261005 - CD Phasing Plan.pdf

PDF 1 MB Posted

Attached to
TSC DQ2027000156
Solicitation number
DQ1 GJMA 2027000156 3
Issued by
Larimer County, Colorado

About this file

This document is a Phasing Plan floor plan for Trinidad State College's Valley Campus located at 1011 Main Street, Alamosa, Colorado. The project involves comprehensive renovation and expansion work across multiple levels of the facility, with construction phased over several months beginning in January 2027. The work includes updates to educational spaces, administrative offices, student services areas, nursing simulation facilities, welding and grinding rooms, cosmetology and esthetician spaces, classrooms, restrooms, mechanical systems, and various support facilities. The construction project is designed by Studiotrope Design Collective with structural engineering by JVA, mechanical/plumbing by The Ballard Group, electrical/technology by BCER, and civil engineering by Elevation Consulting Group, Ltd. The phasing plan establishes five distinct construction phases running from January 11, 2027, through July 12, 2027, with individual phase completion dates specified.

The project includes multiple alternates addressing window replacements, mechanical work, electrical installations, restroom fixtures, and specialized equipment. Critical constraints include maintaining building operations and public access throughout construction, implementing dust partitions, scheduling excessively noisy activities during off-hours, and keeping all building exits and stairs operational. The design is dated January 30, 2026, and marked "Not for Construction," indicating this represents the design development phase. General notes emphasize contractor verification of field conditions, coordination with all trade drawings and specifications, and conformance to applicable codes. The project scope encompasses extensive interior finishes, systems upgrades, and facility enhancements to support expanded educational programming.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

UP

UP

WELDING

WELD. OFFICE

100A

GRINDING RM.

100B

WELDING TOOL STO.

100C

WELDING

FAC. OFFICE

101A

MAKERSPACE

STO.

102B

ELEC.

102C

WOMENS RR

MENS RR

MECH. RM.

102D

STAIR 5

CLASSROOM

MENS RR

WOMENS RR

109 ELEV

CLN. CLOSET

MACH. ROOM

STUDY

NURSING CLASSROOM

STAIR 3

HALLWAY

EMS

MECH RM

AMBULANCE TRAINING

CLASSROOM

STORAGE AND

CONTROL

STORAGE AND LAB

PREP.

ATHLETICS

BOILER RM.

MAINTENANCE

STAIR 2

MECH. RM.

RECEPTION

136A

COSMETOLOGY

LNDRY/STO

136B

FACULTY

136C

CLASSROOM /

MANICURE

136D

ESTHETICIAN

136G

CORRIDOR

CORRIDOR

WTR ENTRY

STORAGE

CLASSROOM

CLASSROOM

IT

ELEC.

145MENS RR

WOMENS RR

MECH

MENS RR

WOMENS RR

JC

MECH.

A-301

NURSING SIM PAT RM.

NURSING SIM PAT RM.

SGA OFFICE

STORAGE AND CNTRL

RM

MED ROOM

SS OFFICE

LACTATION RM.

UNIVERSAL RR

AMAYA

FIN AID

FIN. AID

FIN. AID

STUDENT SERVICES

ADVICE/TRIO

FAFSA

ADVICE/TRIO

TRIO COMP. LAB.

SGA RECREATION

LOUNGE

NURSING SIM PAT RM.

FAFSA VISITING

SEC. STATION

MAIL/COPY

STO.

WELLNESS + NAVG.

A-301

A-301

DOA (MECH)

A-200 2

A-200

FUNDAMENTALS LAB

WINDOWS TO

RECEIVE OPAQUE

FILM, TYP THIS WALL,

EAST SIDE ONLY

OPEN TO

ABOVE

11 1 1 1 1 1 1 1 1

1 1 1 1 1 1

ATHLETICS

OFFICE

141A

136G

199A

A

115A

155A

115B

199B

FACILITIES

FAC. STO.

VESTIBULE

ELEC

102A

A-310

W1

W1

FUND STO.

