About this file

This is a contract plans document prepared by the Bay County Public Works Department Engineering Division for the Bay County Board of County Commissioners in Florida. The project, designated as Contract 26-46, involves the FY26 Annual Resurfacing Phase 2 for local roads within Bay County. The scope of work includes milling and removal of existing asphalt pavement, replacement of graded aggregate base (GAB) or crushed concrete materials, placement of Superpave asphaltic concrete in two lift configurations (SP-12.5 structural course and SP-9.5 surface course), installation of sod in disturbed areas, and construction of paved aprons at driveway and road intersections. The project encompasses approximately 5,484 linear feet (1.039 miles) across five primary roadways: Highpoint Road (1,467 feet), Blanche Drive (1,307 feet), Oak View Drive (1,375 feet), Deep Bayou Drive (610 feet), and Jessica Court (282 feet), plus additional milling work on Highpoint Road near a bridge. All work shall comply with Florida Department of Transportation (FDOT) FY 2026-2027 Standard Plans, Standard Specifications for Road and Bridge Construction, and the Florida Green Book design standards, with modifications noted through pay item notes.

The contract includes seven primary pay items: mobilization (lump sum), maintenance of traffic (lump sum), commercial materials for driveways, graded aggregate base installation, Superpave asphaltic concrete placement, performance turf (sod installation), and shoulder work. Contractor responsibilities include obtaining all required permits from the Florida Department of Environmental Protection (FDEP), Northwest Florida Water Management District (NWFWMD), and Army Corps of Engineers (ACOE), with FDEP generic permits for groundwater discharge obtained by the contractor. The contractor must establish a detailed construction schedule, implement erosion and sedimentation control measures, maintain traffic flow with at least one open lane at all times, notify residents and businesses 48 hours prior to construction, and comply with all FDOT maintenance of traffic requirements using applicable 102 series standard plans. A qualified worksite traffic supervisor per FDOT Section 105-8 is required, traffic control signs must be installed 48 hours prior to construction, and the contractor is responsible for all costs associated with law enforcement assistance if required. Upon project completion, the contractor shall provide as-built plans certified by a professional surveyor and mapper, showing field changes and actual installed conditions in both hard copy and electronic AutoCAD format with three-dimensional location data to the nearest tenth of one foot.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 4

BAY COUNTY CONTRACT PLANS

26-46 FY26 Annual Resurfacing Phase 2 72 of 90

N

BAY COUNTY PUBLIC WORKS DEPARTMENT

ENGINEERING DIVISION

BAY COUNTY GOVERNMENT CENTER

840 W. 11th STREET

PANAMA CITY, FL 32401

PHONE: (850) 248-8301

FY 26 ANNUAL RESURFACING - PHASE 2

(LOCAL ROADS)

BAY COUNTY PUBLIC WORKS DEPARTMENT

ENGINEERING DIVISION

CONTRACT PLANS

26-46 FY26 Annual Resurfacing Phase 2 73 of 90

AutoCAD SHX Text

AutoCAD SHX Text

PANAMA

AutoCAD SHX Text

PENSACOLA

AutoCAD SHX Text

MIAMI

AutoCAD SHX Text

JACKSONVILLE

AutoCAD SHX Text

TALLAHASSEE

AutoCAD SHX Text

LOCATION OF PROJECT

AutoCAD SHX Text

BAY COUNTY, FL.

AutoCAD SHX Text

CITY

AutoCAD SHX Text

TAMPA

AutoCAD SHX Text

ORLANDO

AutoCAD SHX Text

GAINESVILLE

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

BOARD OF COUNTY COMMISSIONERS

AutoCAD SHX Text GOVERNING STANDARD PLANS: FLORIDA DEPARTMENT OF TRANSPORTATION, FY 2026-2027 STANDARD PLANS FOR ROAD AND BRIDGE CONSTRUCTION AND APPLICABLE INTERIM REVISIONS (IRs). STANDARD PLANS FOR ROAD CONSTRUCTION AND ASSOCIATED IRs ARE AVAILABLE AT THE FOLLOWING WEBSITE: http://www.fdot.gov/design/standardplans GOVERNING STANDARD SPECIFICATIONS: FLORIDA DEPARTMENT OF TRANSPORTATION, FY 2026-2027 STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION CAN BE FOUND AT THE FOLLOWING WEBSITE: http://www.fdot.gov/programmanagement/implemented/specbooks GOVERNING DESIGN STANDARDS: MANUAL OF UNIFORM MINIMUM STANDARDS FOR DESIGN, CONSTRUCTION, AND MAINTENANCE FOR STREETS AND HIGHWAYS (COMMONLY REFERRED TO AS THE "FLORIDA GREEN BOOK" CAN BE FOUND AT THE FOLLOWING WEBSITE: http://www.fdot.gov/roadway/floridagreenbook/fgb.shtm AS AMENDED BY CONTRACT DOCUMENTS, PAY ITEM NOTES PRESENT MODIFICATIONS TO FDOT SPECIFICATIONS.

AutoCAD SHX Text

HIGHPOINT RD

AutoCAD SHX Text

INDEX OF PLANS

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

PROJECT #

AutoCAD SHX Text

PAGE #

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

FIELD BOOK

AutoCAD SHX Text

DATE DRAWN

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

NO.

AutoCAD SHX Text

OF

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text N/A

AutoCAD SHX Text

MR

AutoCAD SHX Text

MR

AutoCAD SHX Text

LW

AutoCAD SHX Text 04/16/26

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KEY SHEET

AutoCAD SHX Text

ENGINEER OF RECORD

AutoCAD SHX Text BAY COUNTY PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION BAY COUNTY GOVERNMENT CENTER 840 W. 11th STREET PANAMA CITY, FL 32401 PHONE: (850) 248-8301

AutoCAD SHX Text NOTE: THE SCALE OF THESE PLANS MAY HAVE CHANGED DUE TO REPRODUCTION.THE SCALE OF THESE PLANS MAY HAVE CHANGED DUE TO REPRODUCTION.

AutoCAD SHX Text

PLANS PREPARED BY

AutoCAD SHX Text DANIEL RAFFIELD VICE CHAIRMAN DISTRICT 1 VICE CHAIRMAN DISTRICT 1 DISTRICT 1 ROBERT CARROLL COMMISSIONER DISTRICT 2 COMMISSIONER DISTRICT 2 DISTRICT 2 DOUG CROSBY COMMISSIONER DISTRICT 3 COMMISSIONER DISTRICT 3 DISTRICT 3 DOUGLAS MOORE COMMISSIONER DISTRICT 4 COMMISSIONER DISTRICT 4 DISTRICT 4 CLAIR PEASE CHAIRMAN DISTRICT 5CHAIRMAN DISTRICT 5DISTRICT 5

AutoCAD SHX Text

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

REVISION

AutoCAD SHX Text THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY ON THE DATE ADJACENT TO THE SEAL. SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.

AutoCAD SHX Text THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.

AutoCAD SHX Text THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR ALL SHEETS IN ACCORDANCE WITH RULE 61G15-23.004, F.A.C.

