This document is a Phasing Plan floor plan for Trinidad State College's Valley Campus located at 1011 Main Street, Alamosa, Colorado. The project involves comprehensive renovation and expansion work across multiple levels of the facility, with construction phased over several months beginning in January 2027. The work includes updates to educational spaces, administrative offices, student services areas, nursing simulation facilities, welding and grinding rooms, cosmetology and esthetician spaces, classrooms, restrooms, mechanical systems, and various support facilities. The construction project is designed by Studiotrope Design Collective with structural engineering by JVA, mechanical/plumbing by The Ballard Group, electrical/technology by BCER, and civil engineering by Elevation Consulting Group, Ltd. The phasing plan establishes five distinct construction phases running from January 11, 2027, through July 12, 2027, with individual phase completion dates specified.
The project includes multiple alternates addressing window replacements, mechanical work, electrical installations, restroom fixtures, and specialized equipment. Critical constraints include maintaining building operations and public access throughout construction, implementing dust partitions, scheduling excessively noisy activities during off-hours, and keeping all building exits and stairs operational. The design is dated January 30, 2026, and marked "Not for Construction," indicating this represents the design development phase. General notes emphasize contractor verification of field conditions, coordination with all trade drawings and specifications, and conformance to applicable codes. The project scope encompasses extensive interior finishes, systems upgrades, and facility enhancements to support expanded educational programming.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
UP
UP
WELDING
WELD. OFFICE
100A
GRINDING RM.
100B
WELDING TOOL STO.
100C
WELDING
FAC. OFFICE
101A
MAKERSPACE
STO.
102B
ELEC.
102C
WOMENS RR
MENS RR
MECH. RM.
102D
STAIR 5
CLASSROOM
MENS RR
WOMENS RR
109 ELEV
CLN. CLOSET
MACH. ROOM
STUDY
NURSING CLASSROOM
STAIR 3
HALLWAY
EMS
MECH RM
AMBULANCE TRAINING
CLASSROOM
STORAGE AND
CONTROL
STORAGE AND LAB
PREP.
ATHLETICS
BOILER RM.
MAINTENANCE
STAIR 2
MECH. RM.
RECEPTION
136A
COSMETOLOGY
LNDRY/STO
136B
FACULTY
136C
CLASSROOM /
MANICURE
136D
ESTHETICIAN
136G
CORRIDOR
CORRIDOR
WTR ENTRY
STORAGE
CLASSROOM
CLASSROOM
IT
ELEC.
145MENS RR
WOMENS RR
MECH
MENS RR
WOMENS RR
JC
MECH.
A-301
NURSING SIM PAT RM.
NURSING SIM PAT RM.
SGA OFFICE
STORAGE AND CNTRL
RM
MED ROOM
SS OFFICE
LACTATION RM.
UNIVERSAL RR
AMAYA
FIN AID
FIN. AID
FIN. AID
STUDENT SERVICES
ADVICE/TRIO
FAFSA
ADVICE/TRIO
TRIO COMP. LAB.
SGA RECREATION
LOUNGE
NURSING SIM PAT RM.
FAFSA VISITING
SEC. STATION
MAIL/COPY
STO.
WELLNESS + NAVG.
A-301
A-301
DOA (MECH)
A-200 2
A-200
FUNDAMENTALS LAB
WINDOWS TO
RECEIVE OPAQUE
FILM, TYP THIS WALL,
EAST SIDE ONLY
OPEN TO
ABOVE
11 1 1 1 1 1 1 1 1
1 1 1 1 1 1
ATHLETICS
OFFICE
141A
136G
199A
A
115A
155A
115B
199B
FACILITIES
FAC. STO.
VESTIBULE
ELEC
102A
A-310
W1
W1
FUND STO.