115A

FUND RR

E1

E2

B

B

A

C

D E

28' - 10"

2' - 0"

E3

D

H

B

B

A

A

E

M

N

A-310

A-311

A-310

A-311

A-311

O

P

T T

U

R

S

Q

A-310

A-500

A-500

A-500

A-401

A

B

B

B

A-401

A-410

A-410

A-410

A-410

A-410 15

A-403

A-310

A-200

A-200

A-200

ELEVATOR

19' - 4"

A-311

A-311

A-410

B

A-4111 2

A-200 9

A-200

A-410

ALT 20

ALIGN

GRINDING

VENTILATION

SOURCE CAPTURE

EQUIPMENT, BO

S09

P R

-6

P1R-6

P1R-6 A1-6

A1-4

F1-4

A-402

A-101A

A-101B

10 22 40

A -6

A-410

ALT 18

ALT 21

ALT 21

ALT 21

A

136A

B

C

B

102B

248D

161A

161B

100CA

248C

105B

VESTIBULE

C

-4 SIM

SIM

SIM

SIM

S23

C -4

S24

M1-8R CHILLER ROOM

S25

A1-8

S27

S28

ALT 19

F -3

S29

F

S30

S30

S30

A-410 2

SIM.

4X4 STEEL POSTS

WITH METAL PANEL

CLADDING AND GATES

DOOR AND WALL

MODIFICATIONS

IN BASE SCOPE

EXISTING TO

REMAIN

LEGEND: FLOOR PLAN

REPLACE EXISTING TRANSLUCENT

PANELS WITH NEW INSULATED

GLAZING UNITS (ALT #17)

1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS SHALL

TAKE PRECEDENCE. IF ADDITIONAL DIMENSIONS ARE

REQUIRED, CONTACT ARCHITECT.

2. CONTRACTOR TO VERIFY ALL FIELD CONDITIONS AND

DIMENSIONS AND LAY OUT PROPOSED WORK PRIOR TO

CONSTRUCTION IN NEW WORK AREA. REPORT

DISCREPANCIES TO ARCHITECT FOR RESOLUTION.

3. IN THE EVENT OF CONFLICTING OR UNCLEAR

INFORMATION, CONTRACTOR SHALL CONTACT ARCHITECT

FOR CLARIFICATION.

4. SITE SURVEY PROVIDED IS DEEMED TO BE RELIABLE AND

ACCURATE. CONTRACTOR TO NOTIFY ARCHITECT AND

CIVIL ENGINEER WHEN DISCREPANCIES ARE

ENCOUNTERED PRIOR TO OR DURING CONSTRUCTION.

5. ALL WORK SHALL CONFORM TO APPLICABLE CODES.

NOTIFY ARCHITECT OF ANY CONDITIONS OR DETAILS

WHICH ARE DEEMED TO BE NONCONFORMING.

6. BUILDING TO REMAIN OPEN TO THE PUBLIC AND IN USE

THROUGHOUT CONSTRUCTION.

7. DUST PARTITIONS ARE REQUIRED AND EXCESSIVELY

NOISY ACTIVITIES MUST BE SCHEDULED DURING OFF-

HOURS.

8. COORDINATE WITH ALL OTHER DRAWINGS AND

SPECIFICATIONS FOR ADDITIONAL SCOPE.

9. ALL BUILDING EXITS AND STAIRS MUST REMAIN

OPERATIONAL DURING ALL PHASES OF CONSTRUCTION.

10. FOR ALL EXISTING SURFACES TO REMAIN THAT HAVE BEEN

IDENTIFIED TO RECEIVE NEW PAINT: SCRAPE, SPACKLE,

PATCH, CLEAN, OR OTHERWISE PREPARE SURFACE TO

RECEIVE PAINT WITHOUT NOTICEABLE IMPERFECTION.

11. REFER TO INTERIOR DRAWING FOR FLOOR AND WALL

FINISHES

12. REFER TO FINISH PLAN FOR EXTENT OF NEW FLOORING.

13. DIRECTIONS WHERE NOTED ARE ALWAYS IN REFERENCE

TO PLAN NORTH.

14. ASSUME ALL INTERIOR WALLS TO BE A1-4 U.O.N. REFER TO

G-002 FOR PARTITION TYPES.

