260401 CHILLER REPLACEMENT PD.pdf

PDF 68 KB Posted

Attached to
Chiller Replacement Bldgs. 128, 227, BB125, and RR135
Solicitation number
N4008526R9005
Issued by

About this file

This document appears to be a Project Description for an HVAC Chiller unit installation project at Camp Lejeune, North Carolina. The project scope involves providing and installing new HVAC Chiller units at four specific buildings: Buildings 128, 227, BB125, and RR135.

Key project requirements include maintaining facility operations during construction, with the contractor required to minimize interference with normal facility activities. The project allows flexibility in personnel management, permitting one qualified individual to simultaneously serve as Superintendent, Quality Control Manager, and Safety & Health Officer, subject to meeting the qualifications specified in the project specification.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT DESCRIPTION

This scope of work is to be accomplished at Bldg.’s 128, 227, BB125, and RR135 on board Camp Lejeune NC. Contractor will provide and install new HVAC Chiller units at each location.

SPECIAL SCHEDULING

The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations of the facility/activity.

SUPERVISION

One person may fill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer, if duly qualified for all three positions as defined in the project specification.