115A
FUND RR
E1
E2
B
B
A
C
D E
28' - 10"
2' - 0"
E3
D
H
B
B
A
A
E
M
N
A-310
A-311
A-310
A-311
A-311
O
P
T T
U
R
S
Q
A-310
A-500
A-500
A-500
A-401
A
B
B
B
A-401
A-410
A-410
A-410
A-410
A-410 15
A-403
A-310
A-200
A-200
A-200
ELEVATOR
19' - 4"
A-311
A-311
A-410
B
A-4111 2
A-200 9
A-200
A-410
ALT 20
ALIGN
GRINDING
VENTILATION
SOURCE CAPTURE
EQUIPMENT, BO
S09
P R
-6
P1R-6
P1R-6 A1-6
A1-4
F1-4
A-402
A-101A
A-101B
10 22 40
A -6
A-410
ALT 18
ALT 21
ALT 21
ALT 21
A
136A
B
C
B
102B
248D
161A
161B
100CA
248C
105B
VESTIBULE
C
-4 SIM
SIM
SIM
SIM
S23
C -4
S24
M1-8R CHILLER ROOM
S25
A1-8
S27
S28
ALT 19
F -3
S29
F
S30
S30
S30
A-410 2
SIM.
4X4 STEEL POSTS
WITH METAL PANEL
CLADDING AND GATES
DOOR AND WALL
MODIFICATIONS
IN BASE SCOPE
EXISTING TO
REMAIN
LEGEND: FLOOR PLAN
REPLACE EXISTING TRANSLUCENT
PANELS WITH NEW INSULATED
GLAZING UNITS (ALT #17)
1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS SHALL
TAKE PRECEDENCE. IF ADDITIONAL DIMENSIONS ARE
REQUIRED, CONTACT ARCHITECT.
2. CONTRACTOR TO VERIFY ALL FIELD CONDITIONS AND
DIMENSIONS AND LAY OUT PROPOSED WORK PRIOR TO
CONSTRUCTION IN NEW WORK AREA. REPORT
DISCREPANCIES TO ARCHITECT FOR RESOLUTION.
3. IN THE EVENT OF CONFLICTING OR UNCLEAR
INFORMATION, CONTRACTOR SHALL CONTACT ARCHITECT
FOR CLARIFICATION.
4. SITE SURVEY PROVIDED IS DEEMED TO BE RELIABLE AND
ACCURATE. CONTRACTOR TO NOTIFY ARCHITECT AND
CIVIL ENGINEER WHEN DISCREPANCIES ARE
ENCOUNTERED PRIOR TO OR DURING CONSTRUCTION.
5. ALL WORK SHALL CONFORM TO APPLICABLE CODES.
NOTIFY ARCHITECT OF ANY CONDITIONS OR DETAILS
WHICH ARE DEEMED TO BE NONCONFORMING.
6. BUILDING TO REMAIN OPEN TO THE PUBLIC AND IN USE
THROUGHOUT CONSTRUCTION.
7. DUST PARTITIONS ARE REQUIRED AND EXCESSIVELY
NOISY ACTIVITIES MUST BE SCHEDULED DURING OFF-
HOURS.
8. COORDINATE WITH ALL OTHER DRAWINGS AND
SPECIFICATIONS FOR ADDITIONAL SCOPE.
9. ALL BUILDING EXITS AND STAIRS MUST REMAIN
OPERATIONAL DURING ALL PHASES OF CONSTRUCTION.
10. FOR ALL EXISTING SURFACES TO REMAIN THAT HAVE BEEN
IDENTIFIED TO RECEIVE NEW PAINT: SCRAPE, SPACKLE,
PATCH, CLEAN, OR OTHERWISE PREPARE SURFACE TO
RECEIVE PAINT WITHOUT NOTICEABLE IMPERFECTION.
11. REFER TO INTERIOR DRAWING FOR FLOOR AND WALL
FINISHES
12. REFER TO FINISH PLAN FOR EXTENT OF NEW FLOORING.
13. DIRECTIONS WHERE NOTED ARE ALWAYS IN REFERENCE
TO PLAN NORTH.
14. ASSUME ALL INTERIOR WALLS TO BE A1-4 U.O.N. REFER TO
G-002 FOR PARTITION TYPES.