15. LOCATE DOORS 4" MIN. FROM ADJ. WALL U.O.N.

GENERAL NOTES: FLOOR PLAN

PROJECT NO:P

R

O J E

C T

C 2025 STUDIOTROPE, LLC

NOT FOR CONSTRUCTION

1/30/2026 12:22:56 PM

A-101

OVERALL FLOOR PLAN LEVEL 01

T S

C V a ll e y C a m p u s

M a in

S tr e e t

A la m o s a

C O

TRINIDAD STATE COLLEGE

600 Prospect Street Trinidad, CO 81082

STUDIOTROPE DESIGN COLLECTIVE

2942 Welton Street Denver, CO 80205 303.308.1144

ARCHITECT / INTERIOR DESIGN

OWNER

CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL/PLUMBING

ELECTRICAL/TECHNOLOGY

ELEVATION CONSULTING GROUP, LTD

8315 W 4th Ave, Lakewood, CO 80204 303.913.3543

FLOW DESIGN COLLABORATIVE

303 W 45th Avenue Denver, CO 80216 970.214.4078

JVA

1675 Larimer Street, Suite 550 Denver, CO 80202 303.444.1951

THE BALLARD GROUP

2525 South Wadsworth Blvd. Suite 200 Lakewood, CO 80227 303.988.4514

BCER

14143 Denver West Parkway, Ste 550 Golden, CO 80401 303.422.7400

3/32" = 1'-0"A-101

FLOOR PLAN - LEVEL 011

ISSUE DATE PHASE / REV NAME

1-30-2026 DESIGN DEVELOPMENT

KEYNOTES

KEYNOTE KEYNOTE DESCRIPTION

04 2.10 1" MASONRY REVEAL PATTERN, RE: ELEVATIONS

FOR EXTENT AND BRCK TYPES

05 5.08 METAL FABRICATIONS - PIPE RAILING OR

HANDRAIL

05 5.25 PIPE RAILING PAINTED WHITE, HEIGHT IS

ROUGHTLY 24" ABOVE PARAPET TOP TO MEET

42" ABOVE ROOFING REQ'D

06 4.01 ARCHITECTURAL WOOD CASEWORK

08 4.11 <varies>

09 6.30 RESILIENT BASE

09 7.01 WALLCOVERING

09 8.06 ACOUSTICAL PANEL SYSTEM

09 3000 TILING

10 2.04 PHENOLIC CORE TOILET COMPARTMENTS

10 22 40 WIRE MESH PARTITION

12.3.16 NATURAL QUARTZ / RESIN COMPOSITE

COUNTERTOP

SHEETNOTES

SHEET

NOTE DESCRIPTION

S09 NO WATER, NO EXHAUST, NO SANITARY PER

MEP DRAWINGS

S23 COLUMN; RE: STRL

S24 TEACHING AMBULANCE, BY OWNER

S25 CHILLER; RE: MECH

S27 NEW SINK; RE: PLUMBING

S28 CUH AND ANNUNCIATOR PANEL; RE: MECH

S29 ADA DOOR ACCESS CONTROL

S30 FULL HEIGHT SHELVING ON STANDARDS

ALTERNATES

KEYNOTE KEYNOTE DESCRIPTION

ALT 1.1 OCCUPIABLE TERRACE AT LEVEL 02

ALT 17 REPLACE YELLOWED WINDOWS

ALT 18 ELIMINATE ALL ELECTRICAL WORK AND FINISHES

WITHIN MAKERSPACE

ALT 19 ALL WORK SHOWN IN THIS AREA TO BE

ALTERNATE. WALL DIVIDING 161/162 AND 100 AND

GRINDING VENTILATION EXCLUDED FROM

ALTERNATE.

