- Invitation to Bid for Construction Services
- Solicitation number
- 2625BIMH134
- Issued by
- Middlesex County, Connecticut
About this file
This is an Invitation to Bid (ITB) document issued by the Connecticut Department of Administrative Services (DAS) Construction Services for renovation of the CVH Old Power Plant located on Holmes Drive in Middletown, Connecticut. The project, designated BI-MH-134, involves selective demolition, cast-in-place concrete and reinforcing, precast concrete hollow core planks, structural steel, roofing systems, sheet metal, joint sealants, chain link fencing, and site turf work at an existing power plant facility at Connecticut Valley Hospital. A mandatory pre-bid meeting is scheduled for November 19, 2026 at 11:00 a.m. at Shew Hall, 28 Harvey Drive, Middletown, with attendance required or bids will be rejected as non-responsive. Bids are due December 16, 2026 at 10:00 a.m. EST, with the solicitation open from October 28, 2026 at 2:30 p.m. EDT through that deadline. Vendor questions are accepted through December 2, 2026 at 10:00 a.m. EST. Substantial completion is required within 240 calendar days from the contract start date, followed by a 90-day final acceptance period. Bidders must submit responses electronically through CTsource with documents including a Bid Proposal Form, Certificate of Authority, Standard Bid Bond, General Contractor Bidder's Qualification Statement, and Named Subcontractor Signature Pages if applicable.
Bids exceeding $1,000,000 require current DAS prequalification for General Building Construction (Group B), and all qualified general contractors may respond. The estimated project cost range is $757,138 to $825,833. Bidders must demonstrate good faith efforts to award 8.30% of work to Small Business Enterprise subcontractors and 5.22% to Minority Business Enterprise subcontractors. Prevailing wage requirements under Connecticut General Statutes Section 31-53 apply to this project. Liquidated damages are assessed at $1,639 per calendar day beyond substantial completion and $1,498 per calendar day beyond the 90-day acceptance period. All subcontractors performing work valued above $100,000 must be named in the bid, and subcontractors with subcontracts exceeding $1,000,000 must hold DAS prequalification. Bids remain valid for 90 calendar days after opening, and the apparent low bidder must execute the contract within 15 calendar days of receiving a Letter of Intent. Payment terms are Net 30 Days. The project carries no federal financial assistance and does not include a Project Labor Agreement. Macchi Engineers, LLC of Hartford serves as the architect/engineer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00 40 15 DAS Prequal Cert Reqts 20251001.docx | DOCX document | |
| 2625BIMH134_Nov_2_26_solicitation_doc.pdf | ||
| Drawings Volume 1 of 1.pdf | ||
| 00 43 16 BidBond 20240924.docx | DOCX document | |
| 00 40 14 CertOfAuthority 20231001.docx | DOCX document | |
| 2625BIMH134_Oct_29_26_solicitation_doc.pdf | ||
| 00 41 00 DAS-CS Bid Proposal Form LOCKED 07.01.2026.docx | DOCX document | |
| 00 11 16 DAS-CS Invitation to Bid.pdf | ||
| 00 45 20 Named Sub Signature Page 20251001.docx | DOCX document | |
| 00 45 14 GC Bidder Qual Statement 20251001.docx | DOCX document | |
| 00 40 16 DAS Update Stmt Reqts 20251001.docx | DOCX document | |
| Specifications.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: 2625BIMH134
Invitation to Bid for Construction Services
DAS-CS Invitation to Bid (CITB)
DAS Construction Services
October 28, 2026 - December 16, 2026
Page:2
General Header Information
2625BIMH134
No. 2625BIMH134 Title: Invitation to Bid for Construction Services Start Date: October 28, 2026 at 2:30:00 PM EDT End Date: December 16, 2026 at 10:00:00 AM EST Vendor Q&A Start Date: October 28, 2026 at 2:45:00 PM EDT Vendor Q&A End Date: December 02, 2026 at 10:00:00 AM EST Estimated Total Value:
Who can respond to this bid? : All Vendors Description: CVH - Old Power Plant Renovations
Holmes Drive Middletown, CT
BI-MH-134
Delivery Terms: N/A: Not Applicable Payment Terms: Net 30 Days
Page:3
Contact Information: DAS Construction Services Heather Schlink 450 Columbus Blvd Hartford CT, 06103 heather.schlink@ct.gov
FREQUENTLY ASKED QUESTIONS:
Where can I find the Specifications and Drawings for Department of Correction (DOC) Projects?
