This document is a Project Description excerpt from a federal construction contract solicitation.

The contractor is responsible for prepping, painting, and replacing flooring systems in buildings identified in the project area descriptions, with all work performed according to general requirements. All measurements provided are for reference only and must be field-verified by the contractor. Building access points of contact are listed in the project area descriptions section.

The facility will remain operational throughout the construction period, requiring the contractor to minimize interference with normal operations. The contractor is responsible for moving furniture and other objects within work areas. The contract permits a single qualified individual to serve simultaneously as Superintendent, Quality Control Manager, and Safety & Health Officer, provided that person meets all qualification requirements defined in the project specification.

View the file

Other files

File Type Posted
Amend 0007.pdf PDF
Amend 0006.pdf PDF
Amend 0005.pdf PDF
Amend 0004.pdf PDF
Amend 0003.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
BEQ BB355 FLRPLN.pdf PDF
BEQ BB260 FLRPLN.pdf PDF
26M089CN BEQ BB200-BB300 Area Paint-Flooring Project SOW.pdf PDF
26M089CN BEQ BB200-BB300 Area Paint-Flooring Project QD.pdf PDF
26M089CN BEQ BB200-BB300 Area Paint-Flooring Project PS.pdf PDF
Contractor Environmental Guide.pdf PDF
BEQ BB270 FLRPLN.pdf PDF
26M089CN BEQ BB200-BB300 Area Paint-Flooring Project SR.pdf PDF
09 90 00 PAINTS COATINGS Spec..pdf PDF
BEQ BB274-BB275 FLRPLN.pdf PDF
Combined DIV 01 DBB SPECS.pdf PDF
260434 RFP.pdf PDF
BEQ BB265 FLRPLN.pdf PDF
09 65 00 RESILIENT FLOORING SPECS.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT DESCRIPTION

The responsibility of the contractor is to prep, paint, and replace the flooring systems in the following buildings listed in the project area description / title according to the general requirements. All measurements are for reference only and are to be field verified by contractor. The point of contact for access to the building is listed below in the project area descriptions.

SPECIAL SCHEDULING

The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations of the facility/ activity. The furniture and other objects in the room are to be moved by the contractor.

SUPERVISION

One person may fill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer, if duly qualified for all three positions as defined in the project specification.