26158.JBB Addendum 1.pdf
PDF 1 MB Posted
- Solicitation number
- RFP 171 260000002059 2
- Issued by
- Clinton County, Flint City, Michigan
About this file
This is an Addendum 1 to a contract solicitation issued by the Michigan Department of Natural Resources for restoration work at Fayette Historic State Park. The addendum modifies the original solicitation 751/26158.JBB regarding furnace stack stabilization and restoration at the historic site. The addendum provides clarifications, modifications, and additional requirements to the original scope of work, including updates to specifications, technical requirements, and project conditions that bidders must incorporate into their proposals. The document establishes revised submission requirements and timelines for contractors responding to this preservation project.
The addendum addresses specific technical modifications, material specifications, and construction methodologies related to the furnace stack work that supersede or supplement the original contract documents. It ensures all prospective bidders have consistent and updated information for bid preparation, establishing a level playing field for competition. As an addendum document, it serves as a binding modification to the base solicitation and must be acknowledged by all bidders as part of their proposal submission to demonstrate compliance with the complete and current contract requirements for this Michigan state historic preservation project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Masonry Spec 2.pdf | ||
| As-Built-Plans.pdf | ||
| Masonry Spec 1.pdf | ||
| 26158.JBB RFP.pdf | ||
| SAMPLE Billable Rate Contract (Rev 04-25).pdf | ||
| As-Built-Specification.pdf | ||
| 26158.JBB Project Statement.pdf | ||
| Furnace Structural Assessment Report - 2013.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 RFP (Rev 2/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
REQUEST FOR PROPOSAL
ADDENDUM NO. 1
This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.
Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.
TO:
ALL PROPOSERS
DATE ISSUED
06/15/2026
PROJECT NAME
Fayette Historic State Park Fayette Furnace Stacks Rehabilitation
FILE NUMBER
751/26158.JBB
PROJECT DIRECTOR
Michael Lusk
PROPOSAL DUE DATE:
06/18/2026 at 2:00pm
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
1. Pre-Proposal Meeting Attendance Record
2. Pre-Proposal Meeting Agenda
Questions asked via email:
Q1. Regarding Item 4.C, would equipment rentals be considered a field service to include as a reimbursable expense, or would that be something that you guys would contract directly?
A1. Equipment rentals needed for assessment of the facility would fall under field service reimbursables. The MDNR will not be providing equipment or other resources to directly aid the selected PSC in assessment or design.
Q2. Verifying that whatever subs might be needed (i.e. documentation assistance) should be included in the proposal, correct?
A2. Correct. Any personnel that would be needed to help with assessment and subsequent design should be included in the proposal.
Q3. (Relates to Q1) Onsite discussion relayed information about a possible use of a personnel lift at the facility. Will we be able to use that personnel lift? And, if so, can we review the specs on the equipment?
A3. See Answer 1. In addition to that information, the onsite lift is not capable of reaching high enough to assess the entire height of the stacks. Please include all necessary equipment for inspection and assessment in the proposal.
Q4. Will the awarded professional service consultant, subconsultants, contractors and others involved in this phase be precluded from working on future phases of design and construction/ repairs for the stacks?
A4. No. The PSC that performs the assessment and preliminary design could also potentially provide final design and construction oversight phases, if selected during that process.
http://www.buy4michigan.com/
Q5. Is the interior of the stacks accessible through at least one iron gate at each chimney (e.g. existing panel with hinges) or is removal required for access?
A5. Yes, the interior of the stacks are accessible through at least one point of entry.
Q6. Do additional reports, historic photographs, or test results exist for the stack structures, and if so, will these be made available prior to the start of work?
A6. Yes. There is some historic information available, in paper copy, and can be provided prior to the start of work.
Q7. Is an archaeology review required for any digs? If so, will the State or Park provide that review?
A7. Yes. A UP-archaeology staffer would be available to monitor the digs.
Q8. The RFP states Professional firms must attach a signed Certification of a Michigan Based Business and the Responsibility Certification forms." However, it does not explicitly state that the professional firm must be a certified Michigan based business to qualify. Please clarify if those not certified as a Michigan-based business will be considered for this work.
A8. The PSC must be licensed to operate in a professional capacity in Michigan, for the scope of work requested. As far as being a Michigan Based Business, that can be factored into the basis of selection but is not a requirement in and of itself to be awarded a contract.