AutoCAD SHX Text

MICHAEL F. RAGAN, P.E. P.E. LICENSE NUMBER 95118LICENSE NUMBER 95118

AutoCAD SHX Text

FY 26 ANNUAL RESURFACING PHASE 2 (LOCAL ROADS)

AutoCAD SHX Text

LENGTH OF PROJECT

AutoCAD SHX Text

LINEAR FEET

AutoCAD SHX Text

MILES

AutoCAD SHX Text

ROADWAY (COMBINED)

AutoCAD SHX Text

BRIDGES

AutoCAD SHX Text

GROSS LENGTH OF PROJECT

AutoCAD SHX Text

EXCEPTIONS

AutoCAD SHX Text

NET LENGTH OF PROJECT

AutoCAD SHX Text 5,484

AutoCAD SHX Text 1.039

AutoCAD SHX Text N/A

AutoCAD SHX Text N/A

AutoCAD SHX Text N/A

AutoCAD SHX Text N/A

AutoCAD SHX Text SHEET NO. SHEET DESCRIPTION SHEET DESCRIPTION 1 KEY SHEET KEY SHEET KEY SHEET 2 SUMMARY OF PAY ITEMS, PAY ITEM NOTES SUMMARY OF PAY ITEMS, PAY ITEM NOTES SUMMARY OF PAY ITEMS, PAY ITEM NOTES AND SUMMARY OF PAY ITEMS PER ROAD 3 GENERAL NOTES GENERAL NOTES GENERAL NOTES 4-5 ROADWAY PLANS AND TYPICAL SECTIONS ROADWAY PLANS AND TYPICAL SECTIONS 6 DETAILSDETAILS

AutoCAD SHX Text

DEER POINT LAKE

AutoCAD SHX Text

RESOTA BEACH RD

AutoCAD SHX Text

BAYOU GEORGE

AutoCAD SHX Text

DEER POINT LAKE

AutoCAD SHX Text 5,484

AutoCAD SHX Text 5,484

AutoCAD SHX Text 1.039

AutoCAD SHX Text 1.039

ENGINEERING DIVISION

BAY COUNTY GOVERNMENT CENTER

840 W. 11th STREET

PANAMA CITY, FL 32401

PHONE: (850) 248-8301

26-46 FY26 Annual Resurfacing Phase 2 74 of 90

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

FIELD BOOK

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE DRAWN

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

NO.

AutoCAD SHX Text

PAGE #

AutoCAD SHX Text

PROJECT #

AutoCAD SHX Text Bar is one inch on original drawing 0

AutoCAD SHX Text 1" if not, adjust scale accordingly.

AutoCAD SHX Text

FY 26 ANNUAL RESURFACING

AutoCAD SHX Text

(PHASE 2)

AutoCAD SHX Text

LOCAL ROADS

AutoCAD SHX Text

SUMMARY OF PAY ITEMS & PAY ITEMS NOTES

AutoCAD SHX Text N/A

AutoCAD SHX Text N/A

AutoCAD SHX Text

MR

AutoCAD SHX Text

MR

AutoCAD SHX Text

LW

AutoCAD SHX Text 04/16/26

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.

