This is a bid schedule document for Collier County's Immokalee Sports Complex Phase 1A Project (Bid No. 26-8624), a comprehensive construction initiative requiring sealed bids due January 22, 2026, at 3:00 p.m. local time, with an alternative deadline of February 19, 2026. The project encompasses construction of two artificial turf fields with complete infrastructure, including 2,200 linear feet of galvanized chain link fencing, two single swing gates, one double swing gate, two manual rolling gates with Knox boxes, six 20-foot soft net backstops, two fixed bleachers, vehicular rated bollards, sports lighting painting, and extensive site improvements. Additional work includes 406 square yards of 5-inch thick reinforced concrete sidewalk, 77 square yards of 6-inch thick reinforced concrete pavement, stormwater and sanitary sewer infrastructure with various pipe sizes and drainage structures, fire hydrant installation, potable water connections, soil preparation of 1,682 cubic yards, 181,685 square feet of sod installation, 26 canopy trees, 9 palm trees, and complete irrigation systems. A non-mandatory pre-bid meeting is scheduled for December 12, 2025, at 1:30 p.m. in Naples, Florida. The project requires substantial completion within 240 calendar days from Notice to Proceed and final completion within 30 calendar days thereafter.

The anticipated project budget is $5,000,000, with an owner's allowance of $312,000 designated for unforeseen conditions and owner-directed work through change orders. Liquidated damages are assessed at $3,201 per calendar day for failure to meet the substantial completion deadline. Bidders must hold a valid Florida General Contractor License, be enrolled in E-Verify, possess minimum ten years of experience in sports field construction, and provide five references with at least two from similar projects completed within the last four years. Performance and payment bonds equal to 100% of the contract award amount are required. The contract includes potential additive alternates such as an electric rolling gate with Knox box and a planting irrigation water treatment system. All work includes a one-year warranty, and Collier County will be named as additional insured on all liability policies. Prospective bidders must register through the Collier County procurement portal at https://procurement.opengov.com/portal/collier-county-fl to obtain the complete bid documents.

View the file

Other files

File Type Posted
M-02_Revised_Specification_Page_C-108.pdf PDF
M-02_Revised_Specification_Page_C-109.pdf PDF
M-02_Revised_Specification_Page_C100.pdf PDF
26-8624_Immokalee_Sports_Complex_Section_C_-_Lighting_Design.pdf PDF
26-8624_-_Solicitation..pdf PDF
26-8624_-_Solicitation..pdf PDF
26-8624_ATA_-_Executed.pdf PDF
26-8624_ATA_-_Executed.pdf PDF
26-8624_-_Bid_Schedule.xlsx XLSX spreadsheet
26-8624_-_Exhibit_L_-_Scope_of_Work.pdf PDF
26-8624_-_Exhibit_L_-_Scope_of_Work.pdf PDF
26-8624_-_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
Construction_Bid_Instructions_Version_1.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
26-8624_-_Exhibit_M_-_01_ISC-Phase1ASubmittal(Final)_Keysheets_SS.pdf PDF
26-8624_-_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
Construction_Services_Agreement_2025_Template_ver_3_with_Exhibits.pdf PDF
26-8624_-_Exhibit_J_-_ISC_Phase1A(Final)_SS.pdf PDF
26-8624_-_Exhibit_M_-_01_ISC-Phase1ASubmittal(Final)_Keysheets_SS.pdf PDF
Construction_Services_Agreement_2025_Template_ver_3_with_Exhibits.pdf PDF
26-8624_-_Exhibit_J_-_ISC_Phase1A(Final)_SS.pdf PDF
26-8624_-_Exhibit_M_-_02_ISC-Phase1ASubmittal(Final)_Civil-SS.pdf PDF
26-8624_-_Exhibit_M_-_03_ISC-Phase1ASubmittal(Final)_Landscape-SS.pdf PDF
Construction_Bid_Instructions_Version_1.pdf PDF
26-8624_-_Exhibit_M_-_02_ISC-Phase1ASubmittal(Final)_Civil-SS.pdf PDF
26-8624_-_Exhibit_M_-_03_ISC-Phase1ASubmittal(Final)_Landscape-SS.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROM

Immokalee Sports Complex
Bid Schedule - Phase 1A

Division 00 Procurement and Contracting Requirements

SECTION NUMBER ITEM QUANTITY UNIT UNIT PRICE TOTAL DESCRIPTION

003132Survey1.00LS$ - 0$ - 0Layout and As-Built Survey for certification of fields
003132Mobilization/Demobilization1.00LS$ - 0$ - 0
003132Payment and Performance Bond1.00LS$ - 0$ - 0
003132Maintenance of Traffic1.00LS$ - 0$ - 0
003132Record Drawings1.00LS$ - 0$ - 0Review and certify record (as-built) drawings that have been compiled and provided by the general contractor