The Specifications and Drawings will be made available to the qualified General Contractors who successfully complete Round 1 of the Invitation to Bid and attend the Mandatory Meeting. Once the Mandatory Meeting is concluded, Round 2 of the bid will be posted on CTsource and the Specifications and Drawings will be made available to the qualified General Contractors who attended the Mandatory Meeting.
Commission on Human Rights and Opportunities:
The contractor who is selected to perform this State project must comply with Connecticut General Statutes Sections (C.G.S. §§) 4a-60, 4a-60g, and 46a-68b through 46a-68f. State law requires a minimum spending allocation goal of the state-funded portion of the contract for award to subcontractors holding current certification from DAS under the provisions of C.G.S. § 4a-60g. The contractor must demonstrate good faith effort to meet the spending allocation goals.
Why Can’t I Click “Select” and “Accept” in the Solicitation?
You need to select “Add New Response” and create a Quote (which you can rename) in order to “Select” and “Accept” the boxes next to the documents. If you do not see the “Attach Documents” tab, not all Solicitation Documents have been opened and accepted on the “Overview” tab.
Does My Firm Need To Be Prequalified To Bid?
All bids greater than $1,000,000 require a bidder to be currently prequalified. To find the specific prequalification requirements for a project, see page 1 of the Invitation to Bid. The Invitation to Bid can be downloaded from the DAS Construction Services Bid Board on CTsource (https://portal.ct.gov/DAS/Construction-Services/BidBoard).
How Do I Find The List of Plan Holders?
Go to the DAS Construction Services Bid Board (https://portal.ct.gov/DAS/Construction-Services/BidBoard) and select the “View Plan Holder List”.
How Do I Find The Pre-Bid Site Meeting Attendance List?
The Pre-Bid Site Meeting Attendance List will be provided in an addendum to the solicitation. To find the addendums for a solicitation, go to the DAS Construction Services Bid Board (https://portal.ct.gov/DAS/Construction-Services/BidBoard), scroll down and click on the appropriate solicitation, and click on the link(s) for the addendums. If there are no addendums, then the Pre-Bid Meeting has not yet taken place.
How Do I Find The Bid Tab (and Bids) After The Bid Has Closed?
Go to the DAS Construction Services Bid Board
Page:4
(https://portal.ct.gov/DAS/Construction-Services/BidBoard), scroll down and click on the appropriate solicitation, and click on the “View Award Report” in the top right corner, located next to the “Print/Download solicitation summary”. The Bid Tab Sheet will be available under “Award Documents”. Individual bid documents will be available under “Vendor Attachments”. Note: If “View Award Report” is not available, then it has not yet been published – check back later in the day.
Page:5
Contact Details: If you have any questions, please contact:
Heather Schlink 450 Columbus Blvd Hartford CT, 06103 heather.schlink@ct.gov
FREQUENTLY ASKED QUESTIONS:
Where can I find the Specifications and Drawings for Department of Correction (DOC) Projects?
The Specifications and Drawings will be made available to the qualified General Contractors who successfully complete Round 1 of the Invitation to Bid and attend the Mandatory Meeting. Once the Mandatory Meeting is concluded, Round 2 of the bid will be posted on CTsource and the Specifications and Drawings will be made available to the qualified General Contractors who attended the Mandatory Meeting.
Commission on Human Rights and Opportunities:
The contractor who is selected to perform this State project must comply with Connecticut General Statutes Sections (C.G.S. §§) 4a-60, 4a-60g, and 46a-68b through 46a-68f. State law requires a minimum spending allocation goal of the state-funded portion of the contract for award to subcontractors holding current certification from DAS under the provisions of C.G.S. § 4a-60g. The contractor must demonstrate good faith effort to meet the spending allocation goals.
Why Can’t I Click “Select” and “Accept” in the Solicitation?
You need to select “Add New Response” and create a Quote (which you can rename) in order to “Select” and “Accept” the boxes next to the documents. If you do not see the “Attach Documents” tab, not all Solicitation Documents have been opened and accepted on the “Overview” tab.
Does My Firm Need To Be Prequalified To Bid?
All bids greater than $1,000,000 require a bidder to be currently prequalified. To find the specific prequalification requirements for a project, see page 1 of the Invitation to Bid. The Invitation to Bid can be downloaded from the DAS Construction Services Bid Board on CTsource (https://portal.ct.gov/DAS/Construction-Services/BidBoard).
How Do I Find The List of Plan Holders?