AutoCAD SHX Text THE FOLLOWING PAY ITEM NOTES EMPHASIZE PARTS OF FDOT SPECIFICATIONS OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, FOLLOWING PAY ITEM NOTES EMPHASIZE PARTS OF FDOT SPECIFICATIONS OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, FOLLOWING PAY ITEM NOTES EMPHASIZE PARTS OF FDOT SPECIFICATIONS OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, PAY ITEM NOTES EMPHASIZE PARTS OF FDOT SPECIFICATIONS OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, PAY ITEM NOTES EMPHASIZE PARTS OF FDOT SPECIFICATIONS OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, ITEM NOTES EMPHASIZE PARTS OF FDOT SPECIFICATIONS OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, ITEM NOTES EMPHASIZE PARTS OF FDOT SPECIFICATIONS OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, NOTES EMPHASIZE PARTS OF FDOT SPECIFICATIONS OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, NOTES EMPHASIZE PARTS OF FDOT SPECIFICATIONS OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, EMPHASIZE PARTS OF FDOT SPECIFICATIONS OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, EMPHASIZE PARTS OF FDOT SPECIFICATIONS OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, PARTS OF FDOT SPECIFICATIONS OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, PARTS OF FDOT SPECIFICATIONS OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, OF FDOT SPECIFICATIONS OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, OF FDOT SPECIFICATIONS OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, FDOT SPECIFICATIONS OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, FDOT SPECIFICATIONS OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, SPECIFICATIONS OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, SPECIFICATIONS OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, OR MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, MODIFICATIONS TO FDOT SPECIFICATIONS BY THE PLANS, TO FDOT SPECIFICATIONS BY THE PLANS, TO FDOT SPECIFICATIONS BY THE PLANS, FDOT SPECIFICATIONS BY THE PLANS, FDOT SPECIFICATIONS BY THE PLANS, SPECIFICATIONS BY THE PLANS, SPECIFICATIONS BY THE PLANS, BY THE PLANS, BY THE PLANS, THE PLANS, THE PLANS, PLANS, PLANS, AND/OR SPECIAL PROVISIONS. ITEMS CODED PER FDOT 2026 BASIS OF ESTIMATES. 1. PAY ITEM 101-1 (MOBILIZATION) LUMP SUM PRICE INCLUDES PROJECT LAYOUT, OBTAINING AND COMPLYING WITH FDEP NPDES PAY ITEM 101-1 (MOBILIZATION) LUMP SUM PRICE INCLUDES PROJECT LAYOUT, OBTAINING AND COMPLYING WITH FDEP NPDES ITEM 101-1 (MOBILIZATION) LUMP SUM PRICE INCLUDES PROJECT LAYOUT, OBTAINING AND COMPLYING WITH FDEP NPDES ITEM 101-1 (MOBILIZATION) LUMP SUM PRICE INCLUDES PROJECT LAYOUT, OBTAINING AND COMPLYING WITH FDEP NPDES 101-1 (MOBILIZATION) LUMP SUM PRICE INCLUDES PROJECT LAYOUT, OBTAINING AND COMPLYING WITH FDEP NPDES 101-1 (MOBILIZATION) LUMP SUM PRICE INCLUDES PROJECT LAYOUT, OBTAINING AND COMPLYING WITH FDEP NPDES (MOBILIZATION) LUMP SUM PRICE INCLUDES PROJECT LAYOUT, OBTAINING AND COMPLYING WITH FDEP NPDES (MOBILIZATION) LUMP SUM PRICE INCLUDES PROJECT LAYOUT, OBTAINING AND COMPLYING WITH FDEP NPDES LUMP SUM PRICE INCLUDES PROJECT LAYOUT, OBTAINING AND COMPLYING WITH FDEP NPDES LUMP SUM PRICE INCLUDES PROJECT LAYOUT, OBTAINING AND COMPLYING WITH FDEP NPDES SUM PRICE INCLUDES PROJECT LAYOUT, OBTAINING AND COMPLYING WITH FDEP NPDES SUM PRICE INCLUDES PROJECT LAYOUT, OBTAINING AND COMPLYING WITH FDEP NPDES PRICE INCLUDES PROJECT LAYOUT, OBTAINING AND COMPLYING WITH FDEP NPDES PRICE INCLUDES PROJECT LAYOUT, OBTAINING AND COMPLYING WITH FDEP NPDES INCLUDES PROJECT LAYOUT, OBTAINING AND COMPLYING WITH FDEP NPDES INCLUDES PROJECT LAYOUT, OBTAINING AND COMPLYING WITH FDEP NPDES PROJECT LAYOUT, OBTAINING AND COMPLYING WITH FDEP NPDES PROJECT LAYOUT, OBTAINING AND COMPLYING WITH FDEP NPDES LAYOUT, OBTAINING AND COMPLYING WITH FDEP NPDES LAYOUT, OBTAINING AND COMPLYING WITH FDEP NPDES OBTAINING AND COMPLYING WITH FDEP NPDES OBTAINING AND COMPLYING WITH FDEP NPDES AND COMPLYING WITH FDEP NPDES AND COMPLYING WITH FDEP NPDES COMPLYING WITH FDEP NPDES COMPLYING WITH FDEP NPDES WITH FDEP NPDES WITH FDEP NPDES FDEP NPDES FDEP NPDES NPDES NPDES CONSTRUCTION PERMIT PER SPECIAL PROVISIONS SECTION 104, DETAILED CONSTRUCTION SCHEDULE, AND NOTIFICATIONS PER SPECIAL PERMIT PER SPECIAL PROVISIONS SECTION 104, DETAILED CONSTRUCTION SCHEDULE, AND NOTIFICATIONS PER SPECIAL PERMIT PER SPECIAL PROVISIONS SECTION 104, DETAILED CONSTRUCTION SCHEDULE, AND NOTIFICATIONS PER SPECIAL PER SPECIAL PROVISIONS SECTION 104, DETAILED CONSTRUCTION SCHEDULE, AND NOTIFICATIONS PER SPECIAL PER SPECIAL PROVISIONS SECTION 104, DETAILED CONSTRUCTION SCHEDULE, AND NOTIFICATIONS PER SPECIAL SPECIAL PROVISIONS SECTION 104, DETAILED CONSTRUCTION SCHEDULE, AND NOTIFICATIONS PER SPECIAL SPECIAL PROVISIONS SECTION 104, DETAILED CONSTRUCTION SCHEDULE, AND NOTIFICATIONS PER SPECIAL PROVISIONS SECTION 104, DETAILED CONSTRUCTION SCHEDULE, AND NOTIFICATIONS PER SPECIAL PROVISIONS SECTION 104, DETAILED CONSTRUCTION SCHEDULE, AND NOTIFICATIONS PER SPECIAL SECTION 104, DETAILED CONSTRUCTION SCHEDULE, AND NOTIFICATIONS PER SPECIAL SECTION 104, DETAILED CONSTRUCTION SCHEDULE, AND NOTIFICATIONS PER SPECIAL 104, DETAILED CONSTRUCTION SCHEDULE, AND NOTIFICATIONS PER SPECIAL 104, DETAILED CONSTRUCTION SCHEDULE, AND NOTIFICATIONS PER SPECIAL DETAILED CONSTRUCTION SCHEDULE, AND NOTIFICATIONS PER SPECIAL DETAILED CONSTRUCTION SCHEDULE, AND NOTIFICATIONS PER SPECIAL CONSTRUCTION SCHEDULE, AND NOTIFICATIONS PER SPECIAL CONSTRUCTION SCHEDULE, AND NOTIFICATIONS PER SPECIAL SCHEDULE, AND NOTIFICATIONS PER SPECIAL SCHEDULE, AND NOTIFICATIONS PER SPECIAL AND NOTIFICATIONS PER SPECIAL AND NOTIFICATIONS PER SPECIAL NOTIFICATIONS PER SPECIAL NOTIFICATIONS PER SPECIAL PER SPECIAL PER SPECIAL SPECIAL SPECIAL PROVISIONS SECTION 102. 2. PAY ITEM 102-1 (MAINTENANCE OF TRAFFIC) LUMP SUM PRICE INCLUDES ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION PAY ITEM 102-1 (MAINTENANCE OF TRAFFIC) LUMP SUM PRICE INCLUDES ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION ITEM 102-1 (MAINTENANCE OF TRAFFIC) LUMP SUM PRICE INCLUDES ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION ITEM 102-1 (MAINTENANCE OF TRAFFIC) LUMP SUM PRICE INCLUDES ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION 102-1 (MAINTENANCE OF TRAFFIC) LUMP SUM PRICE INCLUDES ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION 102-1 (MAINTENANCE OF TRAFFIC) LUMP SUM PRICE INCLUDES ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION (MAINTENANCE OF TRAFFIC) LUMP SUM PRICE INCLUDES ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION (MAINTENANCE OF TRAFFIC) LUMP SUM PRICE INCLUDES ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION OF TRAFFIC) LUMP SUM PRICE INCLUDES ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION OF TRAFFIC) LUMP SUM PRICE INCLUDES ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION TRAFFIC) LUMP SUM PRICE INCLUDES ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION TRAFFIC) LUMP SUM PRICE INCLUDES ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION LUMP SUM PRICE INCLUDES ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION LUMP SUM PRICE INCLUDES ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION SUM PRICE INCLUDES ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION SUM PRICE INCLUDES ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION PRICE INCLUDES ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION PRICE INCLUDES ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION INCLUDES ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION INCLUDES ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION ALL MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION MOT SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION SIGNS, POSTS, BARRICADES, CONNECTIONS, INSTALLATION POSTS, BARRICADES, CONNECTIONS, INSTALLATION POSTS, BARRICADES, CONNECTIONS, INSTALLATION BARRICADES, CONNECTIONS, INSTALLATION