261106 - Agenda - Cx Presubmittal Conference.pdf
PDF 225 KB Posted
- Attached to
- TSC DQ2027000156
- Solicitation number
- DQ1 GJMA 2027000156 3
- Issued by
- Larimer County, Colorado
About this file
This document is a pre-bid conference agenda for the TSC Valley Campus Main Building Renovation Commissioning (Cx) project. The conference was scheduled for November 6, 2026, and addressed key procurement milestones including advertisement on November 2, questions due by November 11 with responses posted November 13, and bids due November 20, 2026. The project involves a building addition to create a clear main entry, refresh of all spaces, and significant HVAC improvements with space relocations based on square-footage needs, efficiency, and flow. Construction is scheduled to begin July 16, 2026, with substantial completion targeted for September 20, 2027, and commissioning anticipated from November 9 to December 13, 2027. Prospective bidders were directed to download required exhibits including the Consultant Agreement, Scope of Work, and Drawings and Specifications, with all correspondence directed to Penny Bueno at TSC and copied to Geoff Graham at NV5. Responses to clarifications are posted on the Vendor Self Service (VSS) system rather than sent via email.
The agenda does not contain specific pricing information, set-asides, incumbent contractor details, or funding sources. All questions must be submitted in writing and will be answered through addendum postings on the VSS platform.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TSC – Valley Campus Main Building Renovation
Cx DQ - Pre-Bid Conference – 11/6/2026
Agenda
I. Introductions
II. Review of DQ Schedule
a. Advertisement – 11/2
b. Pre-Bid Conference – 11/6
c. Questions Due – 11/11
d. Question Responses – 11/13
e. Bids Due – 11/20
III. DQ Highlights
a. Direct all correspondence to Penny Bueno, TSC and CC Geoff Graham, NV5.
b. Responses to clarifications will be posted on the VSS, no emails will be sent directly to proposers
c. Exhibits – ensure you have downloaded:
i. Exhibit A – Consultant Agreement
ii. Exhibit B – Scope of Work
iii. Exhibit C – Drawings and Specs
IV. Project Description
a. Building addition to create a clear main entry; refresh of all spaces; and significant HVAC improvements. Relocation of spaces based on square-footage needs, efficiency, and flow.
b. Relation to original HVAC Upgrades project
c. Relation to HPCP
V. Project Status
a. Construction Start – 7/16/26
b. Substantial Completion – 9/20/27
c. Anticipated Cx – 11/9/27 – 12/13/27
VI. Cx Scope of Work
a. See Exhibit B – Scope of Work
VII. Questions
a. All questions must be submitted in writing and will be answered via Addendum