ALT 20 ALL WORK SHOWN IN THIS AREA TO BE

ALTERNATE. MECHANICAL AND SPRINKLER WORK

IS NOT INCLUDED IN THIS ALTERNATE

ALT 21 RESTROOM FLOOR AND WALL TILE AND PLUMBING

FIXTURES

ErnieGarcia Text Box

Phase 1A January 11, 2027 completion

Arrow

ErnieGarcia Polygon

ErnieGarcia Text Box Phase 3A Cosmo (Lower) March 22, 2027- April 29, 2027 Base Scope

ErnieGarcia Arrow

ErnieGarcia Polygon

ErnieGarcia Text Box

Phase 1B Front Entrance Addition (in Red) March 11th 2027

2027 RED

ErnieGarcia Arrow

ErnieGarcia Polygon

ErnieGarcia Polygon

Phase 4 Upper and Lower March 24, 2027 - July 7, 2027

ErnieGarcia Arrow

ErnieGarcia Polygon

Phase 5 May 12 , 2027 - July 12, 2027

ErnieGarcia Arrow

ErnieGarcia Rectangle

ErnieGarcia Polygon

ErnieGarcia Polygon

ErnieGarcia Polygon

New Mechanical Room (Cooling) is driven by construction of the new Electrical service

Arrow

ErnieGarcia Arrow

VictorHorta Polygon

DN

DN

DN

DN

DN

DN

PROCTOR/

GED OFFICE

STAIR

TESTING

IT ROOM

LARGE ASSEMBLY

PRE FUNCTION

ELEV

STAIR

CIRCULATION

STAIR 2

STAIR 3

A-301

GED CLASSROOM

STO.

WOMENS RR

MENS RR

113' - 7"

111' - 2"

112' - 0"

A-301

A-301

CONFERENCE ROOM

OPEN TO

BELOW

EXTERIOR:

OPEN TO

ROOF

BELOW

A-200 2

OPEN TO

BELOW

OPEN TO

BELOW

OPEN TO

BELOW

116' - 0"

116' - 3"

:2

:1

:5

MECHANICAL ROOF

SPACE

STORAGE

204A

ADJ OFFICE -

(4)

GEN ED CLASSROOM

GEN ED CLASSROOM

OFFICE -

CHRIS

CLASSROOM

CONF

OFFICE -

YVETTE

CLASSROOM

FLEX LAB

E-SPORTS

IT OFFICE & STORAGE

WOMENS RR

MENS RR

JC

OFFICE -

LORIRAE + NUA

204C

OFFICE -

TOUCHDOWN

204D

OFFICE -

SAMI

204E

BREAK RM.

204F

E-SPORTS COACH

OFFICE -

JODI

(E) RAIL TO REMAIN

NEW RAILING

1 1

1 1 1 1 1 1 1 1 1 1 1

1 1 1

VP OFFICE -

JIM

STAFF OFFICE -

CAROLYN

HR OFFICE

DEAN'S OFFICE -

EMILY

FACULTY OFFICE -

THERESA

FACULTY OFFICE -

CONNIE

FACULTY OFFICE -

MARK

FACULTY OFFICE -

DENNIS

ADMIN SUITE A

STORAGE

ADMIN SUITE B

D

C

A

204E

204G

A

204A

A

A-310

E1

E1

E2

B

B

A

C

0' - 6"

9' - 8"

D E

E3

B

B

B

B

H

I

J

K

K

K

K

A-310

L

A-311

A-310

A-311

A-311

V

W X Y

A-310

A-500

A-500

A-500

A-401

JAN. CLOSET

B

201B

A-401

CLASSROOM

DENTAL ASSISTANT

CLASSROOM

CIRCULATION

IT

OFFICE

DEA + EMS

LAB PREP

MECH.

BIO LAB

CHEM LAB

159 160

161 157

A-410 2

A-410 17

FACULTY OFFICE -

VISITING STAFF

A-310

A-200

A-200

A-200

ELEV

A-200

A-311

A-311

OPEN TO

BELOW

B

A-200 9

A-200

A-411 43

A1-6 A1-6

A -6

A -6

A1-6

F1-3

A-410 16

C L E

A R

A-410 18

ALT 23

A-102A

A-102B

A -4

A -4

ALT 15

OFFICE - KAYLA

204G

ALT 15

ALT 15

142209

204F

218 217

248U

A-40117

4' - 0"