BARRICADES, CONNECTIONS, INSTALLATION CONNECTIONS, INSTALLATION CONNECTIONS, INSTALLATION INSTALLATION INSTALLATION AND REMOVAL. INCLUDES MAINTENANCE OF TRAFFIC AND DETOURS AS REQUIRED AROUND THE CONSTRUCTION AREAS, REMOVAL AND REMOVAL. INCLUDES MAINTENANCE OF TRAFFIC AND DETOURS AS REQUIRED AROUND THE CONSTRUCTION AREAS, REMOVAL AND REMOVAL. INCLUDES MAINTENANCE OF TRAFFIC AND DETOURS AS REQUIRED AROUND THE CONSTRUCTION AREAS, REMOVAL AND INCLUDES MAINTENANCE OF TRAFFIC AND DETOURS AS REQUIRED AROUND THE CONSTRUCTION AREAS, REMOVAL AND INCLUDES MAINTENANCE OF TRAFFIC AND DETOURS AS REQUIRED AROUND THE CONSTRUCTION AREAS, REMOVAL AND MAINTENANCE OF TRAFFIC AND DETOURS AS REQUIRED AROUND THE CONSTRUCTION AREAS, REMOVAL AND MAINTENANCE OF TRAFFIC AND DETOURS AS REQUIRED AROUND THE CONSTRUCTION AREAS, REMOVAL AND OF TRAFFIC AND DETOURS AS REQUIRED AROUND THE CONSTRUCTION AREAS, REMOVAL AND OF TRAFFIC AND DETOURS AS REQUIRED AROUND THE CONSTRUCTION AREAS, REMOVAL AND TRAFFIC AND DETOURS AS REQUIRED AROUND THE CONSTRUCTION AREAS, REMOVAL AND TRAFFIC AND DETOURS AS REQUIRED AROUND THE CONSTRUCTION AREAS, REMOVAL AND AND DETOURS AS REQUIRED AROUND THE CONSTRUCTION AREAS, REMOVAL AND AND DETOURS AS REQUIRED AROUND THE CONSTRUCTION AREAS, REMOVAL AND DETOURS AS REQUIRED AROUND THE CONSTRUCTION AREAS, REMOVAL AND DETOURS AS REQUIRED AROUND THE CONSTRUCTION AREAS, REMOVAL AND AS REQUIRED AROUND THE CONSTRUCTION AREAS, REMOVAL AND AS REQUIRED AROUND THE CONSTRUCTION AREAS, REMOVAL AND REQUIRED AROUND THE CONSTRUCTION AREAS, REMOVAL AND REQUIRED AROUND THE CONSTRUCTION AREAS, REMOVAL AND AROUND THE CONSTRUCTION AREAS, REMOVAL AND AROUND THE CONSTRUCTION AREAS, REMOVAL AND THE CONSTRUCTION AREAS, REMOVAL AND THE CONSTRUCTION AREAS, REMOVAL AND CONSTRUCTION AREAS, REMOVAL AND CONSTRUCTION AREAS, REMOVAL AND AREAS, REMOVAL AND AREAS, REMOVAL AND REMOVAL AND REMOVAL AND AND AND REINSTALLATION OF EXISTING TRAFFIC SIGNS, AND MAINTENANCE OF DRIVEWAYS DURING CONSTRUCTION TO ALLOW ACCESS TO PROPERTY. 3. PAY ITEM 102-3 (COMMERCIAL MATERIALS FOR DRIVEWAYS) MATERIAL SHALL BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE PAY ITEM 102-3 (COMMERCIAL MATERIALS FOR DRIVEWAYS) MATERIAL SHALL BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE ITEM 102-3 (COMMERCIAL MATERIALS FOR DRIVEWAYS) MATERIAL SHALL BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE ITEM 102-3 (COMMERCIAL MATERIALS FOR DRIVEWAYS) MATERIAL SHALL BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE 102-3 (COMMERCIAL MATERIALS FOR DRIVEWAYS) MATERIAL SHALL BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE 102-3 (COMMERCIAL MATERIALS FOR DRIVEWAYS) MATERIAL SHALL BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE (COMMERCIAL MATERIALS FOR DRIVEWAYS) MATERIAL SHALL BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE (COMMERCIAL MATERIALS FOR DRIVEWAYS) MATERIAL SHALL BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE MATERIALS FOR DRIVEWAYS) MATERIAL SHALL BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE MATERIALS FOR DRIVEWAYS) MATERIAL SHALL BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE FOR DRIVEWAYS) MATERIAL SHALL BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE FOR DRIVEWAYS) MATERIAL SHALL BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE DRIVEWAYS) MATERIAL SHALL BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE DRIVEWAYS) MATERIAL SHALL BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE MATERIAL SHALL BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE MATERIAL SHALL BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE SHALL BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE SHALL BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE PROCESSED ASPHALT CONCRETE MILLINGS, AND SHALL BE ASPHALT CONCRETE MILLINGS, AND SHALL BE ASPHALT CONCRETE MILLINGS, AND SHALL BE CONCRETE MILLINGS, AND SHALL BE CONCRETE MILLINGS, AND SHALL BE MILLINGS, AND SHALL BE MILLINGS, AND SHALL BE AND SHALL BE AND SHALL BE SHALL BE SHALL BE BE BE USED AS DIRECTED BY THE ENGINEER AT UNSURFACED DRIVEWAYS TO COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING AS DIRECTED BY THE ENGINEER AT UNSURFACED DRIVEWAYS TO COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING AS DIRECTED BY THE ENGINEER AT UNSURFACED DRIVEWAYS TO COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING DIRECTED BY THE ENGINEER AT UNSURFACED DRIVEWAYS TO COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING DIRECTED BY THE ENGINEER AT UNSURFACED DRIVEWAYS TO COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING BY THE ENGINEER AT UNSURFACED DRIVEWAYS TO COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING BY THE ENGINEER AT UNSURFACED DRIVEWAYS TO COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING THE ENGINEER AT UNSURFACED DRIVEWAYS TO COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING THE ENGINEER AT UNSURFACED DRIVEWAYS TO COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING ENGINEER AT UNSURFACED DRIVEWAYS TO COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING ENGINEER AT UNSURFACED DRIVEWAYS TO COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING AT UNSURFACED DRIVEWAYS TO COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING AT UNSURFACED DRIVEWAYS TO COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING UNSURFACED DRIVEWAYS TO COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING UNSURFACED DRIVEWAYS TO COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING DRIVEWAYS TO COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING DRIVEWAYS TO COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING TO COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING TO COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING COMPLETE FINAL TRANSITIONS FROM PAVED APRON TO EXISTING FINAL TRANSITIONS FROM PAVED APRON TO EXISTING FINAL TRANSITIONS FROM PAVED APRON TO EXISTING TRANSITIONS FROM PAVED APRON TO EXISTING TRANSITIONS FROM PAVED APRON TO EXISTING FROM PAVED APRON TO EXISTING FROM PAVED APRON TO EXISTING PAVED APRON TO EXISTING PAVED APRON TO EXISTING APRON TO EXISTING APRON TO EXISTING TO EXISTING TO EXISTING EXISTING EXISTING DRIVEWAY. INCLUDES INSTALLATION COST AND EXCAVATION TO PROVIDE A SMOOTH TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS INCLUDES INSTALLATION COST AND EXCAVATION TO PROVIDE A SMOOTH TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS INCLUDES INSTALLATION COST AND EXCAVATION TO PROVIDE A SMOOTH TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS INSTALLATION COST AND EXCAVATION TO PROVIDE A SMOOTH TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS INSTALLATION COST AND EXCAVATION TO PROVIDE A SMOOTH TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS COST AND EXCAVATION TO PROVIDE A SMOOTH TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS COST AND EXCAVATION TO PROVIDE A SMOOTH TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS AND EXCAVATION TO PROVIDE A SMOOTH TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS AND EXCAVATION TO PROVIDE A SMOOTH TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS EXCAVATION TO PROVIDE A SMOOTH TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS EXCAVATION TO PROVIDE A SMOOTH TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS TO PROVIDE A SMOOTH TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS TO PROVIDE A SMOOTH TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS PROVIDE A SMOOTH TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS PROVIDE A SMOOTH TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS A SMOOTH TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS A SMOOTH TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS SMOOTH TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS SMOOTH TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS TRANSITION AND SHALL BE NEATLY PLACED. THE MILLINGS AND SHALL