15. LOCATE DOORS 4" MIN. FROM ADJ. WALL U.O.N.
GENERAL NOTES: FLOOR PLAN
PROJECT NO:P
R
O J E
C T
C 2025 STUDIOTROPE, LLC
NOT FOR CONSTRUCTION
1/30/2026 12:22:56 PM
A-101
OVERALL FLOOR PLAN LEVEL 01
T S
C V a ll e y C a m p u s
M a in
S tr e e t
A la m o s a
C O
TRINIDAD STATE COLLEGE
600 Prospect Street Trinidad, CO 81082
STUDIOTROPE DESIGN COLLECTIVE
2942 Welton Street Denver, CO 80205 303.308.1144
ARCHITECT / INTERIOR DESIGN
OWNER
CIVIL ENGINEER
LANDSCAPE ARCHITECT
STRUCTURAL ENGINEER
MECHANICAL/PLUMBING
ELECTRICAL/TECHNOLOGY
ELEVATION CONSULTING GROUP, LTD
8315 W 4th Ave, Lakewood, CO 80204 303.913.3543
FLOW DESIGN COLLABORATIVE
303 W 45th Avenue Denver, CO 80216 970.214.4078
JVA
1675 Larimer Street, Suite 550 Denver, CO 80202 303.444.1951
THE BALLARD GROUP
2525 South Wadsworth Blvd. Suite 200 Lakewood, CO 80227 303.988.4514
BCER
14143 Denver West Parkway, Ste 550 Golden, CO 80401 303.422.7400
3/32" = 1'-0"A-101
FLOOR PLAN - LEVEL 011
ISSUE DATE PHASE / REV NAME
1-30-2026 DESIGN DEVELOPMENT
KEYNOTES
KEYNOTE KEYNOTE DESCRIPTION
04 2.10 1" MASONRY REVEAL PATTERN, RE: ELEVATIONS
FOR EXTENT AND BRCK TYPES
05 5.08 METAL FABRICATIONS - PIPE RAILING OR
HANDRAIL
05 5.25 PIPE RAILING PAINTED WHITE, HEIGHT IS
ROUGHTLY 24" ABOVE PARAPET TOP TO MEET
42" ABOVE ROOFING REQ'D
06 4.01 ARCHITECTURAL WOOD CASEWORK
08 4.11 <varies>
09 6.30 RESILIENT BASE
09 7.01 WALLCOVERING
09 8.06 ACOUSTICAL PANEL SYSTEM
09 3000 TILING
10 2.04 PHENOLIC CORE TOILET COMPARTMENTS
10 22 40 WIRE MESH PARTITION
12.3.16 NATURAL QUARTZ / RESIN COMPOSITE
COUNTERTOP
SHEETNOTES
SHEET
NOTE DESCRIPTION
S09 NO WATER, NO EXHAUST, NO SANITARY PER
MEP DRAWINGS
S23 COLUMN; RE: STRL
S24 TEACHING AMBULANCE, BY OWNER
S25 CHILLER; RE: MECH
S27 NEW SINK; RE: PLUMBING
S28 CUH AND ANNUNCIATOR PANEL; RE: MECH
S29 ADA DOOR ACCESS CONTROL
S30 FULL HEIGHT SHELVING ON STANDARDS
ALTERNATES
KEYNOTE KEYNOTE DESCRIPTION
ALT 1.1 OCCUPIABLE TERRACE AT LEVEL 02
ALT 17 REPLACE YELLOWED WINDOWS
ALT 18 ELIMINATE ALL ELECTRICAL WORK AND FINISHES
WITHIN MAKERSPACE
ALT 19 ALL WORK SHOWN IN THIS AREA TO BE
ALTERNATE. WALL DIVIDING 161/162 AND 100 AND
GRINDING VENTILATION EXCLUDED FROM
ALTERNATE.