Questions asked at mandatory walk-through:
Q1. Will the state be doing any temp removal of birds or cleaning of guano/bird droppings prior to site investigation and assessment activities?
A1. Yes and No. Temporary pigeon removal will be performed by the agency prior to assessment activities.
Any specific equipment and operation deemed essential for safety during the assessment phase, for removal of animal waste, shall be included as a reimbursable expense. Please list this cost as a separate add/deduct alternate.
Q2. Are there any digital files available that include history of the site and adjacent buildings?
A2. No, digital files are not available. As mentioned above in Email Question 6, there are some existing paper documents available.
APPROVED BY:
Michael Lusk
PROJECT DIRECTOR DATE 06/15/2026
GRETCHEN WHITMER
GOVERNOR
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT & BUDGET
LANSING
MICHELLE LANGE
DIRECTOR
PRE-PROPOSAL MEETING AGENDA
MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
Design and Construction Division
3111 W. St. Joseph Street Lansing, MI 48917
Project: Fayette Historic State Park – Furnace Stacks File Number: 472/26158.JBB Meeting Date and Time: Friday, June 5, 2026, at 10:30 am local time Meeting Place: Fayette Historic State Park
PROJECT REPRESENTATIVES
Project Director: Field Representative:
Michael Lusk Jason Pascoe
DTMB-DCD DTMB-DCD
3111 W St Joseph St 3111 W St Joseph St Lansing, MI 48917 Lansing, MI 48917 906-322-9002 906-280-1046 luskm@michigan.gov pascoej2@michigan.gov
Facility Representatives:
Julia Cogger Department of Natural Resources EUP Planner 1990 US Highway 41 S Marquette, Michigan 49855 517-420-9749 coggerj@michigan.gov
Introductions and Sign-In Sheet
A. Request for Proposals – Standard Not-to-Exceed RFP, with Part I Technical portion and
Part II Cost portion.
mailto:luskm@michigan.gov mailto:pascoej2@michigan.gov mailto:coggerj@michigan.gov
1. Technical – Qualification format includes: General Information; Understanding of the Project and Tasks; Personnel; Management Summary, Work Plan & Schedule; Budget Analysis and References.
2. Cost – Not to Exceed Billable Rate plus reimbursables format.
3. Proposals must include Phase 100 Study, Phase 300 Design, and Phase 400
Preliminary Design. For budgeting purposes, an estimate of Phase 500, 600, and 700 services shall be provided.
4. Include consultants and testing as reimbursable expenses.
5. Include signed Certification of a Michigan Based Business and Responsibility
Certification forms.
6. Proposals will be evaluated by an Ad Hoc Advisory Committee and scored based on the combined 80% Technical portion and 20% Cost portion.
B. Project Scope
1. Study and Design services for Phases 100, 300, and 400. The Fayette Historic State Park is requesting professional architectural and engineering services to asses, design and provide probable construction cost to address failed and/or deteriorated and stressed masonry of the historic stacks at the park.
2. Reference Project Statement for anticipated scope of work
3. Proposals shall include, but are not limited to:
a. Travel reimbursements and billing rates
b. Clear documentation of the number of meetings for each phase
c. Coordination description for all field work
d. Detailed lists of all reimbursable expenses for each phase
C. Site Visits
1. Accessibility to the site – consider this as your only opportunity to walk the site before bidding, unless otherwise discussed.
D. Schedule
1. E-mail questions to luskm@michigan.gov no later than 2:00 p.m., Thursday, June
11, 2026. DO NOT send questions in through SIGMA as they do not get to the project directors from SIGMA.
2. If necessary, an addendum will be posted on the SIGMA VSS website no later than COB, June 11, 2026.
3. Proposals are due on Thursday, June 18, 2026, no later than 2:00 p.m. EST to issuing office and on SIGMA VSS.
mailto:luskm@michigan.gov
4. Ad Hoc Advisory Committee will review proposals June 29, 2026 and award contract by the beginning of August.
5. Investigation and Design Summer/Fall 2026
E. Other Items
1. Access to Site Upon Contract Award
a. Normal business hours for facility, or hours in which work can take place.
b. Provide notice to the facility prior to any site visits.
F. RFP Questions
File details come from the government source that posted it. Updated .