BE NEATLY PLACED. THE MILLINGS AND SHALL BE NEATLY PLACED. THE MILLINGS SHALL BE NEATLY PLACED. THE MILLINGS SHALL BE NEATLY PLACED. THE MILLINGS BE NEATLY PLACED. THE MILLINGS BE NEATLY PLACED. THE MILLINGS NEATLY PLACED. THE MILLINGS NEATLY PLACED. THE MILLINGS PLACED. THE MILLINGS PLACED. THE MILLINGS THE MILLINGS THE MILLINGS MILLINGS MILLINGS SHOULD BE COMPACTED BY USING A STEEL DRUM ROLLER OR VIBRATORY SLED TAMP. 4. PAY ITEM 285-704-MISC (GRADED AGGREGATE BASE, BASE GROUP 04) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND PAY ITEM 285-704-MISC (GRADED AGGREGATE BASE, BASE GROUP 04) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND ITEM 285-704-MISC (GRADED AGGREGATE BASE, BASE GROUP 04) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND ITEM 285-704-MISC (GRADED AGGREGATE BASE, BASE GROUP 04) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND 285-704-MISC (GRADED AGGREGATE BASE, BASE GROUP 04) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND 285-704-MISC (GRADED AGGREGATE BASE, BASE GROUP 04) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND (GRADED AGGREGATE BASE, BASE GROUP 04) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND (GRADED AGGREGATE BASE, BASE GROUP 04) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND AGGREGATE BASE, BASE GROUP 04) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND AGGREGATE BASE, BASE GROUP 04) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND BASE, BASE GROUP 04) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND BASE, BASE GROUP 04) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND BASE GROUP 04) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND BASE GROUP 04) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND GROUP 04) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND GROUP 04) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND 04) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND 04) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND ALL LABOR, MATERIAL, EQUIPMENT AND ALL LABOR, MATERIAL, EQUIPMENT AND LABOR, MATERIAL, EQUIPMENT AND LABOR, MATERIAL, EQUIPMENT AND MATERIAL, EQUIPMENT AND MATERIAL, EQUIPMENT AND EQUIPMENT AND EQUIPMENT AND AND AND INCIDENTALS NECESSARY TO PROVIDE GRADED AGGREGATE BASE (GAB, MINIMUM LBR 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC NECESSARY TO PROVIDE GRADED AGGREGATE BASE (GAB, MINIMUM LBR 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC NECESSARY TO PROVIDE GRADED AGGREGATE BASE (GAB, MINIMUM LBR 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC TO PROVIDE GRADED AGGREGATE BASE (GAB, MINIMUM LBR 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC TO PROVIDE GRADED AGGREGATE BASE (GAB, MINIMUM LBR 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC PROVIDE GRADED AGGREGATE BASE (GAB, MINIMUM LBR 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC PROVIDE GRADED AGGREGATE BASE (GAB, MINIMUM LBR 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC GRADED AGGREGATE BASE (GAB, MINIMUM LBR 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC GRADED AGGREGATE BASE (GAB, MINIMUM LBR 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC AGGREGATE BASE (GAB, MINIMUM LBR 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC AGGREGATE BASE (GAB, MINIMUM LBR 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC BASE (GAB, MINIMUM LBR 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC BASE (GAB, MINIMUM LBR 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC (GAB, MINIMUM LBR 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC (GAB, MINIMUM LBR 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC MINIMUM LBR 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC MINIMUM LBR 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC LBR 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC LBR 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC 100) OR CRUSHED CONCRETE, CONSISTING OF GRANITIC OR CRUSHED CONCRETE, CONSISTING OF GRANITIC OR CRUSHED CONCRETE, CONSISTING OF GRANITIC CRUSHED CONCRETE, CONSISTING OF GRANITIC CRUSHED CONCRETE, CONSISTING OF GRANITIC CONCRETE, CONSISTING OF GRANITIC CONCRETE, CONSISTING OF GRANITIC CONSISTING OF GRANITIC CONSISTING OF GRANITIC OF GRANITIC OF GRANITIC GRANITIC GRANITIC MATERIAL (MINIMUM LBR 150). ALL OTHER BASE MATERIAL OPTIONS, INCLUDING LIMEROCK OR DOLOMITE, WILL NOT BE ACCEPTED. 5. PAY ITEM 334-1-12 (SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC B, SP-9.5, SP-12.5) UNIT PRICE INCLUDES BITUMINOUS PRIME COAT PAY ITEM 334-1-12 (SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC B, SP-9.5, SP-12.5) UNIT PRICE INCLUDES BITUMINOUS PRIME COAT ITEM 334-1-12 (SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC B, SP-9.5, SP-12.5) UNIT PRICE INCLUDES BITUMINOUS PRIME COAT ITEM 334-1-12 (SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC B, SP-9.5, SP-12.5) UNIT PRICE INCLUDES BITUMINOUS PRIME COAT 334-1-12 (SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC B, SP-9.5, SP-12.5) UNIT PRICE INCLUDES BITUMINOUS PRIME COAT 334-1-12 (SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC B, SP-9.5, SP-12.5) UNIT PRICE INCLUDES BITUMINOUS PRIME COAT (SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC B, SP-9.5, SP-12.5) UNIT PRICE INCLUDES BITUMINOUS PRIME COAT (SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC B, SP-9.5, SP-12.5) UNIT PRICE INCLUDES BITUMINOUS PRIME COAT ASPHALTIC CONCRETE, TRAFFIC B, SP-9.5, SP-12.5) UNIT PRICE INCLUDES BITUMINOUS PRIME COAT ASPHALTIC CONCRETE, TRAFFIC B, SP-9.5, SP-12.5) UNIT PRICE INCLUDES BITUMINOUS PRIME COAT CONCRETE, TRAFFIC B, SP-9.5, SP-12.5) UNIT PRICE INCLUDES BITUMINOUS PRIME COAT CONCRETE, TRAFFIC B, SP-9.5, SP-12.5) UNIT PRICE INCLUDES BITUMINOUS PRIME COAT TRAFFIC B, SP-9.5, SP-12.5) UNIT PRICE INCLUDES BITUMINOUS PRIME COAT TRAFFIC B, SP-9.5, SP-12.5) UNIT PRICE INCLUDES BITUMINOUS PRIME COAT B, SP-9.5, SP-12.5) UNIT PRICE INCLUDES BITUMINOUS PRIME COAT B, SP-9.5, SP-12.5) UNIT PRICE INCLUDES BITUMINOUS PRIME COAT SP-9.5, SP-12.5) UNIT PRICE INCLUDES BITUMINOUS PRIME COAT SP-9.5, SP-12.5) UNIT PRICE INCLUDES BITUMINOUS PRIME COAT SP-12.5) UNIT PRICE INCLUDES BITUMINOUS PRIME COAT SP-12.5) UNIT PRICE INCLUDES BITUMINOUS PRIME COAT UNIT PRICE INCLUDES BITUMINOUS PRIME COAT UNIT PRICE INCLUDES BITUMINOUS PRIME COAT PRICE INCLUDES BITUMINOUS PRIME COAT PRICE INCLUDES BITUMINOUS PRIME COAT INCLUDES BITUMINOUS PRIME COAT INCLUDES BITUMINOUS PRIME COAT BITUMINOUS PRIME COAT BITUMINOUS PRIME COAT PRIME COAT PRIME COAT COAT COAT MATERIAL AND INSTALLATION. INCLUDES SWEEPING AND REMOVING EXISTING LOOSE AGGREGATE. INCLUDES CONSTRUCTING PAVED APRONS AT AND INSTALLATION. INCLUDES SWEEPING AND REMOVING EXISTING LOOSE AGGREGATE. INCLUDES CONSTRUCTING PAVED APRONS AT AND INSTALLATION. INCLUDES SWEEPING AND REMOVING EXISTING LOOSE AGGREGATE. INCLUDES CONSTRUCTING PAVED APRONS AT INSTALLATION. INCLUDES SWEEPING AND REMOVING EXISTING LOOSE AGGREGATE. INCLUDES CONSTRUCTING PAVED APRONS AT INSTALLATION. INCLUDES SWEEPING AND REMOVING EXISTING LOOSE AGGREGATE. INCLUDES CONSTRUCTING PAVED APRONS AT INCLUDES SWEEPING AND REMOVING EXISTING LOOSE AGGREGATE. INCLUDES CONSTRUCTING PAVED APRONS AT INCLUDES SWEEPING AND REMOVING EXISTING LOOSE AGGREGATE. INCLUDES CONSTRUCTING PAVED APRONS AT SWEEPING AND REMOVING EXISTING LOOSE AGGREGATE. INCLUDES CONSTRUCTING PAVED APRONS AT SWEEPING AND REMOVING EXISTING LOOSE AGGREGATE. INCLUDES CONSTRUCTING PAVED APRONS AT AND REMOVING EXISTING LOOSE AGGREGATE. INCLUDES CONSTRUCTING PAVED APRONS AT AND REMOVING EXISTING LOOSE AGGREGATE. INCLUDES CONSTRUCTING PAVED APRONS AT REMOVING EXISTING LOOSE AGGREGATE. INCLUDES CONSTRUCTING PAVED APRONS AT REMOVING EXISTING LOOSE AGGREGATE. INCLUDES CONSTRUCTING PAVED APRONS AT EXISTING LOOSE AGGREGATE. INCLUDES CONSTRUCTING PAVED APRONS AT EXISTING LOOSE AGGREGATE. INCLUDES CONSTRUCTING PAVED APRONS AT LOOSE AGGREGATE. INCLUDES CONSTRUCTING PAVED APRONS AT