ALT 20 ALL WORK SHOWN IN THIS AREA TO BE
ALTERNATE. MECHANICAL AND SPRINKLER WORK
IS NOT INCLUDED IN THIS ALTERNATE
ALT 21 RESTROOM FLOOR AND WALL TILE AND PLUMBING
FIXTURES
ErnieGarcia Text Box
Phase 1A January 11, 2027 completion
Arrow
ErnieGarcia Polygon
ErnieGarcia Text Box Phase 3A Cosmo (Lower) March 22, 2027- April 29, 2027 Base Scope
ErnieGarcia Arrow
ErnieGarcia Polygon
ErnieGarcia Text Box
Phase 1B Front Entrance Addition (in Red) March 11th 2027
2027 RED
ErnieGarcia Arrow
ErnieGarcia Polygon
ErnieGarcia Polygon
Phase 4 Upper and Lower March 24, 2027 - July 7, 2027
ErnieGarcia Arrow
ErnieGarcia Polygon
Phase 5 May 12 , 2027 - July 12, 2027
ErnieGarcia Arrow
ErnieGarcia Rectangle
ErnieGarcia Polygon
ErnieGarcia Polygon
ErnieGarcia Polygon
New Mechanical Room (Cooling) is driven by construction of the new Electrical service
Arrow
ErnieGarcia Arrow
VictorHorta Polygon
DN
DN
DN
DN
DN
DN
PROCTOR/
GED OFFICE
STAIR
TESTING
IT ROOM
LARGE ASSEMBLY
PRE FUNCTION
ELEV
STAIR
CIRCULATION
STAIR 2
STAIR 3
A-301
GED CLASSROOM
STO.
WOMENS RR
MENS RR
113' - 7"
111' - 2"
112' - 0"
A-301
A-301
CONFERENCE ROOM
OPEN TO
BELOW
EXTERIOR:
OPEN TO
ROOF
BELOW
A-200 2
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
116' - 0"
116' - 3"
:2
:1
:5
MECHANICAL ROOF
SPACE
STORAGE
204A
ADJ OFFICE -
(4)
GEN ED CLASSROOM
GEN ED CLASSROOM
OFFICE -
CHRIS
CLASSROOM
CONF
OFFICE -
YVETTE
CLASSROOM
FLEX LAB
E-SPORTS
IT OFFICE & STORAGE
WOMENS RR
MENS RR
JC
OFFICE -
LORIRAE + NUA
204C
OFFICE -
TOUCHDOWN
204D
OFFICE -
SAMI
204E
BREAK RM.
204F
E-SPORTS COACH
OFFICE -
JODI
(E) RAIL TO REMAIN
NEW RAILING
1 1
1 1 1 1 1 1 1 1 1 1 1
1 1 1
VP OFFICE -
JIM
STAFF OFFICE -
CAROLYN
HR OFFICE
DEAN'S OFFICE -
EMILY
FACULTY OFFICE -
THERESA
FACULTY OFFICE -
CONNIE
FACULTY OFFICE -
MARK
FACULTY OFFICE -
DENNIS
ADMIN SUITE A
STORAGE
ADMIN SUITE B
D
C
A
204E
204G
A
204A
A
A-310
E1
E1
E2
B
B
A
C
0' - 6"
9' - 8"
D E
E3
B
B
B
B
H
I
J
K
K
K
K
A-310
L
A-311
A-310
A-311
A-311
V
W X Y
A-310
A-500
A-500
A-500
A-401
JAN. CLOSET
B
201B
A-401
CLASSROOM
DENTAL ASSISTANT
CLASSROOM
CIRCULATION
IT
OFFICE
DEA + EMS
LAB PREP
MECH.
BIO LAB
CHEM LAB
159 160
161 157
A-410 2
A-410 17
FACULTY OFFICE -
VISITING STAFF
A-310
A-200
A-200
A-200
ELEV
A-200
A-311
A-311
OPEN TO
BELOW
B
A-200 9
A-200
A-411 43
A1-6 A1-6
A -6
A -6
A1-6
F1-3
A-410 16
C L E
A R
A-410 18
ALT 23
A-102A
A-102B
A -4
A -4
ALT 15
OFFICE - KAYLA
204G
ALT 15
ALT 15
142209
204F
218 217
248U
A-40117
4' - 0"
MECH
224A
S23
S26
P1-4
P1-4
12 3.16
05 5.02
1/8" PERFORATED ALUMINUM PLATE
FACE MOUNTED TO SUPPORT
STRUCTURE, RE: STRUC
05 5.02
1/8" PERFORATED ALUMINUM PLATE
FACE MOUNTED TO SUPPORT
STRUCTURE, RE: STRUC
224A
12 3.16
NEW RAILING TO MATCH (E)
EXISTING TO
REMAIN
LEGEND: FLOOR PLAN
REPLACE EXISTING TRANSLUCENT
PANELS WITH NEW INSULATED
GLAZING UNITS (ALT #17)
1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS SHALL
TAKE PRECEDENCE. IF ADDITIONAL DIMENSIONS ARE
REQUIRED, CONTACT ARCHITECT.
