About this file
This is a construction plan document for the Goodland Pump Station Improvements Project issued by Collier County, Florida (ITB No. 26-8638). The project involves comprehensive wastewater infrastructure upgrades at 2559 San Marco Road, Marco Island, Florida 34145, including replacement of turbine pumps and associated piping, installation of new chemical storage and feed systems, demolition of existing aluminum platforms and stairs, installation of a new generator pad and access stairs, relocation of the existing generator and fuel tank, improvement of recirculation piping systems, replacement of fencing and gates, structural improvements to the pump building, site improvements including grading and drainage, and installation of new mechanical, electrical, and instrumentation systems. Sealed bids must be submitted electronically through the Collier County procurement portal no later than March 5, 2026, at 3:00 p.m. local time, with public bid opening immediately thereafter. A non-mandatory pre-bid meeting is scheduled for January 28, 2026, at 10:00 a.m. at the South County Regional Water Treatment Plant (3851 City Gate Drive, Naples, FL 34117), followed by an immediate non-mandatory site visit. The successful bidder must substantially complete all work within 730 calendar days from the Commencement Date and achieve final completion within 30 calendar days after punch list delivery, with liquidated damages of $1,241.00 per calendar day for schedule delays.
The anticipated project budget is $6,037,500 with an Owner's Allowance of $500,000 designated for unforeseen conditions directed by the Owner. Bidders must submit a bid bond equal to five percent of the total bid amount and, upon award, provide Performance and Payment Bonds equal to 100 percent of the contract amount. Required qualifications include five project references of similar magnitude completed within the last five years, identified key personnel, major subcontractor identification, E-Verify enrollment compliance, Florida Department of State Certificate of Authority, appropriate professional licensing, and trench safety compliance certification. Insurance requirements include Worker's Compensation at statutory limits, Commercial General Liability ($1,000,000 single occurrence/$2,000,000 aggregate), Employer's Liability ($1,000,000), Automobile Liability ($1,000,000), and Pollution Liability ($1,000,000). The contract will be awarded to the lowest responsive and responsible bidder as determined by the Board of County Commissioners, and the successful bidder must execute the contract within ten calendar days of receiving the Notice of Award and maintain the facility for one year following acceptance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .