26-8638_Bid_Schedule.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Goodland Pump Station Improvements
Solicitation number
26-8638
Issued by
Collier County, Florida

About this file

This is a bid schedule document for Collier County, Florida's Invitation to Bid (ITB No. 26-8638) for the Goodland Pump Station Improvements Project, a comprehensive wastewater infrastructure upgrade located at 2559 San Marco Road, Marco Island, Florida. The project encompasses 17 line items, all bid as lump sum contracts, including mobilization/demobilization, general requirements, restoration, demolition, asphalt driveway installation, yard piping, recirculation pump assembly, pump building interior piping, vertical turbine pumps, sodium hypochlorite and caustic pump skids with chemical storage, generator installation, fuel system improvements, mechanical HVAC improvements, electrical improvements, structural improvements, and bypass operations. Sealed bids must be submitted electronically through the Collier County procurement portal no later than March 5-6, 2026, at 3:00 p.m. local time. A non-mandatory pre-bid meeting is scheduled for January 28, 2026, at 10:00 a.m., followed by an immediate non-mandatory site visit at the project location. The successful bidder must achieve substantial completion within 730 calendar days from the Commencement Date and final completion within 30 calendar days after punch list delivery, with liquidated damages assessed at $1,241.00 per calendar day for schedule delays.

The bid schedule shows a total base bid of $0.00 as a placeholder, with an anticipated project budget of $6,037,500. An Owner's Allowance of $500,000 has been allocated for work due to unforeseen conditions and will be directed by the Owner through formal Change Order with proper time and materials documentation; however, this allowance is not guaranteed to be fully expended. Bidders must submit a bid bond equal to five percent of the total bid amount and, upon award, provide Performance and Payment Bonds equal to 100 percent of the contract amount. Required insurance includes Worker's Compensation at statutory limits, Commercial General Liability ($1,000,000 single occurrence/$2,000,000 aggregate), Employer's Liability ($1,000,000), Automobile Liability ($1,000,000), and Pollution Liability ($1,000,000). No specific set-asides for disadvantaged enterprises are identified. The contract will be awarded to the lowest responsive and responsible bidder as determined by the Board of County Commissioners, with the successful bidder required to execute the contract within ten calendar days of receiving the Notice of Award and maintain the facility for one year following acceptance.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

25-XXXXXX Bid Schedule Construction ITB #26-8638 Goodland Pump Station Improvements Bid Schedule

ITEM NODESCRIPTIONQUANTITYUNITSTOTAL
BASE BID: Includes all items described as the Base BId in the Summary of Work as shown on the attached Drawings and Exhibits with no substitutions or limitations.
1Mobilization/Demobilization1Lump Sum
2General Requirements1Lump Sum
3Restoration1Lump Sum
4Demolition1Lump Sum
5Asphalt Driveway1Lump Sum
6Yard Piping1Lump Sum
7Recirculation Pump Assembly1Lump Sum
8Pump Building Interior Piping Assembly1Lump Sum
9Vertical Turbine Pumps1Lump Sum
10Sodium Hypochlorite Pump Skid and Chemical Storage1Lump Sum
11Caustic Pump Skid and Chemical Storage1Lump Sum
12Generator1Lump Sum
13Fuel System Improvements1Lump Sum
14Mechanical HVAC Improvements1Lump Sum
15Electrical Improvements1Lump Sum
16Structural Improvements1Lump Sum
17Bypass Operations1Lump Sum
TOTAL BID FOR ITEMS 1 THROUGH 17$0.00
*Staff has allocated $500,000 in Owner's Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change