combined DIV 01 DBB SPECS.pdf PDF
26M089CN BEQ BB200-BB300 Area Paint-Flooring Project PD.pdf PDF
Contractor Environmental Guide.pdf PDF
BEQ BB270 FLRPLN.pdf PDF
26M089CN BEQ BB200-BB300 Area Paint-Flooring Project SR.pdf PDF
09 90 00 PAINTS COATINGS Spec..pdf PDF
260434 RFP.pdf PDF
BEQ BB265 FLRPLN.pdf PDF
09 65 00 RESILIENT FLOORING SPECS.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DISTRIBUTION: DoW COMMUNITY ONLY

DATE: 6/24/26

PROJECT # 26M089CN

CONTRACT # 26-0434

TITLE: BUILDING BB260, BB265, BB270, BB274, BB275, BB355 PAINT AND FLOORING

REPAIRS

ATTACHMENTS: Paints-Coatings Specifications, Resilient Flooring Specs, Material Quantity Data Sheet, Finish Legend, Combined Division 01 Specifications, Contractor Environmental Guide, Building Floor Plans

SCOPE OF WORK:

The contractor shall provide all material, labor, equipment, and supervision required to accomplish the following:

GENERAL DESCRIPTION

The responsibility of the contractor is to prep, paint, and replace the flooring systems in the following buildings listed in the project area description according to the general requirements. All measurements are for reference only and are to be field verified by contractor. The point of contact for access to the building is listed below in the project area descriptions.

DETAILED REQUIREMENTS AND SPECIFICATIONS

1.) Project Area Description

a. Building BB260 is a BEQ located on Phipps Rd. at Court House Bay Camp Lejeune.

b. Building BB265 is a BEQ located on Phipps Rd. at Court House Bay Camp Lejeune

c. Building BB270 is a BEQ located on Phipps Rd. at Court House Bay Camp Lejeune

d. Building BB274 is a BEQ located on Phipps Rd. at Court House Bay Camp Lejeune.

e. Building BB275 is a BEQ located on Phipps Rd. at Court House Bay Camp Lejeune.

f. Building BB355 is a BEQ located on Munro Rd. at Court House Bay Camp Lejeune

2.) General Requirements - Paint Repairs (As Applicable)

a. Paint all previously painted surfaces throughout the interior and exterior of the building. This will include all wall surfaces, doors, door frames, and window frames.

b. Repair all cracks, holes, and damaged surfaces to provide a solid foundation for painting. If there are significant repairs needed (greater than 50 S.F.), it shall be noted below in the project area description.

c. Clean and treat mold and mildew areas for finish coating application.

d. Apply interior / exterior finish surfacing compound as appropriate to any damaged surfaces to match surrounding finishes.

e. Replace any damaged or rotten trim boards, siding, or moldings, as quantified in the work area descriptions. Replace any loose, damaged, or missing caulking and glazing compound on windows, doors and other surfaces on the interior and exterior.

f. Secure any loose trim boards, siding, or moldings that are not damaged or rotten.

g. All repaired surfaces will be primed with latex KILZ 2 or equivalent unless otherwise noted in the project area description section.

h. All metal surfaces shall have (2) coats of latex direct to metal semi-gloss finish paint applied unless otherwise noted in the project area description section.

i. All interior wall surfaces shall have (2) coats of eggshell / satin finish latex paint applied unless otherwise noted in the project area description section.

j. All wood trim and doors shall have (2) coats of semi-gloss latex finish paint applied unless otherwise noted in the project area description section.

k. All wood trim with natural finishes shall be sanded for finish appearance and (2) coats of polyurethane finish coat shall be applied areas unless otherwise noted in the project area description section.

l. All exterior masonry surfaces shall have (2) coats of Loxon masonry coating or equivalent applied unless otherwise noted in the project area description section.

m. All EFIS finishes shall have (2) coats of Semi-gloss finish paint unless otherwise noted in the project area description section.

n. All high bay areas shall have (2) coats of a high gloss coating applied to provide maximum illumination of the work areas unless otherwise noted in the project area description section.

