26-4-13 Quality Assurance Surveillance Plan.pdf
PDF 230 KB Posted
- Attached to
- BUILDING 299 ZONE 8 BUS DUCT RELOCATIONS
- Solicitation number
- W519TC26RA021
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for the Building 299, Zone 8 Bus Duct Relocation project at Rock Island Arsenal (Requisition #E40005352LGC1). The QASP establishes the standards and procedures for the Contracting Officer's Representative (COR) to evaluate contractor performance during execution of the bus duct installation work. The surveillance plan requires bi-weekly monitoring of the contractor with weekly communication to identify and resolve issues, escalating unresolved problems to the Contracting Officer. The contractor must install bus ducts in accordance with National Electrical Code regulations and adhere to all safety regulations while working on Rock Island Arsenal, with both requirements carrying a 100% adherence performance threshold verified through COR acceptance. Performance evaluations occur on a daily, weekly, or monthly basis to maintain schedule compliance and provide required documentation to the Rock Island Arsenal Environmental Directorate for EPA compliance regarding waste product storage.
The plan defines unacceptable performance as any noncompliance with contract requirements, termed "sub par," for which the contractor bears responsibility for quality control and corrective action. When unacceptable service is detected, the COR documents the issue and requests contractor verification via email; the contractor must resubmit corrected work with results recorded on surveillance checklists. If performance remains unacceptable or cannot be corrected through re-performance, the Government may require the contractor to take corrective action, reduce contract price, perform services independently and charge costs to the contractor, or issue a Cure Notice, Show Cause Notice, or terminate the contract for Convenience or Default. David Holgorsen, the Engineering Technician/COR from TARA-LGC, reviewed and signed the plan on December 13, 2023.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 299_Diagram.png | PNG image | |
| Solicitation Amendment W519TC26RA0210001 SF 30.pdf | ||
| Solicitation - W519TC26RA021.pdf | ||
| RIPD E4000-26-4-13 Building 299 Zone 8 Bus Relocations.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan For
Building 299, Zone 8 Bus Duct Relocation
REQUISITION# E40005352LGC1
The quality assurance surveillance plan for this contract is to monitor the contractor bi-weekly. Have weekly communication with the contractor to see what issues they are running into and forward those issues to the Contracting Officer when a solution cannot be determined. Make sure the installation is in accordance with the National Electrical Code regulations.
Reviewed: Reviewed:
Engineering Technician/COR Contracting Officer David Holgorsen
TARA-LGC
PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a standard for the COR of to evaluate progress of work as it is being performed. .
The QASP provides a systematic method to evaluate the services that the Contractor is required to furnish, but not the details of how the Contractor accomplishes the work. This plan uses inspection as the primary evaluation criteria. This surveillance assures the Government that the Contractor’s performance is acceptable.
Any noncompliance with contract performance is deemed “sub par”. The term “sub par” refers to a support service that does not meet the standard of performance specified in the contract. The Contractor not the Government is responsible for management and quality control actions to meet the terms of the contract. The methods of surveillance recognize that unforeseen and uncontrollable problems do occur. Effective management and use of a quality control plan will allow the Contractor to operate within the specified surveillance requirements. QA’s are expected to be objective, fair, and consistent in evaluating Contractor’s performance against the standards.
1. PROCEDURES
1.1 Quality Assurance Schedule
The Contractor’s performance will be evaluated on a daily/weekly/monthly basis, to ensure the scope of work remains on schedule. (This is necessary to ensure that Rock Island Arsenal Environmental Directorate (IMNE-RIA-PWE) can provide the required documentation to the Environmental Protection Agency (EPA) to show compliance concern safe storage of waste products.
1.2 Surveillance
In accordance with the Statement of Work the Senior Contractor reviewer (SCR) will maintain close contact with the COR to ensure the progress and scope of work is acceptable..
All surveillance inspections made by the QA will be recorded on a Government or locally devised form. Documentation will record the Contractor’s past performance. The completed form(s) becomes the official Government record of the Contractor’s performance.
When surveillance detects unacceptable service, the COR will record the information on the checklist and request the Contractor to verify via email the unacceptable service. The Contractor will be required to resubmit the corrected topic review pages. The results will be recorded on the checklist.
3. Method of Surveillance
Sampling
Random inspections to verify adherence to proscribed procedures may occur at any time.
2. UNACCEPTABLE PERFORMANCE
When performance is deemed unacceptable, the COR will so inform the Contractor’s Senior Contractor Reviewer, explain why, and request confirmation from the SCR via email. By submitting the email confirmation, the SCR is only acknowledging notification of unacceptable performance, not admitting fault.
Disputes in surveillance should be referred to the Contracting Officer.
The COR will notify the Contracting Officer of sub par performance. If any services do not conform to contract requirements, the Government may require the Contractor to reperform the contract requirements at no increased cost to the Government. When sub-par performance cannot be corrected by re-performance the Government may:
• Require the Contractor to take action necessary to ensure future performance conforms to contract requirements.
• Reduce the contract price to reflect the reduced value of the services performed.
If the Contractor fails to promptly re-perform the services, or to take the necessary action to ensure that future performance conforms to contract requirements, the Government may:
• By separate contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service or:
o Issue a Cure Notice o Issue Show Cause Notice o Terminated the contract for Convenience o Terminate the contract for Default
3. SURVEILLANCE GUIDE
The QASP Surveillance Guide defines the performance objective and shows the pertinent portion of the Performance Work Statement, the Performance Threshold and the Government’s Method of Surveillance for this contract.
Performance Objective Performance Threshold Method of Surveillance
CONTRACTOR install bus ducts in accordance with the National Electrical Code
100% adherence COR acceptance
Contractor shall adhere to all safety regulations while working on the Rock Island Arsenal
100% adherence: COR acceptance
| Quality Assurance Surveillance Plan |
| Sampling |
| 2025-12-18T08:08:40-0600 | |
| HOLGORSEN.DAVID.M.1219522661 |
File details come from the government source that posted it. Updated .