2. CONTRACTOR TO VERIFY ALL FIELD CONDITIONS AND
DIMENSIONS AND LAY OUT PROPOSED WORK PRIOR TO
CONSTRUCTION IN NEW WORK AREA. REPORT
DISCREPANCIES TO ARCHITECT FOR RESOLUTION.
3. IN THE EVENT OF CONFLICTING OR UNCLEAR
INFORMATION, CONTRACTOR SHALL CONTACT ARCHITECT
FOR CLARIFICATION.
4. SITE SURVEY PROVIDED IS DEEMED TO BE RELIABLE AND
ACCURATE. CONTRACTOR TO NOTIFY ARCHITECT AND
CIVIL ENGINEER WHEN DISCREPANCIES ARE
ENCOUNTERED PRIOR TO OR DURING CONSTRUCTION.
5. ALL WORK SHALL CONFORM TO APPLICABLE CODES.
NOTIFY ARCHITECT OF ANY CONDITIONS OR DETAILS
WHICH ARE DEEMED TO BE NONCONFORMING.
6. BUILDING TO REMAIN OPEN TO THE PUBLIC AND IN USE
THROUGHOUT CONSTRUCTION.
7. DUST PARTITIONS ARE REQUIRED AND EXCESSIVELY
NOISY ACTIVITIES MUST BE SCHEDULED DURING OFF-
HOURS.
8. COORDINATE WITH ALL OTHER DRAWINGS AND
SPECIFICATIONS FOR ADDITIONAL SCOPE.
9. ALL BUILDING EXITS AND STAIRS MUST REMAIN
OPERATIONAL DURING ALL PHASES OF CONSTRUCTION.
10. FOR ALL EXISTING SURFACES TO REMAIN THAT HAVE BEEN
IDENTIFIED TO RECEIVE NEW PAINT: SCRAPE, SPACKLE,
PATCH, CLEAN, OR OTHERWISE PREPARE SURFACE TO
RECEIVE PAINT WITHOUT NOTICEABLE IMPERFECTION.
11. REFER TO INTERIOR DRAWING FOR FLOOR AND WALL
FINISHES
12. REFER TO FINISH PLAN FOR EXTENT OF NEW FLOORING.
13. DIRECTIONS WHERE NOTED ARE ALWAYS IN REFERENCE
TO PLAN NORTH.
14. ASSUME ALL INTERIOR WALLS TO BE A1-4 U.O.N. REFER TO
G-002 FOR PARTITION TYPES.