o. Apply KILZ 2 or equivalent primer sealer and (2) coats of mildew resistant latex semi-gloss finish paint to all previously painted surfaces in the bathroom areas unless otherwise noted in the project area description section.

p. Due to inadequate adhesion of previously painted finishes additional scrapping and preparation shall be required for all wood, masonry and metal surfaces.

q. No roof surfaces are to be painted unless otherwise noted in the project area description.

r. Cover all furniture, possessions, and building components as required protecting them from damage during accomplishment of interior and exterior painting. The contractor shall be responsible for the removal and resetting of all furniture. This includes any required disassembling and reassembling of furniture.

s. The contractor shall provide a storage container on site to store furniture and other large items to keep them from being damaged during the work process. If work can be completed with furniture items in the center of the room and properly covered to ensure they are not damaged, then there is no need for a container to be utilized. The furniture will be the responsibility of the contractor to move.

t. Remove and reinstall all electrical/data switch and receptacle covers, to ensure all previously painted surfaces are repainted.

u. Paint over existing painted stenciled signage and replace with newly painted stenciled signage with the same lettering or numbering.

v. Repaint all exposed piping and piping insulation. Stencil proper markings on piping.

w. Spray paint electrical panels, access panels, and expansion joints to match the adjacent wall color. Panels painted by brush are not acceptable.

x. Clean all over-spray, drips, splatters and spills resulting from accomplishing this project from all surfaces as appropriate.

y. No glass surfaces are to be painted unless otherwise noted in the project area description area.

z. Special scheduling shall be required on all the buildings listed below. Approximately ¼ of the work areas shall be available for paint at one given time. It is the responsibility of the contractor to coordinate a schedule with the point of contact for each building.

aa. The statement that all surfaces tested positive or negative for lead paint means that all surfaces are to be assumed as positive or negative as listed in the project area description section of this scope.

bb. The intent of this project is not to abate the lead paint. The intent is only to remove the lead paint to the extent necessary to prep for a new coat of paint.

cc. All paint and prep work shall comply with the attached painting and coating specifications as applicable.

3.) General Requirements – Flooring Repairs (As-Applicable)

a. Remove existing flooring in all sleeping rooms throughout the building.

b. Install new LVT flooring in all sleeping rooms throughout the building where like type existing flooring systems were removed.

c. Remove all existing flooring systems in all shared / common spaces and lounges throughout the building.

d. Install Epoxy Resinous Flooring in all shared / common spaces and lounges throughout the building where like type existing flooring systems were removed. This shall include all stair tread and stairwell flooring surfaces.

e. All flooring surfaces shall be free of all previous adhesives prior to installing the new flooring systems.

f. All LVT flooring surfaces shall be sealed with Ardex floor sealer or equivalent prior to installing the new flooring systems.

g. All existing flooring transition strips and rubber cove base shall be removed and replaced with new flooring transition strips and rubber cove base in all flooring system replacements.

h. All products shall be installed per manufacturers’ specifications.

i. Product Specifications: See Attached

j. Finish Specifications: See attached

SUBMITTALS: The contractor shall submit the manufacturer’s product specifications including all technical data for all material being used in process. Contractor shall make electronic copies of all submittals, include the approved submittal sheets, and provide two (2) CD’s/DVD’s containing all submittals for project and should be marked ‘Complete Submittal Package’ must include contract numbers.

SPECIAL SCHEDULING AND ACCESS:

POC for BB260 is Casey Barnes at 910-440-0713

POC for BB265 and BB355 is Chuck Callahan at 910-451-8070

POC for BB270 is Daniel Tritt at 910-376-0784

POC for BB274 and BB 275 is Shane Legg at 910-546-6631

SPECIAL CONDITIONS: As identified.

HAZARDOUS MATERIALS: Where there is lead present. The intent is to only scrape and incapsulate the lead present. The contractor shall submit a hazardous materials plan for all lead work.

ENVIRONMENTAL: As identified.