MECH

224A

S23

S26

P1-4

P1-4

12 3.16

05 5.02

1/8" PERFORATED ALUMINUM PLATE

FACE MOUNTED TO SUPPORT

STRUCTURE, RE: STRUC

05 5.02

1/8" PERFORATED ALUMINUM PLATE

FACE MOUNTED TO SUPPORT

STRUCTURE, RE: STRUC

224A

12 3.16

NEW RAILING TO MATCH (E)

EXISTING TO

REMAIN

LEGEND: FLOOR PLAN

REPLACE EXISTING TRANSLUCENT

PANELS WITH NEW INSULATED

GLAZING UNITS (ALT #17)

1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS SHALL

TAKE PRECEDENCE. IF ADDITIONAL DIMENSIONS ARE

REQUIRED, CONTACT ARCHITECT.

2. CONTRACTOR TO VERIFY ALL FIELD CONDITIONS AND

DIMENSIONS AND LAY OUT PROPOSED WORK PRIOR TO

CONSTRUCTION IN NEW WORK AREA. REPORT

DISCREPANCIES TO ARCHITECT FOR RESOLUTION.

3. IN THE EVENT OF CONFLICTING OR UNCLEAR

INFORMATION, CONTRACTOR SHALL CONTACT ARCHITECT

FOR CLARIFICATION.

4. SITE SURVEY PROVIDED IS DEEMED TO BE RELIABLE AND

ACCURATE. CONTRACTOR TO NOTIFY ARCHITECT AND

CIVIL ENGINEER WHEN DISCREPANCIES ARE

ENCOUNTERED PRIOR TO OR DURING CONSTRUCTION.

5. ALL WORK SHALL CONFORM TO APPLICABLE CODES.

NOTIFY ARCHITECT OF ANY CONDITIONS OR DETAILS

WHICH ARE DEEMED TO BE NONCONFORMING.

6. BUILDING TO REMAIN OPEN TO THE PUBLIC AND IN USE

THROUGHOUT CONSTRUCTION.

7. DUST PARTITIONS ARE REQUIRED AND EXCESSIVELY

NOISY ACTIVITIES MUST BE SCHEDULED DURING OFF-

HOURS.

8. COORDINATE WITH ALL OTHER DRAWINGS AND

SPECIFICATIONS FOR ADDITIONAL SCOPE.

9. ALL BUILDING EXITS AND STAIRS MUST REMAIN

OPERATIONAL DURING ALL PHASES OF CONSTRUCTION.

10. FOR ALL EXISTING SURFACES TO REMAIN THAT HAVE BEEN

IDENTIFIED TO RECEIVE NEW PAINT: SCRAPE, SPACKLE,

PATCH, CLEAN, OR OTHERWISE PREPARE SURFACE TO

RECEIVE PAINT WITHOUT NOTICEABLE IMPERFECTION.

11. REFER TO INTERIOR DRAWING FOR FLOOR AND WALL

FINISHES

12. REFER TO FINISH PLAN FOR EXTENT OF NEW FLOORING.

13. DIRECTIONS WHERE NOTED ARE ALWAYS IN REFERENCE

TO PLAN NORTH.

14. ASSUME ALL INTERIOR WALLS TO BE A1-4 U.O.N. REFER TO

G-002 FOR PARTITION TYPES.