Go to the DAS Construction Services Bid Board (https://portal.ct.gov/DAS/Construction-Services/BidBoard) and select the “View Plan Holder List”.
How Do I Find The Pre-Bid Site Meeting Attendance List?
The Pre-Bid Site Meeting Attendance List will be provided in an addendum to the solicitation. To find the addendums for a solicitation, go to the DAS Construction Services Bid Board (https://portal.ct.gov/DAS/Construction-Services/BidBoard), scroll down and click on the appropriate solicitation, and click on the link(s) for the addendums. If there are no addendums, then the Pre-Bid Meeting has not yet taken place.
How Do I Find The Bid Tab (and Bids) After The Bid Has Closed?
Go to the DAS Construction Services Bid Board
Page:6
(https://portal.ct.gov/DAS/Construction-Services/BidBoard), scroll down and click on the appropriate solicitation, and click on the “View Award Report” in the top right corner, located next to the “Print/Download solicitation summary”. The Bid Tab Sheet will be available under “Award Documents”. Individual bid documents will be available under “Vendor Attachments”. Note: If “View Award Report” is not available, then it has not yet been published – check back later in the day.
Selected Categories:
Page:7
Header Custom Fields:
2625BIMH134
DAS Construction Services – Response Requirements For This Solicitation
Invitations to Bid:
Bid Package Document Requirements:
Upload the following documents under the “Attach Documents” tab prior to the end date and time of the solicitation, as described in the attached Solicitation Documents. IMPORTANT NEW
REQUIREMENT: If the project includes Named Subcontractors, you must upload NAMED
SUBCONTRACTOR SIGNATURE PAGES (see Section 00 45 20).
•1. 00 41 00 Bid Proposal Form
•2. 00 40 14 Certificate (of Authority)
•3. 00 43 16 Standard Bid Bond
•4. 00 45 14 General Contractor Bidder’s Qualification Statement
•5. DAS Contractor Prequalification Certificate FOR BIDS EXCEEDING $1MILLION
•6. DAS Update Statement FOR BIDS EXCEEDING $1MILLION
•7. NEW: Named Subcontractor Signature Page(s) FOR BIDS WITH NAMED
SUBCONTRACTORS
If you do not see the “Attach Documents” tab, not all Solicitation Documents have been opened and accepted on the “Overview” tab.
List of Plan Holders:
Subcontractors looking for a list of contractors who have viewed the plans for a DAS Construction
Serv ices pro jec t shou ld go to the DAS Construct ion Serv ices Bid Board
(https://portal.ct.gov/DAS/Construction-Services/BidBoard), and select the “View Plan Holder
List”.
Pre-Bid Site Meeting Attendance List:
Subcontractors looking for a list of contractors who attended the Pre-Bid Meeting can find the information within the Addendums for a Solicitation. To find the Addendums for a Solicitation, go to the DAS Construction Services Bid Board (https://portal.ct.gov/DAS/Construction-
Services/BidBoard), scroll down and click on the appropriate Solicitation, and click on the link(s) for the Addendums. If there are no Addendums, then the Pre-Bid Meeting has not yet taken place.
https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fprotect-us.mimecast.com%2Fs%2FqQ1tCW6lD8hjX3BVIBJC85%3Fdomain%3Dportal.ct.gov&data=04%7C01%7CRebecca.Cutler%40ct.gov%7C1d6941000ac3431b176008d8fac3fc3a%7C118b7cfaa3dd48b9b02631ff69bb738b%7C0%7C0%7C637535067102254685%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=e3RYcrqnqBd47iLlw2fgtbfdAA%2BhHv2Cqr37ZuTo3%2FM%3D&reserved=0 https://portal.ct.gov/DAS/Construction-Services/BidBoard https://portal.ct.gov/DAS/Construction-Services/BidBoard
Page:8
This bid has no questions defined.
Page:9
Documents:
Specifications.pdf
Drawings Volume 1 of 1.pdf
00 11 16 DAS-CS Invitation to Bid.pdf
00 41 00 DAS-CS Bid Proposal Form LOCKED 07.01.2026.docx
00 40 14 CertOfAuthority 20231001.docx
00 40 15 DAS Prequal Cert Reqts 20251001.docx
00 40 16 DAS Update Stmt Reqts 20251001.docx
00 45 14 GC Bidder Qual Statement 20251001.docx
00 45 20 Named Sub Signature Page 20251001.docx
00 43 16 BidBond 20240924.docx
Page:10
Item Specifications Solicitation has been designated as having no line items.
Page:11
File details come from the government source that posted it. Updated .