2610524016 Replace Shingle Roof-UTES-blgd 2295-fctc PreBid Addendum #1.pdf

PDF 256 KB Posted

Attached to
511/25133. AGY; Fort Custer T. C. - Replace Roof, Bldg. 2295
Solicitation number
RFQ 171 250000000255 3
Issued by
Kalamazoo County, Ann Arbor City, Michigan

About this file

This is a Pre-Bid Addendum No. 1 issued by the State of Michigan Department of Military and Veterans Affairs, Construction & Facilities Management Office, for a roof replacement project at the University of Michigan Transportation Engineering Services (UTES) Building 2295 located at 3423 Martin Luther King Jr. Boulevard in Lansing. The project involves replacing a shingle roof on an existing structure. The bid opening is scheduled for April 9th, 2025 at 2:00 PM. Bidders are required to acknowledge receipt of this addendum on the Bid-Summary Sheet.

The addendum provides two critical clarifications regarding project specifications. First, notes on sheet A2 referencing grout fill for existing block construction are clarified to be in error, as no block work exists on this project. Second, the addendum includes attached photographic documentation of the roof core completed in October 2024, which depicts the existing roof assembly composition consisting of asphalt shingles, ice/water shield, air gap, rigid insulation, vapor barrier, and metal roof deck. Bidders must account for these existing conditions and materials in their proposals.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORM BF-1

State of Michigan DATE ISSUED: March 11, 2025 Department of Military and Veterans Affairs PROJECT: Replace Shingle Roof-UTES Construction & Facilities Management Office 3423 Martin Luther King Jr. Blvd. INDEX CODE NO: 1050 Lansing, MI 48906 File No. 511/25133.AGY BID OPENING: April 9th @ 2:00PM

ADDENDUM NO. 1

TO: All Bidders

SUBJECT: Revisions and Clarifications:

1. CLARIFICATION: Note(s) on Sheet A2 call for providing grout fill for existing block construction was made in error. No block work on this project.

2. CLARIFICATION: See attached sheets for images of the roof core completed in October of 2024.

Images show:

-Asphalt shingles -Ice/water shield -Air gap -Rigid insulation -Vapor barrier -Metal roof deck

ACKNOWLEDGEMENT: The Acknowledgement for this Addendum shall be noted on the Bid- Summary Sheet.

FIRM NAME

BIDDER’S SIGNATURE

Roof Core pic #1

Roof Core pic #2

Roof Core pic #3

File details come from the government source that posted it. Updated .