Total Division 00 $ - 0

Division 01 General Requirements

SECTION NUMBER ITEM QUANTITY UNIT UNIT PRICE TOTAL NOTES

015639Temporary Tree and Plant Protection1.00LS$ - 0$ - 0Construction-phase tree and plant protection, trimming, protection - zone fencing, and pruning
017419Construction Waste Management and Disposal1.00LS$ - 0$ - 0Salvaging, recycling, and disposing of non-hazardous demolition and construction waste

Total Division 01 $ - 0

Division 03 Concrete

SECTION NUMBER ITEM QUANTITY UNIT UNIT PRICE TOTAL NOTES

5" thick reinforced concrete sidewalk or slab w/ sub-base406.00SY$ - 0$ - 0Bleacher pads, sidewalks
6" thick reinforced concrete pavement with sub-base77.00SY$ - 0$ - 0Drive apron

Total Division 03 $ - 0

Division 11 Equipment

SECTION NUMBER ITEM QUANTITY UNIT UNIT PRICE TOTAL NOTES

116800Galvanized Chain Link Fence2200.00LF$ - 0$ - 08.0' height 9-gauge galvanized chain link fence, posts, footings, fasteners, etc.
116800Single Swing Gate2.00EA$ - 0$ - 08.0' height x 4' wide 9-gauge galvanized chain link gate, latch hardware, posts, footings, fasteners, etc.
116800Double Swing Gate1.00EA$ - 0$ - 08.0' height x 8' wide (two 4' panels) 9-gauge galvanized chain link gates, latch hardware, posts, footings, fasteners, etc.
116800Manual Rolling Gate & Knox Box2.00EA$ - 0$ - 016' manual rolling gate atop v-track and concrete grade beam w/ Knox Box
ADD ALTElectric Rolling Gate & Knox Box1.00EA$ - 0$ - 016' electric motor w/ emergency vehicle accessibility rolling gate atop v-track and concrete grade beam w/ Knox Box
116800Artificial Turf Field & Infrastructure2.00EA$ - 0$ - 0Includes Removal of Upper 6 Inches of Existing Field, Installation of Field/Underdrain system, Backfill, Turf Carpet, Field Striping, 8" Ribbon Curb Around Field & Furnishing, Zeofill Topping
11680020'H soft net backstops6.00EA$ - 0$ - 020'H soft net backstops, inline and freestanding poles, concrete ribbon curb, net hoist system

Total Division 11 $ - 0

Division 12 Furnishings

SECTION NUMBER ITEM QUANTITY UNIT UNIT PRICE TOTAL NOTES

Trash Receptacle2.00EA$ - 0$ - 0By Collier County Parks and Recreation Department
Recycle Receptacle2.00EA$ - 0$ - 0By Collier County Parks and Recreation Department
Bleacher (Fixed)2.00EA$ - 0$ - 0Bleacher locations #3 and #4 between fields 2 and 3

Total Division 12 $ - 0

Division 13 Special Construction

SECTION NUMBER ITEM QUANTITY UNIT UNIT PRICE TOTAL NOTES

Vehicular Rated Bollards3.00EA$ - 0$ - 0Vehicular rated guard bollard painted yellow with reflective markings
Sports Lighting Painting (does not include pool area)15.00EA$ - 0$ - 0Includes all materials, equipment, and labor to remove mold, algae, and staining buildup; prepare the pole for paint, (1) coat primer per surface type (metal or concrete) and apply (2) coats high-quality Sherwin-Williams paint up to a height of 20'

Total Division 13 $ - 0

Division 31 Earthworks

SECTION NUMBER ITEM QUANTITY UNIT UNIT PRICE TOTAL NOTES

311000Site Clearing1.00LS$ - 0$ - 0Clearing, grubbing, vegetation protection, stumping, stripping and stockpiling topsoil and rock, and disconnecting utilities. Includes removal of existing hardscape, irrigation and fencing
311000Erosion Control and NPDES1.00LS$ - 0$ - 0Includes silt fencing
311000Embankment800.00CY$ - 0$ - 0Includes miscellaneous fill as needed for construction and berm restoration - fields not included