15. LOCATE DOORS 4" MIN. FROM ADJ. WALL U.O.N.

GENERAL NOTES: FLOOR PLAN

PROJECT NO:P

R

O J E

C T

C 2025 STUDIOTROPE, LLC

NOT FOR CONSTRUCTION

1/30/2026 12:15:12 PM

A-102

OVERALL FLOOR PLAN LEVEL 02

T S

C V a ll e y C a m p u s

M a in

S tr e e t

A la m o s a

C O

TRINIDAD STATE COLLEGE

600 Prospect Street Trinidad, CO 81082

STUDIOTROPE DESIGN COLLECTIVE

2942 Welton Street Denver, CO 80205 303.308.1144

ARCHITECT / INTERIOR DESIGN

OWNER

CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL/PLUMBING

ELECTRICAL/TECHNOLOGY

ELEVATION CONSULTING GROUP, LTD

8315 W 4th Ave, Lakewood, CO 80204 303.913.3543

FLOW DESIGN COLLABORATIVE

303 W 45th Avenue Denver, CO 80216 970.214.4078

JVA

1675 Larimer Street, Suite 550 Denver, CO 80202 303.444.1951

THE BALLARD GROUP

2525 South Wadsworth Blvd. Suite 200 Lakewood, CO 80227 303.988.4514

BCER

14143 Denver West Parkway, Ste 550 Golden, CO 80401 303.422.7400

3/32" = 1'-0"A-102

FLOOR PLAN - LEVEL 021

ISSUE DATE PHASE / REV NAME

1-30-2026 DESIGN DEVELOPMENT

KEYNOTES

KEYNOTE KEYNOTE DESCRIPTION

<varies>

04 2.10 1" MASONRY REVEAL PATTERN, RE: ELEVATIONS

FOR EXTENT AND BRCK TYPES

05 5.02 1/8" PERFORATED ALUMINUM PLATE FACE

MOUNTED TO SUPPORT STRUCTURE, RE: STRUC

05 5.08 METAL FABRICATIONS - PIPE RAILING OR

HANDRAIL

05 5.25 PIPE RAILING PAINTED WHITE, HEIGHT IS

ROUGHTLY 24" ABOVE PARAPET TOP TO MEET

42" ABOVE ROOFING REQ'D

06 4.01 ARCHITECTURAL WOOD CASEWORK

06 6.01 PREFINISHED METAL PARAPET CAP WITH

CONTINUOUS BLOCKING AND DRIP EDGES,

SLOPED TO DRAIN

07 4.08 ACM PANEL SYSTEM, RE: WALL TYPES

08 4.11 <varies>

09 3000 TILING

10 2.04 PHENOLIC CORE TOILET COMPARTMENTS

10 5.05 PLASTIC LAMINATE LOCKERS

12 3.16 NATURAL QUARTZ / RESIN COMPOSITE

COUNTERTOP

12.3.16 NATURAL QUARTZ / RESIN COMPOSITE

COUNTERTOP

SHEETNOTES

SHEET NOTE DESCRIPTION

S23 COLUMN; RE: STRL

S26 CUSTOM MILLWORK SURROUND. 3'Wx7'Hx1'D.

FULL HEIGHT DOORS WITH ATTACHED TOE

KICK AND KEYED LOCKING MECHANISM. PL-01

FINISH

ALTERNATES

KEYNOTE KEYNOTE DESCRIPTION

ALT 1.1 OCCUPIABLE TERRACE AT LEVEL 02

ALT 15 TUBULAR DAYLIGHTING DEVICE, BOD SOLATUBE

ALT 17 REPLACE YELLOWED WINDOWS

ALT 19 ALL WORK SHOWN IN THIS AREA TO BE

ALTERNATE. WALL DIVIDING 161/162 AND 100 AND

GRINDING VENTILATION EXCLUDED FROM

ALTERNATE.

ALT 23 PROVIDE SELF-SUPPORTING OPERABLE

PARTITION AND POCKET WALLS, STEEL

REINFORCEMENT BELOW IN BASE SCOPE

ErnieGarcia Polygon

ErnieGarcia Polygon

ErnieGarcia Polygon

ErnieGarcia Text Box Phase 3B March 8, 2027- May 20, 2027

ErnieGarcia Text Box

Phase 1B Front Entrance Addition (in Red) Phase 1B Front Entrance Addition (in Red) March 11th 2027

2027 RED

ErnieGarcia Text Box

Phase 2 (Light Blue)December 31, 26- April 23, 2027 Completion

ErnieGarcia Polygon

ErnieGarcia Text Box

Phase 4 Upper and Lower March 24, 2027 - July 8, 2027

ErnieGarcia Polygon

Phase 5 May 12 , 2027 - July 1, 2027

ErnieGarcia Arrow

ErnieGarcia Arrow

ErnieGarcia Arrow

ErnieGarcia Arrow

Arrow

File details come from the government source that posted it. Updated .