About this file
This document is an Environmental, Health and Safety (EHS) Contractor Requirements exhibit for Collier County construction projects, specifically prepared for Bid No. 26-8624 for the Immokalee Sports Complex Phase 1A project in Collier County, Florida. The requirements establish comprehensive EHS compliance standards that all contractors must follow, including adherence to applicable federal and state regulations from OSHA, DOT, EPA, DHS, ANSI, FDEP, and NFPA, as well as Collier County CMA's Standard Operating Procedures and Job Safety Analysis documents. Contractors must implement mandatory site-specific safety plans covering site-specific safety, security, hurricane preparedness, pandemic safety, respirable crystalline silica, confined space entry, asbestos management, mold remediation, and environmental protection. Additionally, contractors working within rights-of-way must comply with all FDOT and MUTCD requirements, including Class 2 or 3 hi-visibility safety garments per ANSI/ISEA 107-2010 standards and proper work zone traffic control measures. The sealed bid deadline for the project is January 22, 2026 at 3:00 p.m. local time, with a non-mandatory pre-bid meeting scheduled for December 12, 2025 at 1:30 p.m. in Naples, Florida.
All contractor activities must incorporate risk management protocols during pre-construction, construction, and post-construction phases. Contractors are required to wear BCC-provided vendor badges at all times on county property and maintain proper certifications for powered industrial vehicles and equipment operation. Jobsite safeguarding is mandatory, requiring contractors to adequately protect hazardous areas with orange barricade fencing, appropriate signage, and closure notices to prevent public access after daily work completion. All work must meet or exceed standards set forth in Collier County Vertical Construction Standards and Collier County IT Construction Standards unless specifically exempted in writing by the Facilities Management Division Director and Risk Management Director. Daily incident and accident reporting is required, along with weekly internal safety inspections of equipment and worksites.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Environmental, Health and Safety
Contractor Requirements for all BCC Construction Projects
1. Contractors will be required to understand and comply with all applicable laws and regulations of any governmental entity (OSHA, DOT, EPA, DHS, ANSI, FDEP. NFPA, etc.) and
Collier County CMA’s, EHS Standard Operating Procedures (SOP’s) or Job Safety Analysis
(JSA’s) that that pertain to environmental, health and safety standards and/or work practices applicable to the activities they perform for Collier County. These include but are not limited to:
• Must wear a BCC provided Vendor Badge at all times while on BCC property.
• Powered Industrial Vehicle Certifications (Heavy Equipment, Cranes, etc.)
• Storage, handling, and use of flammable liquids and hazardous materials, including fuels and compressed gas cylinders.
• Daily reporting of any incidents/accidents or any OSHA safety inspections of equipment and worksites.
• Weekly reporting of at least one internal safety inspection of equipment and worksite.
• Use of Personal Fall Protection Devices while working at heights above 6 feet.
• Following Electrical Safety Practices, Arc Flash and Lockout/Tagout procedures.
• Proper use of Personal Protective Equipment. (PPE)
• Proper maintenance and use of ladders and other equipment.
• Guarding of wall and floor openings, open trenches, and excavations.
• Environmental Requirements (Permitting, Tanks, etc.)
2. Required Site EHS Plans for:
• Site Specific Safety Plan
• Site Specific Security Plan
• Site Specific Hurricane Plan
• Site Specific Pandemic Safety Plan (COVID-19) (If Applicable)
• Site Specific Respirable Crystalline Silica Plan (If Applicable)
• Site Specific Confined Space Entry Plan (If Applicable)
• Site Specific Asbestos Management Plan (If Applicable)
• Site Specific Mold Testing and Remediation Management Plan (If Applicable)
• Site Specific Environmental Protection Plan (Spill Cleanup, SPCC, etc.) (If
Applicable)
3. When working within a right-of-way (i.e. roads, sidewalks, bike paths, etc) – All applicable
FDOT and/or MUTCD requirements are to be followed at all times. Specifics include but are not limited to:
• ANSI/ISEA 107-2010 Compliant Class 2 or 3 Hi-Visibility Safety Garments.
• Applicable work zone signage, cones, barricades or barrels, arrow panels, flagging personnel and Stop/Slow Paddles, where necessary, required by law or the BCC.
• An applicable work zone (Maintenance of traffic) plan based on FDOT and/or
MUTCD designs on site.
4. Risk Management is included in all Pre-Activity/Construction, Activity/Construction and
Post Activity/Construction Meetings.
5. Safeguarding construction sites – Protecting the jobsite and preventing or inhibiting public access after activities are finished for the day is equally important. Therefore, all hazardous locations within construction sites and rights-of-ways are to be adequately protected.
Specifics include but are not limited to:
• Damaged, blocked, or missing sections of sidewalks, bike paths or other pedestrian access zones shall be protected with orange barricade fencing, barricades with yellow or red tape (depending on the hazard) or an equivalent means of protection. Sidewalks must also be posted as being closed on both sides with a white sign with black letters.
• Excavations must be protected in a similar manner as listed above if they must be left open overnight, during weekend hours, etc.
• All other hazards shall be evaluated by the contractor to ensure there are no dangerous conditions remaining that could be inadvertently encountered by collier county employees and/or the public while the construction site is not active (i.e., when no construction work is taking place).
6. Contractor must agree that all work must meet or exceed the standards set forth in the
Collier County Vertical Construction Standards and Collier County IT Construction Standards
(if applicable) unless specifically exempted in writing by Facilities Management Division
Director and Risk Management Director.