Total Division 31 $ - 0

Division 32 Exterior Improvements

SECTION NUMBER ITEM QUANTITY UNIT UNIT PRICE TOTAL NOTES

3212001.5" thick asphaltic concrete type SP-12.5 - structural course507.00SY$ - 0$ - 0
3212001" thick asphaltic concrete type SP-9.5 - friction course507.00SY$ - 0$ - 0
32120010" Limerock Base607.00SY$ - 0$ - 0
321200Type F Curb62.00LF$ - 0$ - 0
321200Painted pavement Markings STD1.00LS$ - 0$ - 0
3212006" PVC Conduits60.00LF$ - 0$ - 0Irrigation sleeves
3212004" PVC Conduits60.00LF$ - 0$ - 0Irrigation sleeves
328400Planting Irrigation Retrofit1.00LS$ - 0$ - 0Includes Rerouting and Quick Connection Valves w/ Valve Box (includes repair and reactivation of Field #1 upon completion of construction)
328400Planting Irrigation New Installation102685.00SF$ - 0$ - 0Includes irrigation control system, piping, valves, drip, bubbler, and sprinkler distribution (excludes field #1 irrigation intended to remain for re-use)
ADD ALTPlanting Irrigation Water Treatment System1.00EA$ - 0$ - 0Well-water treatment system to mitigate high levels of iron, sulfur, bacteria, and sediment
329115Soil Preparation (Performance Specification)1682.00CY$ - 0$ - 06" depth in shrub beds for planting soils specified according to tesed performance requirements (particle size, organic matter percentage, pH, CEC, fertility, etc.), layered soil assemblies
329200Sod Areas181685.00SF$ - 0$ - 0Seeded, sodded, plugged, and sprigged turf; pesticides, erosion-control materials, turf renovation, and grass paving. (includes sod replacement of Field #1 at project completion)
329300Plants - Canopy Tree26.00EA$ - 0$ - 0Nursery-grown trees and other plants, pesticides, tree stabilization, tree watering devices, landscape edgings, and tree grates
329300Plants - Palm Tree9.00EA$ - 0$ - 0Nursery-grown trees and other plants, pesticides, tree stabilization, tree watering devices, landscape edgings, and tree grates
329300Plants - Mulch Rings20.00CY$ - 0$ - 04' dia mulch ring x 3" depth typical
329300Plants - Root Barrier126.00LF$ - 0$ - 0Deeproot UB24-2: 24" deep rigid panel root barrier

Total Division 32 $ - 0

Division 33 Utilities

SECTION NUMBER ITEM QUANTITY UNIT UNIT PRICE TOTAL NOTES

33000Proposed Fire Hydrant1.00LS$ - 0$ - 0Assumes up to 300 ft of fire main; fire hydrant installation; valves, fittings and isolation valve
33000Sanitary Sewer tie-in and clean-out32.00LF$ - 0$ - 0Assume 6" PVC pipe
33000Connect/modifications to existing drainage structures1.00EA$ - 0$ - 015-inch drainage pipe connection
33000Clean out existing Drainage Structures and flush pipe1.00LS$ - 0$ - 09 structures. Flush all pipes.
3300015" RCP Stormwater Pipe13.00LF$ - 0$ - 0
3300012" HPStorm PE Pipe374.00LF$ - 0$ - 0
3300015" HPStorm PE Pipe390.00LF$ - 0$ - 0
3300018" HPStorm PE Pipe506.00LF$ - 0$ - 0
3300024" HPStorm PE Pipe415.00LF$ - 0$ - 0
330006" PVC Drainage Pipe and Cap40.00LF$ - 0$ - 0
3300010" PVC Drainage Pipe and Cap2.00LF$ - 0$ - 0
3300012" PVC Drainage Pipe (C900 PVC, Class 305, DR 14)62.00LF$ - 0$ - 0Add 2 caps
3300015" PVC Drainage Pipe (C900 PVC, Class 305, DR 14)33.00LF$ - 0$ - 0
330002" Potable water tie-in and stub out24.00LF$ - 0$ - 0Water line serving Restroom
330001" Potable water tie-in and stub out w/ Valve12.00LF$ - 0$ - 0Water line to service future 1" polytube to Phase 2 pool
33000Outlet Control Structure2.00EA$ - 0$ - 0Structure prior to Mitered End Sections (M.E.S.)
33000FDOT Mitered End Section2.00EA$ - 0$ - 0
33000Proposed Catch Basin - Type C15.00EA$ - 0$ - 0
33000Proposed Yard Drain - 18" ADS Basin9.00EA$ - 0$ - 0

Total Division 33 $ - 0

Sub Total All Divisions- 0
Contractor Overhead, Subs, Profit, Insurance, & General Conditions- 0
Grand Total All Divisions- 0
Staff will allocate $312,000 for Owner's Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.