LOOSE AGGREGATE. INCLUDES CONSTRUCTING PAVED APRONS AT AGGREGATE. INCLUDES CONSTRUCTING PAVED APRONS AT AGGREGATE. INCLUDES CONSTRUCTING PAVED APRONS AT INCLUDES CONSTRUCTING PAVED APRONS AT INCLUDES CONSTRUCTING PAVED APRONS AT CONSTRUCTING PAVED APRONS AT CONSTRUCTING PAVED APRONS AT PAVED APRONS AT PAVED APRONS AT APRONS AT APRONS AT AT AT INTERSECTING ROADS AND DRIVEWAYS PER THE DETAIL IN THE PLANS. COMPACT IN STATIC ROLLING MODE ONLY. 6. PAY ITEM 570-1-2 (PERFORMANCE TURF) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO PAY ITEM 570-1-2 (PERFORMANCE TURF) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO ITEM 570-1-2 (PERFORMANCE TURF) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO ITEM 570-1-2 (PERFORMANCE TURF) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO 570-1-2 (PERFORMANCE TURF) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO 570-1-2 (PERFORMANCE TURF) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO (PERFORMANCE TURF) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO (PERFORMANCE TURF) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO TURF) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO TURF) UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO UNIT PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO PRICE INCLUDES ALL LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO INCLUDES ALL LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO INCLUDES ALL LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO ALL LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO ALL LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO EQUIPMENT, AND INCIDENTALS NECESSARY TO EQUIPMENT, AND INCIDENTALS NECESSARY TO AND INCIDENTALS NECESSARY TO AND INCIDENTALS NECESSARY TO INCIDENTALS NECESSARY TO INCIDENTALS NECESSARY TO NECESSARY TO NECESSARY TO TO TO INSTALL ONE SQUARE YARD OF SOD IN ACCORDANCE WITH THE SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO ONE SQUARE YARD OF SOD IN ACCORDANCE WITH THE SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO ONE SQUARE YARD OF SOD IN ACCORDANCE WITH THE SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO SQUARE YARD OF SOD IN ACCORDANCE WITH THE SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO SQUARE YARD OF SOD IN ACCORDANCE WITH THE SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO YARD OF SOD IN ACCORDANCE WITH THE SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO YARD OF SOD IN ACCORDANCE WITH THE SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO OF SOD IN ACCORDANCE WITH THE SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO OF SOD IN ACCORDANCE WITH THE SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO SOD IN ACCORDANCE WITH THE SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO SOD IN ACCORDANCE WITH THE SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO IN ACCORDANCE WITH THE SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO IN ACCORDANCE WITH THE SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO ACCORDANCE WITH THE SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO ACCORDANCE WITH THE SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO WITH THE SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO WITH THE SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO THE SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO THE SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO SPECIAL PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO PROVISIONS SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO SECTION 104, WHICH INCLUDES BUT NOT LIMITED TO 104, WHICH INCLUDES BUT NOT LIMITED TO 104, WHICH INCLUDES BUT NOT LIMITED TO WHICH INCLUDES BUT NOT LIMITED TO WHICH INCLUDES BUT NOT LIMITED TO INCLUDES BUT NOT LIMITED TO INCLUDES BUT NOT LIMITED TO BUT NOT LIMITED TO BUT NOT LIMITED TO NOT LIMITED TO NOT LIMITED TO LIMITED TO LIMITED TO TO TO LIME, FERTILIZER, WATER AND ANY INCIDENTALS FOR A HEALTHY STAND OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS FERTILIZER, WATER AND ANY INCIDENTALS FOR A HEALTHY STAND OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS FERTILIZER, WATER AND ANY INCIDENTALS FOR A HEALTHY STAND OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS WATER AND ANY INCIDENTALS FOR A HEALTHY STAND OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS WATER AND ANY INCIDENTALS FOR A HEALTHY STAND OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS AND ANY INCIDENTALS FOR A HEALTHY STAND OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS AND ANY INCIDENTALS FOR A HEALTHY STAND OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS ANY INCIDENTALS FOR A HEALTHY STAND OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS ANY INCIDENTALS FOR A HEALTHY STAND OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS INCIDENTALS FOR A HEALTHY STAND OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS INCIDENTALS FOR A HEALTHY STAND OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS FOR A HEALTHY STAND OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS FOR A HEALTHY STAND OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS A HEALTHY STAND OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS A HEALTHY STAND OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS HEALTHY STAND OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS HEALTHY STAND OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS STAND OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS STAND OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS OF GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS GRASS. INCLUDES FURNISHING AND INSTALLING PINS AS INCLUDES FURNISHING AND INSTALLING PINS AS INCLUDES FURNISHING AND INSTALLING PINS AS FURNISHING AND INSTALLING PINS AS FURNISHING AND INSTALLING PINS AS AND INSTALLING PINS AS AND INSTALLING PINS AS INSTALLING PINS AS INSTALLING PINS AS PINS AS PINS AS AS AS NECESSARY FOR LAPPING SOD. 7. PAY ITEM MISC. 1 (SHOULDER WORK) UNIT PRICE INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER PAY ITEM MISC. 1 (SHOULDER WORK) UNIT PRICE INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER ITEM MISC. 1 (SHOULDER WORK) UNIT PRICE INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER ITEM MISC. 1 (SHOULDER WORK) UNIT PRICE INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER MISC. 1 (SHOULDER WORK) UNIT PRICE INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER MISC. 1 (SHOULDER WORK) UNIT PRICE INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER 1 (SHOULDER WORK) UNIT PRICE INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER 1 (SHOULDER WORK) UNIT PRICE INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER (SHOULDER WORK) UNIT PRICE INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER (SHOULDER WORK) UNIT PRICE INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER WORK) UNIT PRICE INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER WORK) UNIT PRICE INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER UNIT PRICE INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER UNIT PRICE INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER PRICE INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER PRICE INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER ALL LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER ALL LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER LABOR, EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER EQUIPMENT, AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER AND MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER MATERIALS (EXCEPT SOD) TO PERFORM SHOULDER (EXCEPT SOD) TO PERFORM SHOULDER (EXCEPT SOD) TO PERFORM SHOULDER SOD) TO PERFORM SHOULDER SOD) TO PERFORM SHOULDER TO PERFORM SHOULDER TO PERFORM SHOULDER PERFORM SHOULDER PERFORM SHOULDER SHOULDER SHOULDER WORK PER THE SHOULDER WORK DETAIL IN THE PLANS. INCLUDES REMOVAL OF EXCESS MATERIAL.