15. LOCATE DOORS 4" MIN. FROM ADJ. WALL U.O.N.
GENERAL NOTES: FLOOR PLAN
PROJECT NO:P
R
O J E
C T
C 2025 STUDIOTROPE, LLC
NOT FOR CONSTRUCTION
1/30/2026 12:15:12 PM
A-102
OVERALL FLOOR PLAN LEVEL 02
T S
C V a ll e y C a m p u s
M a in
S tr e e t
A la m o s a
C O
TRINIDAD STATE COLLEGE
600 Prospect Street Trinidad, CO 81082
STUDIOTROPE DESIGN COLLECTIVE
2942 Welton Street Denver, CO 80205 303.308.1144
ARCHITECT / INTERIOR DESIGN
OWNER
CIVIL ENGINEER
LANDSCAPE ARCHITECT
STRUCTURAL ENGINEER
MECHANICAL/PLUMBING
ELECTRICAL/TECHNOLOGY
ELEVATION CONSULTING GROUP, LTD
8315 W 4th Ave, Lakewood, CO 80204 303.913.3543
FLOW DESIGN COLLABORATIVE
303 W 45th Avenue Denver, CO 80216 970.214.4078
JVA
1675 Larimer Street, Suite 550 Denver, CO 80202 303.444.1951
THE BALLARD GROUP
2525 South Wadsworth Blvd. Suite 200 Lakewood, CO 80227 303.988.4514
BCER
14143 Denver West Parkway, Ste 550 Golden, CO 80401 303.422.7400
3/32" = 1'-0"A-102
FLOOR PLAN - LEVEL 021
ISSUE DATE PHASE / REV NAME
1-30-2026 DESIGN DEVELOPMENT
KEYNOTES
KEYNOTE KEYNOTE DESCRIPTION
<varies>
04 2.10 1" MASONRY REVEAL PATTERN, RE: ELEVATIONS
FOR EXTENT AND BRCK TYPES
05 5.02 1/8" PERFORATED ALUMINUM PLATE FACE
MOUNTED TO SUPPORT STRUCTURE, RE: STRUC
05 5.08 METAL FABRICATIONS - PIPE RAILING OR
HANDRAIL
05 5.25 PIPE RAILING PAINTED WHITE, HEIGHT IS
ROUGHTLY 24" ABOVE PARAPET TOP TO MEET
42" ABOVE ROOFING REQ'D
06 4.01 ARCHITECTURAL WOOD CASEWORK
06 6.01 PREFINISHED METAL PARAPET CAP WITH
CONTINUOUS BLOCKING AND DRIP EDGES,
SLOPED TO DRAIN
07 4.08 ACM PANEL SYSTEM, RE: WALL TYPES
08 4.11 <varies>
09 3000 TILING
10 2.04 PHENOLIC CORE TOILET COMPARTMENTS
10 5.05 PLASTIC LAMINATE LOCKERS
12 3.16 NATURAL QUARTZ / RESIN COMPOSITE
COUNTERTOP
12.3.16 NATURAL QUARTZ / RESIN COMPOSITE
COUNTERTOP
SHEETNOTES
SHEET NOTE DESCRIPTION
S23 COLUMN; RE: STRL
S26 CUSTOM MILLWORK SURROUND. 3'Wx7'Hx1'D.
FULL HEIGHT DOORS WITH ATTACHED TOE
KICK AND KEYED LOCKING MECHANISM. PL-01
FINISH
ALTERNATES
KEYNOTE KEYNOTE DESCRIPTION
ALT 1.1 OCCUPIABLE TERRACE AT LEVEL 02
ALT 15 TUBULAR DAYLIGHTING DEVICE, BOD SOLATUBE
ALT 17 REPLACE YELLOWED WINDOWS
ALT 19 ALL WORK SHOWN IN THIS AREA TO BE
ALTERNATE. WALL DIVIDING 161/162 AND 100 AND
GRINDING VENTILATION EXCLUDED FROM
ALTERNATE.
ALT 23 PROVIDE SELF-SUPPORTING OPERABLE
PARTITION AND POCKET WALLS, STEEL
REINFORCEMENT BELOW IN BASE SCOPE
ErnieGarcia Polygon
ErnieGarcia Polygon
ErnieGarcia Polygon
ErnieGarcia Text Box Phase 3B March 8, 2027- May 20, 2027
ErnieGarcia Text Box
Phase 1B Front Entrance Addition (in Red) Phase 1B Front Entrance Addition (in Red) March 11th 2027
2027 RED
ErnieGarcia Text Box
Phase 2 (Light Blue)December 31, 26- April 23, 2027 Completion
ErnieGarcia Polygon
ErnieGarcia Text Box
Phase 4 Upper and Lower March 24, 2027 - July 8, 2027
ErnieGarcia Polygon
Phase 5 May 12 , 2027 - July 1, 2027
ErnieGarcia Arrow
ErnieGarcia Arrow
ErnieGarcia Arrow
ErnieGarcia Arrow
Arrow
File details come from the government source that posted it. Updated .