AutoCAD SHX Text

PAY ITEM NOTES:

AutoCAD SHX Text

PAY ITEMS:

PAY ITEMS PER ROAD:

BAY COUNTY GOVERNMENT CENTER

840 W. 11th STREET

PANAMA CITY, FL 32401

PHONE: (850) 248-8301

26-46 FY26 Annual Resurfacing Phase 2 75 of 90

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

FIELD BOOK

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE DRAWN

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

NO.

AutoCAD SHX Text

PAGE #

AutoCAD SHX Text

PROJECT #

AutoCAD SHX Text Bar is one inch on original drawing 0

AutoCAD SHX Text 1" if not, adjust scale accordingly.

AutoCAD SHX Text

FY 26 ANNUAL RESURFACING

AutoCAD SHX Text

(PHASE 2)

AutoCAD SHX Text

LOCAL ROADS

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text N/A

AutoCAD SHX Text N/A

AutoCAD SHX Text

MR

AutoCAD SHX Text

MR

AutoCAD SHX Text

LW

AutoCAD SHX Text 04/16/26

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1. FOR THE PURPOSE OF DETERMINING THEIR COST TO PERFORM THE WORK, THE CONTRACTOR SHALL PHYSICALLY EXAMINE THE ENTIRE PROJECT SITE AND INFORM THEMSELVES FULLY IN FOR THE PURPOSE OF DETERMINING THEIR COST TO PERFORM THE WORK, THE CONTRACTOR SHALL PHYSICALLY EXAMINE THE ENTIRE PROJECT SITE AND INFORM THEMSELVES FULLY IN REGARD TO ALL CONDITIONS PERTAINING TO WHERE ALL ASPECTS OF THE CONSTRUCTION ARE TO BE PERFORMED. CLEARING AND GRUBBING LIMITS PRESENTED IN THE PLANS ARE APPROXIMATE. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE ACTUAL CONSTRUCTION LIMITS. 2. THE CONTRACTOR SHALL HAVE ALL REQUIRED PERMITS IN-HAND PRIOR TO BEGINNING CONSTRUCTION AND SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE REQUIREMENTS OF THE THE CONTRACTOR SHALL HAVE ALL REQUIRED PERMITS IN-HAND PRIOR TO BEGINNING CONSTRUCTION AND SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE REQUIREMENTS OF THE PERMITS OBTAINED BY THE NECESSARY REGULATORY AGENCIES AND THOSE PERMITS OBTAINED BY THE CONTRACTOR. FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP), NORTHWEST FLORIDA WATER MANAGEMENT DISTRICT (NWFWMD), AND/OR ARMY CORPS OF ENGINEERS (ACOE) PERMITS SHALL BE FURNISHED BY THE OWNER. THE CONTRACTOR SHALL OBTAIN AND COMPLY WITH ALL OTHER REQUIRED PERMITS TO INCLUDE FDEP GENERIC PERMIT FOR DISCHARGE OF PRODUCED GROUND WATER FROM ANY NON-CONTAMINATED SITE ACTIVITY. 3. THE CONTRACTOR SHALL PUT FORTH EVERY REASONABLE EFFORT TO MINIMIZE DISRUPTION AND DISTURBANCE OF ADJACENT PROPERTIES. ACCESS BY PROPERTY OWNERS TO THEIR THE CONTRACTOR SHALL PUT FORTH EVERY REASONABLE EFFORT TO MINIMIZE DISRUPTION AND DISTURBANCE OF ADJACENT PROPERTIES. ACCESS BY PROPERTY OWNERS TO THEIR PROPERTY SHALL BE MAINTAINED AT ALL TIMES. 4. ASPHALT MILLINGS SHALL BE HAULED TO THE COUNTY YARD ON OLD MAJETTE TOWER ROAD. CONTACT THE ROADS & BRIDGES DIVISION (248-8810) FOR STOCK PILE LOCATIONS. ASPHALT MILLINGS SHALL BE HAULED TO THE COUNTY YARD ON OLD MAJETTE TOWER ROAD. CONTACT THE ROADS & BRIDGES DIVISION (248-8810) FOR STOCK PILE LOCATIONS. 5. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING AND PRESERVING ALL PROPERTY CORNERS AND MONUMENTS SHOWN ON THE DRAWINGS OR FOUND DURING CONSTRUCTION. IF A THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING AND PRESERVING ALL PROPERTY CORNERS AND MONUMENTS SHOWN ON THE DRAWINGS OR FOUND DURING CONSTRUCTION. IF A PROPERTY CORNER OR MONUMENT IS DESTROYED OR DISTURBED, THE CONTRACTOR SHALL HAVE IT REPLACED AND CERTIFIED BY A PROFESSIONAL SURVEYOR AND MAPPER REGISTERED IN THE STATE OF FLORIDA. ALL COSTS FOR PRESERVING, REPLACING, AND CERTIFYING PROPERTY CORNERS AND MONUMENTS WILL BE INCLUDED IN THE PAY ITEM FOR MOBILIZATION. 6. IF A CORNER MONUMENT IS IN DANGER OF BEING DESTROYED AND HAS NOT BEEN PROPERLY REFERENCED, THE BAY COUNTY SURVEYOR'S OFFICE SHOULD BE NOTIFIED WITHOUT DELAY, IF A CORNER MONUMENT IS IN DANGER OF BEING DESTROYED AND HAS NOT BEEN PROPERLY REFERENCED, THE BAY COUNTY SURVEYOR'S OFFICE SHOULD BE NOTIFIED WITHOUT DELAY, (850) 248-8301. 7. ANY N.A.V.D.-'88 MONUMENT WITHIN THE LIMITS OF CONSTRUCTION IS TO BE PROTECTED. IF IN DANGER OF DAMAGE, NOTIFY THE BAY COUNTY SURVEYOR AT (850) 248-8301. ANY N.A.V.D.-'88 MONUMENT WITHIN THE LIMITS OF CONSTRUCTION IS TO BE PROTECTED. IF IN DANGER OF DAMAGE, NOTIFY THE BAY COUNTY SURVEYOR AT (850) 248-8301. 8. THE LOCATION OF ANY UTILITIES (IF ANY) SHOWN IN THE PLAN ARE APPROXIMATE ONLY. THE EXACT LOCATION SHALL BE DETERMINED BY THE CONTRACTOR DURING CONSTRUCTION AND THE LOCATION OF ANY UTILITIES (IF ANY) SHOWN IN THE PLAN ARE APPROXIMATE ONLY. THE EXACT LOCATION SHALL BE DETERMINED BY THE CONTRACTOR DURING CONSTRUCTION AND VERIFIED PRIOR TO PROCEEDING WITH ROAD SIDE WORK. 9. UTILITIES ARE TO BE ADJUSTED BY UTILITY OWNERS. CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANIES WHEN ADJUSTMENTS ARE REQUIRED. UTILITIES ARE TO BE ADJUSTED BY UTILITY OWNERS. CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANIES WHEN ADJUSTMENTS ARE REQUIRED. 10. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL UTILITIES. THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE AND LOCATION OF UNDERGROUND AND THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL UTILITIES. THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE AND LOCATION OF UNDERGROUND AND OTHER UTILITIES IS BASED ON INFORMATION PROVIDED BY THE UTILITY OWNERS, AVAILABLE RECORDS, AND SURVEYED FIELD INFORMATION. THE INFORMATION MAY NOT REFLECT ACTUAL CONDITIONS, INCLUDE ALL UTILITIES IN THE AREA EITHER IN SERVICE OR ABANDONED, OR SHOW THE UTILITIES IN THE CORRECT HORIZONTAL OR VERTICAL LOCATIONS. THE CONTRACTOR SHALL MAKE HIS OWN DETERMINATION AS TO THE TYPE AND LOCATION OF UTILITIES AS NECESSARY TO ESTABLISH THEIR LOCATIONS AND AVOID DAMAGE. THE FOLLOWING UTILITIES SHOULD BE CONTACTED FOR INFORMATION CONCERNING TYPE AND LOCATION OF THEIR FACILITIES. THE LIST MAY NOT INCLUDE ALL UTILITIES IN THE AREA. UTILITY OWNER PHONE NUMBER CONTACT PHONE NUMBER CONTACT PHONE NUMBER CONTACT CONTACT AT&T FLORIDA (805) 257-1968 TIM PATTERSON (805) 257-1968 TIM PATTERSON TIM PATTERSON AT&T (STD) (813) 888-8300, EXT. 201 STEVE HAMER (813) 888-8300, EXT. 201 STEVE HAMER (813) 888-8300, EXT. 201 STEVE HAMER STEVE HAMER BAY COUNTY TRAFFIC ENGINEERING (850) 248-8759 BOB EDMUNDS (850) 248-8759 BOB EDMUNDS (850) 248-8759 BOB EDMUNDS BOB EDMUNDS BAY COUNTY UTILITY SERVICES (850) 819-5098 MIKE ANDERSON (850) 819-5098 MIKE ANDERSON MIKE ANDERSON CITY OF PANAMA CITY (850) 819-3565 ANGIE LIGHTFOOT (850) 819-3565 ANGIE LIGHTFOOT ANGIE LIGHTFOOT COMCAST (850) 815-7797 ANDREW SWEENY (850) 815-7797 ANDREW SWEENY (850) 815-7797 ANDREW SWEENY ANDREW SWEENY FLORIDA POWER & LIGHT TRANSMISSION (850) 444-6374 JASON BENTON (850) 444-6374 JASON BENTON JASON BENTON FLORIDA POWER & LIGHT (850) 872-3218 JEREMY COON (850) 872-3218 JEREMY COON JEREMY COON GULF COAST ELECTRIC (850) 814-6310 TONY MORELL (850) 814-6310 TONY MORELL TONY MORELL MEDIACOM (850) 278-6832 PAUL PITTS (850) 278-6832 PAUL PITTS PAUL PITTS SOUTHERN LIGHT (UNIT1 FIBER) (850) 544-1400 JAMES HILL (850) 544-1400 JAMES HILL (850) 544-1400 JAMES HILL JAMES HILL TECO PEOPLES GAS (850) 258-5032 LEON MATHIS (850) 258-5032 LEON MATHIS LEON MATHIS WOW (850) 832-6680 WILLIAM EVENS (850) 832-6680 WILLIAM EVENS WILLIAM EVENS ONE-CALL (811)* 811 811 OPERATOR 811 811 OPERATOR 811 811 OPERATOR 811 OPERATOR *CONTRACTOR SHALL CONTACT IRTH ONE-CALL A MINIMUM OF 5-DAYS PRIOR TO CONSTRUCTION. 11. PRIOR TO ANY SCHEDULED INTERRUPTION OF UTILITY SERVICE, THE CONTRACTOR SHALL COORDINATE SUCH INTERRUPTION WITH THE UTILITY PROVIDER AND PROVIDE A MINIMUM PRIOR TO ANY SCHEDULED INTERRUPTION OF UTILITY SERVICE, THE CONTRACTOR SHALL COORDINATE SUCH INTERRUPTION WITH THE UTILITY PROVIDER AND PROVIDE A MINIMUM 24-HOUR NOTICE TO ALL AFFECTED PARTIES. THE CONTRACTOR SHALL NOTIFY THE ELECTRIC UTILITY PROVIDER A MINIMUM OF TWO WEEKS PRIOR TO CONSTRUCTION IN THE VICINITY OF THEIR FACILITIES. 12. SEE ROADWAY PLANS FOR ROAD REPAIRS TO BE MADE PRIOR TO RESURFACING. SEE ROADWAY PLANS FOR ROAD REPAIRS TO BE MADE PRIOR TO RESURFACING. 13. PRIOR TO COMMENCING CONSTRUCTION, CONTRACTOR SHALL INSTALL ANY REQUIRED SILT FENCING OR INLET PROTECTION FOR SILT CONTROL. LOCATION SHALL BE AS SHOWN ON THE PRIOR TO COMMENCING CONSTRUCTION, CONTRACTOR SHALL INSTALL ANY REQUIRED SILT FENCING OR INLET PROTECTION FOR SILT CONTROL. LOCATION SHALL BE AS SHOWN ON THE PLANS OR DIRECTED IN THE FIELD OR AS SPECIFIED BY THE APPLICABLE REGULATORY AGENCY STANDARDS. 14. THE CONTRACTOR IS EXPECTED TO MONITOR THE LONG-RANGE WEATHER FORECAST, AND SCHEDULE THE WORK DURING A PERIOD OF PREDICTED GOOD CONSTRUCTION WEATHER DURING THE CONTRACTOR IS EXPECTED TO MONITOR THE LONG-RANGE WEATHER FORECAST, AND SCHEDULE THE WORK DURING A PERIOD OF PREDICTED GOOD CONSTRUCTION WEATHER DURING THE CROSS-DRAIN INSTALLATIONS. NIGHT WORK WILL NOT BE AUTHORIZED EXCEPT IN EMERGENCY CONDITIONS AND ONLY AFTER ALL ELEMENTS OF NIGHT TRAFFIC CONTROLS THROUGH WORK ZONE ARE IMPLEMENTED. 15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING A WORK SCHEDULE SO THAT ANY LOCATION UNDER CONSTRUCTION WILL NOT BE LEFT IN A HAZARDOUS CONDITION AT THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING A WORK SCHEDULE SO THAT ANY LOCATION UNDER CONSTRUCTION WILL NOT BE LEFT IN A HAZARDOUS CONDITION AT THE END OF ANY WORK PERIOD.NO TRENCHES OR SHALL BE ALLOWED TO REMAIN OPEN OVERNIGHT. 16. AT THE END OF EACH WORKDAY OR WHENEVER THE WORK ZONE BECOMES INACTIVE, ANY DROP-OFF ADJACENT TO THE SUBJECT TRAVEL PATH SHALL BE BACK-FILLED FLUSH WITH AT THE END OF EACH WORKDAY OR WHENEVER THE WORK ZONE BECOMES INACTIVE, ANY DROP-OFF ADJACENT TO THE SUBJECT TRAVEL PATH SHALL BE BACK-FILLED FLUSH WITH THE TRAVEL PATH OR SHALL BE PROTECTED WITH BARRICADES, TEMPORARY BARRIER WALL, OR APPROVED HANDRAIL. 17. THE CONTRACTOR IS TO STORE ALL EXCAVATED MATERIAL, TEMPORARY AND PERMANENT, WITHIN THE PROJECT LIMITS UTILIZING THE PROPER BEST MANAGEMENT PRACTICES (I.E. SILT THE CONTRACTOR IS TO STORE ALL EXCAVATED MATERIAL, TEMPORARY AND PERMANENT, WITHIN THE PROJECT LIMITS UTILIZING THE PROPER BEST MANAGEMENT PRACTICES (I.E. SILT FENCING AROUND THE EXCAVATED MATERIAL TO PREVENT OFFSITE RUNOFF). UPON COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL RETURN ALL EXCESS SOIL TO THE UPLANDS AS NECESSARY TO COMPLETE FINAL GRADING. AN ACCEPTABLE ALTERNATE METHOD IS TO DISPOSE OF EXCESS EXCAVATED MATERIAL TO A LOCAL MUNICIPALITY APPROVED LANDFILL. IF AN ALTERNATE METHOD IS PREFERRED, THE CONTRACTOR SHALL SUBMIT DISPOSAL DOCUMENTATION TO THE COUNTY AND TO THE NWFWMD. 18.